Appendix_A_-_Attachment_3_-_Site_Layout.pdf

PDF 38 KB Posted

Attached to
DLA-Energy Sustainment, Restoration, and
Solicitation number
W912GB18R0030
Issued by

About this file

Appendix A - Attachment 3 - Site Layout

View the file

Other files

Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Rohr 5 Rohr 7.1

Rohr 9

Stz 150 -3.0-

Sb 300 -51.8-

Sb 300 -35.4-

Rohr 9.1

Stz 150 -3.0-

Rohr 5.3 Stz 150 -4.6-

Rohr 7

Sb 300 -39.9-

S1

S2

S3

S4

A = 615 m² A = 642 m²

A = 642 m²

A = 684 m²

PAD 4

PAD 3

PAD 2

PAD 1

LEGENDE / LEGEND

Regenwasserkanal / storm sewer system

Schacht / manhole

Zufahrtsflächen: A = ca. 840 m² /

Abscheider Klasse II / oil-water separator class II

Abfüllflächen: A = ca. 2580 m² /

Entwässerungsrinne / trench drain

Straßeneinlauf / street inlet

Fliesspfeil / flow direction access roads: A = approx. 840 m² containment areas: A = approx. 2580 m²

Betonmuldenrinne / concret drain

Schlammfang / sludge trapS

II

Versickerungsflächen: A = ca. 3050 m² / infiltration areas: A = approx. 3050 m²

R o h r

S tz

-2 .0

R oh r

R o h r

S tz

-2 .8

S tz

-2 8.

0-

R o h r

S tz

-2 .0

- Rohr 10.1

Stz 150 -14.0-

Rohr 5.1 + 5.2 Stz 150 -2.0-

Rohr 8.1 Stz 150 -15.0-

Rohr 6.1 Stz 150 -17.0-

Rohr 3.1 Stz 150 -3.4-

HELI FUELING PADS

Rohr 4 Stz 150 -4.3-

Rohr 1

GGG 300 -0.85-

Rohr 2 Stz 200 -1.6-

S B

Probenahmeschacht / sampling manholeP

E1.1

E1.2

E1.3E1.4

E2.2

E2.1

E2.3

E3.1

E4.1

E4.2

E4.3

E4.4

ER4.5

ER3.5

E3.3

E3.4

E2.4ER1.5

E1.6

ER2.5 E3.2

File details come from the government source that posted it.