Appendix_A_-_Attachment_3_-_Site_Layout.pdf
PDF 38 KB Posted
- Attached to
- DLA-Energy Sustainment, Restoration, and
- Solicitation number
- W912GB18R0030
About this file
Appendix A - Attachment 3 - Site Layout
View the file
Other files
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Rohr 5 Rohr 7.1
Rohr 9
Stz 150 -3.0-
Sb 300 -51.8-
Sb 300 -35.4-
Rohr 9.1
Stz 150 -3.0-
Rohr 5.3 Stz 150 -4.6-
Rohr 7
Sb 300 -39.9-
S1
S2
S3
S4
A = 615 m² A = 642 m²
A = 642 m²
A = 684 m²
PAD 4
PAD 3
PAD 2
PAD 1
LEGENDE / LEGEND
Regenwasserkanal / storm sewer system
Schacht / manhole
Zufahrtsflächen: A = ca. 840 m² /
Abscheider Klasse II / oil-water separator class II
Abfüllflächen: A = ca. 2580 m² /
Entwässerungsrinne / trench drain
Straßeneinlauf / street inlet
Fliesspfeil / flow direction access roads: A = approx. 840 m² containment areas: A = approx. 2580 m²
Betonmuldenrinne / concret drain
Schlammfang / sludge trapS
II
Versickerungsflächen: A = ca. 3050 m² / infiltration areas: A = approx. 3050 m²
R o h r
S tz
-2 .0
R oh r
R o h r
S tz
-2 .8
S tz
-2 8.
0-
R o h r
S tz
-2 .0
- Rohr 10.1
Stz 150 -14.0-
Rohr 5.1 + 5.2 Stz 150 -2.0-
Rohr 8.1 Stz 150 -15.0-
Rohr 6.1 Stz 150 -17.0-
Rohr 3.1 Stz 150 -3.4-
HELI FUELING PADS
Rohr 4 Stz 150 -4.3-
Rohr 1
GGG 300 -0.85-
Rohr 2 Stz 200 -1.6-
S B
Probenahmeschacht / sampling manholeP
E1.1
E1.2
E1.3E1.4
E2.2
E2.1
E2.3
E3.1
E4.1
E4.2
E4.3
E4.4
ER4.5
ER3.5
E3.3
E3.4
E2.4ER1.5
E1.6
ER2.5 E3.2
File details come from the government source that posted it.