497449 RSLFAC DP8 PKG 5 Specifications - Al Qassim.pdf
PDF 1 MB Posted
- Attached to
- Al Qassim Simulator, Kingdom of Saudi Arabia
- Solicitation number
- W912ER22R0028
About this file
This solicitation is for the construction of a Simulator Building and supporting facilities at the Royal Saudi Land Forces Aviation Command Aviation Institute in Al Qassim, Kingdom of Saudi Arabia. The project includes electric services, water, sewer, gas, paving, walks, curbs, gutters, drainage, site improvements, demolition, and information systems. The magnitude of construction is over $10 million. The solicitation requires the contractor to provide Defense Base Act insurance after award and prior to notice to proceed, as well as performance and payment bonds of 20%. The Department of the Army Corps of Engineers Engineering District Middle East is the agency.
View the file
Other files
Show all 25
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RSLFAC PHASE 2A FACILITIES & INFRASTRUCTURE AL QASSIM AVIATION INSTITUTE,
DESIGN PACKAGE 8 KINGDOM OF SAUDI ARABIA
PROJECT TABLE OF CONTENTS
DIVISION 01 - GENERAL REQUIREMENTS
01 11 00 SUMMARY OF WORK - REVISED BY AMENDMENT NO. 0003
01 14 00 WORK RESTRICTIONS
01 15 00.12 10 SUPPLEMENTARY REQUIREMENTS
01 30 00 ADMINISTRATIVE REQUIREMENTS
01 32 17.12 10 COST-LOADED NETWORK ANALYSIS SCHEDULES (NAS)
01 33 00 SUBMITTAL PROCEDURES
01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS
01 42 00 SOURCES FOR REFERENCE PUBLICATIONS
01 42 15 METRIC MEASUREMENTS
01 45 00.00 10 QUALITY CONTROL
01 45 00.15 10 RESIDENT MANAGEMENT SYSTEM CONTRACTOR MODE (RMS CM)
01 50 00 TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS
01 57 19 TEMPORARY ENVIRONMENTAL CONTROLS
01 58 00 PROJECT IDENTIFICATION
01 78 00.49 CLOSEOUT SUBMITTALS
01 78 23 OPERATION AND MAINTENANCE DATA
01 91 00.15 TOTAL BUILDING COMMISSIONING
DIVISION 02 - EXISTING CONDITIONS
02 41 00 DEMOLITION
DIVISION 03 - CONCRETE
03 30 00 CAST-IN-PLACE CONCRETE
03 40 00.00 10 PLANT-PRECAST CONCRETE PRODUCTS FOR BELOW GRADE
CONSTRUCTION
03 45 00 PRECAST ARCHITECTURAL CONCRETE
DIVISION 04 - MASONRY
04 20 00 UNIT MASONRY
DIVISION 05 - METALS
05 05 23.16 STRUCTURAL WELDING
05 12 00 STRUCTURAL STEEL
05 30 00 STEEL DECKS
05 50 13 MISCELLANEOUS METAL FABRICATIONS
05 51 00 METAL STAIRS
05 51 33 ALUMINUM LADDERS
05 52 00 METAL RAILINGS
DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES
06 10 00 ROUGH CARPENTRY
06 41 16.00 10 PLASTIC-LAMINATE-CLAD ARCHITECTURAL CABINETS
06 61 16 SOLID SURFACING FABRICATIONS
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
07 05 23 PRESSURE TESTING AN AIR BARRIER SYSTEM FOR AIR TIGHTNESS
07 13 53 ELASTOMERIC SHEET WATERPROOFING
07 21 13 BOARD AND BLOCK INSULATION
07 21 16 MINERAL FIBER BLANKET INSULATION
PROJECT TABLE OF CONTENTS Page 1
REVISED BY AMENDMENT NO. 0003 20 APRIL 2022
W912ER22R0028 AMENDMENT 0003
07 22 00 ROOF AND DECK INSULATION
07 27 10.00 10 BUILDING AIR/WATER/VAPOR BARRIER SYSTEM
07 27 19.01 SELF-ADHERING AIR BARRIERS
07 27 26 FLUID-APPLIED MEMBRANE AIR/VAPOR BARRIERS
07 52 00 MODIFIED BITUMINOUS MEMBRANE ROOFING
07 55 00 PROTECTED MEMBRANE ROOFING
07 60 00 FLASHING AND SHEET METAL
07 84 00 FIRESTOPPING
07 92 00 JOINT SEALANTS
DIVISION 08 - OPENINGS
08 11 13 STEEL DOORS AND FRAMES
08 11 16 ALUMINUM DOORS AND FRAMES
08 14 00 WOOD DOORS
08 22 20 FIBERGLASS REINFORCED PLASTIC (FRP) DOORS
08 31 00 ACCESS DOORS AND PANELS
08 33 23 OVERHEAD COILING DOORS
08 41 13 ALUMINUM-FRAMED ENTRANCES AND STOREFRONTS
08 51 13 ALUMINUM WINDOWS
08 71 00 DOOR HARDWARE
08 81 00 GLAZING
DIVISION 09 - FINISHES
09 06 00 SCHEDULES FOR FINISHES
09 22 00 SUPPORTS FOR PLASTER AND GYPSUM BOARD
09 23 00 GYPSUM PLASTERING (FOR INTERIOR USE)
09 24 23 CEMENT STUCCO (FOR EXTERIOR USE)
09 29 00 GYPSUM BOARD
09 30 10 CERAMIC, QUARRY, AND GLASS TILING
09 51 00 ACOUSTICAL CEILINGS
09 65 00 RESILIENT FLOORING
09 69 13 RIGID GRID ACCESS FLOORING
09 90 00 PAINTS AND COATINGS
DIVISION 10 - SPECIALTIES
10 11 00 VISUAL DISPLAY UNITS
10 14 00.10 EXTERIOR SIGNAGE
10 14 00.20 INTERIOR SIGNAGE
10 28 13 TOILET ACCESSORIES
10 44 16 FIRE EXTINGUISHERS
10 56 13 STEEL SHELVING (OPEN AND DRAWER UNITS)
DIVISION 12 - FURNISHINGS
12 24 13 ROLLER WINDOW SHADES
12 34 00 MANUFACTURED PLASTIC CASEWORK
12 36 00 COUNTERTOPS
12 50 00.13 10 FURNITURE AND FURNITURE INSTALLATION
12 59 00 SYSTEMS FURNITURE
DIVISION 13 - SPECIAL CONSTRUCTION
13 31 33 TENSIONED FABRIC STRUCTURES
13 48 73 SEISMIC CONTROL FOR MISCELLANEOUS EQUIPMENT
DIVISION 21 - FIRE SUPPRESSION
PROJECT TABLE OF CONTENTS Page 2
21 13 13.00 10 WET PIPE SPRINKLER SYSTEM, FIRE PROTECTION
21 13 18.00 10 PREACTION SPRINKLER SYSTEMS, FIRE PROTECTION
21 22 00.00 40 CLEAN AGENT FIRE EXTINGUISHING SYSTEMS
DIVISION 22 - PLUMBING
22 00 00 PLUMBING, GENERAL PURPOSE - REVISED BY AMENDMENT NO. 0003
DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)
23 03 00.00 20 BASIC MECHANICAL MATERIALS AND METHODS
23 05 93 TESTING, ADJUSTING, AND BALANCING FOR HVAC
23 07 00 THERMAL INSULATION FOR MECHANICAL SYSTEMS
23 09 13 INSTRUMENTATION AND CONTROL DEVICES FOR HVAC
23 23 00 REFRIGERANT PIPING
23 25 00 CHEMICAL TREATMENT OF WATER FOR MECHANICAL SYSTEMS
23 30 00 HVAC AIR DISTRIBUTION
23 35 16.17 10 MECHANICAL ENGINE EXHAUST SYSTEMS
23 64 10 WATER CHILLERS, VAPOR COMPRESSION TYPE
23 64 26 CHILLED AND CONDENSATE WATER PIPING SYSTEMS
23 81 00 DECENTRALIZED UNITARY HVAC EQUIPMENT
23 81 23.00 20 COMPUTER ROOM AIR CONDITIONING UNITS
DIVISION 26 - ELECTRICAL
26 08 00 APPARATUS INSPECTION AND TESTING
26 11 16 13.8KV COMPACT SUBSTATIONS
26 20 00 INTERIOR DISTRIBUTION SYSTEM
26 24 13 SWITCHBOARDS
26 33 53.00 20 UNINTERRUPTIBLE POWER SUPPLY (UPS)
26 41 00 LIGHTNING PROTECTION SYSTEM
26 51 00 INTERIOR LIGHTING
26 56 00 EXTERIOR LIGHTING
DIVISION 27 - COMMUNICATIONS
27 05 28.36 40 CABLE TRAYS FOR COMMUNICATIONS SYSTEMS
27 10 00 BUILDING TELECOMMUNICATIONS CABLING SYSTEM
27 20 01.12 10 INTERIOR DISTRIBUTION SYSTEM FOR COMMUNICATIONS SYSTEMS
27 41 16.00 10 SATELLITE TELEVISION SIGNAL RECEPTION SYSTEM (SATV)
27 51 16 PUBLIC ADDRESS SYSTEMS
DIVISION 28 - ELECTRONIC SAFETY AND SECURITY
28 10 05 ELECTRONIC SECURITY SYSTEMS (ESS)
28 31 76 INTERIOR FIRE ALARM AND MASS NOTIFICATION SYSTEM
DIVISION 31 - EARTHWORK
31 00 00 EARTHWORK
31 32 11 SOIL SURFACE EROSION CONTROL
DIVISION 32 - EXTERIOR IMPROVEMENTS
32 01 19 FIELD MOLDED SEALANTS FOR SEALING JOINTS IN RIGID PAVEMENTS
32 11 20 SUBBASES FOR FLEXIBLE PAVING
32 11 23.01 AGGREGATE BASE COURSES
32 12 10 BITUMINOUS TACK AND PRIME COATS
PROJECT TABLE OF CONTENTS Page 3
32 12 16 HOT-MIX ASPHALT (HMA) FOR ROADS
32 16 13 CONCRETE SIDEWALKS AND CURBS
32 17 23.00 20 PAVEMENT MARKINGS
DIVISION 33 - UTILITIES
33 11 00 WATER UTILITY DISTRIBUTION PIPING
33 30 00 SANITARY SEWERS
33 71 02 UNDERGROUND ELECTRICAL DISTRIBUTION
33 72 02 UNDERGROUND COMMUNICATION SYSTEM
33 82 00 TELECOMMUNICATIONS OUTSIDE PLANT (OSP)
DIVISION 41 - MATERIAL PROCESSING AND HANDLING EQUIPMENT
41 22 13.15 BRIDGE CRANES, OVERHEAD ELECTRIC, UNDER RUNNING (SINGLE
GIRDER)
-- End of Project Table of Contents --
PROJECT TABLE OF CONTENTS Page 4
RSLFAC PH2A, DP-8, AL QASSIM SIMULATOR BLDG, SAUDI ARABIA 457449PKG5DP8
SECTION TABLE OF CONTENTS
DIVISION 01 - GENERAL REQUIREMENTS
SECTION 01 11 00
SUMMARY OF WORK - REVISED AMENDMENT NO. 0003
PART 1 GENERAL
1.1 WORK COVERED BY CONTRACT DOCUMENTS
1.1.1 Project Description
1.1.2 Location
1.2 EXISTING WORK
1.3 EXHIBITS - Provided Under Separate Cover
PART 2 PRODUCTS
PART 3 EXECUTION
-- End of Section Table of Contents --
SECTION 01 11 00 Page 1
SECTION 01 11 00
SUMMARY OF WORK - REVISED AMENDMENT NO. 0003
PART 1 GENERAL
1.1 WORK COVERED BY CONTRACT DOCUMENTS
1.1.1 Project Description
Under the Foreign Military Sales (FMS) case, SR-B-WAL the Kingdom of Saudi Arabia (KSA) has a requirement for a design bid build RFP to construct a Simulator Building along with all supporting facilities including electric service, water, sewer, gas, paving, drainage, site improvements, demolition, and information systems for the Royal Saudi Land Forces Aviation Command (RSLFAC) at the Aviation Institute in Al Qassim. All work shall be done in accordance with the design documents including plans and specifications provided herein. All construction and other associated efforts shall be done in accordance with local building codes and internationally recognized standards with respect to safety and general construction, and as described in these documents. Moreover, the construction contractor will be responsible for reviewing and confirming the site conditions in the topographic and geotechnical surveys and reports provided by Exhibits A, B, and C . The Contractor shall also perform a pre-construction site investigation with the USACE field staff and RSLFAC to evaluate and finalize travel routes, site conditions, and any other incidental work to make requirements fully functional in order to provide the Government with a complete construction and warranty for this project.
The Contractor is to construct improvements at Al Qassim as identified below:
Construct Simulator Building along with all supporting facilities including electric service, water, sewer, gas, paving, walks, curbs, gutters, drainage, site improvements, demolition, and information systems.
1.1.2 Location
Institute at Al Qassim: Located in Al Qassim approximately 395 KM north-west of Riyadh.
1.2 EXISTING WORK
In addition to "FAR 52.236-9, Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements":
a. Remove or alter existing work in such a manner as to prevent injury or damage to any portions of the existing work which remain.
b. Repair or replace portions of existing work which have been altered during construction operations to match existing or adjoining work, as approved by the Contracting Officer. At the completion of operations, existing work shall be in a condition equal to or better than that which existed before new work started.
SECTION 01 11 00 Page 2
1.3 EXHIBITS - Provided Under Separate Cover
Exhibit A - Final Geotechnical Report Exhibit B - Supplemental Geotechnical Report Exhibit C - Topographical Survey
PART 2 PRODUCTS
Not used.
PART 3 EXECUTION
In addition to work being executed in accordance with the Technical Requirements described in this package, all work shall be coordinated and approved with the CONTRACTING OFFICER prior to further coordination with representatives of Royal Saudi Land Forces Aviation Command (RSLFAC) and other Command elements, either identified or not, that may be impacted during this project. The Contractor shall be responsible for coordinating and completing all work under this contract within the performance period under this contract. Base Life Support Area is not available, the Contractor is responsible for the sustainment of their work force, and the Contractor shall plan for daily commutes to access work sites. Base access is the sole responsibility of the Contractor. The Contractor shall follow all regulation and process put forth by the Royal Saudi Land Forces Aviation Command (RSLFAC) necessary to obtain and maintain base access for the duration of the project. USACE has no obligation to act as an intermediary. The U.S. Government will not be responsible for any lack of coordination and communication by the Contractor which results in delays.
The Contractor is responsible for all delays with base access for personnel, vehicles, and deliveries.
-- End of Section --
SECTION 01 11 00 Page 3
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 83 PAGES
Phase2A
01 14 00 SD-01 Preconstruction Submittals
1.3.1.1 G RList of Contact Personnel
01 15 00.12 10 SD-01 Preconstruction Submittals
1.2 G M/RProof of Degrees and Licensing
1.5.2 G M/RRequests for Digging Permits
1.7 G M/RProposed Means of Providing
Project Security
1.22.2 G M/RRequests for Hot Work Permits
SD-07 Certificates
1.8Certificates Of Compliance
SD-11 Closeout Submittals
1.19 G M/RInventory of All Excess Supplies, Materials and Equipment
01 32 17.12 10 SD-01 Preconstruction Submittals
1.5 G M/RQualifications
1.3 G M/RBaseline Network Analysis
Schedule (NAS)
1.3 G M/RBaseline Network Analysis
Schedule (NAS)
SD-07 Certificates
1.6.4 G MMonthly Network Analysis
1.7.3 G MMonthly Network Analysis
SD-11 Closeout Submittals
1.7.4 G M/RAs-Built Schedule
01 33 00 SD-01 Preconstruction Submittals
1.8 G M/RSubmittal Register
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 83 PAGES
01 35 26 SD-01 Preconstruction Submittals
1.7 G MAccident Prevention Plan (APP)
SD-06 Test Reports
1.4Monthly Exposure Reports
1.12Notifications and Reports
1.12.3 G MAccident Reports
1.12.2 G MEpidemic/Pandemic Reporting
1.12.4LHE Inspection Reports
SD-07 Certificates
1.6.1.4Crane Operators/Riggers
1.7.2.2 G MStandard Lift Plan
1.7.2.3 G MCritical Lift Plan
1.8Activity Hazard Analysis (AHA)
1.9.1Confined Space Entry Permit
1.9.1Hot Work Permit
1.12.5Certificate of Compliance
01 45 00.00 10 SD-01 Preconstruction Submittals
3.2 G M/RContractor Quality Control (CQC)
Plan
3.2.2 G DOAdditional Requirements for
Design Quality Control (DQC) Plan
SD-05 Design Data
3.2.2Discipline-Specific Checklists
3.9.1Design Quality Control
SD-06 Test Reports
3.9.2Verification Statement
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 83 PAGES
01 50 00 SD-01 Preconstruction Submittals
1.3 G M/RConstruction Site Plan
3.4.1 G M/RTraffic Control Plan
2.2.1 G M/RHaul Road Plan
SD-06 Test Reports
2.5Backflow Preventer Tests
SD-07 Certificates
1.4.1Backflow Tester
1.4Backflow Preventers
01 57 19 SD-01 Preconstruction Submittals
1.5.1Preconstruction Survey
1.9 G M/RSolid Waste Management Permit
1.5.2 G M/RRegulatory Notifications
1.6 G M/REnvironmental Protection Plan
3.2.1.1 G M/RStormwater Pollution Prevention
Plan
3.2.1.2 G M/RStormwater Notice of Intent
1.6.9.1 G M/RDirt and Dust Control Plan
1.4.2 G M/REmployee Training Records
1.5.4 G M/REnvironmental Manager
Qualifications
SD-06 Test Reports
3.7.1.1.2Laboratory Analysis
3.2.1.3Inspection Reports
1.9.1 G MMonthly Solid Waste Disposal
Report
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 83 PAGES
01 57 19 SD-11 Closeout Submittals
3.2.1.4 G M/RStormwater Pollution Prevention
Plan Compliance Notebook
3.2.1.5 G M/RStormwater Notice of Termination
3.7.1 G M/RWaste Determination
Documentation
3.7.3.6 G M/RDisposal Documentation for
Hazardous and Regulated Waste
1.9 G M/RSolid Waste Management Permit
3.7.2.1 G M/RProject Solid Waste Disposal
Documentation Report
3.8.1 G M/RContractor Hazardous Material
Inventory Log
3.7.3.1 G M/RHazardous Waste/Debris
Management
1.5.2 G M/RRegulatory Notifications
3.7.2.1 G M/RSales Documentation
3.7.2.1Contractor Certification
3.2.1.5As-Built Topographic Survey
01 58 00 SD-02 Shop Drawings
1.3.1 G MSign Legend Orders
01 78 00.49 SD-11 Closeout Submittals
3.1 G M/RAs-Built Drawings
3.3 G M/RRecord Drawings
3.4 G M/RFinal Approved Shop Drawings
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 5 OF 83 PAGES
01 78 00.49 3.5 GConstruction Contract
Specifications
01 78 23 SD-10 Operation and Maintenance
Data
3.1.1 G RTraining Plan
3.1.3 G RTraining Outline
3.1.2 G RTraining Content
SD-11 Closeout Submittals
3.1.4 G RTraining Video Recording
3.1.6 G RValidation of Training Completion
01 91 00.15 SD-01 Preconstruction Submittals
1.7 G M/RCommissioning Firm
1.7.1 G M/RLead Commissioning Specialist
1.7.2 G M/RTechnical Commissioning
Specialists
1.7 G M/RCommissioning Firm's Contract
SD-05 Design Data
3.1.2 G MDesign Phase Commissioning
Plan
SD-06 Test Reports
3.1.3 G M/RDesign Review Report
3.2.2.1 G M/RInterim Construction Phase
Commissioning Plan
3.2.2.2 G M/RFinal Construction Phase
Commissioning Plan
3.2.4.2 G M/RPre-Functional Checklists
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 6 OF 83 PAGES
01 91 00.15 1.9 G M/RIssues Log
3.3 G M/RCommissioning Report
SD-07 Certificates
1.10Certificate of Readiness
SD-10 Operation and Maintenance
Data
3.2.5 G M/RTraining Plan
3.2.5 G M/RTraining Attendance Rosters
3.2.6 G M/RSystems Manual
3.2.7 G M/RMaintenance Plans
02 41 00 SD-01 Preconstruction Submittals
1.5 G M/RWork Schedule
1.2.1 G M/RDemolition Plan
1.10 G M/RExisting Conditions
SD-07 Certificates
1.7Notification
03 30 00 SD-01 Preconstruction Submittals
1.6.3.1 G M/RConcrete Curing Plan
1.6.6 G M/RQuality Control Plan
1.6.7 G M/RQuality Control Personnel
Certifications
1.6.7 G M/RQuality Control Organizational
Chart
1.6.9 G M/RLaboratory Accreditation
1.6.2.1 G M/RForm Removal Schedule
3.3.10 G M/RMaturity Method Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 7 OF 83 PAGES
03 30 00 SD-02 Shop Drawings
1.6.2.1 G MFormwork
1.6.2.2 G MReinforcing Steel
SD-03 Product Data
2.4.5Joint Sealants
2.4.4Joint Filler
2.1Formwork Materials
2.3.1Cementitious Materials
2.4.6Vapor Barrier
2.4.1Concrete Curing Materials
2.6Reinforcement
2.4.3.1Liquid Chemical Floor Hardeners and Sealers
2.3.4Admixtures
2.6.2Mechanical Reinforcing Bar
Connectors
2.2.2Waterstops
2.2.3Biodegradable Form Release
Agent
1.6.3.2Pumping Concrete
1.6.3.4Finishing Plan
2.4.2Nonshrink Grout
SD-04 Samples
1.6.5.1 G RSlab Finish Sample
1.6.5.2 G RSurface Finish Samples
SD-05 Design Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 8 OF 83 PAGES
03 30 00 1.6.1.2 G MConcrete Mix Design
1.6.1.1 G MFormwork Calculations
SD-06 Test Reports
1.6.1.2 G MConcrete Mix Design
1.6.4.1 G MFly Ash
1.6.4.1 G MPozzolan
1.6.4.2 G MSlag Cement
1.6.4.3 G MAggregates
3.10.2.1 G MTolerance Report
3.14.2.3 G MCompressive Strength Tests
3.14.2.5 G MUnit Weight of Structural
Concrete
3.14.2.6 G MChloride Ion Concentration
3.14.2.4 G MAir Content
3.14.2.1 G MSlump Tests
2.3.2 G MWater
SD-07 Certificates
1.6.2.2Reinforcing Bars
2.6.1Reinforcing Bars
1.8Welder Qualifications
1.6.3.3Silica Fume Manufacturer's
Representative
1.6.3.5VOC Content for Form Release
Agents, Curing Compounds, and
Concrete Penetrating Sealers
1.6.3.6Safety Data Sheets
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 9 OF 83 PAGES
03 30 00 1.6.7.2Field Testing Technician and
Testing Agency
SD-08 Manufacturer’s Instructions
2.4.3.1Liquid Chemical Floor Hardeners and Sealers
2.4.5Joint Sealants
2.4.1Curing Compound
03 40 00.00 10 SD-01 Preconstruction Submittals
1.4.2.2 G M/RQuality Control Procedures
SD-02 Shop Drawings
1.2.1 G MStandard Precast Units
1.2.2 G MCustom-Made Precast Units
SD-03 Product Data
1.2.1Standard Precast Units
1.2.3Proprietary Precast Units
3.1.3Embedded Items
2.1.10Accessories
SD-05 Design Data
1.2.2 G MDesign Calculations
1.2.5.1 G MConcrete Mix Proportions
SD-06 Test Reports
1.4.2.4 G MTest Reports
SD-07 Certificates
1.4.2.2Quality Control Procedures
03 45 00 SD-01 Preconstruction Submittals
1.11.5 G M/RPre-Installation Meeting
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 10 OF 83 PAGES
03 45 00 SD-02 Shop Drawings
1.11.1 G MPrecast Drawings
SD-03 Product Data
2.3Cast-In Embedded Items And
Connectors
2.3.2Connection Devices
2.2.5Admixtures
2.5Gasket
2.6Bearing Pads
SD-04 Samples
1.11.2 G RConcrete Wall Panel Surface
Finish
1.11.4 G RMock-up
1.11.2 G RFull Size Sample Wall Panel
SD-05 Design Data
1.5.4 G MDesign Calculations
2.1.1 G MContractor-Furnished Mix Design
2.4.9 G MRepair of Surface Defects
1.5.5 G MThermal Calculations
SD-06 Test Reports
1.10.2 G MStrength Tests
1.10.2 G MSlump
1.10.2 G MAir Content
1.10.1 G MTest for Concrete Materials
2.2.6 G MWater
3.6.4 G MTesting Precast Units for Strength
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 11 OF 83 PAGES
03 45 00 SD-07 Certificates
1.4Manufacturer's Qualifications
1.8.1Fabricator Quality Certifications
1.9Erector Certification
SD-08 Manufacturer’s Instructions
3.3Installation
3.8Cleaning
SD-11 Closeout Submittals
1.11.3 G M/RBatch Ticket Information
04 20 00 SD-02 Shop Drawings
3.3.2.1 G MCut CMU
3.4.1.1 G MDetail Drawings
SD-03 Product Data
1.5.1Hot Weather Procedures
2.2.2.2.1Cement
2.4.1.1Cementitious Materials
2.6.8Insulation
SD-04 Samples
1.3.1.1 G RMock-Up Panel
2.2.2.2 G RConcrete Masonry Units (CMU)
2.4.1.3 G RAdmixtures for Masonry Mortar
2.6.3 G RAnchors, Ties, and Bar
Positioners
2.6.4 G RJoint Reinforcement
SD-05 Design Data
2.1.2 G MMasonry Compressive Strength
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 12 OF 83 PAGES
04 20 00 2.2.2.3 G MFire-Rated Concrete Masonry
Units
3.2.5 G MBracing Calculations
SD-06 Test Reports
2.2.2.3 G MFire-Rated Concrete Masonry
Units
3.6.1.1 G MField Testing of Mortar
3.6.1.2 G MField Testing of Grout
3.6.1.3 G MPrism Tests
3.6.1.4 G MSingle-Wythe Masonry Wall
Water Penetration Test
2.1.2 G MUnit Strength Method
SD-07 Certificates
2.4.1.1Cementitious Materials
2.4.1.3Admixtures for Masonry Mortar
2.4.2.2Admixtures for Grout
2.6.3Anchors, Ties, and Bar
Positioners
2.6.4Joint Reinforcement
SD-08 Manufacturer’s Instructions
2.4.1.3Admixtures for Masonry Mortar
2.4.2.2Admixtures for Grout
05 05 23.16 SD-01 Preconstruction Submittals
3.2 G M/RWelding Quality Assurance Plan
SD-03 Product Data
1.3Welding Procedure Qualifications
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 13 OF 83 PAGES
05 05 23.16 1.3.4Welder, Welding Operator, and
Tacker Qualification
1.3.2Previous Qualifications
1.3.3Pre-Qualified Procedures
2.2Welding Electrodes and Rods
SD-06 Test Reports
3.3 G MNondestructive Testing
3.2 G MWeld Inspection Log
SD-07 Certificates
1.3.1Certified Welding Procedure
Specifications (WPS)
1.3.1Certified Brazing Procedure
Specifications (BPS)
1.3.1Certified Procedure Qualification
Records (PQR)
1.3.1Certified Welder Performance
Qualifications (WPQ)
1.3.1Certified Brazer Performance
Qualifications (BPQ)
1.3.5Certified Welding Inspector
1.3.5Nondestructive Testing Personnel
05 12 00 SD-01 Preconstruction Submittals
1.4.1.1 G M/RErection and Erection Bracing
Drawings
SD-02 Shop Drawings
1.4.2 G MFabrication Drawings
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 14 OF 83 PAGES
05 12 00 SD-03 Product Data
2.6.2Shop Primer
2.4.1Welding Electrodes and Rods
2.4.2Non-Shrink Grout
2.3.3Tension Control Bolts
SD-05 Design Data
1.4.2 G MShoring and Temporary Bracing
SD-06 Test Reports
2.3 G MBolts, Nuts, and Washers
3.7.1.2 G MWeld Inspection Reports
3.7.2.1 G MBolt Testing Reports
3.7.3 G MEmbrittlement Test Reports
SD-07 Certificates
2.2Steel
2.3Bolts, Nuts, and Washers
2.5Galvanizing
1.4.3.1Welding Procedures and
Qualifications
2.4.1Welding Electrodes and Rods
3.7.1.1Certified Welding Inspector
3.7.1.2NDT Technician
3.4Welding Procedure Specifications
(WPS)
1.4.3.2Overhead, Under Running Crane
Rail Beam
05 30 00 SD-02 Shop Drawings
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 15 OF 83 PAGES
05 30 00 1.3.4 G MFabrication Drawings
SD-03 Product Data
2.2Accessories
1.3.1Deck Units
3.2.4.1Galvanizing Repair Paint
2.2.15Mechanical Fasteners
1.3.2Welding Equipment
1.3.2Welding Rods and Accessories
SD-05 Design Data
1.3.1 G MDeck Units
SD-07 Certificates
1.3.2Welder Qualifications
1.3.2Welding Procedures
1.3.1Manufacturer's Certificate
2.2.10Stud Manufacturer's Certification
2.2.10Stud Manufacturer's Test Reports
05 50 13 SD-02 Shop Drawings
2.3 G MFloor Gratings
2.4 G MBollards/Pipe Guards
2.5 G MAngles and Plates
2.6 G MRoof Hatches
SD-03 Product Data
2.3Floor Gratings
2.6Roof Hatches
05 51 00 SD-02 Shop Drawings
2.1 G MIron and Steel Hardware
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 16 OF 83 PAGES
05 51 00 2.1 G MSteel Shapes, Plates, Bars, and
Strips
2.2.1 G MMetal Stair System
SD-03 Product Data
2.4.1Structural-Steel Plates, Shapes, and Bars
2.4.2Structural-Steel Tubing
2.4.5Hot-Rolled Carbon Steel Sheets and Strips
2.4.4Cold-Finished Steel Bars
2.4.3Hot-Rolled Carbon Steel Bars
2.4.6Cold-Rolled Carbon Steel Sheets
2.4.7Galvanized Carbon Steel Sheets
2.4.8Cold-Drawn Steel Tubing
2.4.9Gray Iron Castings
2.4.10Malleable Iron Castings
2.3.3Concrete Inserts
2.3.4Masonry Anchorage Devices
2.2.4Protective Coating
2.2.2Steel Pan Stairs
2.3.1Steel Stairs
SD-07 Certificates
1.3.1Welding Procedures
1.3.1Welder Qualification
SD-08 Manufacturer’s Instructions
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 17 OF 83 PAGES
05 51 00 2.4.1Structural-Steel Plates, Shapes, and Bars
2.4.2Structural-Steel Tubing
2.4.5Hot-Rolled Carbon Steel Sheets and Strips
2.4.4Cold-Finished Steel Bars
2.4.3Hot-Rolled Carbon Steel Bars
2.4.6Cold-Rolled Carbon Steel Sheets
2.4.7Galvanized Carbon Steel Sheets
2.4.8Cold-Drawn Steel Tubing
2.4.9Gray Iron Castings
2.4.10Malleable Iron Castings
2.2.4Protective Coating
2.3.4Masonry Anchorage Devices
05 51 33 SD-02 Shop Drawings
2.3 G MLadders
SD-03 Product Data
2.3Ladders
SD-07 Certificates
1.3Fabricator Certification for Ladder
Assembly
05 52 00 SD-02 Shop Drawings
1.2.1 G MFabrication Drawings
3.2 G MIron and Steel Hardware
3.2 G MSteel Shapes, Plates, Bars and
Strips
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 18 OF 83 PAGES
05 52 00 SD-03 Product Data
2.2.1Structural-Steel Plates, Shapes, and Bars
2.2.2Structural-Steel Tubing
2.2.4Cold-Finished Steel Bars
2.2.3Hot-Rolled Carbon Steel Bars
2.2.5Cold-Drawn Steel Tubing
1.2.1Concrete Inserts
2.2.7Masonry Anchorage Devices
2.1.2Protective Coating
2.2.9Steel Railings and Handrails
1.2.1Anchorage and Fastening
Systems
SD-07 Certificates
1.4.1Welding Procedures
1.4.2Welder Qualification
SD-08 Manufacturer’s Instructions
3.2Installation Instructions
06 10 00 SD-03 Product Data
1.7Fire-retardant treatment
06 41 16.00 10 SD-02 Shop Drawings
1.4.2 G MShop Drawings
2.10 G MShop Drawings
3.1 G MInstallation
SD-03 Product Data
2.1Wood Materials
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 19 OF 83 PAGES
06 41 16.00 10 2.10.7.3Finish Schedule
SD-04 Samples
2.3 G RPlastic Laminates
2.6 G RCabinet Hardware
SD-07 Certificates
1.4Quality Assurance
3.1Laminate Clad Casework
06 61 16 SD-02 Shop Drawings
1.4.2 G MDetail Drawings
3.1 G MInstallation
SD-03 Product Data
2.1Solid Polymer Material
1.4.1Qualifications
2.3Fabrications
SD-04 Samples
2.1 G RMaterial
2.3.4 G RCounter and Vanity Tops
SD-06 Test Reports
2.1 G MSolid Polymer Material
SD-07 Certificates
2.3Fabrications
1.4.1Qualifications
SD-10 Operation and Maintenance
Data
3.2 G RClean-up
07 05 23 SD-01 Preconstruction Submittals
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 20 OF 83 PAGES
07 05 23 1.4 G M/RWork Plan
SD-03 Product Data
2.2Thermal Imaging Camera
SD-05 Design Data
3.2 G MEnvelope Surface Area
Calculations
SD-06 Test Reports
3.5 G MPressure Test Procedures
1.6.4 G MAir Leakage Test Report
3.5.8 G MAir Leakage Test Report
1.6.4 G MDiagnostic Test Report
3.6.5 G MDiagnostic Test Report
SD-07 Certificates
1.6.2.1Pressure Test Agency
1.6.2.2Thermographer Qualifications
1.6.3Test Instruments
1.6.3Date Of Last Calibration
07 13 53 SD-03 Product Data
1.3Manufacturer's Standard Details
2.1Elastomeric Waterproofing Sheet
Material
2.3Protection Board
1.4Primers, Adhesives, and Mastics
2.1Primers, Adhesives, and Mastics
SD-06 Test Reports
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 21 OF 83 PAGES
07 13 53 2.1 G MElastomeric Waterproofing Sheet
Material
3.6 G MField Quality Control
3.7 G MProtective Covering
SD-07 Certificates
2.1Elastomeric Waterproofing Sheet
Material
1.4Primers, Adhesives, and Mastics
2.1Primers, Adhesives, and Mastics
1.4Protective Coverings
1.7Special Warranties
1.7Special Warranties
SD-08 Manufacturer’s Instructions
1.4Primers, Adhesives, and Mastics
2.1Primers, Adhesives, and Mastics
07 21 13 SD-03 Product Data
1.3Manufacturer's Standard Details
2.1Block or Board Insulation
2.2Vapor Barrier
2.3Pressure Sensitive Tape
2.4Accessories
SD-07 Certificates
2.1Block or Board Insulation
2.2Vapor Barrier
1.4Protection Board or Coatings
1.7Special Warranties
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 22 OF 83 PAGES
07 21 13 1.7Special Warranties
SD-08 Manufacturer’s Instructions
2.1Block or Board Insulation
2.4.1Adhesive
07 21 16 SD-03 Product Data
2.1Blanket Insulation
2.3Accessories
SD-08 Manufacturer’s Instructions
3.2.1Insulation
07 22 00 SD-02 Shop Drawings
1.3 G MInsulation Board Layout
1.3 G MVerification of Existing Conditions
SD-03 Product Data
2.1Insulation
1.4Protection Board
3.4Fasteners
SD-06 Test Reports
1.7.1 G MFlame Spread Rating
SD-07 Certificates
1.6Installer Qualifications
SD-08 Manufacturer’s Instructions
3.4Fasteners
2.1Insulation
07 27 10.00 10 SD-02 Shop Drawings
2.1 G MAir Barrier System Shop
Drawings
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 23 OF 83 PAGES
07 27 10.00 10 SD-03 Product Data
2.1Air Barrier System Product Data
SD-04 Samples
3.1.2 G RMock-Up
2.1 G RMaterial Samples For Air Barrier
System
SD-05 Design Data
1.8 G MDesign Data And Calculations
For The Air Barrier System
SD-06 Test Reports
1.8 G MDesign Review Report
3.1.3 G MTesting and Inspection
SD-07 Certificates
1.7Air Barrier Inspector
07 27 19.01 SD-01 Preconstruction Submittals
1.8.1 G M/RQualifications of Manufacturer
1.8.2 G M/RQualifications of Installer
SD-02 Shop Drawings
1.4 G MSelf-adhering Air Barrier
SD-03 Product Data
1.4Self-adhering Air Barrier
2.2Primers, Adhesives, and Mastics
1.4.2Safety Data Sheets
SD-04 Samples
1.4 G RSelf-adhering Air Barrier
SD-06 Test Reports
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 24 OF 83 PAGES
07 27 19.01 1.6 G MField Peel Adhesion Test
1.4.4 G MFlame Propagation of Wall
Assemblies
1.4.4 G MFlame Spread and Smoke
Developed Index Ratings
3.4.1 G MSite Inspections and Testing
SD-07 Certificates
1.4Self-adhering Air Barrier
1.8.1Qualifications of Manufacturer
1.8.2Qualifications of Installer
SD-08 Manufacturer’s Instructions
1.4Self-adhering Air Barrier
2.2Primers, Adhesives, and Mastics
07 27 26 SD-01 Preconstruction Submittals
1.9.1 G M/RQualifications of Manufacturer
1.9.2 G M/RQualifications of Installer
SD-02 Shop Drawings
1.4 G MFluid-Applied Membrane
Air/Vapor Barrier
SD-03 Product Data
1.4Fluid-Applied Membrane
Air/Vapor Barrier
2.3Transition Membrane
2.2Primers, Adhesives, and Mastics
2.6Reinforcement
1.4.2Safety Data Sheets
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 25 OF 83 PAGES
07 27 26 SD-04 Samples
1.4.3 G RMockup
SD-06 Test Reports
1.6 G MCapillary Moisture Test
1.4.4 G MField Peel Adhesion Test
1.4.4 G MFlame Propagation of Wall
Assemblies
1.4.4 G MFlame Spread and Smoke
Developed Index Ratings
3.4.1 G MSite Inspections
SD-07 Certificates
1.4Fluid-Applied Membrane
Air/Vapor Barrier
2.3Transition Membrane
1.9.1Qualifications of Manufacturer
1.9.2Qualifications of Installer
SD-08 Manufacturer’s Instructions
1.4Fluid-Applied Membrane
Air/Vapor Barrier
2.3Transition Membrane
2.2Primers, Adhesives, and Mastics
07 52 00 SD-02 Shop Drawings
1.4.6 G MRoof plan
SD-03 Product Data
2.1Modified Bitumen Sheets
2.3Asphalt
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 26 OF 83 PAGES
07 52 00 2.4Cold-Applied Membrane
Adhesive
2.6Primer
2.7Modified Bitumen Roof Cement
2.9Fasteners And Plates
1.9Warranty
SD-05 Design Data
1.4.5 G MWind Uplift Calculations
SD-07 Certificates
1.4.1Qualification of Manufacturer
1.4.2Qualification of Applicator
1.4.3Qualification of Engineer of
Record
1.5.1Bill of Lading
1.4.5Wind Uplift Resistance
1.4.4Fire Resistance
SD-08 Manufacturer’s Instructions
3.3.5Modified Bitumen Membrane
Application
3.3.6Flashing
3.2.3.1Temperature Limitations for
Asphalt
3.2.2.3Torches
3.3.3.3Cold Adhesive Applied Modified
Bitumen Membrane
2.6Primer
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 27 OF 83 PAGES
07 52 00 2.9.1Fasteners
3.3.7.1Coating Application
1.6Cold Weather Installation
SD-11 Closeout Submittals
1.9 G M/RWarranty
3.8 G M/RInformation Card
3.7 G M/RInstructions To Government
Personnel
07 55 00 SD-02 Shop Drawings
1.2.1 G MRoof Assembly
SD-07 Certificates
1.4.1Material and Equipment
1.4.2Qualifications
07 60 00 SD-02 Shop Drawings
2.1.1 G MExposed Sheet Metal
3.1.14 G MGutters
3.1.15 G MDownspouts
3.1.20 G MIsolation Joints
3.1.10 G MCounterflashing
3.1.21 G MFlashing at Roof Penetrations
and Equipment Supports
2.1.6 G MReglets
3.1.16 G MScuppers
3.1.13 G MDrip Edges
3.1.17 G MConductor Heads
SD-04 Samples
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 28 OF 83 PAGES
07 60 00 1.4.2 G RFinish Samples
SD-08 Manufacturer’s Instructions
1.4.3Instructions for Installation
3.5Quality Control Plan
SD-10 Operation and Maintenance
Data
1.4.3 G RCleaning and Maintenance
07 84 00 SD-02 Shop Drawings
2.1 G MFirestopping System
SD-03 Product Data
2.2Firestopping Materials
SD-06 Test Reports
3.3 G MInspection
SD-07 Certificates
1.5.2Inspector Qualifications
2.2Firestopping Materials
1.5.1Installer Qualifications
07 92 00 SD-03 Product Data
2.1Sealants
2.2Primers
2.3Bond Breakers
2.4Backstops
3.1 G MField Adhesion
08 11 13 SD-02 Shop Drawings
2.1 G MDoors
2.1 G MDoors
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 29 OF 83 PAGES
08 11 13 2.6 G MFrames
2.6 G MFrames
2.4 G MAccessories
2.8 G MWeatherstripping
SD-03 Product Data
2.1Doors
2.6Frames
2.4Accessories
2.8Weatherstripping
08 11 16 SD-02 Shop Drawings
1.5.1 G MDoor and Frame Assembly
SD-03 Product Data
1.5.1Door and Frame Assembly
SD-04 Samples
1.5.2 G RFinish Samples
SD-05 Design Data
1.2.1 G MCalculations
1.2.3 G MAir Infiltration
1.2.4 G MWater Penetration
1.2.5NFRC Project Label Certificates for Fenestration
SD-08 Manufacturer’s Instructions
1.5.1Door and Frame Assembly
1.5.3 G RAdjustments, Cleaning, and
Maintenance
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 30 OF 83 PAGES
08 11 16 1.2.5 G M/RNFRC Project Label Certificates for Fenestration
08 14 00 SD-02 Shop Drawings
2.1 G MDoors
SD-03 Product Data
2.1Doors
2.2Accessories
2.3.7Water-resistant Sealer
1.4Warranty
2.1.2Sound Transmission Class
Rating
2.1.3Fire Resistance Rating
SD-04 Samples
2.1 G RDoors
2.3.6.2 G RDoor Finish Color
SD-06 Test Reports
2.4 G MCycle-Slam
2.4 G MHinge Loading Resistance
SD-11 Closeout Submittals
1.4 G M/RWarranty
08 22 20 SD-02 Shop Drawings
1.2.1 G MDoors
2.1.1.5 G MDoors
2.1.1.6 G MDoor Hardware Components and
Accessories
SD-03 Product Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 31 OF 83 PAGES
08 22 20 1.2.1Doors
2.1.1.5Doors
2.1.1.6Door Hardware Components and
Accessories
SD-04 Samples
1.4.1 G RProduct Samples
SD-07 Certificates
1.2.1Sample Warranty
3.4.1Warranty
08 31 00 SD-02 Shop Drawings
1.3 G MAccess Doors And Panels
SD-03 Product Data
1.3Access Doors And Panels
1.3.2Hardware
2.1.8Accessories
SD-04 Samples
2.4 G RFinishes
SD-06 Test Reports
1.3.1 G MFire-rating(s) of Assemblies
1.3.1 G MAcoustical Ratings of Assemblies
08 33 23 SD-02 Shop Drawings
2.2.1 G MOverhead Coiling Doors
2.2.3 G MCounterbalancing Mechanism
2.2.4 G MManual Door Operators
2.2.5 G MElectric Door Operators
2.2.1.4 G MBottom Bars
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 32 OF 83 PAGES
08 33 23 2.1.1.1 G MGuides
2.2.3.1 G MMounting Brackets
2.2.2.2 G MHood
2.1.1.1 G MInstallation Drawings
SD-03 Product Data
2.2.1Overhead Coiling Doors
2.2.2Hardware
2.2.3Counterbalancing Mechanism
2.2.4Manual Door Operators
2.2.5Electric Door Operators
SD-05 Design Data
2.2.1 G MOverhead Coiling Doors
2.2.2 G MHardware
2.2.3 G MCounterbalancing Mechanism
2.2.4 G MManual Door Operators
2.2.5 G MElectric Door Operators
1.3 G MFire-Rated Door
SD-10 Operation and Maintenance
Data
3.3.2 G ROperation and Maintenance
Manuals
3.3.2 G RMaterials
3.3.2 G RDevices
3.3.2 G RProcedures
3.3.2 G RManufacturer's Brochures
3.3.2 G RParts Lists
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 33 OF 83 PAGES
08 33 23 SD-11 Closeout Submittals
3.3.1 G M/RWarranty
08 41 13 SD-01 Preconstruction Submittals
1.2.1 G M/RSample Warranty
1.2.1 G M/RList of Product Installations
SD-02 Shop Drawings
3.3 G MInstallation Drawings
2.2 G MFabrication Drawings
SD-03 Product Data
1.2.1Manufacturer's Catalog Data
2.2.3Finish
SD-04 Samples
1.2.1 G RFinish and Color Samples
SD-06 Test Reports
1.2.1 G MCertified Test Reports
3.4.3 G MDeflection
3.4.1 G MAir Infiltration
3.4.4 G MThermal Transmittance
3.4.5 G MWater Infiltration
SD-08 Manufacturer’s Instructions
3.3Manufacturer's Instructions
SD-11 Closeout Submittals
3.6 G M/RManufacturer's Product Warranty
08 51 13 SD-02 Shop Drawings
2.1 G MWindows
1.7 G MFabrication Drawings
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
T…