Attachment 1 - Performance Distribution Statement.pdf

PDF 186 KB Posted

Attached to
Al Qassim Simulator, Kingdom of Saudi Arabia
Solicitation number
W912ER22R0028
Issued by

About this file

This document contains an attachment outlining the requirements for a performance distribution statement and details for a federal contract opportunity to construct a simulator building at a military installation in Saudi Arabia. The attachment provides guidance on listing major subcontractors performing 20% or more of the total contract value. The related federal contract opportunity is seeking bids for a design-build project to construct the simulator building and supporting facilities at the Royal Saudi Land Forces Air Command Aviation Institute at Al Qassim, Saudi Arabia, with a construction magnitude of over $10 million. Bidders must provide documentation including Defense Base Act insurance after award and prior to notice to proceed, and performance and payment bonds of 20% are required. The solicitation is being conducted by the U.S. Army Corps of Engineers Engineering District Middle East.

View the file

Other files

File Type Posted
Conform W912ER22R00280003 Al Qassim Simulator.pdf PDF
Attachment 10 - Topographic Survey Report Rev01 - Al Qassim.pdf PDF
Attachment 9 - 2022-01-31_RSLFAC Phase 2A_Supplementary Geotechnical Report_Al Qassim.pdf PDF
497449 RSLFAC DP8 PKG 5 Specifications - Al Qassim.pdf PDF
2022-04-26_AM03_DP08_SA-457449-10_Al Qassim Facilities.pdf PDF
Amendment W912ER22R00280003 Al Qassim Simulator.pdf PDF
Attachment 8 - 2021-09-23_RSLFAC Phase 2A_Revised Final Geotech Report_Al Qassim.pdf PDF
Attachment 11 - Proposed Field Office and Laydown Area_RSLFAC Al Qassim Simulator.pdf PDF
Attachment 3 - Project Overview Sheet Rev 1.pdf PDF
Amendment W912ER22R00280002 Al Qassim Simulator.pdf PDF
Conform W912ER22R00280002 Al Qassim Simulator.pdf PDF
Amendment W912ER22R00280001 Al Qassim Simulator.pdf PDF
Conform W912ER22R00280001 Al Qassim Simulator.pdf PDF
Enclosure A - Corporate Certificate.pdf PDF
Attachment 5 - Past Performance Questionnaire - PPQ.pdf PDF
2022-02-25_RTA_DP08_SA-457449-10_Qassim Facilities_V2.pdf PDF
Attachment 4 - Project Summary Form.pdf PDF
2022-02-25_RTA_DP08_SA-457449-10_Qassim Facilities_V1.pdf PDF
Attachment 3 - Project Overview Sheet.pdf PDF
Attachment 7 - Anti-Collusion Certification.pdf PDF
Attachment 6 - Proposal Price Breakout Schedule.pdf PDF
Enclosure B - Pre-Award_Contractor Responsibility Information.pdf PDF
Solicitation - W912ER22R0028 Al Qassim Simulator.pdf PDF
Attachment 2 - Construction Experience Form.pdf PDF
CDC - 2022-02-11_RSLFAC Phase 2A_DP8_Specifications.pdf PDF
Show all 25

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT 1

PERFORMANCE DISTRIBUTION STATEMENT

1. Although not all subcontractors need to be listed, statement must include all major subcontractors, defined as those performing 20% or more of the total dollar value ($) of the contract.

2. Add more lines, if needed, to list more than 2 subcontractors.

3. The “% of Work” column must total no more than 100%.

4. See example below for details.

Line Company / Entity Role Scope of Work % of Work

File details come from the government source that posted it. Updated .