Attachment 2 - Construction Experience Form.pdf

PDF 96 KB Posted

Attached to
Al Qassim Simulator, Kingdom of Saudi Arabia
Solicitation number
W912ER22R0028
Issued by

About this file

This solicitation is for the construction of a Simulator Building and supporting facilities at the Royal Saudi Land Forces Air Command Aviation Institute at Al Qassim, Kingdom of Saudi Arabia. The scope of work includes construction of the Simulator Building, electric services, water, sewer, gas, paving, walks, curbs, gutters, drainage, site improvements, demolition, and information systems. The magnitude of construction is over $10 million. Offerors must provide documentation including Defense Base Act insurance after award and prior to the notice to proceed. Performance and payment bonds of 20% are required. The soliciting agency is the Department of the Army Corps of Engineers Engineering District Middle East.

View the file

Other files

File Type Posted
Conform W912ER22R00280003 Al Qassim Simulator.pdf PDF
Attachment 10 - Topographic Survey Report Rev01 - Al Qassim.pdf PDF
Attachment 9 - 2022-01-31_RSLFAC Phase 2A_Supplementary Geotechnical Report_Al Qassim.pdf PDF
497449 RSLFAC DP8 PKG 5 Specifications - Al Qassim.pdf PDF
2022-04-26_AM03_DP08_SA-457449-10_Al Qassim Facilities.pdf PDF
Amendment W912ER22R00280003 Al Qassim Simulator.pdf PDF
Attachment 8 - 2021-09-23_RSLFAC Phase 2A_Revised Final Geotech Report_Al Qassim.pdf PDF
Attachment 11 - Proposed Field Office and Laydown Area_RSLFAC Al Qassim Simulator.pdf PDF
Attachment 3 - Project Overview Sheet Rev 1.pdf PDF
Amendment W912ER22R00280002 Al Qassim Simulator.pdf PDF
Conform W912ER22R00280002 Al Qassim Simulator.pdf PDF
Amendment W912ER22R00280001 Al Qassim Simulator.pdf PDF
Conform W912ER22R00280001 Al Qassim Simulator.pdf PDF
Enclosure A - Corporate Certificate.pdf PDF
Attachment 5 - Past Performance Questionnaire - PPQ.pdf PDF
2022-02-25_RTA_DP08_SA-457449-10_Qassim Facilities_V2.pdf PDF
Attachment 4 - Project Summary Form.pdf PDF
2022-02-25_RTA_DP08_SA-457449-10_Qassim Facilities_V1.pdf PDF
Attachment 3 - Project Overview Sheet.pdf PDF
Attachment 7 - Anti-Collusion Certification.pdf PDF
Attachment 6 - Proposal Price Breakout Schedule.pdf PDF
Attachment 1 - Performance Distribution Statement.pdf PDF
Enclosure B - Pre-Award_Contractor Responsibility Information.pdf PDF
Solicitation - W912ER22R0028 Al Qassim Simulator.pdf PDF
CDC - 2022-02-11_RSLFAC Phase 2A_DP8_Specifications.pdf PDF
Show all 25

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT 2

CONSTRUCTION EXPERIENCE FORM - INSTRUCTIONS

1. Use one form for each contract.

2. Forms may expand to more than one page but remember that this form is only for greater weight considerations.

3. Do not make changes to any of the shaded blocks.

4. Complete all non-shaded blocks in the top summary section.

5. Place an “x” next to all Topics that are applicable to the specific contract (not all topics need to be addressed for each contract).

6. Complete the non-shaded “How experience gained” column to describe your experience with that specific topic and how it will enable successful performance on this project.

7. See example below for details.

Summary Section

# Contract Name / Title

Location (Country/Base or City) Role Value ($) Start / End Dates

Prime/Sub (Circle) $

Contract Description - briefly describe the scope and summarize the salient features of the contract

Specific Experience (paragraph letters below align with the solicitation evaluation criteria)

Topic How experience gained on listed contract will enable successful performance on Al Qassim Simulator Facility x a. Similar scope projects.

x b. Permits and approvals x c. Working on or around operational military or airfield facilities x d. Work locations access

File details come from the government source that posted it. Updated .