Attachment 3 - Project Overview Sheet.pdf

PDF 186 KB Posted

Attached to
Al Qassim Simulator, Kingdom of Saudi Arabia
Solicitation number
W912ER22R0028
Issued by

About this file

This overview sheet and federal contract opportunity document provide details for a construction project requiring a contractor to build a Simulator Building and supporting facilities at the Royal Saudi Land Forces Air Command Aviation Institute in Al Qassim, Kingdom of Saudi Arabia. The project scope includes electric services, water, sewer, gas, paving, walks, curbs, gutters, drainage, site improvements, demolition, and information systems. The magnitude of construction is over $10,000,000. The solicitation was issued by the Department of the Army Corps of Engineers Engineering District Middle East. The contractor must provide all documentation requested including Defense Base Act insurance after award and prior to notice to proceed, and performance and payment bonds of 20% are required.

View the file

Other files

File Type Posted
Conform W912ER22R00280003 Al Qassim Simulator.pdf PDF
Attachment 10 - Topographic Survey Report Rev01 - Al Qassim.pdf PDF
Attachment 9 - 2022-01-31_RSLFAC Phase 2A_Supplementary Geotechnical Report_Al Qassim.pdf PDF
497449 RSLFAC DP8 PKG 5 Specifications - Al Qassim.pdf PDF
2022-04-26_AM03_DP08_SA-457449-10_Al Qassim Facilities.pdf PDF
Amendment W912ER22R00280003 Al Qassim Simulator.pdf PDF
Attachment 8 - 2021-09-23_RSLFAC Phase 2A_Revised Final Geotech Report_Al Qassim.pdf PDF
Attachment 11 - Proposed Field Office and Laydown Area_RSLFAC Al Qassim Simulator.pdf PDF
Attachment 3 - Project Overview Sheet Rev 1.pdf PDF
Amendment W912ER22R00280002 Al Qassim Simulator.pdf PDF
Conform W912ER22R00280002 Al Qassim Simulator.pdf PDF
Amendment W912ER22R00280001 Al Qassim Simulator.pdf PDF
Conform W912ER22R00280001 Al Qassim Simulator.pdf PDF
Enclosure A - Corporate Certificate.pdf PDF
Attachment 5 - Past Performance Questionnaire - PPQ.pdf PDF
2022-02-25_RTA_DP08_SA-457449-10_Qassim Facilities_V2.pdf PDF
Attachment 4 - Project Summary Form.pdf PDF
2022-02-25_RTA_DP08_SA-457449-10_Qassim Facilities_V1.pdf PDF
Attachment 7 - Anti-Collusion Certification.pdf PDF
Attachment 6 - Proposal Price Breakout Schedule.pdf PDF
Attachment 1 - Performance Distribution Statement.pdf PDF
Enclosure B - Pre-Award_Contractor Responsibility Information.pdf PDF
Solicitation - W912ER22R0028 Al Qassim Simulator.pdf PDF
Attachment 2 - Construction Experience Form.pdf PDF
CDC - 2022-02-11_RSLFAC Phase 2A_DP8_Specifications.pdf PDF
Show all 25

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT 3

PROJECT OVERVIEW SHEET

List projects that are described in the Offeror’s narrative in Factor 2 and may have a completed Project Summary Form (Attachment 2). Limited to three (3) minimum of five (5) maximum projects completed by the prime contractor within the last 6 years of the solicitation issuance date.

Mark Prime, Sub, or Joint Venture (ONLY ONE).

Contract Name/Client, Location of Services

Prime Sub JV Total Contract $ Amount

Offeror's Share of Responsibility for Total Construction Contract

SAMPLE: Ellis Island Seawall Renovation/ X $10,000,000 $10,000,000

1.

3.

4.

5.

6.

7.

8.

9.

10.

OFFEROR’S NAME DATE

File details come from the government source that posted it. Updated .