Amendment 11 answers RFIs and makes minor CLIN revisions.

View the file

Other files

File Type Posted
W912EQ-16-R-0010_AMD_10.pdf PDF
W912EQ-16-R-0010_CONFORM_COPY_AO_291134SEP16.pdf PDF
W912EQ-16-R-0010_AMD_09.pdf PDF
W912EQ-16-R-0010_AMD_08.pdf PDF
W912EQ-16-R-0010_AMD_07.pdf PDF
W912EQ-16-R-0010_AMD_06.pdf PDF
W912EQ-16-R-0010_AMD05.pdf PDF
USACE_Haul_and_Install_Guide.pptx PPTX presentation
W912EQ-16-R-0010_AMD04.pdf PDF
W912EQ-16-R-0010_CONFORM_COPY.pdf PDF
16-R-0010_AMD_03.pdf PDF
W912EQ-16-R-0010_AMD_2.pdf PDF
10-R-0010_AMD1.pdf PDF
W912EQ-16-R-0010.pdf PDF
Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W38XGR62639742

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

This amendment answ ers questions/RFIs from industry, adds a maximum quantity to CLIN 0047 and includes deletion language in CLIN 0048.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 3

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 30-Sep-2016

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912EQ-16-R-0010

X 9B. DATED (SEE ITEM 11)

25-Sep-2016

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

30-Sep-2016

CODE

US ARMY ENGINEER DISTRICT, MEMPHIS

167 N MAIN STREET B202

MEMPHIS TN 38103-1894

W912EQ 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912EQ-16-R-0010

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION 00010 - SOLICITATION CONTRACT FORM

CLIN 0047

The pricing detail quantity has increased by 2,500.00 from 0.00 to 2,500.00.

CLIN 0048

The CLIN description has changed from Expediting Cost to Expediting Cost - DELETED.

The CLIN extended description has changed from "Expediting" for the purposes of this Contract include providing all equipment, labor and other resources as required to deliver and prepare a designated MHU for occupation at a site in no less than 48 hours after notice to proceed. This includes the full scope of work as required by any other installation CLIN. This cost shall not be paid unless contractor fully satisfies this condition. to THIS

CLIN HAS BEEN REMOVED. SOFTWARE LIMITATIONS PREVENT DELETION FROM THE CONFORM

COPY. "Expediting" for the purposes of this Contract include providing all equipment, labor and other resources as required to deliver and prepare a designated MHU for occupation at a site in no less than 48 hours after notice to proceed. This includes the full scope of work as required by any other installation CLIN. This cost shall not be paid unless contractor fully satisfies this condition..

SECTION 00100 - INSTRUCTIONS TO BIDDERS

The following have been added by full text:

QUESTIONS FROM INDUSTRY, VOL9

Amendment 0011, QUESTIONS FROM INDUSTRY, VOL IX

This document answers questions from industry (marked with Q) ) with answers marked with A) . Items are individually-numbered. Questions are written as sent; no edits were made. The Government reminds offerors that answers to questions may exist in the solicitation. The Government holds a reasonable expectation that prospective offerors are capable of reading the solicitation.

Q1) So do I fill out this form [pages 28-30 of latest conformed copy] indicating the minimum amount of quantities and minimum dollar amounts and maximum qualities and maximum dollar amount that we are willing to accept on this contract? If so, could I put 0 for Minimum quantity/amount and unlimited for max quantity/amount?

A1) Minimum/maximum quantities are completed/assigned by the Government.

W912EQ-16-R-0010

Q2) Slide 38 of the “USACE Haul and Install Guide” provided shows outside material being brought in and crowned for site prep. Are outside materials (such as rock) required to be brought in and shaped to make the MHU pad? If yes, what are the specs for the materials?

A2) As stated in the Solicitation, the USACE Haul and Install Guide is merely provided for information, and does NOT take precedence over the SOW or any other portion of solicitation. Please consult the SOW for specifications with which to base your proposal on.

Q3) Is they anyway this solicitation can be extended, our company over look it, we have pass experience in setup and tear down in travel trailers and moble homes.

A3) Due to mission requirements, this solicitation cannot be extended.

(End of Summary of Changes)