About this file

This amendment makes various changes/additions.

View the file

Other files

File Type Posted
W912EQ-16-R-0010_AMD_11.pdf PDF
W912EQ-16-R-0010_AMD_10.pdf PDF
W912EQ-16-R-0010_CONFORM_COPY_AO_291134SEP16.pdf PDF
W912EQ-16-R-0010_AMD_09.pdf PDF
W912EQ-16-R-0010_AMD_08.pdf PDF
W912EQ-16-R-0010_AMD_07.pdf PDF
W912EQ-16-R-0010_AMD_06.pdf PDF
W912EQ-16-R-0010_AMD05.pdf PDF
USACE_Haul_and_Install_Guide.pptx PPTX presentation
W912EQ-16-R-0010_AMD04.pdf PDF
W912EQ-16-R-0010_CONFORM_COPY.pdf PDF
16-R-0010_AMD_03.pdf PDF
W912EQ-16-R-0010_AMD_2.pdf PDF
W912EQ-16-R-0010.pdf PDF
Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W38XGR62639742

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

Adds clauses 52.226-4, Notice of Disaster or Emergency Area Set-aside and 52.226-5, Restrictions on Subcontracting Outside Disaster or Emergency Area. Also adds CLINs for site deactivation for each category of MHU sets, a CLIN for concrete repair and amends the Statement of Work accordingly. Also re-locates the Statement of Work to correct a softw are error. Also corrects some minor CLIN errors.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 53

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 26-Sep-2016

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912EQ-16-R-0010

X 9B. DATED (SEE ITEM 11)

25-Sep-2016

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

26-Sep-2016

CODE

US ARMY ENGINEER DISTRICT, MEMPHIS

167 N MAIN STREET B202

MEMPHIS TN 38103-1894

W912EQ 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912EQ-16-R-0010

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SECTION SF30 - BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION 00010 - SOLICITATION CONTRACT FORM

CLIN 0005

The CLIN extended description has changed from Mobile Home Basic Setup 14' X 43' per Statement of Work. Group Site - Utilities underground within 10 feet to Mobile Home Basic Setup 14' X 43' per Statement of Work. Group Site - Utilities underground within 50 feet.

CLIN 0008

This CLIN has been renumbered to CLIN 0009.

CLIN 0009

This CLIN has been renumbered to CLIN 0010.

CLIN 0010

This CLIN has been renumbered to CLIN 0011.

CLIN 0011

This CLIN has been renumbered to CLIN 0012.

CLIN 0012

This CLIN has been renumbered to CLIN 0013.

CLIN 0013

This CLIN has been renumbered to CLIN 0014.

CLIN 0014

This CLIN has been renumbered to CLIN 0015.

CLIN 0015

This CLIN has been renumbered to CLIN 0017.

CLIN 0016

This CLIN has been renumbered to CLIN 0018.

CLIN 0017

This CLIN has been renumbered to CLIN 0019.

CLIN 0018

This CLIN has been renumbered to CLIN 0020.

CLIN 0019

This CLIN has been renumbered to CLIN 0021.

CLIN 0020

This CLIN has been renumbered to CLIN 0022.

CLIN 0021

This CLIN has been renumbered to CLIN 0023.

CLIN 0022

This CLIN has been renumbered to CLIN 0025.

CLIN 0023

This CLIN has been renumbered to CLIN 0026.

CLIN 0024

This CLIN has been renumbered to CLIN 0027.

CLIN 0025

This CLIN has been renumbered to CLIN 0028.

CLIN 0026

This CLIN has been renumbered to CLIN 0029.

CLIN 0027

This CLIN has been renumbered to CLIN 0030.

CLIN 0028

This CLIN has been renumbered to CLIN 0031.

CLIN 0029

This CLIN has been renumbered to CLIN 0033.

CLIN 0030

This CLIN has been renumbered to CLIN 0034.

CLIN 0031

This CLIN has been renumbered to CLIN 0035.

CLIN 0032

This CLIN has been renumbered to CLIN 0036.

CLIN 0033

This CLIN has been renumbered to CLIN 0037.

CLIN 0034

This CLIN has been renumbered to CLIN 0038.

CLIN 0035

This CLIN has been renumbered to CLIN 0039.

CLIN 0036

This CLIN has been renumbered to CLIN 0040.

CLIN 0037

This CLIN has been renumbered to CLIN 0041.

CLIN 0038

This CLIN has been renumbered to CLIN 0042.

CLIN 0039

This CLIN has been renumbered to CLIN 0043.

CLIN 0040

This CLIN has been renumbered to CLIN 0044.

CLIN 0041

This CLIN has been renumbered to CLIN 0045.

CLIN 0042

This CLIN has been renumbered to CLIN 0046.

SUBCLIN 0042AA

This SUBCLIN has been renumbered to SUBCLIN 0046AA.

SUBCLIN 0042AB

This SUBCLIN has been renumbered to SUBCLIN 0046AB.

SUBCLIN 0042AC

This SUBCLIN has been renumbered to SUBCLIN 0046AC.

CLIN 0043

This CLIN has been renumbered to CLIN 0048.

The CLIN extended description has changed from Cost for expediting an associated MHU installation per SOW. to "Expediting" for the purposes of this Contract include providing all equipment, labor and other resources as required to deliver and prepare a designated MHU for occupation at a site in no less than 48 hours after notice to proceed. This includes the full scope of work as required by any other installation CLIN. This cost shall not be paid unless contractor fully satisfies this condition..

CLIN 0008 is added as follows:

ITEM NO SUPPLIES/SERVICES MAX

QUANTITY

UNIT UNIT PRICE MAX AMOUNT

0008 225 Each DEACTIVATION: INDIV Site UNDG UTIL

FFP

Deactivation/demobilization for Individual Site - All Utilities Underground up to 50 feet per SOW.

FOB: Destination

MAX

NET AMT

CLIN 0016 is added as follows:

UNIT UNIT PRICE MAX AMOUNT

0016 225 Each DEACTIVATION: INDIV Site - Utilities OVR

FFP

Site deactivation for Individual Site - Sewer run on ground. Water and power underground per SOW.

CLIN 0024 is added as follows:

UNIT UNIT PRICE MAX AMOUNT

0024 225 Each DEACTIVATION: COMM Site - Utilities UND

FFP

Site deactivation for Commercial Site - Utilities underground within 25 feet per

SOW.

CLIN 0032 is added as follows:

UNIT UNIT PRICE MAX AMOUNT

0032 225 Each DEACTIVATION: Group Site - Utilities UND

FFP

Site deactivation for Group Site - Utilities underground within 10 feet per SOW.

CLIN 0047 is added as follows:

UNIT UNIT PRICE MAX AMOUNT

0047 Cubic Yard

Concrete Repair (COST)

FFP

Concrete repair as part of demobilization/deactivation activities. This CLIN is a COST CLIN; a software limitation prevents re-classifying this CLIN as Cost.

The following Acceptance/Inspection Schedule was added for CLIN 0008:

INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY

N/A N/A N/A Government

The following Acceptance/Inspection Schedule was added for CLIN 0016:

The following Acceptance/Inspection Schedule was added for CLIN 0024:

The following Acceptance/Inspection Schedule was added for CLIN 0032:

The following Acceptance/Inspection Schedule was added for CLIN 0047:

The following Delivery Schedule Item has been deleted from CLIN 0008:

DELIVERY DATE QUANTITY SHIP TO ADDRESS UIC

3 mths. ADC 30 N/A

The following Delivery Schedule Item has been deleted from CLIN 0010:

3 mths. ADC 50 N/A

The following Delivery Schedule Item has been deleted from CLIN 0011:

The following Delivery Schedule Item has been deleted from CLIN 0014:

3 mths. ADC 25 N/A

The following Delivery Schedule Item has been deleted from CLIN 0015:

The following Delivery Schedule Item has been deleted from CLIN 0016:

The following Delivery Schedule Item has been deleted from CLIN 0017:

The following Delivery Schedule Item has been deleted from CLIN 0019:

The following Delivery Schedule Item has been deleted from CLIN 0021:

The following Delivery Schedule Item has been deleted from CLIN 0023:

The following Delivery Schedule Item has been deleted from CLIN 0024:

The following Delivery Schedule Item has been deleted from CLIN 0027:

The following Delivery Schedule Item has been deleted from CLIN 0028:

The following Delivery Schedule Item has been deleted from CLIN 0030:

The following Delivery Schedule Item has been deleted from CLIN 0031:

The following Delivery Schedule Item has been deleted from CLIN 0032:

The following Delivery Schedule Item has been deleted from CLIN 0033:

3 mths. ADC 2,500 N/A

The following Delivery Schedule Item has been deleted from CLIN 0034:

3 mths. ADC 100 N/A

The following Delivery Schedule Item has been deleted from CLIN 0035:

The following Delivery Schedule Item has been deleted from CLIN 0036:

3 mths. ADC 225 N/A

The following Delivery Schedule Item has been deleted from CLIN 0037:

3 mths. ADC 15 N/A

The following Delivery Schedule Item has been deleted from CLIN 0038:

The following Delivery Schedule Item has been deleted from CLIN 0039:

The following Delivery Schedule Item has been deleted from CLIN 0040:

The following Delivery Schedule Item has been deleted from CLIN 0041:

The following Delivery Schedule Item has been deleted from CLIN 0042:

3 mths. ADC N/A

The following have been added by full text:

NOTES

SECTION 00100 - INSTRUCTIONS TO BIDDERS

The following have been added by full text:

INSTRUCTION TO BIDDERS

SECTION 00100

LOWEST PRICE TECHNICALLY ACCEPTABLE (LPTA)

PROPOSAL PREPARATION

GENERAL INFORMATION

1. INQUIRIES

OFFEROR'S QUESTIONS AND COMMENTS

Questions and/or comments relative to these documents should be submitted via e-mail or mailed to:

Contract Specialist – Primary POC U.S. Army Corps of Engineers, Memphis ATTN: CECT-MVM/ Matthew S. Urbanic 405 N. 15th Street Baton Rouge, LA. 70802 Phone: 901-585-4618 Email: Matthew.s.urbanic@usace.army.mil Offers will NOT be publicly opened. Information concerning the status of the evaluation and/or award will NOT be available after receipt of proposals

Oral explanations or instructions are not binding. Any information given to an offeror which impacts the solicitation and/or offer will be given in the form of a written amendment to the solicitation.

As this is a competitive negotiation acquisition, there is no public bid opening and no information will be given out as to the number of offerors or the results of the competition until all awards are made.

2. DIRECTIONS FOR SUBMITTING PROPOSALS

a. Offers must be in sealed envelopes/packages, marked and addressed as follows:

MARK PACKAGES:

Solicitation No. W912EQ-16-R-0010 Offer Closing Date: September 28, 2016 Offer Closing Time: 4:00 p.m. Local time

ADDRESS PACKAGES TO:

U.S. Army Corps of Engineers (USACE), Memphis District Attention: Matthew Urbanic 405 N. 15th Street Baton Rouge LA. 70802

Special Instruction Pertaining to Hand Carried Offers: Hand-carried offers must be delivered to the USACE Office at the address above. Offerors who desire to hand-deliver their offers must notify the Contract Specialist in advance due to security requirements.

b. OFFERS BY TELEGRAPH. Offers received by telegraph, modifications thereto, or cancellations of offers will or will not be accepted.

c. FACSIMILE OFFERS. Facsimile offers, modifications thereto, or cancellations of offers will or will not be accepted.

d. E MAIL OFFERS. Offers received by e mail, modifications thereto, or cancellations of offers will or will not be accepted.

PROPOSAL INSTRUCTIONS

Basis for Award:

Award will be made to the responsible Offeror offering the Lowest-Priced, Technically Acceptable (LPTA) proposal. Each technical evaluation factor must be found to be “ACCEPTABLE” in order for the proposal to be found technically acceptable. Proposals will not be technically ranked.

It is the Offeror’s responsibility to ensure the completeness of the proposal. The Government may evaluate solely on the information provided in the initial proposal and not assume that an Offeror possesses any capability that is not specifically identified in the proposal.

Failure to submit mandatory information for a factor, indicated by the word “shall”, will result in a rating of “unacceptable” for that factor, and the Offeror will be ineligible for award unless the Contracting Officer decides to hold discussions, and includes the Offeror in the competitive range.

Solicitation Submittal Requirements:

The proposal shall be submitted in two sections, a Technical Proposal and a Price Proposal.

All pages containing text shall be consecutively numbered, type-written on 8½ x 11 inch paper with margins of at least one inch, and created using a font no smaller than 12. Proposals shall not be permanently bound (in order to facilitate incorporation of portions of the proposal into the final contract document if necessary).

Technical Proposal: Offerors shall submit (1) hardcopy single-sided original or an emailed version of the proposal. The Technical Proposal shall include the following characteristics:

• The Solicitation number (“W912EQ-16-R-0010”)

• The Offeror’s name, address, telephone and facsimile numbers, and email address

• Names, titles, telephone and facsimile numbers, and email addresses of persons authorized to negotiate on the Offeror’s behalf with the Government in connection with this solicitation

• Name, title, and signature of person authorized to sign the proposal. Proposals signed by an agent shall be accompanied by evidence of that agent’s authority

• Responses to all technical evaluation factors. The format used for the areas and factors below should be strictly adhered to. All responses in the Offeror’s package must clearly indicate the applicable evaluation factors:

Part I: Schedule and Work Plan Part II: Key Personnel Part III: Stafford Act Eligibility Part IV: Past Performance

• The Technical Proposal shall not include pricing information and is limited to no more than 20 pages.

Price Proposal: Offerors shall submit (1) hardcopy single-sided original Price Proposal or an emailed version of the proposal. The Price Proposal shall include the following:

• Completed Standard Form (SF) 1442, including acknowledgement of Amendments

• Completed Pricing Schedule (Section 00 01 00).

• Proof of Central Contractor Registration (CCR) and ORCA registration and any other applicable representations (Section 00 60 00)

• If applicable, a copy of any Teaming, Joint Venture or Mentor-Protégé

Agreement

EVALUATION FACTORS

The evaluation factors are listed below. It is intended that proposals be evaluated, and award made, without discussions with the Offerors. If necessary, the Government may contact Offerors for the purpose of minor clarifications(s). If discussions are determined to be necessary, discussions will occur with all Offerors unless a competitive range has been established.

Failure to submit mandatory information for a factor, indicated by the word “shall” or “must”, will result in a rating of “unacceptable” for that factor, and the Offeror will be ineligible for award unless the Contracting Officer decides to hold discussions, and includes the Offeror in the competitive range. Technical evaluation factors (Part I: Schedule, Part II: Key Personnel, Part III: Stafford Act Eligibility, Part IV: Past Performance) will be evaluated first. Price will be evaluated last.

An offeror that wishes to submit a proposal must propose on all of the work. Award will be made on an “All or None” basis to the lowest priced, technically acceptable proposal. Each non-price evaluation factor must be found to be technically acceptable in order for the proposal to be found technically acceptable.

Proposals will not be technically ranked. Only one technical proposal will be evaluated for each offeror.

A. Technical Evaluation Factors

Part I: Schedule and Work Plan

Schedule Requirements: Offerors shall submit a project schedule listing at minimum each phase of construction. The schedule must provide enough information such that the technical evaluation team is able to determine the reasonableness of the schedule in comparison to the Specification requirements and the clause FAR 52.211-10, Commencement, Prosecution, and Completion of Work.

Work Plan Requirements: The offeror’s work plan must adequately demonstrates how offeror proposes to staff/organize the required effort by providing a realistic approach to meeting the requirements of hauling, installing (comprised of performing all the site preparation and tradeswork needed to achieve RFE of the unit), and delivering up to 25 MHUs per day that have been “licensed in” as RFO within 72 hours from task order issuance. For purposes of the work plan only, and not as a contractually-binding requirement, Offeror shall assume that it receives daily a task order for 25 units at different sites in the declared disaster area until 500 trailers have been ordered. The plan should demonstrate:

a. Offeror’s ability to properly staff/organize/subcontract the required effort by providing a realistic management structure from general staff/subcontractor oversight. Offeror shall detail its chain of command structure and methodology, internal controls for problem resolution and plan for identifying and resolving safety issues.

b. Offeror’s rationale for its proposed number of crews available per task and staffing levels per skill set by trade and/or functional area. Rationale adequately describes the methodology for determining how many crews per day is necessary to ensure proper execution and delivery of up to 25 MHUs deemed RFO per day.

c. Flexible staffing/subcontracting approach – the offeror adequately demonstrates ability to cross-utilize, temporarily reallocate, and rapidly increase and decrease its workforce. The offeror adequately identifies how this approach will be executed during surges in effort and during periods of protracted reductions in workload without sacrificing quality or timeliness of production. Offeror adequately demonstrates its ability to effectively and efficiently cross utilize personnel when possible to better support short term requirement changes; emergency requirements where RFO is requested faster than 72 hours from issuance of task order; and during periods of protracted reductions in workload without sacrificing capacity to perform work.

d. Mobilization approach – the offeror adequately identifies a realistic and feasible approach to have a sufficient number of subcontractors and workforce mobilized to begin work within 48 hours of award.

The Schedule and Work Plan will receive a combined rating of “acceptable” or “unacceptable” based upon its entirety. In order to receive an “acceptable” rating, the proposed schedule and Work Plan shall contain each construction phase, must be considered feasible by the government, and shall meet all schedule requirements specified in the solicitation. Noncompliant, missing, incomplete, or ambiguous information may result in a rating of “unacceptable”.

Part II: Key Personnel

Submittal Requirements: Key personnel are defined as the offeror’s proposed full-time employees and/or subcontractor employees responsible for directing operations at the construction sites.

Offerors shall submit a one-page resume for each of the three (3) key personnel listed below:

• Site Safety and Health Officer. The Site Safety and Health Officer shall meet the qualification requirements stated in scope of work paragraph 13.3.

• Contractor Quality Control (CQC) System Manager: The CQC System Manager shall meet the qualification requirements stated in specification paragraph 13.3.

• Site Project Superintendent: The on‐site Project Superintendent shall have experience as a Project Superintendent on projects similar in monetary size and/or scope to the project described in this solicitation.

Three resumes indicating three separate people must be submitted for all three roles. Duplication of personnel for these three positions is deemed Unacceptable for purposes of this RFP. If personnel presented here are later replaced for the execution of this project, replacement personnel must have equal or better qualifications as those proposed and must be approved by the contracting officer before they perform work at the project site.

The Key Personnel factor will receive a rating of “acceptable” or “unacceptable” based on its entirety.

In order to receive an “acceptable” rating, the proposal must demonstrate that all key personnel proposed comply with the minimum requirements stated in the specifications and have sufficient relevant experience and education to indicate that they have the knowledge and capability to successfully perform their assigned roles. Missing, incomplete, or ambiguous information could result in a rating of “unacceptable”.

Part III: Stafford Act Eligibility

Submittal Requirements: The offeror shall complete and submit the provision at 52.226-3, Disaster or Emergency Area Representation (NOV 2007) and provide documentation to support the representation.

The Stafford Act Eligibility factor will receive a rating of “acceptable” only if the offeror represents that it meets all of the criteria as stated in the provision and provides sufficient evidence to establish that the offeror meets the criteria. Offerors that do not represent they meet the criteria stated in the provision will receive an “unacceptable” rating. Missing, incomplete, or ambiguous information could result in a rating of “unacceptable”.

Part IV: Past Performance

Submittal Requirements: Offerors shall provide past performance information for at least (2) projects for completed work by the Offeror within the past thirty-six (36) months. For each project, offerors shall provide the following information:

• Reference (Name, title, company, phone, email)

• Project Title and Description

• Contract or Subcontract number

• Date of Award

• Contract Value

If less than two past performance references are submitted, the submitted project will be evaluated, and the lack of the requested number of projects will not affect the rating for this factor, provided the Offeror certifies that additional past performance information is not available and provides an acceptable explanation as to why additional past performance is not available.

In the case of an Offeror with no relevant performance history, or for whom information on past performance is not available, the Offeror will be evaluated as acceptable provided the Offeror certifies that additional past performance information is not available and provides an acceptable explanation as to why past performance information is not available.

The past performance reference must have been a client, or client representative, with whom the Offeror had a contract, or subcontract (if applicable) for one or more projects. The reference must hold, or have held at the time, a senior position in the client organization with responsibilities of contract administration, quality control, engineering, or technical supervision, or was otherwise in a position to evaluate the Offeror’s performance in executing the contract or subcontract. The past performance reference must have first-hand knowledge of the Offeror’s performance. The reference must have a current, valid phone number at which they can be reached during normal business hours, a fax number, and must be able to speak, read, and write in the English language.

The Government’s assessment of past performance will be based mainly on the Offeror’s reputations with customers and other sources. The Government will consider the currency and relevance of past performance information, source of the information, context of the data, and general trends in the contractor’s performance. The Government may contact any or all of the past performance references provided by the Offeror in response to this solicitation, and may also use information obtained from any other sources when evaluating past performance of the Offeror and major subcontractors. Other sources may include, but are not limited to, the Past Performance Information Retrieval System (PPIRS). While the Government may elect to consider data from other sources, the burden of providing detailed, current, accurate and complete past performance rests with the Offeror.

The evaluation will take into account relevant past performance information regarding predecessor companies or subcontractors that will perform major or critical aspects of the requirements when such information is available and relevant to the instant acquisition. If necessary during the evaluation process, any adverse information received regarding subcontractor past performance may be shared with Offerors during clarifications or discussions if held.

The past performance factor will receive a rating of “acceptable” or “unacceptable” based on its entirety. Past performance will be rated “unacceptable” if the contractor receives an unsatisfactory rating for any of the factors identified on the Government’s past performance questionnaire unless the offeror can demonstrate that adequate corrective actions were taken.

B. Price

Submittal Requirements: Offerors shall complete and submit the pricing schedule in Section 00 01 00 with its proposal and include a price for each line item, including subtotals and totals.

The Government will evaluate price based on the total proposed price. The Contracting Officer, or the Contracting Officer’s designee, will evaluate the Offeror’s price for unbalancing and other potential performance risks. Price reasonableness will be determined in accordance with FAR 15.404-1. In this context, reasonableness may be determined by comparing offered prices to one another, to the government estimate, and to pricing for previous work of a similar nature.

EVALUATION PROCESS

1. After receipt of proposals, the Contract Specialist will separate the Technical Proposals from the Price Proposals. Technical Proposals will be provided to the technical evaluation team.

2. The technical evaluation team will convene and independently evaluate the submitted proposals according to the evaluation factors. After concluding the evaluations, the technical evaluation team will provide the evaluation worksheets documenting their evaluation to the SSA. The technical evaluation team will make no recommendation as to which firm should receive the award and additionally shall not establish a rank order or order of merit list pertaining to the offers being evaluated.

3. After receiving the evaluation documentation, the SSA, independently exercising prudent business judgment, will make a source selection decision on the basis of the lowest priced proposal meeting or exceeding the acceptability standards for non-price factors. While the SSA may use reports and analyses prepared by others, the source selection decision shall represent the SSA's independent judgment. The source selection decision shall be documented, and the documentation shall include the rationale for any business judgments made or relied on by the

SSA.

4. If, during the evaluation process, any Offerors are eliminated from the competitive range, the Offerors excluded from the competitive range shall be promptly notified in writing. The notice shall state the basis for the determination and that a proposal revision will not be considered.

The contracting officer shall award a contract to the successful Offeror by furnishing the executed contract or other notice of the award to that Offeror. Each Offeror whose proposal was in the competitive range, but was not selected for award, will be notified in writing within three days after the date of the contract award. Debriefings will be provided to unsuccessful Offerors who submit timely requests.

NOTES

NOTE 1: Bidders shall furnish unit prices for all items listed on the schedule of bid items, which require unit prices. If the bidder fails to insert a unit price in the appropriate blank for required items, but does furnish an extended total or an estimated amount for such items, the Government will deem his unit price to be the quotient obtained by dividing the extended estimated amount for that line item by the quantity. IF THE

BIDDER OMITS BOTH THE UNIT PRICE AND THE EXTENDED ESTIMATED AMOUNT FOR ANY

ITEM, HIS BID WILL BE DECLARED NONRESPONSIVE.

In the event there is a difference between a unit price and the extended total, the unit price will be held to be the intended bid. If the bidder shows only the total price but fails to enter a unit price, the total divided by the estimated quantity will be held to be the intended unit price.

Any bid price for items indicated above which are unbalanced as to price may be rejected as non-responsive. An unbalanced bid is one which is based on price significantly less than cost for some work and price which is significantly overstated for other work.

Award will be made as a whole to one bidder.

AC = Acre CF = Cubic Feet CY = Cubic Yard DH = Miles EA = Each FC = 1000 Cubic Feet FT = Foot HF = 100 Feet HH = 100 Cubic Feet HL = 100 Linear Feet HR = Hours HS = 100 Square Feet HY = 100 Yards LB = Pound LF = Linear Foot LH = Labor Hour LS = Lump Sum LY = Linear Yard MO = Months SB = Square Mile SF = Square Foot SQ = Square SY = Square Yard TL = 1000 Linear Feet TN = Net Ton UN = Unit YD = Yard YL = 100 Linear Yards YM = Cubic Yards Per Mile

All quantities are estimated except where unit is given as "LS" or "EA".

NOTE 2: If a bid or modification to a bid based on unit prices is submitted and provides for a lump sum adjustment to the total estimated cost, the application of the lump sum adjustment to each unit price, including lump sum units, in bid schedule must be stated, or, if it is not stated, the bidder agrees that the lump sum adjustment shall be applied on a pro rata basis to every unit price in the bid schedule.

NOTE 3: Bidders are cautioned to read Contract Clause entitled "Systems for Award Management Registration" (52.204-99) located in Section 00700 CONTRACT CLAUSES.

52.226-4 NOTICE OF DISASTER OR EMERGENCY AREA SET-ASIDE (NOV 2007)

(a) Set-aside area. Offers are solicited only from businesses residing or primarily doing business in the city of Baton Rouge and its surrounding parishes including Cameron, Vermilion, Jefferson Davis, Acadia, Lafayette, Iberia, St Martin, Evangeline, St. Landry, Avoyelles, Pointe Coupee, West Feliciana, East, Feliciana, West Baton Rouge, East Baton Rouge, Iberville, Ascension, St. James, Livingston, St. Helena, Tangipahoa, Assumption, St John the Baptist, St. Charles, St. Tammany, and Washington Louisiana.

Offers received from other businesses shall not be considered.

(b) This set-aside is in addition to any small business set-aside contained in this contract.

(End of provision)

52.226-5 RESTRICTIONS ON SUBCONTRACTING OUTSIDE DISASTER OR EMERGENCY AREA (NOV

2007)

(a) Definitions. The definitions of the following terms used in this clause are found in the Small Business Administration regulations at 13 CFR 125.6(e): cost of the contract, cost of contract performance incurred for personnel, cost of manufacturing, cost of materials, personnel, and subcontracting.

(b) The Contractor agrees that in performance of the contract in the case of a contract for--

(1) Services (except construction). At least 50 percent of the cost of contract performance incurred for personnel shall be expended for employees of the Contractor or employees of other businesses residing or primarily doing business in the clause at FAR 52.226--4, Notice of Disaster or Emergency Area Set-Aside;

(2) Supplies (other than procurement from a nonmanufacturer of such supplies). The Contractor or employees of other businesses residing or primarily doing business in the set-aside area shall perform work for at least 50 percent of the cost of manufacturing the supplies, not including the cost of materials;

(3) General construction. The Contractor will perform at least 15 percent of the cost of the contract, not including the cost of materials, with its own employees or employees of other businesses residing or primarily doing business in the set-aside area; or

(4) Construction by special trade Contractors. The Contractor will perform at least 25 percent of the cost of the contract, not including the cost of materials, with its own employees or employees of other businesses residing or primarily doing business in the set-aside area.

(End of clause)

The following have been modified:

STATEMENT OF WORK

U.S. ARMY ENGINEER DISTRICT, MEMPHIS

CORPS OF ENGINEERS

MANUFACTURED HOME INSTALLATION SPECIFICATIONS

1.0 General

1.1 This specification establishes the minimum requirements for the transportation and installation of manufactured homes (MHs) to support FEMA disaster operations.

Specifically included are the Contractors’ responsibilities for the transportation, labor, and materials to accomplish the following tasks:

1.1.1 Transportation of manufactured homes from the designated area to the installation site(s) beyond a 50-mile distance is an additive contract cost.

1.1.2 Site preparation includes readying the site for foundation piers and anchoring systems. Also included are locating and exposing water, sewer, electrical, and natural or LP gas lines and connections whereby they can be hooked up and made serviceable for the MHU.

1.1.3 The Contractor is responsible for light site preparation including minor clearing and grubbing not to exceed 1CY as required to set trailer. Does not include TPS pad.

1.1.4 Unit installation includes placement of manufactured homes on the designated lots, installing foundation piers, anchoring the units, and hooking up the utilities. Also, the units winterized and skirted, and steps or handicap ramps as specified, installed.

Inside the units, furniture and appliances shall be unpacked, set-up and made ready for use. Units will be cleaned and inspected by the Contractor to ensure occupancy readiness. Contract performance will be determined by a final acceptance inspection of each unit by USACE.

*Skirting of MHs is required.

NOTE: The air conditioner cover shall be removed before operation.

1.2 This specification addresses the technical requirements that govern the transport and installation of manufactured homes. Technical specifications include the “Manufacturer’s Installation Guidelines”, “FEMA Guidelines”, and “State and Local Codes and Regulations”. The Contractor is responsible for notifying the USACE inspector of any conflict between the various technical requirements and request appropriate direction.

1.3 The Site Inspector will provide a layout of installation areas to include site locations and areas for the placement of each manufactured home. The Corps will contact LA One call prior to issuing work order. The contractor is responsible for verifying the layout prior to unit placement. Distance between units and overall positioning will be in accordance with local setback, fire and other installation codes.

Directions and plat details will be provided by USACE to the contractor as required for planning of site preparation and set-up of the manufactured homes. USACE will also identify any special requirements (e.g., handicap ramps, and handicap modifications) for specific lots. The contractor is responsible for coordination with local code authorities to determine and ensure that specific installation code requirements are met.

1.4 The contractor must use, registered/licensed technicians (plumbers, electricians’ etc.) to conform to State and local requirements for installing and/or hooking up systems or repairing defects involving their particular trade. It is the contractor’s responsibility to obtain all proper licenses and permits to set-up the units.

1.5 The contractor is responsible for supplying all materials and supplies needed to perform the assigned tasks and make the MHs ready for occupancy (RFO). The exceptions are the unit’s furnishing, appliances, water heater, furnace, A/C and other items that are provided with the unit.

1.6 Terms and Acronyms

AHJ – Authority Having Jurisdiction RFO – Ready for occupancy RFE – Ready for the electrical company time in to contractor power pole MHU – Manufactured Housing Unit UFAS – Uniform Federal Accessibility Standards

2.1 Codes, Regulations and Standards

Work performed under the contract shall be in accordance with applicable Federal, State and local codes and regulations. The contractor will follow the manufacturer’s installation instructions and guidelines unless overridden by a State or local code. As a supplement to the manufacturer’s guidance, the American National Standard for Manufactured Home Installations (NCSBCS/ANSI A225.1) provides additional installation details and standards and shall be followed for work not covered by the manufacturer or USACE specifications. Precedent for applying codes and regulations are State and local first, manufacturers second, and NCSBCS/ANSI A 225.1, third.

2.2 Lot Preparations

All trenches shall be backfilled in accordance with applicable codes. All wood used on site (blocking, steps, ramps, etc.) shall be exterior grade lumber or construction grade lumber. All lumber must be treated.

2.3 Transport

Most of the deliveries of manufactured homes to site are within 50 miles of the designated staging area. Distances beyond 50-miles are additive costs.

Towing shall be from a FEMA designated staging area (2695 North Sherwood Forest Baton Rouge LA. 70814) to designated sites. The manufactured home shall be properly placed, positioned and aligned on the site as laid out and staked by the Site Inspector. If the unit is improperly positioned, the Contractor must reposition the unit by the end of the day following delivery to site. If this is not accomplished as stated, USACE reserves the rights to reassign the unit to another set-up contractor or have the unit repositioned by another party and back charge the original contractor the cost of the repositioning. The towing operator must be properly licensed and insured to protect the Government’s interest.

3.0 MHU Installation

MHU installation includes haul from the staging area and placement at its installation location as indicated on the site inspection drawing. The unit is then blocked, leveled, and anchored;

utilities are connected and outfitted with proper skirting, stairs, ramps, or platform stairs. The MHU shall be made Ready for Occupancy (RFO) by testing all appliances and assembling all furniture. The lot shall be cleaned and have all excess material removed.

3.1 Utilities locator

The utilities to be located by others. The contractor shall use the markings to avoid obstacles underground. The markings will be on the road right of way.

3.2 MHU Dimensions

FEMA’s current MHU inventory is as follows:

Three (3) Bedroom Regular -14X60.

Three (3) Bedroom UFAS - 14X60.

Two (2) Bedroom Regular - 12X43.

Two (2) Bedroom Regular – 14X60 Two (2) Bedroom UFAS – 12X43 Two (2) Bedroom Regular – 14X53 Two (2) Bedroom Regular – 12X60 One (1) Bedroom Regular – 14X43 One (1) Bedroom UFAS – 14X43 One (1) Bedroom Regular – 12X45 One (1) Bedroom Express Regular – 8X48 One (1) Bedroom Express UFAS – 8X48

3.3. MHU Temporary Installation Requirements

The Contracting Officer shall issue work orders to the Contractor for installation of any of the above classes of MHUs of varying sizes. FEMA MHUs are installed in accordance with all applicable Federal, State, and local laws or regulations, as well as the manufacturer’s installation instructions and FEMA double blocking system. All UFAS MHUs shall be installed in compliance with the Uniform Federal Accessibility Standards (UFAS). In the case of conflicting requirements, the most stringent requirement shall be followed.

Upon receipt of a Contracting Officer issued work order, the Contractor shall install the MHU at the location on the work order. The site may be marked by paint or flagged showing the location of the MHU and approximate utility connection points. Basic installation includes the following:

BASIC INSTALLATION ITEMS INDIVIDUAL SITES

All MHUs ITEM / REFERENCE MHU Basic Installation Individual

Sites

All items below are included in MHU Basic Installation:

• Site Preparation and Enhancement 3.5

• Blocking 3.6

• Strapping / Anchor 3.7

• Electrical connections to 50 feet 3.8

• Water connection to 50 feet 3.9

• Sewer Line Installation to 50 feet 4.0

• HVAC installation 5.0

• Skirting 6.0

• Clean and make ready 8.0

• Standard Stairs (rear) 9.1

• Removal of Equipment, Excess Materials and Debris 10.1

• Residential Fire Sprinkler Installation 7.0

• 50 MHU Transportation Mileage included with Basic

Installation 11.0

MHU Front Entrance Individual

Sites

Work Orders will include one of the below which are in addition to MHU Basic Installation:

• Standard Stairs 9.1

• Platform steps 9.2

• UFAS ramp 9.3

(if required) • Permits 3.4

BASIC INSTALLATION ITEMS COMMERCIAL SITES

MHU Basic Installation Commercial

Sites

• Strapping / Anchor 3.7

• Electrical connections to 25 feet 3.8

• Water connection to 25 feet 3.9

• Sewer Line Installation to 25 feet 4.0

• HVAC installation 5.0

• Skirting 6.0

• Clean and make ready 8.0

• Standard Stairs (rear) 9.1

• Removal of Equipment, Excess Materials and Debris 10.1

• Residential Fire Sprinkler Installation 7.0

• 50 MHU Transportation Mileage included with Basic

Installation 11.0

MHU Front Entrance

Commercial Sites

BASIC INSTALLATION ITEMS GROUP SITES

MHU Basic Installation Group Sites

• Strapping / Anchor 3.7

• Electrical connections to 10 feet 3.8

• Water connection to 10 feet 3.9

• Sewer Line Installation to 10 feet 4.0

• HVAC installation 5.0

• Skirting 6.0

• Clean and make ready 8.0

• Standard Stairs (rear) 9.1

• Removal of Equipment, Excess Materials and Debris 10.1

• Residential Fire Sprinkler Installation 7.0

• 50 MHU Transportation Mileage included with Basic

Installation 11.0

MHU Front Entrance

Group Sites

3.4 Permits

The Contractor shall identify and obtain all permits, to include transportation permits, and inspections that are required for MHU installation. The Contractor shall be responsible for obtaining necessary permits associated with placing and installing the unit and utility installation.

The Contractor shall identify the permits required for completing the unit installation. The cost of permits is included in basic installation.

3.5 Site Preparation and Enhancement

A vapor barrier shall be installed to cover the ground under the MHU. The entire area underneath the MHU shall be covered with a 6 mil vapor barrier and any joints shall overlap at least 12 inches and be sealed. If additional crowning material is required the vapor barrier shall be installed after the site is crowned. Movement of debris that prevents the MHU from being installed may be directed by the Contracting Officer (CLIN 41)

3.6 Blocking and Piers for Manufactured Homes

The Contractor shall construct piers consisting of double courses of concrete blocks and shall meet or exceed the requirements of the local entity issuing the permits as well as the manufacturer specifications. The number and location of piers shall be in accordance with the manufacturer’s instructions and The FEMA Haul and Install Guide available upon request. For any conflicts between the FEMA Haul and Install Guide and manufacturers requirements the most stringent requirement shall govern.

A vapor barrier shall be installed to cover the ground under the MHU. The entire area underneath the MHU shall be covered with a 6 mil vapor barrier and any joints should overlap at least 12 inches and be sealed.

Blocking shall be installed at locations specified by the manufacturer.

Minimum requirements for MHUs include:

1. Piers shall consist of courses of double concrete block.

a. Piers will have at a minimum two (2) solid cap blocks on the base and two (2) solid cap blocks at the top of the piers (top course to be laid parallel to the I-beam).

b. Space between the top of the pier’s solid cap block and the bottom of the I-beam frame of the MHU shall not exceed three inches (3”). Up to three inches (3”) of this space may be filled with blocking timber and wedges laid perpendicular to the I-beam, and no more than one inch (1”) of this area shall be shimmed with wedges.

2. Piers consisting of single courses of concrete block will be installed on either side of each exterior door opening and any exterior openings. This includes windows, which are forty eight inches (48”) or wider.

3. Contractor shall provide a base for each pier. The approximate size of the base is twenty-four inches by twenty-four inches (24”x24”) with double blocking. The base will be a State and local approved Acrylonitrile butadiene styrene (ABS) type pier pad, unless otherwise specified by State or local code.

4. Blocking height will be no more than forty-four inches (44”) for manufactured homes, unless otherwise directed by the Contracting Officer.

5. Contractor shall remove all grass roots, loose dirt, rocks and debris at the base of the piers.

After the weight of the unit is transferred to the concrete block piers, the piers shall be vertically aligned and tightly shimmed with wooden wedges. If the piers are not vertical at the time of final inspection, they shall be removed and reinstalled by the Contractor at no additional cost.

3.7 Strapping and Anchoring for Manufactured Homes

Strapping and anchoring shall be governed by the stricter of the stipulations found in either the manufacturer requirements, or the official instruction of the State or local permitting entity.

Strapping and anchoring shall be installed at locations specified by the manufacturer for the wind zone as established by Housing and Urban Development (HUD) for Manufactured. Requirements for MHU include:

1. Straps shall be 1 ¼” with a thickness of 35/1000” cold rolled galvanized steel, as per Federal Specification QQ-S-781 G for Type 1 Class B, Grade 1 strapping.

2. Anchor straps shall be snug and in a near vertical position. The number and spacing of straps is typically dependent on the frame size for the MHU, the length and height of the piers and the wind zone.

3. Anchors may be driven through asphalt or concrete surfaces as directed by the Contracting Officer. The extra cost above basic setup will be considered under CLIN 40

Tie-downs and strapping shall be inspected and adjusted no earlier than seven days and no later than 14 days after installation.

Note: The Contractor shall only remove the wheel/axle, if the manufacturer installation instruction or regulation requires the removal of the wheel/axle.

3.8 Electric Connections for all MHUs

3.8.1 Direct Wiring of Manufactured Home

Sites with electrical service drop (meter box or other service connection point) already installed, the Contractor shall provide underground service (in compliance with all codes and regulations) from the electrical assembly to the manufactured home interior electrical distribution panel or manufactured home junction box, up to 50 feet. Service entrance cables shall be XLPE USE-2, 600V rated, 3#3/0 and #4 copper in 2” conduit or as required by the local power company and municipal AHJ, and must have a rating of 200 AMPS. Service entrance cables shall be installed in 2” PVC Schedule 40 conduit and shall be buried at a minimum of 18” (conduit type and burial depth shall be used if more conservative as required by the local power company and municipal AHJ). (Note: This includes the sprinkler system pump power and control wiring) The conduit shall be securely attached to the electrical boxes with weather-tite locking hubs and in accordance with accepted methods and standards. Sweeps shall be used at the manufactured home junction box and meter loop assembly. If an electrical service drop (temporary power pole, meter, and main disconnect) is not in place, the Contractor shall provide and install per power company and municipal AHJ for utility company connection

MHs shall be grounded per NFPA 70 Article 250. Note the ground and neutral conductors shall only be bonded in the main utility disconnect and not anywhere within the MHU.

Furnish and install manufactured home electric power pole and meter loop).

The Contractor shall install an overhead electric assembly. The assembly shall be 200 AMP (120/240-volt service) with a weatherproof, rain-tight meter box containing 200 AMP circuit breakers. All components shall be installed in accordance the National Electric Code (NEC). All conduit connections on the meter pole must be watertight. Pole shall have a minimum top diameter of six inches (6”) and meet all code requirements.

3.9 Water Connection Requirements for all MHU types

The Contractor shall install water connections for all types of MHUs Requirements include:

a. Contractor shall provide water runs of up to fifty feet (50’) for private sites, twenty-five feet (25’) for existing commercial mobile home parks and ten (10’) feet for group sites.

b. Water line installation is measured from the connection point of the MHU to the water connection source for each MHU.

c. ONLY the horizontal run will be calculated for the actual measurement. Any vertical runs will not be counted as part of the total linear feet of water line installed.

Contractor shall run the water line at an excavation depth not less than twenty-four inches (24”) below the surface of the ground where no code requirements exist. Local code depth requirement shall govern if one exists.