The U.S. Army Corps of Engineers (USACE) intends to issue a Request for Proposal (RFP) to award 20 Indefinite Delivery, Indefinite Quantity (IDIQ) Single Award Task Order Contracts (SATOCs) with a total capacity of $4.9 billion. USACE seeks contractors to provide pre-event planning and post-event debris removal, reduction, and disposal services within 24 hours of a mission assignment for natural or man-made disasters. Suite 2 is restricted to small businesses registered under NAICS code 562119 with a size standard of $38.5 million. A virtual pre-proposal conference will be held, and the solicitation will be posted to FedBizOpps. Proposals will be due at least 45 days after solicitation posting. The contract duration is five years from award.
W912EK-18-R-0022 ProjNet Questions and Answers
View the file
Other files
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
UNCLASSIFIED\\FOR OFFICIAL USE ONLY
Bid Inquiry Contracting Officers Report All Inquiries
Project: Advanced Contract Initiative (ACI) Regional Contracts for Debris Management Services (RCDMS) Review:
Solicitiation Bidder Inquiry (00002) (sorted by CommentID ) Displaying 193 inquiries.
Id Discipline Sheet Detail Spec
7971784 General VOLUME II 0 PAST PERFORMANCE
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
VOLUME II, FACTOR II PAST PERFORMANCE
Instructions only call for PPQs delivered directly to the CO - section M additionally calls out adding demonstrating corrective actions. There is no PPQ form attached to the RFP. Additionally there is a 25 page limit for this section with no instructions for what the 25 pages should contain. Assuming project descriptions, maximum of 5, 5 pages each for 25 pages total? No PD form attached to the RFP. Please advise specific instructions form(s), and what should be contained in the 25 pages.
By: DIANE OMALLEY; BRICE ENVIRONMENTAL SVS; (907.275.2820 ). On: May 03 2019. Forward request by email.
1-0 Evaluation Concurred. Will require an amendment to the solicitation. By: Edward LeBlanc; MVD Mississippi Valley Division; (3373226757) On: May 06 2019
1-1 Government Response. See forth coming amendment. By: Sally Duncan; Contracting Division;
(309 794-5628 ) On: May 06 2019
Current Request Status: Request Closed
Information for this report is procurement sensitive.
7972088 General RFP Section L
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
The Introduction to Section L on Page 99 reads: "The term 'offeror' is defined as a single offeror, joint venture, or team of offerors and major sub-contractors."
Section (ii) VOLUME II – FACTOR II – PAST PERFORMANCE on Page 103 states: "The offeror may submit up to five (5) Past Performance Questionnaire (PPQ) Forms."
Q: Will projects performed by a mix of a single Prime/JV partners and named major subcontractors (i.e., the proposed team) all be rated the same in relevancy and/or confidence? If not, please provide details on how varying projects will be scored.
By: Nicholas Steyn; AECOM Technical Services, Inc - Los Angeles, CA; (5124195671). On: May 03 2019.
Forward request by email.
1-0 Evaluation Concurred. Will require an amendment to the solicitation. By: Edward LeBlanc; MVD Mississippi Valley Division; (3373226757) On: May 06 2019
1-1 Government Response. See forth coming amendment. By: Sally Duncan; Contracting Division;
(309 794-5628 ) On: May 06 2019
Current Request Status: Request Closed
Information for this report is procurement sensitive.
7972090 General RFP Section L
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
We request that cover sheets, tables of contents, cover letters, acronym lists, and tabs/dividers NOT be included in the page counts for Volumes I-III. Please confirm that these items will be excluded from the count.
By: Nicholas Steyn; AECOM Technical Services, Inc - Los Angeles, CA; (5124195671). On: May 03 2019.
Forward request by email.
1-0 Evaluation Concurred. will require an amendment to the solicitation. By: Edward LeBlanc; MVD Mississippi Valley Division; (3373226757) On: May 06 2019
Page 1 of 61ProjNet: Logged In User
6/7/2019https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicAdminReportAll...
1-1 Government Response. See forth coming amendment. By: Sally Duncan; Contracting Division;
(309 794-5628 ) On: May 06 2019
Current Request Status: Request Closed
Information for this report is procurement sensitive.
7974912 General Volume II Past Performance
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Page 103 states "Questionnaires shall be submitted directly from client to Government Representative" however, the PPQ form states "The Offeror will include it in proposal"
Please clarify
By: Tiffany Jean; TFR Enterprises,Inc; (5125650710). On: May 06 2019.
Requires Amendment.
Forward request by email.
1-0 Evaluation Concurred. CORRECTED IN FORTH COMING AMENDMENT. By: Sally Duncan; Contracting Division; (309 794-5628 ) On: May 06 2019
1-1 Government Response. SEE FORTH COMING AMENDMENT. By: Sally Duncan; Contracting Division;
(309 794-5628 ) On: May 06 2019
Current Request Status: Request Closed
Information for this report is procurement sensitive.
7975648 General Solicitation pg 103 Volume I Subfactor B
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Solicitation Page 103, Volume I Subfactor B, Item c. Safety. Our safety full safety plan is over 200 pages, can this be submitted as separate file or can we include a overview of plan in leu of the entire document.
By: Evelyn Buckley-Mogan; Dian Hua Studios, LLC; (781-956-6453 ). On: May 06 2019. Forward request by email.
1-0 Evaluation Concurred. See amendment 0003 By: Sally Duncan; Contracting Division;
(309 794-5628 ) On: May 08 2019
1-1 Government Response. See amendment 0003 By: Sally Duncan; Contracting Division;
(309 794-5628 ) On: May 08 2019
Current Request Status: Request Closed
Information for this report is procurement sensitive.
7975656 General Solicitation Page 103 Volume 1, Subfactor B Item C
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Solicitation Page 103, Volume I Subfactor B, Item c. Safety. Demonstration of safety and health program experience for the past 5 years, please confirm this is not included in the page count or can be submitted in an Appendix to Volume I.
By: Evelyn Buckley-Mogan; Dian Hua Studios, LLC; (781-956-6453 ). On: May 06 2019. Forward request by email.
1-0 Evaluation Concurred. See amendment 0003 By: Sally Duncan; Contracting Division;
(309 794-5628 ) On: May 08 2019
1-1 Government Response. See amendment 0003 By: Sally Duncan; Contracting Division;
(309 794-5628 ) On: May 08 2019
Current Request Status: Request Closed
Information for this report is procurement sensitive.
7975659 General Past Performance PPQs
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
As a curtesy to our clients, please confirm an individual PPQ can be submitted once for multiple regions.
Page 2 of 61ProjNet: Logged In User
By: Evelyn Buckley-Mogan; Dian Hua Studios, LLC; (781-956-6453 ). On: May 06 2019. Forward request by email.
1-0 Evaluation Concurred. See amendment 0003 By: Sally Duncan; Contracting Division;
(309 794-5628 ) On: May 08 2019
1-1 Government Response. See amendment 0003 By: Sally Duncan; Contracting Division;
(309 794-5628 ) On: May 08 2019
Current Request Status: Request Closed
Information for this report is procurement sensitive.
7975662 General Solicitation Pg 4
INSTRUCTIONS FOR SUBMITTING
ELECTRONIC PROPOSALS:
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Please clarify the submittal differences for Phase One and Phase Two. If the requested volumes.
By: Evelyn Buckley-Mogan; Dian Hua Studios, LLC; (781-956-6453 ). On: May 06 2019. Forward request by email.
1-0 Evaluation Non-concurred. Question was incomplete. Additional information provided in the next question. By: Sally Duncan; Contracting Division; (309 794-5628 ) On: May 07 2019
1-1 Government Response. Thank you By: Sally Duncan; Contracting Division; (309 794-5628 ) On: May 08 2019
Current Request Status: Request Closed
Information for this report is procurement sensitive.
7975672 General Solicitation Instructions for Submitting Electronic
Proposal
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Please excuse the previous question it is incomplete. It should have read...
Please clarify the submittal differences for Phase One and Phase Two. If the requested volumes are Phase One what and When is Phase Two?
By: Evelyn Buckley-Mogan; Dian Hua Studios, LLC; (781-956-6453 ). On: May 06 2019. Forward request by email.
1-0 Evaluation Concurred. See amendment 0003 By: Sally Duncan; Contracting Division;
(309 794-5628 ) On: May 08 2019
1-1 Government Response. See amendment 0003 By: Sally Duncan; Contracting Division;
(309 794-5628 ) On: May 08 2019
Current Request Status: Request Closed
Information for this report is procurement sensitive.
7976742 General 108 Section M
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Suite 2 is described as "Small Business Set-Aside" in the past the set-asides included SDVOSB, 8a, HUB, etc. Is that not the case this time around?
By: Ricardo Morillo; Conquistador/Dorado JV; (407-688-0600 ). On: May 07 2019. Forward request by email.
1-0 Evaluation Concurred. The current solicitation suite 2 is Small Business Set Aside, no additional socio-economic set asides. By: Sally Duncan; Contracting Division; (309 794-5628 ) On: May 08 2019
1-1 Government Response. The current solicitation suite 2 is Small Business Set Aside, no additional socio-economic set asides. By: Sally Duncan; Contracting Division; (309 794-5628 ) On: May 08 2019
Current Request Status: Request Closed
Information for this report is procurement sensitive.
7976749 Contracting Small Business
Participation Plan
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Page 3 of 61ProjNet: Logged In User
The small business participation plan includes VOSBs and SDVOSBs. If the subcontractor is a CVE certified SDVOSB can they also be used as the VOSB?
By: Ricardo Morillo; Conquistador/Dorado JV; (407-688-0600 ). On: May 07 2019. Forward request by email.
1-0 Evaluation Concurred. A CVE certified SDVOSB can be counted towards the SDVOSB and the VOSB goal. Of note, SDVOSB and VOSB do not require CVE certification; self-certification in the System for Award Management (SAM) is sufficient. By: Sally Duncan; Contracting Division; (309 794-5628 ) On:
May 08 2019
1-1 Government Response. A CVE certified SDVOSB can be counted towards the SDVOSB and the VOSB goal. Of note, SDVOSB and VOSB do not require CVE certification; self-certification in the System for Award Management (SAM) is sufficient. By: Sally Duncan; Contracting Division; (309 794-5628 ) On:
May 08 2019
Current Request Status: Request Closed
Information for this report is procurement sensitive.
7976956 General Volume II Past Performance
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Is it acceptable to submit PPQ from prior USACE projects?
By: Tiffany Jean; TFR Enterprises,Inc; (5125650710). On: May 07 2019. Forward request by email.
1-0 Evaluation Concurred. Review Section M – B. Factor II: Past Performance By: Sally Duncan; Contracting Division; (309 794-5628 ) On: May 08 2019
1-1 Government Response. Review Section M – B. Factor II: Past Performance By: Sally Duncan; Contracting Division; (309 794-5628 ) On: May 08 2019
Current Request Status: Request Closed
Information for this report is procurement sensitive.
7976989 General Section L Volume III
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
1. Section L.3.i.a Key Personnel identifies 4 key personnel resumes required for each Region. In addition, Section G, Contract Administration Data, Contractor Key Personnel identifies primary and alternate Contractor ACI Debris Program Managers as key personnel. However, Section L submittal requirements does not mention whether we need to identify or submit resumes for the ACI Debris Program Manager and alternate in our Proposal. Please confirm if we are required to submit resumes for the Primary and Alternate Contractor ACI Debris Program Managers in our Proposal response.
By: Keith Owenby; ECC; (650-515-2442 ). On: May 07 2019. Forward request by email.
1-0 Evaluation Concurred. Section L.2.i.a identifies personnel to be evaluated for technical review for operational aspects. Section G refers to Corporate ACI debris Program manager and alternate which are the POCs for contracting, coordination, etc. Personnel in section G are not part of the management cell that is evaluated. Only primary personnel under Section L is a requirement. By: Sally Duncan; Contracting Division; (309 794-5628 ) On: May 08 2019
1-1 Government Response. Section L.2.i.a identifies personnel to be evaluated for technical review for operational aspects. Section G refers to Corporate ACI debris Program manager and alternate which are the POCs for contracting, coordination, etc. Personnel in section G are not part of the management cell that is evaluated. Only primary personnel under Section L is a requirement. By: Sally Duncan; Contracting Division; (309 794-5628 ) On: May 08 2019
Current Request Status: Request Closed
Information for this report is procurement sensitive.
7976990 General Section L
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
2. There were a few significant changes between the pre-solicitation identified requirements and those in the final RFP. Prior to final release we were under the impression that we could bid only one of the four primary regions.
However, this requirement was removed in the final RFP, making it possible to bid as many regions as we believe we can qualify to bid. This is a significant change since many contractors are now considering bidding regions that we previously thought we could not bid. In order to identify team partners to support the effort, and in particular, Page 4 of 61ProjNet: Logged In User identify small and minority businesses in these additional regions, as well as develop competitive pricing, we feel that it is in the government's best interest to provide a 2-week extension to the due date so that we can develop the most competitive pricing and establish firm commitments to maximize the use of small and minority businesses. We respectfully request that the government please consider providing a 2-week extension to the proposal due day to allow contractors time to respond to this significant change.
By: Keith Owenby; ECC; (650-515-2442 ). On: May 07 2019. Forward request by email.
1-0 Evaluation Concurred. The solicitation proposal due date will not be extended at this time. By: Sally Duncan; Contracting Division; (309 794-5628 ) On: May 08 2019
1-1 Government Response. The solicitation proposal due date will not be extended at this time. By: Sally Duncan; Contracting Division; (309 794-5628 ) On: May 08 2019
Current Request Status: Request Closed
Information for this report is procurement sensitive.
7976992 General Section L
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
3. Please confirm if the maximum number of 11 by 17 flow chart graphic pages is 3 or if each flow chart graphic is limited to 3-11 by 17 pages.
By: Keith Owenby; ECC; (650-515-2442 ). On: May 07 2019. Forward request by email.
1-0 Evaluation Concurred. Review Section L – 3. Proposal Files a. Page count By: Sally Duncan; Contracting Division; (309 794-5628 ) On: May 08 2019
1-1 Government Response. Review Section L – 3. Proposal Files a. Page count By: Sally Duncan; Contracting Division; (309 794-5628 ) On: May 08 2019
Current Request Status: Request Closed
Information for this report is procurement sensitive.
7976994 General Section L
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
4. According to existing instructions Volume I, Sub-Factor B, Part B Management/ Operations Plan is not in the page count and should therefore be placed in an Appendix. Please confirm that the Management/Operations Plan is not page counted and that it should be placed in an Appendix.
By: Keith Owenby; ECC; (650-515-2442 ). On: May 07 2019. Forward request by email.
1-0 Evaluation Concurred. Review Section L – Paragraph 2. Proposal Submission Requirements. By: Sally Duncan; Contracting Division; (309 794-5628 ) On: May 08 2019
1-1 Government Response. Review Section L – Paragraph 2. Proposal Submission Requirements. By: Sally Duncan; Contracting Division; (309 794-5628 ) On: May 08 2019
Current Request Status: Request Closed
Information for this report is procurement sensitive.
7976995 General Section L
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
5. Section L, Proposal Submission, 1. Introduction and b Staffing Approach. The instructions contained in the opening paragraph indicate that offeror's shall convey how multiple missions in separate regions will be executed simultaneously if offeror is awarded multiple regions. However, under B. the Staffing Approach we are to convey how we plan to prepare and execute concurrent missions in different areas of a specific Region. Section M also evaluates us on concurrent missions in different areas of a specific Region. We assume we are to address the different areas of a specific Region. Is this the correction assumption?
By: Keith Owenby; ECC; (650-515-2442 ). On: May 07 2019. Forward request by email.
1-0 Evaluation Concurred. See amendment 0003 By: Sally Duncan; Contracting Division;
(309 794-5628 ) On: May 08 2019
1-1 Government Response. See amendment 0003 By: Sally Duncan; Contracting Division;
(309 794-5628 ) On: May 08 2019
Current Request Status: Request Closed
Page 5 of 61ProjNet: Logged In User
Information for this report is procurement sensitive.
7976996 General Section L
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
6. Section L, B. Staffing Approach and B. Management/Operations Plan. Section b. Staffing Approach requires us to demonstrate our capability to meet, sustain, and management geographic areas relating to sectoring, sector management, and resources needed. Section B. Management/Operations Plan also requires us to demonstrate management of geographic areas related to sectoring, sector management, number of crews in each sector etc.
These two requirements seem to be duplicative. Can you tell us the difference you are looking for between these two sections?
By: Keith Owenby; ECC; (650-515-2442 ). On: May 07 2019. Forward request by email.
1-0 Evaluation Concurred. Sectoring is related to both the Staffing Approach and Management/Operations Plan. Staffing Approach is how the offeror will staff. Management Operations is the offerors actual management/operations. By: Sally Duncan; Contracting Division; (309 794-5628 ) On: May 08 2019
1-1 Government Response. Sectoring is related to both the Staffing Approach and Management/Operations Plan. Staffing Approach is how the offeror will staff. Management Operations is the offerors actual management/operations. By: Sally Duncan; Contracting Division; (309 794-5628 ) On: May 08 2019
Current Request Status: Request Closed
Information for this report is procurement sensitive.
7976998 General section L
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
7. Since the organization chart does not count towards the page count and the USACE requires us to provide on-site and management personnel with lines of authority and list of subcontractor's key personnel, which are more extensive by the larger geographic regions, can we use an 11x17 foldout for the organization chart which would allow us to show all the requirements?
By: Keith Owenby; ECC; (650-515-2442 ). On: May 07 2019. Forward request by email.
1-0 Evaluation Concurred. Review Section M – Sub factor A – a. Key Personnel By: Sally Duncan; Contracting Division; (309 794-5628 ) On: May 08 2019
1-1 Government Response. Review Section M – Sub factor A – a. Key Personnel By: Sally Duncan; Contracting Division; (309 794-5628 ) On: May 08 2019
Current Request Status: Request Closed
Information for this report is procurement sensitive.
7976999 General Sdction L
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
8. Does the letter of commitment signed by key personnel count towards the 75 page count?
By: Keith Owenby; ECC; (650-515-2442 ). On: May 07 2019. Forward request by email.
1-0 Evaluation Concurred. Review Section M – Sub factor A – a. Key Personnel
Refer to Amendment 2 By: Sally Duncan; Contracting Division; (309 794-5628 ) On: May 08 2019
1-1 Government Response. Review Section M – Sub factor A – a. Key Personnel By: Sally Duncan; Contracting Division; (309 794-5628 ) On: May 08 2019
Current Request Status: Request Closed
Information for this report is procurement sensitive.
7977002 General Section L
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
9. For Volume I, we are assuming that the summary section counts towards the page count. Is this a correct assumption?
By: Keith Owenby; ECC; (650-515-2442 ). On: May 07 2019. Forward request by email.
1-0 Evaluation Concurred. Refer to Amendment 2 By: Sally Duncan; Contracting Division;
(309 794-5628 ) On: May 08 2019
Page 6 of 61ProjNet: Logged In User
1-1 Government Response. Refer to Amendment 2 By: Sally Duncan; Contracting Division;
(309 794-5628 ) On: May 08 2019
Current Request Status: Request Closed
Information for this report is procurement sensitive.
7977008 General Section L
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
10. For Volume 1, does the Table of Contents count towards the 75 page submittal?
By: Keith Owenby; ECC; (650-515-2442 ). On: May 07 2019. Forward request by email.
1-0 Evaluation Concurred. Refer to Amendment 2 By: Sally Duncan; Contracting Division;
(309 794-5628 ) On: May 08 2019
1-1 Government Response. Refer to Amendment 2 By: Sally Duncan; Contracting Division;
(309 794-5628 ) On: May 08 2019
Current Request Status: Request Closed
Information for this report is procurement sensitive.
7977012 General Section L
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
11. There is not a clear definition of what is acceptable for a Past Performance Questionnaire. Section L mentions contracts and projects. (a) On an IDIQ contract is it acceptable to write up the entire contract or are we limited to an individual Task Order under the IDIQ contract. (b) If we can not use the contract, please identify if it is acceptable on an IDIQ contract that included award of multiple TOs for the same disaster under the contract, if we can combine those TOs into one project or if each TO would need to be submitted as a separate project.
By: Keith Owenby; ECC; (650-515-2442 ). On: May 07 2019. Forward request by email.
1-0 Evaluation Concurred. Review Section M – B. Factor II: Past Performance By: Sally Duncan; Contracting Division; (309 794-5628 ) On: May 08 2019
1-1 Government Response. Review Section M – B. Factor II: Past Performance By: Sally Duncan; Contracting Division; (309 794-5628 ) On: May 08 2019
Current Request Status: Request Closed
Information for this report is procurement sensitive.
7977017 General Section L Past Performance
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
12. If we have a final CPARS for a project do you still require us to submit a Past Performance Questionnaire or is the CPARS acceptable
By: Keith Owenby; ECC; (650-515-2442 ). On: May 07 2019. Forward request by email.
1-0 Evaluation Concurred. Review Section M – B. Factor II: Past Performance By: Sally Duncan; Contracting Division; (309 794-5628 ) On: May 08 2019
1-1 Government Response. Review Section M – B. Factor II: Past Performance By: Sally Duncan; Contracting Division; (309 794-5628 ) On: May 08 2019
Current Request Status: Request Closed
Information for this report is procurement sensitive.
7977954 Project
Management Volume II, Factor II - Past Performance
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Volume II, Factor II - Past Performance. Are project narrative/write-ups required to accompany the five PPQs requested? Section M for Past Performance leads us to believe that separate project narratives are not required/desired for this section and that only Past Performance Evaluations will be evaluated for relevant projects.
Please clarify
By: Debbie Taveras; QRI; (225-292-1400 ). On: May 07 2019. Forward request by email.
Page 7 of 61ProjNet: Logged In User
1-0 Evaluation Concurred. See amendment 0004 By: Sally Duncan; Contracting Division;
(309 794-5628 ) On: May 09 2019
1-1 Government Response. See amendment 0004 By: Sally Duncan; Contracting Division;
(309 794-5628 ) On: May 09 2019
Current Request Status: Request Closed
Information for this report is procurement sensitive.
7977979 Program
Management Volume I, Factor I Mgmt/Technical
Approach
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Volume I, Factor I Mgmt/Technical Approach. Subfactor A. (a) Key Personnel and Staffing Approach and Subfactor B.
(b) Management/Ops Plan seem to overlap on the required information requested. (Number 1 on Attachment 2 - Mgmt and OPs Plan minimum requirements for (1) Organizational Structure and Key Personnel) Is this information to be duplicated for Subfactor B. (b) Management/Ops Plan? Please clarify
By: Debbie Taveras; QRI; (225-292-1400 ). On: May 07 2019. Forward request by email.
1-0 Evaluation Concurred. The Staffing Approach is how the offeror will staff (i.e. the staff members). The Management Operations is the offerors actual management/operations (i.e. how the staff will perform the work). Review Section M. Sub-Factor A – b. Staffing Approach and Section M Sub-Factor B – b.
Management/Operations Plan.
Review, SECTION L - (i) VOLUME I – FACTOR I – MANAGEMENT/TECHNICAL APPROACH
Sub-Factor A – Key Personnel and Staffing Approach and Sub-Factor B – Management/Operations Plan.
By: Sally Duncan; Contracting Division; (309 794-5628 ) On: May 09 2019
1-1 Government Response. The Staffing Approach is how the offeror will staff (i.e. the staff members). The Management Operations is the offerors actual management/operations (i.e. how the staff will perform the work). Review Section M. Sub-Factor A – b. Staffing Approach and Section M Sub-Factor B – b.
Management/Operations Plan.
Review, SECTION L - (i) VOLUME I – FACTOR I – MANAGEMENT/TECHNICAL APPROACH
Sub-Factor A – Key Personnel and Staffing Approach and Sub-Factor B – Management/Operations Plan.
By: Sally Duncan; Contracting Division; (309 794-5628 ) On: May 13 2019
Current Request Status: Request Closed
Information for this report is procurement sensitive.
7978311 Other Past Performance Questionnaire contract date clarification
Comment Classification: UNCLASSIFIED (U)
Is the contract completion date supposed to be the contract expiration date or the date we completed the specific project for this client?
By: Christopher Holsinger; AshBritt Inc.; (954-725-6992 ). On: May 07 2019. Forward request by email.
1-0 Evaluation Concurred. See amendment 0004 By: Sally Duncan; Contracting Division;
(309 794-5628 ) On: May 09 2019
1-1 Government Response. See amendment 0004 By: Sally Duncan; Contracting Division;
(309 794-5628 ) On: May 09 2019
Current Request Status: Request Closed
Information for this report is procurement sensitive.
7978315 Other Section 3.5.1 - Page 27
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Are partial framed trailers allowed?
By: Christopher Holsinger; AshBritt Inc.; (954-725-6992 ). On: May 07 2019. Forward request by email.
1-0 Evaluation Concurred. No - partial framed trailers will not be allowed. By: Sally Duncan; Contracting Division; (309 794-5628 ) On: May 09 2019
Page 8 of 61ProjNet: Logged In User
1-1 Government Response. No - partial framed trailers will not be allowed By: Sally Duncan; Contracting Division; (309 794-5628 ) On: May 09 2019
Current Request Status: Request Closed
Information for this report is procurement sensitive.
7978316 Other Section A. Page 102
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
What are the minimum Qualifications for a Quality Control Manager?
By: Christopher Holsinger; AshBritt Inc.; (954-725-6992 ). On: May 07 2019. Forward request by email.
1-0 Evaluation Concurred. The Government is not prescribing minimum qualifications for these positions.
By: Sally Duncan; Contracting Division; (309 794-5628 ) On: May 09 2019
1-1 Government Response. The Government is not prescribing minimum qualifications for these positions.
By: Sally Duncan; Contracting Division; (309 794-5628 ) On: May 09 2019
Current Request Status: Request Closed
Information for this report is procurement sensitive.
7978571 Specifications Page 38 Attachment 2 Management and
Operations Plan Minimum Requirements
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Please clarify: are we required to include the items listed in Attachment 2 Management and Operations Plan Minimum Requirements in our Management/Operations Plan?
By: Margarita Gusakovskaya; Ceres Environmental Services, Inc.; (6123844886). On: May 07 2019.
Forward request by email.
1-0 Evaluation Concurred. See Amendment 0005 - Performance Work Statement, Section L and Section M By: Sally Duncan; Contracting Division; (309 794-5628 ) On: May 13 2019
1-1 Government Response. See Amendment 0005 - Performance Work Statement, Section L and Section M By: Sally Duncan; Contracting Division; (309 794-5628 ) On: May 13 2019
Current Request Status: Request Closed
Information for this report is procurement sensitive.
7978710 General Amendment 0002 Section L
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
12. Amendment 0002 request Past Performance from prime and subcontractors, including all relevant Government and/or commercial contracts for the Prime Offeror and each major subcontractor during the past 10 years as well as performance recognition documents received in the last 3 years for the Offeror and major subcontractors. (a) It is not clear to us if USACE will consider it a strength or weakness if the prime is able to provide all the required Past Performance contracts/projects without relying on "major subcontractors" or if we will be scored down for taking this approach – would USACE please clarify. (b) If the prime is providing all 5 Past Performance contracts/projects are we still required to provide "all relevant Government and/or commercial contracts for each major subcontractor during the past 10 years." (c) If yes, please define what is meant by "major subcontractor." Would a subcontractor be considered a major subcontractor only if we are relying on their Past Performance information as one of the 5 Past Performance contracts/projects?
By: Keith Owenby; ECC; (650-515-2442 ). On: May 08 2019. Forward request by email.
1-0 Evaluation Concurred. See Amendment 0005 - Section L and Section M By: Sally Duncan; Contracting Division; (309 794-5628 ) On: May 13 2019
1-1 Government Response. See Amendment 0005 - Section L and Section M By: Sally Duncan; Contracting Division; (309 794-5628 ) On: May 13 2019
Current Request Status: Request Closed
Information for this report is procurement sensitive.
7978711 General Amendment 0002 section L
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Page 9 of 61ProjNet: Logged In User
13. Amendment 0002, Past Performance Requirements, May 6th, Additional Clarifications. The original Past performance requirement requested up to five contracts/projects and PPQs along with organizational change history.
The Amendment 0002 released on May 6th provides additional definition for what is to be contained in the section.
However we are unclear as to the project write-ups. We are assuming you want up to 5 contracts/project write-ups with PPQs first, please confirm this is required. Second, USACE requires all relevant Government and/or commercial contracts for the Prime Offeror and each major subcontractor during the past ten years, performance recognition documents received in the last three years for the Offeror and Major subcontractors, and small business subcontracting goals for contracts, copies of six subcontracting reports or a summary subcontracting report. This is a significant addition to the original requirement as it was up to Offerors if they submitted prime only contracts/subcontracts. This requirement asks information of our subcontractors which is a new requirement and we would ask for a two week extension to accommodate these new requirements.
By: Keith Owenby; ECC; (650-515-2442 ). On: May 08 2019. Forward request by email.
1-0 Evaluation Concurred. Review Section L and Section M Factor II – Past Performance. PPQs are separate from an offerors past performance included in the proposal. PPQs are an offeror's references.
The solicitation proposal due date will not be extended at this time. By: Sally Duncan; Contracting Division; (309 794-5628 ) On: May 09 2019
1-1 Government Response. Review Section L and Section M Factor II – Past Performance. PPQs are separate from an offerors past performance included in the proposal. PPQs are an offeror's references.
The solicitation proposal due date will not be extended at this time. By: Sally Duncan; Contracting Division;
(309 794-5628 ) On: May 09 2019
Current Request Status: Request Closed
Information for this report is procurement sensitive.
7979173 Other Section B. Page 100
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Would USACE consider allowing proposers to utilize a reduced font size for the resumes as was allowed for tables and illustrations?
By: Christopher Holsinger; AshBritt Inc.; (954-725-6992 ). On: May 08 2019. Forward request by email.
1-0 Evaluation Concurred. No By: Sally Duncan; Contracting Division; (309 794-5628 ) On: May 13
1-1 Government Response. No By: Sally Duncan; Contracting Division; (309 794-5628 ) On: May 13 2019
Current Request Status: Request Closed
Information for this report is procurement sensitive.
7980345 General Amendment 0002 Question 1
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Response to Question 1 in Amendment 0002 added the following language: "You may provide copies of not more than six Individual Subcontracting Reports (ISRs) or Summary Subcontracting Report (SSR)) to validate your past performance."
Please confirm that ISR files will not count against the 25-page limit set for Volume II – Past Performance.
By: Nicholas Steyn; AECOM Technical Services, Inc - Los Angeles, CA; (5124195671). On: May 08 2019.
Forward request by email.
1-0 Evaluation Concurred. See Amendment 0005 – Section L and M By: Sally Duncan; Contracting Division; (309 794-5628 ) On: May 13 2019
1-1 Government Response. See Amendment 0005 - Section L and Section M By: Sally Duncan; Contracting Division; (309 794-5628 ) On: May 13 2019
Current Request Status: Request Closed
Information for this report is procurement sensitive.
7980347 General Amendment 0002 Question 1
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Page 10 of 61ProjNet: Logged In User
Response to Question 1 in Amendment 0002 was written to clarify what is to be included in Volume II – Past Performance. However, it remains unclear whether or not offerors are to include project descriptions for our five past performance examples. Please clarify if the intent is to have offerors include a project description and PPQ for each of their five projects and up to six ISRs.
By: Nicholas Steyn; AECOM Technical Services, Inc - Los Angeles, CA; (5124195671). On: May 08 2019.
Forward request by email.
1-0 Evaluation Concurred. See Amendment 0005 – Section L and M By: Sally Duncan; Contracting Division; (309 794-5628 ) On: May 13 2019
1-1 Government Response. See Amendment 0005 - Section L and Section M By: Sally Duncan; Contracting Division; (309 794-5628 ) On: May 13 2019
Current Request Status: Request Closed
Information for this report is procurement sensitive.
7980350 General RFP
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Please clarify what counts in the 25-page limit for Volume II – Past Performance.
By: Nicholas Steyn; AECOM Technical Services, Inc - Los Angeles, CA; (5124195671). On: May 08 2019.
Forward request by email.
1-0 Evaluation Concurred. See Amendment 0005 – Section L and M By: Sally Duncan; Contracting Division; (309 794-5628 ) On: May 13 2019
1-1 Government Response. See Amendment 0005 - Section L and Section M By: Sally Duncan; Contracting Division; (309 794-5628 ) On: May 13 2019
Current Request Status: Request Closed
Information for this report is procurement sensitive.
7980355 General Amendment 0002 Question 1
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Response to Question 1 in Amendment 0002 states: "No past performance information shall be contained in any other volume of this proposal."
Q1: Please confirm offerors are permitted to reference past experience (what we performed) in text as proofs for Volume I – Management/Technical Approach.
Q2: Please confirm that we can cite specific projects in our narrative that demonstrate safe performance of similar work. Please clarify.
By: Nicholas Steyn; AECOM Technical Services, Inc - Los Angeles, CA; (5124195671). On: May 08 2019.
Forward request by email.
1-0 Evaluation Concurred. See Amendment 0005 – Section L and M By: Sally Duncan; Contracting Division; (309 794-5628 ) On: May 13 2019
1-1 Government Response. See Amendment 0005 - Section L and Section M By: Sally Duncan; Contracting Division; (309 794-5628 ) On: May 13 2019
Current Request Status: Request Closed
Information for this report is procurement sensitive.
7980357 General RFP
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
We request that tabs/dividers NOT be included in page counts for Volumes I-III. Please confirm that tabs/dividers will not be counted.
By: Nicholas Steyn; AECOM Technical Services, Inc - Los Angeles, CA; (5124195671). On: May 08 2019.
Forward request by email.
1-0 Evaluation Concurred. See Amendment 0005 – Section L and M By: Sally Duncan; Contracting Division; (309 794-5628 ) On: May 13 2019
1-1
Page 11 of 61ProjNet: Logged In User
Government Response. See Amendment 0005 - Section L and Section M By: Sally Duncan; Contracting Division; (309 794-5628 ) On: May 13 2019
Current Request Status: Request Closed
Information for this report is procurement sensitive.
7980731 Other W912EK18R0022
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Please confirm that the note on Page 100, "** The Management/Operations Plan and Organization Chart is excluded from the page count" means that the whole section under Vol I - Factor I, Sub-factor B.b. Management/Operations Plan is excluded from the page county.
By: jason sanders; D&j Enterprises, Inc.; (334-559-0106 ). On: May 08 2019. Forward request by email.
1-0 Evaluation Concurred. See Amendment 0005 – Section L and M By: Sally Duncan; Contracting Division; (309 794-5628 ) On: May 13 2019
1-1 Government Response. See Amendment 0005 - Section L and Section M By: Sally Duncan; Contracting Division; (309 794-5628 ) On: May 13 2019
Current Request Status: Request Closed
Information for this report is procurement sensitive.
7980732 Other W912EK18R0022
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
If we are submitting proposals for multiple Regions, will we be able to list the same subcontractors in each of these Regions? Some subcontractors have Nationwide capabilities.
By: jason sanders; D&j Enterprises, Inc.; (334-559-0106 ). On: May 08 2019. Forward request by email.
1-0 Evaluation Concurred. See Amendment 0005 – Instruction to Offerer's and Section L and M By: Sally Duncan; Contracting Division; (309 794-5628 ) On: May 13 2019
1-1 Government Response. See Amendment 0005 – Instruction to Offerer's and Section L and M By: Sally Duncan; Contracting Division; (309 794-5628 ) On: May 13 2019
Current Request Status: Request Closed
Information for this report is procurement sensitive.
7980734 Other W912EK18R0022
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
If we qualify as eligible to submit as a "Restriced bidder in Suite 2, may we also bid as an Unrestricted bidder Suite 1?
By: jason sanders; D&j Enterprises, Inc.; (334-559-0106 ). On: May 08 2019. Forward request by email.
1-0 Evaluation Concurred. See Amendment 0005 – Section L and M By: Sally Duncan; Contracting Division; (309 794-5628 ) On: May 13 2019
1-1 Government Response. See Amendment 0005 – Section L and M By: Sally Duncan; Contracting Division; (309 794-5628 ) On: May 13 2019
Current Request Status: Request Closed
Information for this report is procurement sensitive.
7980736 Other W912EK18R0022
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
If we qualify as eligible to submit as a "Restriced bidder in Suite 2, may we also bid as an Unrestricted bidder Suite 1?
If the answer to question above is yes, then will we be able to submit proposals for Suite 1 and Suite 2 in the same Region?
By: jason sanders; D&j Enterprises, Inc.; (334-559-0106 ). On: May 08 2019. Forward request by email.
1-0 Evaluation Concurred. See Amendment 0005 – Section L and M By: Sally Duncan; Contracting Division; (309 794-5628 ) On: May 13 2019
Page 12 of 61ProjNet: Logged In User
1-1 Government Response. See Amendment 0005 – Section L and M By: Sally Duncan; Contracting Division; (309 794-5628 ) On: May 13 2019
Current Request Status: Request Closed
Information for this report is procurement sensitive.
7981137 Other Section 3.6.1 HHW
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
According to 3.6.1, "HHW is excluded from the definition of Hazardous Waste and therefore does not require the same collection or handling procedures as Hazardous Waste. Examples of HHW include, but are not limited to:
batteries, waste oil, waste fuels, paint, chemicals, antifreeze, pesticides, spray cans, unidentified liquids, and household cleaners." The terms "chemicals" and "unidentified liquids" is very broad. Therefore, due to potential exposures, ignitability, corrosivity, reactivity, and toxicity of "chemicals" and "unidentified liquids" that residential property owners may possess, the contractor cannot EXCLUDE "chemicals" and "unidentified liquids" from the definition of Hazardous Waste unless properly tested and categorized. Is there a more comprehensive list of what is determined Non-Hazardous Waste to be labeled HHW?
By: Christopher Holsinger; AshBritt Inc.; (954-725-6992 ). On: May 09 2019. Forward request by email.
1-0 Evaluation Concurred. See Amendment 0005 – Performance Work Statement By: Sally Duncan; Contracting Division; (309 794-5628 ) On: May 13 2019
1-1 Government Response. See Amendment 0005 – Performance Work Statement By: Sally Duncan; Contracting Division; (309 794-5628 ) On: May 13 2019
Current Request Status: Request Closed
Information for this report is procurement sensitive.
7981139 Other Section 3.6.2 - Page 28
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Due to the requirement of each crew member being 40 Hr. Hazwoper trained (certified in accordance with Environmental Protection Agency (EPA) requirements for handling HHW materials), does this contradict that HHW are considered Non-Hazardous and only applies to HTRW materials?
By: Christopher Holsinger; AshBritt Inc.; (954-725-6992 ). On: May 09 2019. Forward request by email.
1-0 Evaluation Concurred. See Amendment 0005 – Performance Work Statement By: Sally Duncan; Contracting Division; (309 794-5628 ) On: May 13 2019
1-1 Government Response. See Amendment 0005 – Performance Work Statement By: Sally Duncan; Contracting Division; (309 794-5628 ) On: May 13 2019
Current Request Status: Request Closed
Information for this report is procurement sensitive.
7981141 Other Section 3.6 - Page 27
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Who determines the classification of HHW vs. HTRW on awarded Base Contracts and Task Orders, the USACE or the Contractor?
By: Christopher Holsinger; AshBritt Inc.; (954-725-6992 ). On: May 09 2019. Forward request by email.
1-0 Evaluation Concurred. See Amendment 0005 – Performance Work Statement By: Sally Duncan; Contracting Division; (309 794-5628 ) On: May 13 2019
1-1 Government Response. See Amendment 0005 – Performance Work Statement By: Sally Duncan; Contracting Division; (309 794-5628 ) On: May 13 2019
Current Request Status: Request Closed
Information for this report is procurement sensitive.
7981147 Other Restricted vs Unrestricted
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
What are the guidelines for hierarchy of hiring restricted vs unrestricted?
By: Christopher Holsinger; AshBritt Inc.; (954-725-6992 ). On: May 09 2019. Forward request by email.
Page 13 of 61ProjNet: Logged In User
1-0 Evaluation Concurred. Review Section G – Contract Administration - PREDOMINDANT TASK ORDER SIZE DETERMINATION By: Sally Duncan; Contracting Division; (309 794-5628 ) On: May 13 2019
1-1 Government Response. Review Section G – Contract Administration - PREDOMINDANT TASK ORDER SIZE DETERMINATION By: Sally Duncan; Contracting Division; (309 794-5628 ) On: May 13 2019
Current Request Status: Request Closed
Information for this report is procurement sensitive.
7981343 Other Contract Award
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
What are the USACE guidelines on how many contracts are going to be awarded in the unrestricted regions for each region?
By: Christopher Holsinger; AshBritt Inc.; (954-725-6992 ). On: May 09 2019. Forward request by email.
1-0 Evaluation Concurred. One contract per region within each Suite By: Sally Duncan; Contracting Division; (309 794-5628 ) On: May 13 2019
1-1 Government Response. One contract per region within each Suite By: Sally Duncan; Contracting Division; (309 794-5628 ) On: May 13 2019
Current Request Status: Request Closed
Information for this report is procurement sensitive.
7981354 Other Order of Issuance of Notice to Proceed
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
What criteria will determine the order of the issuance of the Notice to Proceeds between the unrestricted and restricted contractors in each region?
By: Christopher Holsinger; AshBritt Inc.; (954-725-6992 ). On: May 09 2019. Forward request by email.
1-0 Evaluation Concurred. Review Section G – Contract Administration - PREDOMINDANT TASK ORDER SIZE DETERMINATION By: Sally Duncan; Contracting Division; (309 794-5628 ) On: May 13 2019
1-1 Government Response. Review Section G – Contract Administration - PREDOMINDANT TASK ORDER SIZE DETERMINATION By: Sally Duncan; Contracting Division; (309 794-5628 ) On: May 13 2019
Current Request Status: Request Closed
Information for this report is procurement sensitive.
7981780 Contracting 108 Section M
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
IF a small business contractor has four teams but wants to bid all regions, and the contractor provides prices for all regions, will the USACE consider the contractor in the order stated that the awards will be given out? And the contractor will have the opportunity to compete in all regions as long as it has not been awarded the maximum amount of teams it has proposed. In simple English if we have 4 teams that can mobilize to any part of the country can we submit prices for all regions and be considered up to our maximum of four teams until all regions are awarded? We don't want to have four teams ready to go and only price out 4 regions and if we don't get those regions not be able to compete for any other region if we are not awarded the four we chose, this is why we would like to price out all regions.
By: Ricardo Morillo; Conquistador/Dorado JV; (407-688-0600 ). On: May 09 2019. Forward request by email.
1-0 Evaluation Concurred. See Amendment 0005 – Section L and M By: Sally Duncan; Contracting Division; (309 794-5628 ) On: May 13 2019
1-1 Government Response. See Amendment 0005 – Section L and M By: Sally Duncan; Contracting Division; (309 794-5628 ) On: May 13 2019
Current Request Status: Request Closed
Information for this report is procurement sensitive.
7982612 Other Section A. Solicitation Guidelines Page
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Page 14 of 61ProjNet: Logged In User
If we are submitting proposals for several regions may we use Subcontractor company names in more than a single region?
By: Christopher Holsinger; AshBritt Inc.; (954-725-6992 ). On: May 09 2019. Forward request by email.
1-0 Evaluation Concurred. See Amendment 0005 – Section L and M By: Sally Duncan; Contracting Division; (309 794-5628 ) On: May 13 2019
1-1 Government Response. See Amendment 0005 – Section L and M By: Sally Duncan; Contracting Division; (309 794-5628 ) On: May 13 2019
Current Request Status: Request Closed
Information for this report is procurement sensitive.
7982618 Other Section L Page 100
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
The Proposal Submission Requirements state "A standard, 12-point minimum font size applies. Arial or New Times Roman fonts are required." I believe you meant to say Arial and Times New Roman fonts are required, am I correct?
By: Christopher Holsinger; AshBritt Inc.; (954-725-6992 ). On: May 09 2019. Forward request by email.
1-0 Evaluation Concurred. See Amendment 0005 – Section L By: Sally Duncan; Contracting Division;
(309 794-5628 ) On: May 13 2019
1-1 Government Response. See Amendment 0005 – Section L By: Sally Duncan; Contracting Division;
(309 794-5628 ) On: May 13 2019
Current Request Status: Request Closed
Information for this report is procurement sensitive.
7983728 Other Section A. Solicitation Guidelines Page
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
This question is replacing question number: 7982612 as it was not fully developed before submitting. If we are submitting proposals for several regions may we use the same Subcontractor company names in more than a single region?
By: Christopher Holsinger; AshBritt Inc.; (954-725-6992 ). On: May 10 2019. Forward request by email.
1-0 Evaluation Concurred. See Amendment 0005 – Section L and M By: Sally Duncan; Contracting Division; (309 794-5628 ) On: May 13 2019
1-1 Government Response. See Amendment 0005 – Section L and M By: Sally Duncan; Contracting Division; (309 794-5628 ) On: May 13 2019
Current Request Status: Request Closed
Information for this report is procurement sensitive.
7983782 Other Attachment 2 - Page 38
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Will the USACE accept an individual's signature on their resume as the equivalent of a letter of commitment?
By: Christopher Holsinger; AshBritt Inc.; (954-725-6992 ). On: May 10 2019. Forward request by email.
1-0 Evaluation Concurred. See Amendment 0005 – Section L and M By: Sally Duncan; Contracting Division;…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .