26RA003 - Amend-007 - VOL. 1 - T1 Redlines.pdf

PDF 6 MB Posted

Attached to
Spare Transformers for the Lower Snake River Plants
Solicitation number
W912EF26RA003
Issued by

About this file

Summary: Little Goose 500 KV Spare GSU Transformer Requirements Summary Sheet

This document is a detailed Requirements Summary Sheet for a 500 KV spare Ground Service Unit (GSU) transformer for the Little Goose facility, referenced to Specification Section 48 19 23 08 26. The transformer specifications include a 500 MVA capacity, 500/230/13.8 KV voltage levels, single-phase configuration with impedance of 17.75%, and maximum winding temperature rise of 65°C. The transformer must accommodate a hydrogen blanket pressured system at 2 psig with oil preservation capability. Key construction requirements specify weatherproof steel tanks, durable enamel paint, ASTM M27 oil with preservation features, and dual tank nitrogen regulator cabinets with control power supplied at 120 VAC. The unit must include separate control and power cabinets with weather-proof design, high-voltage bushings with 230 KV and 13.8 KV ratings, and specialized internal cooling components including thermowells, radiators, and fan control systems.

The document provides comprehensive bills of materials across multiple transformer segments (Segments 1-4) and includes detailed factory assembly requirements, acceptance testing protocols, and spare parts specifications. Factory Acceptance Tests (FAT) must include routine tests per IEEE Std 57.12.90, temperature tests, and specialized procedures for high-voltage bushing testing, leakage reactance, frequency response analysis, and dissolved gas analysis. All components must be completely assembled and tested at the factory with comprehensive documentation. Detailed engineering drawings are included showing transformer cover configurations, low-voltage bushing holsings, core and core frame grounding details, and tank segment identifications for proper assembly and installation.

View the file

Other files

File Type Posted
Solicitation Amendment W912EF26RA0030009 SF 30.pdf PDF
Solicitation Amendment W912EF26RA0030008 SF 30.pdf PDF
W912EF26RA003 Amendment 8 Westinghouse Test Report for 7000374 7000942 and 7001750.pdf PDF
W912EF26RA003 Amendment 0008 JDA_and_LSR_Average_Impedance.pdf PDF
26RA003 - Amend-007 - Transformer Design Specs.pdf PDF
26RA003 - Amend-007 - VOL. 2 - T2 Redlines.pdf PDF
Solicitation Amendment W912EF26RA0030007 SF 30.pdf PDF
Solicitation Amendment W912EF26RA0030006 SF 30.pdf PDF
Solicitation Amendment W912EF26RA0030005 SF 30.pdf PDF
Solicitation Amendment W912EF26RA0030004 SF 30.pdf PDF
Solicitation Amendment W912EF26RA0030004 SF 30.pdf PDF
Solicitation Amendment W912EF26RA0030003 SF 30.pdf PDF
26RA003 - Tech Specs Amendment 0003.pdf PDF
Solicitation Amendment W912EF26RA0030002 SF 30.pdf PDF
Solicitation Amendment W912EF26RA0030001 SF 30.pdf PDF
Past Performance Questionnaire Form.pdf PDF
NWW_JA Sole Source Determination ABB-Hitachi Bushings_Signed_Print_Redacted.pdf PDF
Solicitation - W912EF26RA003.pdf PDF
26RA003_Plans_V1.pdf PDF
26RA003 Solicitation Tech Specs.pdf PDF
26RA003_Plans_V2.pdf PDF
26RA003_Supplemental_Drawings_V2.pdf PDF
Small Business Participation Proposal.pdf PDF
26RA003_Supplemental_Drawings_V1.pdf PDF
Show all 24

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

LG503118a_G-004

LG503118a_E-101
LG503118a_E-102
LG503118a_E-103
LG503118a_E-104
LG503118a_E-105

File details come from the government source that posted it. Updated .