This is a detailed design document for spare transformers at the Little Goose Lock and Dam, part of the Lower Snake River project for the US Army Corps of Engineers Walla Walla District. The document provides comprehensive technical specifications for a 500 kV Generator Step-Up (GSU) transformer with a 164,000/218,666 kVA rating, designed for ONAN/ONAF cooling. Key specifications include a maximum weight of 591,500 pounds, maximum oil quantity of 15,539 gallons, and a temperature rise of 65°C. The transformer will feature multiple cooling fans, hot-dip galvanized radiators, and a nitrogen blanket or constant oil pressure preservation system. The design includes detailed schematics for control and power cabinets, current transformers, annunciation systems, and external connections, with provisions for future electronic monitoring and diagnostic equipment.
View the file
Other files
Show all 24
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
VOLUME 1 - SPARE TRANSFORMERS T1
VOLUME 2 - SPARE TRANSFORMERS T2
A N
S I
D
F
IN
A L
T
L O
W E
R S
N A
K E
R
IV
E R
S P
A R
E T
R A
N S
F O
R M
E R
S
L
IT
T L
E G
O O
S E
L O
C K
A N
D D
A M
W
E F
R A
O C
T O
B E
R
W A
L L
A W
A L
L A
W
A S
H
IN
G T
O N
N
R
D A
V E
W A
L L
A W
A L
L A
D
IS
T R
IC
T
P O
R T
L A
N D
O
R E
G O
N
S
W
S T
A V
E
H Y
D R
O E
L E
C T
R
IC
D E
S
IG
N C
E N
T E
R
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S F
IL
E
N U
M B
E R
F
IL
E N
A M
E
J O
R D
A N
S F
IN
K
P
.E
P R
O
JE
C T
L O
C A
T
IO
N
V
IC
IN
IT
Y M
A P
S
G-001
P
K L
E
IN
E
P .E
D
F
IL
E
L G a G
-0 .d g n
L G
S -1
-6 -0
-A /1
P
K L
E
IN
E
P .E
VOLUME 1
T1
LOWER SNAKE RIVER SPARE TRANSFORMERS
LITTLE GOOSE LOCK AND DAM
W912EF26RA003
OCTOBER 2025
WALLA WALLA DISTRICT
PLAN
NORTH
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
S U
B M
IT
T
E D
B Y
C H
E C
K E
D B
Y
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
IS
S
U E
D A
T E
S I Z
E
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E
SHEET ID
®of Engineers
US Army Corps
U .S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
R S
SEE LOCATION
MAP
SPOKANE
OREGON
CLEARWATER R.
EUGENE
BOISE
P A
C
IF
IC
O
C E
A N
WASHINGTON
IDAHO
R
IV
E
REVERETT
C O
L U
M B
IA
SNAKE R.
PASCO
SEATTLE
PORTLAND
SALEM
THE
OLYMPIA
DALLES
WALLA WALLA
PENDLETON
VANCOUVER
PROJECT
LOCATION
Washtucna
Riparia
GOOSE
DAM
LITTLE
F la t
ID
A
H O
P A L O
U S E
B. N.
C. P. RR.
C r.
C r.
Alkali
E A
K
IV
E
R
SN
Cr ee kD ry
Waitsburg
R
Pomeroy
R
Flat
Union
N O
N
Cr.
As oti n
TUCAN
Camp Wooten
R
PENDLETON
WALLA WALLA
PASCO
KENNEWICK
COLFAX
GRANITE
LOWER
PULLMAN
DAM
RICHLAND
DAM
OREGON
WASHINGTON
HARBOR
ICE
CLARKSTON
YA
K
A
IM
Farrington
R
McNARY
R
IV
E R
LEWISTON
DAM
CO
U
M L
IA
B Cr
RIVER
R O
N D E
GRANDE
U M
ATILLA
C
r. U
. P . R
R
. RIVER
B u tt e r
Elgin Wallowa
Athena
Weston
Hermiston
Anatone
Asotin
M ill
R.
WALLA
T O
U C
H E T
Touchet
Milton-Freewater
R.
Wallula
B.N.
Kahlotus
Umatilla
Plymouth
Dayton
Almota
Ferry
Starbuck
BishopCentral
MONUMENTAL
LOWER Dodge
DAM
W A
L L
A
N
NAVIGATION LOCK
N. 5000
POWERHOUSE
N. 6000
SPILLWAY
TO STARBUCK
STORAGE YARD
UNIT
UNIT
UNIT
NAV LOCK BRIDGE
500 KV TRANSMISSION LINE
UNIT
UNIT
UNIT
BAY 2
BAY 1
X
BAY 5
BAY 4
BAY 3
X
X X
BAY 6
E
E
0Lower Monumental Pool EL. 540
E
N. 7000
S N A K E
BAY 8
BAY 7
TO RIPARIA
Camas Prairie Railroad
R I V E R of Engineers
US Army Corps
D1
VICINITY MAP
SCALE: NTS
N
D7
LOCATION MAP
SCALE: NTS
SUBMITTED BY:
SUBMITTED BY:
APPROVED BY: APPROVED BY:
HYDROELECTRIC DESIGN CENTER
DIRECTOR OF
JORDAN S. FINK, P.E.
WALLA WALLA DISTRICT
CHIEF OF DESIGN BRANCH
MARCUS PALMER, P.E.
WALLA WALLA DISTRICT
CHIEF OF ENGINEERING & CONST DIV.
DWAYNE WESTON, P.E.
DESIGNATIONS OF INDIVIDUALS APPEAR ON THESE PROJECT DOCUMENTS WITHIN THE SCOPE OF THEIR EMPLOYMENT AS REQUIRED BY ER 1110-1-8152.
THIS PROJECT WAS DESIGNED BY THE HYDROELECTRIC DESIGN CENTER OF THE U.S. ARMY CORPS OF ENGINEERS. THE INITIALS OR SIGNATURES AND REGISTRATION
WALLA WALLA DISTRICT
CHIEF OF ELECTRICAL DESIGN SECTION
LEVI VAN STEDUM, P.E.
SUBMITTED BY:
HYDROELECTRIC DESIGN CENTER
CHIEF OF ELECTRICAL BRANCH
JOHN Z. YEN, P.E.
SOLICITATION NO.:
CONTRACT NO.:
ISSUE DATE:
DAM ENTRANCE ROAD
G13
SITE MAP
SCALE: NTS
VOLUME NO.: 1
N
S I
D
F
IN
A L
T
L O
W E
R S
N A
K E
R
IV
E R
S P
A R
E T
R A
N S
F O
R M
E R
S
L
IT
T L
E G
O O
S E
L O
C K
A N
D D
A M
W
E F
R A
O C
T O
B E
R
L L
A W
A L
L A
W
A S
H
IN
G T
O N
N
R
D A
V E
W A
L L
A W
A L
L A
D
IS
T R
IC
T
P O
R T
L A
N D
O
R E
G O
N
S
W
S T
A V
E
H Y
D R
O E
L E
C T
R
IC
D E
S
IG
N C
E N
T E
R
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S F
IL
E
N U
M B
E R
F
IL
E N
A M
E
J O
R D
A N
S F
IN
K
P
D
A W
IN
G
S I
N D
E X
G-002
P
K L
E
IN
E
P .E
D
F
IL
a G
-0 .d g n
L G
S -1
-6 -0
-A /2
P
K L
E
IN
E
P .E
VOLUME 1
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
S U
B M
IT
T
E D
B Y
C H
E C
K E
D B
Y
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
IS
S
U E
D A
T E
S I Z
E
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E
SHEET ID
®of Engineers
US Army Corps
U .S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
R S
DRAWING INDEXDRAWING INDEX
GENERAL
DRAWING NUMBER
NO
SHEET
TITLE
ELECTRICAL
FILE NUMBER TITLE
S I
D
F
IN
A L
T
L O
W E
R S
N A
K E
R
IV
E R
S P
A R
E T
R A
N S
F O
R M
E R
S
L
IT
T L
E G
O O
S E
L O
C K
A N
D D
A M
W
E F
R A
O C
T O
B E
R
L L
A W
A L
L A
W
A S
H
IN
G T
O N
N
R
D A
V E
W A
L L
A W
A L
L A
D
IS
T R
IC
T
P O
R T
L A
N D
O
R E
G O
N
S
W
S T
A V
E
H Y
D R
O E
L E
C T
R
IC
D E
S
IG
N C
E N
T E
R
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S F
IL
E
N U
M B
E R
F
IL
E N
A M
E
J O
R D
A N
S F
IN
K
P
T
A N
S F
O R
M E
R S
IT
E
D E
L
IV
E R
Y A
N D
S T
O R
A G
E L
O C
A T
IO
N
G-003
P
K L
E
IN
E
P .E
D
F
IL
a G
-0 .d g n
L G
S -1
-6 -0
-A /3
P
K L
E
IN
E
P .E
VOLUME 1
PLAN
NORTH
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
S U
B M
IT
T
E D
B Y
C H
E C
K E
D B
Y
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
IS
S
U E
D A
T E
S I Z
E
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E
SHEET ID
®of Engineers
US Army Corps
U .S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
R S
E
NAVIGATION LOCK
XX
X
X
S P
IL
L
W A
Y
P O
W E
R H
O U
S E
TO RIPARIA
STORAGE YARD
TO STARBUCK
SPARE TRANSFORMER STORAGE LOCATION
NOT PART OF THIS CONTRACT
FUTURE STORAGE BUILDINGS
A1
TRANSFORMER SITE
S I
D
F
IN
A L
T
L O
W E
R S
N A
K E
R
IV
E R
S P
A R
E T
R A
N S
F O
R M
E R
S
L
IT
T L
E G
O O
S E
L O
C K
A N
D D
A M
W
E F
R A
O C
T O
B E
R
L L
A W
A L
L A
W
A S
H
IN
G T
O N
N
R
D A
V E
W A
L L
A W
A L
L A
D
IS
T R
IC
T
P O
R T
L A
N D
O
R E
G O
N
S
W
S T
A V
E
H Y
D R
O E
L E
C T
R
IC
D E
S
IG
N C
E N
T E
R
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S F
IL
E
N U
M B
E R
F
IL
E N
A M
E
J O
R D
A N
S F
IN
K
P
A N
S F
O R
M E
R E
Q U
IP
M
E N
T S
U M
M A
R Y
S H
E E
T
G-004
P
K L
E
IN
E
P .E
D
F
IL
a G
-0 .d g n
L G
S -1
-6 -0
-A /4
P
K L
E
IN
E
P .E
VOLUME 1
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
S U
B M
IT
T
E D
B Y
C H
E C
K E
D B
Y
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
IS
S
U E
D A
T E
S I Z
E
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E
SHEET ID
®of Engineers
US Army Corps
U .S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
R S
NAMEPLATE DATA:
TANK AND CONSTRUCTION:
ACCESSORIES:
BUSHINGS:
INSULATING OIL:
SEPARATE CONTROL AND POWER CABINETS:
SPARE PARTS:
FACTORY ASSEMBLY AND PAINT:
FACTORY ACCEPTANCE TESTS (F.A.T.):
REQUIREMENTS SUMMARY SHEET
LITTLE GOOSE 500 KV SPARE GSU TRANSFORMER
(REFERENCE SPECIFICATION SECTION 48 19 23.08 26)
∙ TYPE: NAPTHENIC BASE - ASTM D 3487 TYPE II; 0.3% BY MASS OF OXIDATION INHIBITOR
(4) COMPLETELY ASSEMBLED AND WITNESSING OF FACTORY ACCEPTANCE TESTS
TRANSFORMER)
(3) COMPLETED CORE/COIL ASSEMBLY, BUT PRIOR TO TANKING (IF PROVIDING A CORE TYPE
(2) AFTER COMPLETION OF WINDINGS BUT PRIOR TO LANDING ON CORE
(1) DESIGN REVIEW MEETING
∙ INSPECTIONS: GOVERNMENT INSPECTIONS PERFORMED DURING
FOR ONE WEEK PRIOR TO OIL FILLING.
∙ INTERIOR PAINT: PRIMER COAT, OIL-RESISTANT FINISH COAT - WHITE. ALLOW TO CURE
STEEL CABINETS, SHALL REMAIN UNPAINTED. COVER TO RECEIVE A NON-SLIP COATING.
5BG 7/0.4 HIGH-GLOSS (ANSI NO. 70 GRAY). CORROSION RESISTANT SURFACES, AND STAINLESS
∙ EXTERIOR PAINT: PRIMER COAT, EPOXY BASE COAT, POLYURETHANE TOP COAT - MUNSELL
MATCH-MARKED FOR EASE OF REASSEMBLY.
∙ ASSEMBLY: TRANSFORMER TO BE FULLY ASSEMBLED, WITH REMOVABLE COMPONENTS
15,539 GALLONS∙ MAXIMUM OIL QUANTITY:
591,500 POUNDS∙ MAXIMUM WEIGHT:
∙ FREQUENCY: 60 HZ
∙ MAXIMUM LOAD LOSSES: 314 KW
∙ MAXIMUM NO-LOAD LOSSES: 165 KW
∙ MAXIMUM SOUND LEVEL (ONAF): 80 DB
∙ OIL PRESERVATION SYSTEM: NITROGEN BLANKET (PREFERRED) OR CONSTANT OIL PRESSURE SYSTEM
∙ TEMPERATURE RISE: 65 ºC
∙ SECONDARY WINDING (H) DETC: 5 TAPS; 3 @ +2.5%, 1 @ -2.5% OF NOMINAL 500 KV TAP
∙ IMPEDANCE: 17.7% @ 82,000 KVA (H-X & H-Y),
∙ PHASING: SINGLE-PHASE
∙ BIL LEVELS, KV: 1,425 (H) / 110 (X & Y) / 150 (H0)
∙ VOLTAGE RATINGS: 500,000 GRDY (H) - 13,200 DELTA (X) 13,200 DELTA (Y)
∙ KVA RATING: 164,000 / 218,666
∙ COOLING CLASS: ONAN/ONAF
∙ TYPE: CLASS II GSU POWER TRANSFORMER
∙ ANALOG TEMPERATURE GAGE FUNCTIONAL VERIFICATION
∙ BUSHING CURRENT TRANSFORMER ROUTINE TESTS
AND POWER FACTOR TESTS DURING TRANSFORMER F.A.T.
∙ EACH HIGH-VOLTAGE AND HIGH-VOLTAGE NEUTRAL BUSHING SHALL UNDERGO CAPACITANCE
∙ ALL ELECTRICAL AND ELECTO-MECHANICAL DEVICES SHALL BE FUNCTIONALLY TESTED
∙ DE-ENERGIZED TAP CHANGER MECHANICAL OPERATIONAL TEST (5 COMPLETE CYCLES)
SHIPPING CONFIGURATION
- ONE SFRA TEST TO BE PERFORMED WITH THE TRANSFORMER IN THE
OIL FILLED
- ONE SFRA TEST TO BE PERFORMED WITH THE TRANSFORMER FULLY ASSEMBLED AND
- CABLE INTEGRITY TEST REQUIRED
∙ SWEEP FREQUENCY RESPONSE ANALYSIS (WITH ELECTRONIC DATA FILES)
∙ LEAKAGE REACTANCE (WITH ELECTRONIC DATA FILES)
ONE HOUR LEVEL: 300 PC
∙ INDUCED VOLTAGE TEST ACCEPTANCE CRITERIA: 7,200 CYCLE ENHANCEMENT LEVEL: 500 PC;
∙ AUDIBLE SOUND LEVEL TESTS SHALL BE PERFORMED
∙ LIGHTNING IMPULSE TESTS
∙ TEMPERATURE RISE TESTS SHALL BE PERFORMED AT EACH COOLING STAGE
∙ ALL 'ROUTINE' TESTS (IEEE C57.12.00, TABLE 17)
THE ISOPHASE BUS WHEN PERMENTLY INSTALLING THE SPARE AT A PROJECT
THE GOVERNMENT WILL USE THE EXISTING COPPER BUS BARS THAT CONNECT THE LV BUSHING TO
∙ PROVIDE LOW-VOLTAGE HOUSINGS TO CONNECT THE TRANSFORMER TO THE ISOPHASE BUS COVER
∙ COOLING FANS: HORTIZONTAL-DRAFT
∙ RADIATORS: HOT-DIP GALVANIZED.
STEEL. MAXIMUM DESIGN FLUX DENSITY OF 1.75 TESLA. STEP-LAP CONSTRUCTION.
∙ CORE: LAMINATIONS MAXIMUM THICKNESS OF 0.270MM, COLD-ROLLED, GRAIN-ORIENTED
∙ SEISMIC: SEISMIC CALCULATIONS REQUIRED FOR MAIN TANK AND ALL MAJOR COMPONENTS.
∙ LIFTING EYES: DESIGN LOADS FOR EACH EYE SHALL BE TWO TIMES THE ACTUAL LOAD.
∙ BASE: DESIGNED FOR PAD MOUNTING WITH SEISMIC WELDING TO STEEL PLATES.
CONSISTING OF A SINGLE ANCHOR POST, SHALL BE PROVIDED.
WITH A NON-SLIP MATERIAL, THE SAME COLOR AS THE TANK WALLS. A FALL PROTECTION SYSTEM, ∙ PERSONAL FALL ARREST SYSTEM: THE TOP OF THE TRANSFORMER TANK SHALL BE COVERED
∙ VALVES: STAINLESS STEEL BALL-TYPE (RADIATORS MAY USE BUTTERFLY-TYPE)
O-RING GASKETS SHALL NOT BE USED FOR GASKET GROOVES OF RECTANGULAR CROSS-SECTION.
THAT THE LOW-VOLTAGE BUSHING GASKETS SHALL BE FLURORELASTOMERIC RUBER.
∙ GASKETS: NITRILE NBR (BUNA-N), DURO 50-60, 25% COMPRESSION, WITH THE EXCEPTION
∙ MAN-HOLE: 24-INCH DIAMETER (MINIMUM TWO)
∙ (QTY 1): VALVE OF EACH SIZE AND TYPE
∙ (QTY 1): BUCHHOLZ RELAY (IF SUPPLYING A COPS TYPE OIL PRESERVATION SYSTEM)
∙ (QTY 1): PRESSURE REGULATOR (IF SUPPLYING NITROGEN BLANKET TYPE OIL PRESERVATION SYSTEM)
∙ (QTY 1): FUSE OF EACH TYPE AND RATING
∙ (QTY 3): FIBER OPTIC EXTENSION CABLE THAT CONNECTS THE FEED-THROUGH WALL PLATE LEFT UNCONNECTED
∙ (QTY 1): CRATED RADIATOR, COMPLETE WITH INLET AND OUTLET ISOLATION VALVES, VENT AND DRAIN VALVES
∙ (QTY 2): COOLING FAN COMPLETE WITH MOTOR, CABLES AND CONNECTORS
∙ (QTY 1): ONE RAPID PRESSURE RELAY AND SEAL IN RELAY
∙ (QTY 1): BUSHING CURRENT TRANSFORMER OF EACH TYPE AND RATING
∙ (QTY 1): OIL TEMPERATURE INDICATOR
∙ (QTY 1): WINDING TEMPERATURE INDICATOR
∙ (QTY 1): LIQUID LEVEL INDICATOR
∙ (QTY 1): PRESSURE RELIEF DEVICE
∙ (QTY 1): RELAY AND CONTACTOR OF EACH TYPE AND RATING
∙ (QTY 1): SET OF GASKETS FOR TRANSFORMER REASSEMBLY
∙ (QTY 1): COMPLETE GASKET SET
OR STAINLESS STEEL WITH ENGRAVED BLACK LETTERING.
NAMEPLATES WITHIN THE CONTROL AND POWER CABINETS SHALL BE ANODIZED ALUMINUM
LOW-VOLTAGE BUSHINGS MADE OF STAINLESS STEEL WITH BLACK LETTERING. DEVICE
PROVIDED. EQUIPMENT NAMEPLATES SHALL BE PROVIDED FOR THE HIGH-VOLTAGE BUSHINGS AND
AN ADDITIONAL DIAGRAM NAMEPLATE FOR SLING LOCATIONS AND LIFT POSITIONS SHALL ALSO BE
AND VACUUM THE TANK WILL WITHSTAND, DRY WEIGHT OF THE INSULATION, AND CALCULATED X/R RATIO.
MANUFACTURING DATE, PLANT LOCATION, GOVERNMENT CONTRACT NUMBER, PRESSURE
∙ NAMEPLATES: CAST BRONZE OR STAINLESS STEEL; IEEE C57.12.00, TABLE 7, INCLUDING
- FOLD-DOWN MAINTENANCE TRAY ON INSIDE OF CONTROL CABINET DOOR.
GRADE HUMIDISTAT / THERMOSTAT CONTROL.
- PTC RESISTOR DESIGN ENCLOSURE HEATERS WITH INTEGRAL FANS, AND INDUSTRIAL
CABINET.
- 120 V AC, 20 A HOSPITAL GRADE GFCI RECEPTACLE MOUNTED INSIDE THE CONTROL
- 120 V AC, 1,000 LUMEN LED TYPE A19 LAMPS WITH DOOR-ACTUATED SWITCH.
IN POWER CABINET.
- ALL CIRCUITS, WIRING AND EQUIPMENT RATED GREATER THAN 120 V AC TO BE MOUNTED
∙ SPECIAL FEATURES:
- 125 AND 250 V DC CIRCUITS - RATED 125/250 OR 250 V DC, AND 10,000 A INTERRUPTING
- 120 V AC CIRCUITS - RATED 250 V DC AND 120/240 OR 240 V AC, AND 10,000 A INTERRUPTING
- 480 V AC CIRCUITS - RATED 600 V AC AND 18,000 A INTERRUPTING AT 480 VAC
∙ MOLDED-CASE CIRCUIT BREAKERS:
120 V AC CIRCUITS - 10 A
- SINGLE-BREAK INDUCTIVE LOAD INTERRUPTING RATING: 125 V DC CIRCUITS - 1.5 A;
- RATED FOR 600 V AC OR 250 V DC
∙ SWITCHES:
120 V AC CIRCUITS - 6.0 A
- SINGLE-CONTACT INDUCTIVE LOAD INTERRUPTING CAPACITY: 125 V DC CIRCUITS - 1.0 A;
- RATED FOR 125 V DC OR 120 V AC; MEETS REQUIREMENTS OF NEMA ICS5; 10 A CONTACTS
∙ AUXILIARY RELAYS:
∙ TERMINAL BLOCKS: 600 V, 30 A MINIMUM, 90 ºC RATED TERMINATIONS.
NFPA 70.
WITH CAST COVERS AND LIQUID-TIGHT HUBS. CONDUIT FILL SHALL BE IN ACCORDANCE WITH
JOINT COMPOUND APPLIED. OUTLET AND JUNCTION BOXES SHALL BE MALLEABLE CAST IRON
CHANNELS NOT ALLOWED. ALL CONDUIT THREADED JOINTS SHALL HAVE A CONDUCTIVE
∙ CONDUIT: ALL WIRING TO BE RUN IN CONDUIT. WIRE RUNS THROUGH TANK REINFORCING
GROUND - GREEN/YELLOW
PHASE B - ORANGE; PHASE C - YELLOW; GROUNDED NEUTRAL - WHITE; INSULATED
∙ WIRING: XLPE; 3-PHASE POWER CONDUCTORS COLOR CODED: PHASE A - BROWN;
POWER - 125 V DC; COOLING FANS - 480 V AC, 3-WIRE, 3-PHASE, 60 HZ
∙ GOVERNMENT-FURNISHED POWER: CONTROL POWER - 125 V DC; ANNUNCIATION
IN CONTROL CABINET. SOLAR SHIELDING ON TOP, FRONT AND SIDE PANELS OF ENCLOSURES.
PROVISIONS. WINDOWS FOR VIEWING THE FUTURE TEMPERATURE MONITOR AND ANNUNCIATOR
∙ CABINET MATERIAL: WEATHER-PROOF TYPE 304 STAINLESS STEEL WITH LOCKING
∙ TRANSFORMER EMBEDDED FIBER-OPTIC WINDING TEMPERATURE MEASUREMENT PROBES
∙ DIRECTED-FLOW PRESSURE RELIEF DEVICE WITH METAL DISCHARGE PIPING
∙ WTI AND OTI GAUGES WITH RTDS - HARDENED FOR HARSH WEATHER CONDITIONS
∙ CORE GROUNDS: 2.5 KV CLASS, 45 KV BIL, 100 AMP
T025W0412ATHITACHI TYPE O+ C
∙ NEUTRAL (H0): 25 KV CLASS, MINIMUM 150 KV BIL, 1,200 AMP
INDICATING EQUIPMENT)
(BUSHING CURRENT TRANSFORMERS AS REQUIRED FOR THE WINDING TEMPERATURE
HITACHI TYPE RJ T025B1000DS
BULK-TYPE, LOW-CORONA, LIGHT CONTAMINATION, 125 ºC TEMPERATURE RISE RATING
∙ PRIMARY WINDING: 25 KV CLASS, MINIMUM 150 KV BIL, 10,000 AMP, PORCELAIN CONSTRUCTION, (TWO 1200:5 MRCT)
T550W2000VVHITACHI TYPE O+ C
∙ SECONDARY WINDING (H1): 500 KV CLASS, MINIMUM 1,500 KV BIL, 1,600 AMP, OIL-FILLED BUSHING
S I
D
F
IN
A L
T
L O
W E
R S
N A
K E
R
IV
E R
S P
A R
E T
R A
N S
F O
R M
E R
S
L
IT
T L
E G
O O
S E
L O
C K
A N
D D
A M
W
E F
R A
O C
T O
B E
R
L L
A W
A L
L A
W
A S
H
IN
G T
O N
N
R
D A
V E
W A
L L
A W
A L
L A
D
IS
T R
IC
T
P O
R T
L A
N D
O
R E
G O
N
S
W
S T
A V
E
H Y
D R
O E
L E
C T
R
IC
D E
S
IG
N C
E N
T E
R
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S F
IL
E
N U
M B
E R
F
IL
E N
A M
E
J O
R D
A N
S F
IN
K
P
G
IO
N A
L T
E M
P E
R A
T U
R E
A N
N U
A L
S U
M M
A R
Y
G-005
P
K L
E
IN
E
P .E
D
F
IL
a G
-0 .d g n
L G
S -1
-6 -0
-A /5
P
K L
E
IN
E
P .E
VOLUME 1
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
S U
B M
IT
T
E D
B Y
C H
E C
K E
D B
Y
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
IS
S
U E
D A
T E
S I Z
E
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E
SHEET ID
®of Engineers
US Army Corps
U .S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
S
S I
D
F
IN
A L
T
L O
W E
R S
N A
K E
R
IV
E R
S P
A R
E T
R A
N S
F O
R M
E R
S
L
IT
T L
E G
O O
S E
L O
C K
A N
D D
A M
W
E F
R A
O C
T O
B E
R
L L
A W
A L
L A
W
A S
H
IN
G T
O N
N
R
D A
V E
W A
L L
A W
A L
L A
D
IS
T R
IC
T
P O
R T
L A
N D
O
R E
G O
N
S
W
S T
A V
E
H Y
D R
O E
L E
C T
R
IC
D E
S
IG
N C
E N
T E
R
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S F
IL
E
N U
M B
E R
F
IL
E N
A M
E
J O
R D
A N
S F
IN
K
P
IT
E L
O C
A T
IO
N
P H
O T
O G
R A
P H
S
G-006
N
B E
E M
D
F
IL
a G
-0 .d g n
L G
S -1
-6 -0
-A /6
P
K L
E
IN
E
P .E
VOLUME 1
STORAGE YARD
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
S U
B M
IT
T
E D
B Y
C H
E C
K E
D B
Y
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
IS
S
U E
D A
T E
S I Z
E
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E
SHEET ID
®of Engineers
US Army Corps
U .S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
R S
H3
STORAGE YARD MAP VIEW
SCALE: NTS
H13
STORAGE YARD
SCALE: NTS
B2
TRANSFORMER INTAKE DECK
SCALE: NTS
B13
ACROSS INTAKE BRIDGE AT LITTLE GOOSE
PREVIOUS SPARE TRANSFORMER MOVEMENT
SEGMENT 2 SEGMENT 4
BUSHING SIDE)
(LOW-VOLTAGE
SEGMENT 1
BUSHING SIDE)
(HIGH-VOLTAGE
SEGMENT 3
M A
X O
V E
R A
L L
L E
N G
T H
/4
MAX OVERALL WIDTH 309"
JACKING CENTERS
47"47"
72"72"
50" CENTERLINE TO CENTER OF ITEM 2
144"
L V
B U
S H
IN
G
S
C
E N
T E
R
/4
T O
C E
N T
E R
O F
H
B U
S H
IN
G
T E
R M
IN
A
L 5
/2
L V
H O
U S
IN
G
S C
E N
T E
R O
F
CENTERLINE OF ITEM 7394"
7" 7"
13 1/4 "
26 1/2 "
7" 7"
2 1/2 "
6 1/2 "
/2
/4
/2
/8
9 1/4 "
/4
18" 14 11/16 " 14 11/16 " 18"
A N
S I
D
F
IN
A L
T
L O
W E
R S
N A
K E
R
IV
E R
S P
A R
E T
R A
N S
F O
R M
E R
S
L
IT
T L
E G
O O
S E
L O
C K
A N
D D
A M
W
E F
R A
O C
T O
B E
R
L L
A W
A L
L A
W
A S
H
IN
G T
O N
N
R
D A
V E
W A
L L
A W
A L
L A
D
IS
T R
IC
T
P O
R T
L A
N D
O
R E
G O
N
S
W
S T
A V
E
H Y
D R
O E
L E
C T
R
IC
D E
S
IG
N C
E N
T E
R
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S F
IL
E
N U
M B
E R
F
IL
E N
A M
E
J O
R D
A N
S F
IN
K
P
P V
IE
W
G E
N E
R A
T O
R S
T E
P -U
P T
R A
N S
F O
R M
E R
E-101
P
K L
E
IN
E
P .E
D
F
IL
a E
-1 .d g n
L G
S -1
-6 -1
E
/1
P
K L
E
IN
E
P .E
REQUIREMENTS
DETAIL H1 FOR
SEE NOTE 4 AND
C E
N T
E R
O F
H B
U S
H
IN
G T
O X
F M
R C
E N
T E
R L
IN
E
X-1
X-2
Y-1
Y-2
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
S U
B M
IT
T
E D
B Y
C H
E C
K E
D B
Y
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
IS
S
U E
D A
T E
S I Z
E
M A
R K
D E
S C
R
IP
T
IO
N D
A T
SHEET ID
/8
B A
S E
EXISTING
COPPER BARS
TO ISOPHASE BUS
CL
CL
COVER
XFMR
EXISTING
COVER
XFMR
EXISTING
CL OF LV BUSHING
LV BUSHING
CL OF
ACCESS COVER
LV HOUSING
OF HOUSING
WELD TO INSIDE
3/8X NUTS TOTAL
SEGMENT
1 HIGH-VOLTAGE (H1) BUSHING1
QTYITEM DESCRIPTION
1.5-INCH UPPER FILTER VALVE
3-INCH VACUUM VALVE
RADIATORS (TYPICAL)
RADIATOR ISOLATION VALVES
HIGH-VOLTAGE NEUTRAL (H0) BUSHING
LOW-VOLTAGE BUSHINGS
COVER
COVER
COVER
OIL LEVEL INDICATOR
AS DES.
AS DES.
CONTROL CABINET
COVER
3-INCH MAIN OIL DRAIN VALVE
1.5-INCH LOWER FILTER VALVE
COVER
EXAMPLE MODEL NUMBER
33 4, COVER
HITACHI
HITACHI
QUALITROL XPRDPRESSURE RELIEF DEVICE WITH DISCHARGE PIPING
MILWAUKEE VALVE F20 SERIES, SS, CLASS 150
MILWAUKEE VALVE
MILWAUKEE VALVE
MILWAUKEE VALVE
MILWAUKEE VALVE
QUALITROL 042 SERIES
35 COVER MANHOLE ACCESS COVER
45 AS DES. COVER FALL ARREST SYSTEM MOUNTING BRACKETS DBI-SALA 8517412
CORE & CORE FRAME GROUND BUSHINGS (SEE FIGURE 2)
AS DES.
BILL OF MATERIALS
BULK, TYPE RJ T025B1000DS
1, 2, 4
1, 2, 4
15 1 2 DUAL TANK NITROGEN REGULATOR CABINET ABB RND2
2 2-INCH GAS-IN-OIL MONITOR INTERFACE VALVES
5 THERMOWELLS (QTY. 3 - STANDARD, QTY. 2 - HEATED)
TYPE O + C T550W2000VV
10 1, 2, 4 HORIZONTAL DRAFT COOLING FANS KRENZ-VENTAS DES.
1 POWER CABINET17 3
70 1 3 AUXILIARY POWER TRANSFORMER
GENERAL NOTES
PROTECTIVE COVER
CORE
(#4 AWG)
GROUNDING CABLE
BUSHING
CORE GROUND
GROUND BUSHING
CORE FRAME
TANK COVER
CORE FRAME
(#4 AWG)
GROUNDING CABLE
TANK COVER
CL
E10
CORE AND CORE FRAME GROUNDING
SCALE: NTS
A17
SEGMENT IDENTIFICATION (TOP VIEW)
TRANSFORMER TANK
SCALE: NTS
A1
TRANSFORMER COVER
3/8"=1'-0"SCALE:
A9
EXISTING LV BUSHING BUS BARS
SCALE: NTS
HITACHI
TYPE O + C T025W0412AT
H1
LOW-VOLTAGE BUSHING HOUSINGS
SCALE: 1/2" = 1'-0"
21 1 3 RAPID PRESSURE RISE RELAY WITH 1-1/2-INCH ISOLATION VALVE QUALITROL/MILWAUKEE VALVE
F20 SERIES, SS, CLASS 150
F20 SERIES, SS, CLASS 150
F20 SERIES, SS, CLASS 150
900-FLA & F20 SERIES, SS, CLASS 150
®of Engineers
US Army Corps
U .S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
R S
6. SEE RESOURCE DRAWINGS FOR PAD DETAILS.
5. MAXIMUM WEIGHT: 591,500 POUNDS
FLEXIBLE CONDUCTORS. SEE SECTION H1 AND A9.
BARS WILL BE REUSED TO CONNECT THE BUSHING TO THE ISOPHASE BUS AND
CABLES THAT CONNECT TO THE ISOPHASE BUS. THE EXISTING COPPER BUS
TO REMOVE AND ALLOWS ACCESS TO THE LV BUSHINGS AND THE FLEXIBLE
4. PROVIDE WEATHER PROOF LV HOUSINGS WITH ACCESS COVER THAT ARE EASY
ARE NOT INTENDED TO INDICATE THE ACTUAL QUANTITY.
3. THE RADIATORS AS DEPICTED INDICATE THE PERMISSIBLE LOCATIONS, AND
BREATHER, AND BUCHHOLZ RELAY.
SYSTEM MUST BE INCLUDED, SUCH AS A MAINTENACE-FREE DEHYDRATING
REQUIRED IN SECTION 48 19 23.08 26 FOR A CONSTANT OIL PRESERVATION
OIL PRESERVATION SYSTEM IS PROVIDED, ALL ASSOCIATED EQUIPMENT
THE POWERHOUSE EQUIPMENT NEEDED TO FIT THE COPS TANK. IF CONSTANT
CONDUCTORS PER IEEE STD 1427. THERE SHALL BE NO MODIFICATIONS TO
MUST MAINTAIN A MINIMUM OF 105" CLEARANCE FROM THE OVERHEAD 500KV
THE DIMENSIONAL REQUIREMENTS IDENTIFIED MUST BE MET. THE COPS TANK
TRANSFORMER AND/OR A CONSTANT OIL PRESERVATION SYSTEM IS PROVIDED,
DRAWINGS WITH AN INERT-GAS OIL PRESERVATION SYSTEM. IF A CORE-FORM
THE DRAWING SHOWN IS BASED ON THE WESTINGHOUSE SHELL-FORM2.
J. MAXIMUM OVERALL LENGTH
I. MAXIMUM OVERALL WIDTH
H. STRUCTURAL BASE
G. JACKING & LIFTING FACILITIES
F. ANCILLARY DEVICES
E. CONTROL AND POWER CABINETS
VOLTAGE BUS
D. LOW-VOLTAGE BUSHING HOUSING DIMENSIONS AND LOCATION OF LOW-
C. HIGH-VOLTAGE NEUTRAL BUSHING LOCATION AND TERMINAL CONNECTION
B. LOW-VOLTAGE BUSHINGS LOCATIONS AND TERMINAL CONNECTIONS
A. HIGH-VOLTAGE BUSHING LOCATION AND TERMINAL CONNECTION
INTERCONNECTION:
TRANSFORMER EQUIPMENT ARE CONSIDERED CRITICAL TO ASSURE PROPER
THE TRANSFORMER VAULT. THE LOCATIONS OF THE FOLLOWING
PROPER INTERCONNECTION TO THE EXISTING EQUIPMENT AND INTERFACES IN
FOR THE MANUFACTURER'S USE IN DESIGNING THE TRANSFORMER FOR
1. THE TRANSFORMER LAYOUT AND LIMITING DIMENSIONS HAVE BEEN PROVIDED
72 4 COVER LOW-VOLTAGE BUSHING HOUSINGS (SEE H1 AND A9)
73 2 1 COMBINATION JACKING PAD, ROCKER, AND LIFTING EYES
42 2 3 COMBINATION JACKING PAD AND LIFTING EYES
75 1 3 EXTERNAL GAS EXPANSION TANK
AS DES.
/8
T O
T O
P O
F L
V B
U S
H
IN
G
/2
T
O T
H E
C E
N T
E R
O F
T H
E T
O P
O F
T H
E H
V B
U S
H
IN
G T
E R
M
IN
A L
/8
T
O T
O P
O F
L V
H O
U S
IN
G
/8
T O
C E
N T
E R
O F
L V
B U
S
MAXIMUM OVERALL WIDTH 309"
CENTERLINE OF ITEM 42
10'-10 1/2 "
1'-6"
7'-10"
A N
S I
D
F
IN
A L
T
L O
W E
R S
N A
K E
R
IV
E R
S P
A R
E T
R A
N S
F O
R M
E R
S
L
IT
T L
E G
O O
S E
L O
C K
A N
D D
A M
W
E F
R A
O C
T O
B E
R
L L
A W
A L
L A
W
A S
H
IN
G T
O N
N
R
D A
V E
W A
L L
A W
A L
L A
D
IS
T R
IC
T
P O
R T
L A
N D
O
R E
G O
N
S
W
S T
A V
E
H Y
D R
O E
L E
C T
R
IC
D E
S
IG
N C
E N
T E
R
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S F
IL
E
N U
M B
E R
F
IL
E N
A M
E
J O
R D
A N
S F
IN
K
P
.E
S E
G M
E N
T
L A
Y O
U T
A N
D L
IM
IT
IN
G
D
IM
E N
S
IO
N S
G E
N E
R A
T O
R S
T E
P -U
P T
R A
N S
F O
R M
E R
E-102
P
K L
E
IN
E
P .E
D
F
IL
a E
-1 .d g n
L G
S -1
-6 -1
E
/2
P
K L
E
IN
E
P .E
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
B
C
D
E
F
G
H
J
K
L
M
N
P
S U
B M
IT
T
E D
B Y
C H
E C
K E
D B
Y
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
IS
S
U E
D A
T E
S I Z
E
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E
SHEET ID
®of Engineers
US Army Corps
U .S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
R S
SEE NOTE 4
DECK LEVEL
A13
SEGMENT IDENTIFICATION (TOP VIEW)
FIGURE 1 - TRANSFORMER TANK
SCALE: NTS
SEGMENT
1 HIGH-VOLTAGE (H1) BUSHING1
QTYITEM DESCRIPTION
3-INCH VACUUM VALVE
RADIATORS (TYPICAL)
RADIATOR ISOLATION VALVES
LOW-VOLTAGE BUSHINGS
COVER
COVER
AS DES.
AS DES.
COVER
EXAMPLE MODEL NUMBER
HITACHI
HITACHI
MILWAUKEE VALVE F20 SERIES, SS, CLASS 150
BILL OF MATERIALS
BULK, TYPE RJ T025B1000DS
1, 2, 4
1, 2, 4
TYPE O+ C T550W2000VV
HORIZONTAL DRAFT COOLING FANSAS DES.10 1, 2, 4 KRENZ-VENT
27 1 1 1.5-INCH UPPER FILTER VALVE MILWAUKEE VALVE F20 SERIES, SS, CLASS 150
6. SEE RESOURCE DRAWINGS FOR PAD DETAILS.
MAXIMUM WEIGHT: 591,500 POUNDS5.
SHEET E-101 FOR DIMENSIONAL REQUIREMENTS AND DETAILS.
PROVIDE LOW-VOLTAGE BUSHING HOUSINGS AS INDICATED. SEE SECTION H1 ON 4.
ARE NOT INTENDED TO INDICATE THE ACTUAL QUANTITY.
3. THE RADIATORS AS DEPICTED INDICATE THE PERMISSIBLE LOCATIONS, AND
BREATHER, AND BUCHHOLZ RELAY.
SYSTEM MUST BE INCLUDED, SUCH AS A MAINTENACE-FREE DEHYDRATING
REQUIRED IN SECTION 48 19 23.08 26 FOR A CONSTANT OIL PRESERVATION
OIL PRESERVATION SYSTEM IS PROVIDED, ALL ASSOCIATED EQUIPMENT
THE POWERHOUSE EQUIPMENT NEEDED TO FIT THE COPS TANK. IF CONSTANT
CONDUCTORS PER IEEE STD 1427. THERE SHALL BE NO MODIFICATIONS TO
MUST MAINTAIN A MINIMUM OF 105" CLEARANCE FROM THE OVERHEAD 500KV
THE DIMENSIONAL REQUIREMENTS IDENTIFIED MUST BE MET. THE COPS TANK
TRANSFORMER AND/OR A CONSTANT OIL PRESERVATION SYSTEM IS PROVIDED,
DRAWINGS WITH AN INERT-GAS OIL PRESERVATION SYSTEM. IF A CORE-FORM
THE DRAWING SHOWN IS BASED ON THE WESTINGHOUSE SHELL-FORM2.
I. MAXIMUM OVERALL WIDTH
H. STRUCTURAL BASE
G. JACKING & LIFTING FACILITIES
F. ANCILLARY DEVICES
E. CONTROL AND POWER CABINETS
VOLTAGE BUS
D. LOW VOLTAGE BUSHING HOUSING DIMENSIONS AND LOCATION OF LOW
C. LOW-VOLTAGE BUSHINGS LOCATIONS AND TERMINAL CONNECTIONS
B. HIGH-VOLTAGE NEUTRAL BUSHING LOCATION AND TERMINAL CONNECTION
A. HIGH-VOLTAGE BUSHING LOCATION AND TERMINAL CONNECTION
INTERCONNECTION:
TRANSFORMER EQUIPMENT ARE CONSIDERED CRITICAL TO ASSURE PROPER
THE TRANSFORMER VAULT. THE LOCATIONS OF THE FOLLOWING
PROPER INTERCONNECTION TO THE EXISTING EQUIPMENT AND INTERFACES IN
FOR THE MANUFACTURER'S USE IN DESIGNING THE TRANSFORMER FOR
1. THE TRANSFORMER LAYOUT AND LIMITING DIMENSIONS HAVE BEEN PROVIDED
GENERAL NOTES
SEGMENT 2 SEGMENT 4
BUSHING SIDE)
(LOW-VOLTAGE
SEGMENT 1
BUSHING SIDE)
(HIGH-VOLTAGE
SEGMENT 3
49 4 1,3 GROUNDING PADS (TYPICAL)
A1
TRANSFORMER ELEVATION VIEW- SEGMENT 1
SCALE: 3/8" = 1'-0"
COVER72 4 LOW-VOLTAGE BUSHING HOUSINGS
73 2 1 COMBINATION JACKING PAD, ROCKER AND LIFTING EYES
43 AS DES. BASE STRUCTURAL BASE
/8
T O
C E
N T
E R
L
IN
E O
F L
V B
U S
/4
T
O T
O P
O F
H V
N E
U T
R A
L B
U S
H
IN
G
21'-3 3/4 " MAXIMUM LENGTH
LV BUSHINGS
2'-11" CENTER OF
OF LV BUS
3'-4" CENTER
MAXIMUM OVER OPEN DOOR10'-2 3/8 "
7'-11 3/4 " TO EXISTING EMBEDDED CONDUIT
/2
T
O T
H E
C E
N T
E R
O F
T H
E T
O P
O F
T H
E H
V B
U S
H
IN
G T
E R
M
IN
A L
A N
S I
D
F
IN
A L
T
L O
W E
R S
N A
K E
R
IV
E R
S P
A R
E T
R A
N S
F O
R M
E R
S
L
IT
T L
E G
O O
S E
L O
C K
A N
D D
A M
W
E F
R A
O C
T O
B E
R
L L
A W
A L
L A
W
A S
H
IN
G T
O N
N
R
D A
V E
W A
L L
A W
A L
L A
D
IS
T R
IC
T
P O
R T
L A
N D
O
R E
G O
N
S
W
S T
A V
E
H Y
D R
O E
L E
C T
R
IC
D E
S
IG
N C
E N
T E
R
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S F
IL
E
N U
M B
E R
F
IL
E N
A M
E
J O
R D
A N
S F
IN
K
P
.E
S E
G M
E N
T
L A
Y O
U T
A N
D L
IM
IT
IN
G
D
IM
E N
S
IO
N S
G E
N E
R A
T O
R S
T E
P -U
P T
R A
N S
F O
R M
E R
E-103
P
K L
E
IN
E
P .E
D
F
IL
a E
-1 .d g n
L G
S -1
-6 -1
E
/3
P
K L
E
IN
E
P .E
B
C
D
E
F
G
H
J
K
L
M
N
P
S U
B M
IT
T
E D
B Y
C H
E C
K E
D B
Y
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
IS
S
U E
D A
T E
S I Z
E
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E
SHEET ID
®of Engineers
US Army Corps
U .S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
R S
DECK LEVEL
SEE NOTE 4
DECK LEVEL
DECK LEVEL
A1
TRANSFORMER ELEVATION VIEW - SEGMENT 2
SCALE: 1/2"=1'-0" A16
IDENTIFICATION (TOP VIEW)
FIGURE 1 - TRANSFORMER TANK SEGMENT
SCALE: NTS
SEGMENT
1 HIGH-VOLTAGE (H1) BUSHING1
QTYITEM DESCRIPTION
RADIATORS (TYPICAL)
HIGH-VOLTAGE NEUTRAL (H0) BUSHING
COVER
COVER
AS DES.
POWER CABINET
EXAMPLE MODEL NUMBER
17 3
HITACHI
HITACHI
MILWAUKEE VALVE
BILL OF MATERIALS
1, 2, 4
32 2-INCH GAS-IN-OIL MONITOR INTERFACE VALVES
TYPE O + C T550W2000VV
10 1, 2, 4 HORIZONTAL DRAFT COOLING FANS KRENZ-VENTAS DES.
16 1 3 CONTROL CABINET
20 5 3 THERMOWELLS (QTY. 3 - STANDARD, QTY. 2 - HEATED)
21 1 3 RAPID PRESSURE RISE RELAY WITH 1-1/2-INCH ISOLATION VALVE QUALITROL/MILWAUKEE VALVE 900-FLA & F20 SERIES, SS, CLASS 150
43 AS DES. BASE STRUCTURAL BASE
27 1 1 1.5-INCH UPPER FILTER VALVE MILWAUKEE VALVE
6. SEE RESOURCE DRAWINGS FOR PAD DETAILS.
MAXIMUM WEIGHT: 591,500 POUNDS5.
SHEET E-101 FOR DIMENSIONAL REQUIREMENTS AND DETAILS.
PROVIDE LOW-VOLTAGE BUSHING HOUSINGS AS INDICATED. SEE SECTION H1 ON 4.
ARE NOT INTENDED TO INDICATE THE ACTUAL QUANTITY.
3. THE RADIATORS AS DEPICTED INDICATE THE PERMISSIBLE LOCATIONS, AND
BREATHER, AND BUCHHOLZ RELAY.
SYSTEM MUST BE INCLUDED, SUCH AS A MAINTENACE-FREE DEHYDRATING
REQUIRED IN SECTION 48 19 23.08 26 FOR A CONSTANT OIL PRESERVATION
OIL PRESERVATION SYSTEM IS PROVIDED, ALL ASSOCIATED EQUIPMENT
THE POWERHOUSE EQUIPMENT NEEDED TO FIT THE COPS TANK. IF CONSTANT
CONDUCTORS PER IEEE STD 1427. THERE SHALL BE NO MODIFICATIONS TO
MUST MAINTAIN A MINIMUM OF 105" CLEARANCE FROM THE OVERHEAD 500KV
THE DIMENSIONAL REQUIREMENTS IDENTIFIED MUST BE MET. THE COPS TANK
TRANSFORMER AND/OR A CONSTANT OIL PRESERVATION SYSTEM IS PROVIDED,
DRAWINGS WITH AN INERT-GAS OIL PRESERVATION SYSTEM. IF A CORE-FORM
THE DRAWING SHOWN IS BASED ON THE WESTINGHOUSE SHELL-FORM2.
AND POWER CABINET
I. LOCATION OF EXISTING EMBEDDED CONDUIT COMPARED TO THE CONTROL
H. MAXIMUM OVERALL LENGTH
H. STRUCTURAL BASE
G. JACKING & LIFTING FACILITIES
F. ANCILLARY DEVICES
E. CONTROL AND POWER CABINETS
VOLTAGE BUS
D. LOW-VOLTAGE BUSHING HOUSINGS DIMENSIONS AND LOCATIONS OF LOW-
C. HIGH-VOLTAGE NEUTRAL BUSHING LOCATION AND TERMINAL CONNECTION
B. LOW-VOLTAGE BUSHING LOCATIONS AND TERMINAL CONNECTIONS
A. HIGH-VOLTAGE BUSHING LOCATION AND TERMINAL CONNECTION
EQUIPMENT ARE CONSIDERED CRITICAL TO ASSURE PROPER INTERCONNECTION:
. THE LOCATIONS OF THE FOLLOWING TRANSFORMER TRANSFORMER VAULT
INTERFACES IN THE INTERCONNECTION TO THE EXISTING EQUIPMENT AND
THE MANUFACTURER'S USE IN DESIGNING THE TRANSFORMERS FOR PROPER
1. THE TRANSFORMER LAYOUT AND LIMITING DIMENSIONS HAVE BEEN PROVIDED FOR
GENERAL NOTES
SEGMENT 2 SEGMENT 4
BUSHING SIDE)
(LOW-VOLTAGE
SEGMENT 1
BUSHING SIDE)
(HIGH-VOLTAGE
SEGMENT 3
TYPE O + C TO25W0412AT
19 3 3 ANALOG TEMPERATURE INDICATORS
18 1 3 OIL LEVEL INDICATOR
72 4 COVER LOW-VOLTAGE BUSHING HOUSINGS
75 1 3 EXTERNAL GAS EXPANSION TANK
7 COVER CORE & CORE FRAME GROUND BUSHINGS
15 1 1 DUAL TANK NITROGEN REGULATOR CABINET ABB RND2
42 2 3 COMBINATION JACKING PAD, AND LIFTING EYES
25 1 3 3-INCH MAIN OIL DRAIN VALVE MILWAUKEE VALVE
RADIATOR ISOLATION VALVES1, 2, 4AS DES.9
QUALITROL 042 SERIES
F20 SERIES, SS, CLASS 150
F20 SERIES, SS, CLASS 150
F20 SERIES, SS, CLASS 150
QUALITROL TR6000 SERIES
73 2 1 COMBINATION JACKING PAD, ROCKER, & LIFTING EYES
74 2 3 LIFTING EYES FOR UPRIGHTING THE TRANSFORMER
XRPDQUALITROLPRESSURE RELIEF DEVICE WITH DISCHARGE PIPING33 1 4, COVER
JACKING CENTERS
1'-0" 3'-5"
7'-10"
/2
T
O T
H E
C E
N T
E R
O F
T H
E T
O P
O V
T H
E H
V B
U S
H
IN
G T
E R
M
IN
A L
/8
T
O T
O P
O F
L V
H O
U S
IN
G
2'-2 1/8 "
MAXIMUM OVERAL WIDTH 309"
12'-0"
C E
N T
E R
L
IN
E O
F L
V B
U S
T O
T O
P O
F L
V B
U S
H
IN
G
/4
T
O P
O F
H V
N E
U T
R A
L B
U S
H
IN
G
10'-10 1/2 "
A N
S I
D
F
IN
A L
T
L O
W E
R S
N A
K E
R
IV
E R
S P
A R
E T
R A
N S
F O
R M
E R
S
L
IT
T L
E G
O O
S E
L O
C K
A N
D D
A M
W
E F
R A
O C
T O
B E
R
L L
A W
A L
L A
W
A S
H
IN
G T
O N
N
R
D A
V E
W A
L L
A W
A L
L A
D
IS
T R
IC
T
P O
R T
L A
N D
O
R E
G O
N
S
W
S T
A V
E
H Y
D R
O E
L E
C T
R
IC
D E
S
IG
N C
E N
T E
R
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S F
IL
E
N U
M B
E R
F
IL
E N
A M
E
J O
R D
A N
S F
IN
K
P
.E
S E
G M
E N
T
L A
Y O
U T
A N
D L
IM
IT
IN
G
D
IM
E N
S
IO
N S
G E
N E
R A
T O
R S
T E
P -U
P T
R A
N S
F O
R M
E R
E-104
P
K L
E
IN
E
P .E
D
F
IL
a E
-1 .d g n
L G
S -1
-6 -1
E
/4
P
K L
E
IN
E
P .E
DECK LEVEL
SEE NOTE 4
DECK LEVELDECK LEVEL
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
S U
B M
IT
T
E D
B Y
C H
E C
K E
D B
Y
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
IS
S
U E
D A
T E
S I Z
E
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E
SHEET ID
®of Engineers
US Army Corps
U .S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
R S
A16
IDENTIFICATION (TOP VIEW)
FIGURE 1 - TRANSFORMER TANK SEGMENT
SCALE: NTS
ARE NOT INTENDED TO INDICATE THE ACTUAL QUANTITY.
3. THE RADIATORS AS DEPICTED INDICATE THE PERMISSIBLE LOCATIONS, AND
BREATHER, AND BUCHHOLZ RELAY.
SYSTEM MUST BE INCLUDED, SUCH AS A MAINTENACE-FREE DEHYDRATING
REQUIRED IN SECTION 48 19 23.08 26 FOR A CONSTANT OIL PRESERVATION
OIL PRESERVATION SYSTEM IS PROVIDED, ALL ASSOCIATED EQUIPMENT
THE POWERHOUSE EQUIPMENT NEEDED TO FIT THE COPS TANK. IF CONSTANT
CONDUCTORS PER IEEE STD 1427. THERE SHALL BE NO MODIFICATIONS TO
MUST MAINTAIN A MINIMUM OF 105" CLEARANCE FROM THE OVERHEAD 500KV
THE DIMENSIONAL REQUIREMENTS IDENTIFIED MUST BE MET. THE COPS TANK
TRANSFORMER AND/OR A CONSTANT OIL PRESERVATION SYSTEM IS PROVIDED,
DRAWINGS WITH AN INERT-GAS OIL PRESERVATION SYSTEM. IF A CORE-FORM
THE DRAWING SHOWN IS BASED ON THE WESTINGHOUSE SHELL-FORM2.
I. MAXIMUM OVERAL WIDTH
H. STRUCTURAL BASE INCLUDING WIDTH
G. JACKING FACILITIES
F. ANCILLARY DEVICES
E. CONTROL AND POWER CABINETS
LOW VOLTAGE BUS
D. LOW-VOLTAGE BUSHING HOUSING DIMENSIONS AND LOCATION OF
CONNECTION
C. HIGH-VOLTAGE NEUTRAL BUSHING LOCATION AND TERMINAL
B. LOW-VOLTAGE BUSHING LOCATIONS AND TERMINAL CONNECTIONS
A. HIGH-VOLTAGE BUSHING LOCATION AND TERMINAL CONNECTION
EQUIPMENT ARE CONSIDERED CRITICAL TO ASSURE PROPER INTERCONNECTION:
. THE LOCATIONS OF THE FOLLOWING TRANSFORMER TRANSFORMER VAULT
INTERFACES IN THE INTERCONNECTION TO THE EXISTING EQUIPMENT AND
PROPER THE MANUFACTURER'S USE IN DESIGNING THE TRANSFORMER FOR
1. THE TRANSFORMER LAYOUT AND LIMITING DIMENSIONS HAVE BEEN PROVIDED FOR
GENERAL NOTES
SEGMENT 2 SEGMENT 4
BUSHING SIDE)
(LOW-VOLTAGE
SEGMENT 1
BUSHING SIDE)
(HIGH-VOLTAGE
SEGMENT 3
SEGMENT
1 HIGH-VOLTAGE (H1) BUSHING1
QTYITEM DESCRIPTION
RADIATORS (TYPICAL)
RADIATOR ISOLATION VALVES
HIGH-VOLTAGE NEUTRAL (H0) BUSHING
LOW-VOLTAGE BUSHINGS
COVER
COVER
COVER
OIL LEVEL INDICATOR
AS DES
AS DES
CONTROL CABINET
3-INCH MAIN OIL DRAIN VALVE
1.5-INCH LOWER FILTER VALVE
EXAMPLE MODEL NUMBER
33 4, COVER
HITACHI
HITACHI
HITACHI
PRESSURE RELIEF DEVICE WITH DISCHARGE PIPING
MILWAUKEE VALVE
MILWAUKEE VALVE
QUALITROL 042 SERIES
BILL OF MATERIALS
BULK, TYPE RJ TO25B1000DS
1, 2, 4
1, 2, 4
35 THERMOWELLS (QTY 3 - STANDARD, QTY 2 - HEATED)
TYPE O + C T550W2000VV
QUALITROL
17 1 3 POWER CABINET
19 3 3 ANALOG TEMPERATURE GAUGES
21 1 3 RAPID PRESSURE RISE RELAY WITH 1-1/2-INCH ISOLATION VALVE QUALITROL/MILWAUKEE VALVE 900-FLA & F20 SERIES, SS, CLASS 150
38 1 3 TRANSFORMER NAMEPLATE
42 2 3 COMBINATION JACKING PAD, AND LIFTING EYES
43 AS DES BASE STRUCTURAL BASE
70 1 3 AUXILIARY POWER TRANSFORMER
EXTERNAL GAS EXPANSION TANK1 375
LOW-VOLTAGE BUSHING HOUSINGS4 COVER72
TYPE O + C T025W0412AT
15 1 2 DUAL TANK NITROGEN REGULATOR CABINET
22 2 2 MOUNTING BRACKETS FOR FUTURE ON-LINE DGA MONITOR
XRPD
30 2 3 2-INCH GAS-IN-OIL MONITOR ISOLATION VALVES MILWAUKEE VALVE
ABB RND2
F20 SERIES, SS, CLASS 150
F20 SERIES, SS, CLASS 150
F20 SERIES, SS, CLASS 150
QUALITROL TR6000 SERIES
49 GROUNDING PADS (TYPICAL)1,34
A1
SEGMENT 3
3/8"=1'-0"SCALE:
GENERAL NOTES (CONT)
6. SEE RESOURCE DRAWINGS FOR PAD DETAILS.
MAXIMUM WEIGHT: 591,500 POUNDS5.
SHEET E-101 FOR DIMENSIONAL REQUIREMENTS AND DETAILS.
4. PROVIDE LOW-VOLTAGE BUSHING HOUSINGS AS INDICATED. SEE DETAIL H1 ON
74 2 3 LIFTING EYES FOR UPRIGHTING THE TRANSFORMER
LV BUSHINGS
2'-11" CENTER OF
3'-4" CENTER OF BUS
/4
T
O T
O P
O F
H O
B U
S H
IN
G
/2
T
O T
O P
O F
T H
E H
B
U S
H
IN
G T
E R
M
IN
A L
21'-3 3/4 " MAXIMUM OVERALL LENGTH
7'-11 3/4 " TO EXISTING EMBEDDED CONDUIT
/8
16 17
SEE NOTE 4
A N
S I
D
F
IN
A L
T
L O
W E
R S
N A
K E
R
IV
E R
S P
A R
E T
R A
N S
F O
R M
E R
S
L
IT
T L
E G
O O
S E
L O
C K
A N
D D
A M
W
E F
R A
O C
T O
B E
R
L L
A W
A L
L A
W
A S
H
IN
G T
O N
N
R
D A
V E
W A
L L
A W
A L
L A
D
IS
T R
IC
T
P O
R T
L A
N D
O
R E
G O
N
S
W
S T
A V
E
H Y
D R
O E
L E
C T
R
IC
D E
S
IG
N C
E N
T E
R
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S F
IL
E
N U
M B
E R
F
IL
E N
A M
E
J O
R D
A N
S F
IN
K
P
.E
S E
G M
E N
T
L A
Y O
U T
A N
D L
IM
IT
IN
G
D
IM
E N
S
IO
N S
G E
N E
R A
T O
R S
T E
P -U
P T
R A
N S
F O
R M
E R
E-105
P
K L
E
IN
E
P .E
D
F
IL
a E
-1 .d g n
L G
S -1
-6 -1
E
/5
P
K L
E
IN
E
P .E
T
L E
G O
O S
E L
O C
K A
N D
D
M
B
C
D
E
F
G
H
J
K
L
M
N
P
S U
B M
IT
T
E D
B Y
C H
E C
K E
D B
Y
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
IS
S
U E
D A
T E
S I Z
E
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E
SHEET ID
®of Engineers
US Army Corps
U .S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
R S
DECK LEVEL
A2
TRANSFORMER ELEVATION VIEW - SEGMENT 4
SCALE: 1/2"=1'-0"
A13
IDENTIFICATION (TOP VIEW)
FIGURE 1 - TRANSFORMER TANK SEGMENT
SCALE: NTS
SEGMENT
1 HIGH-VOLTAGE (H1) BUSHING1
QTYITEM DESCRIPTION
RADIATORS (TYPICAL)
HIGH-VOLTAGE NEUTRAL (H0) BUSHING
CORE & CORE FRAME GROUND BUSHINGS
COVER
COVER
COVER
OIL LEVEL INDICATOR
AS DES.
POWER CABINET
EXAMPLE MODEL NUMBER
ABB-HITACHI
ABB-HITACHI
MILWAUKEE VALVE
QUALITROL 042 SERIES
42 2 3 COMBINED JACK PAD, AND LIFTING EYES
BILL OF MATERIALS
1,2,4
32 2-INCH DISSOLVED GAS-IN-OIL MONITOR INTERFACE VALVES
TYPE O + C T550W2000VV
10 COVER HORIZONTAL DRAFT COOLING FANS (TYPICAL) KRENZ-VENTAS DES.
16 1 3 CONTROL CABINET
22 2 3 MOUNTING BRACKETS FOR FUTURE ON-LINE DGA MONITOR
43 AS DES. BASE STRUCTURAL BASE
TYPE O + C T025W0412AT
33 QUALITROL XPRD4,COVER1 PRESSURE RELIEF DEVICE WITH DISCHARGE PIPING
27 1 1 1-1/2-INCH UPPER FILTER VALVE MILWAUKEE VALVE F20 SERIES, SS, CLASS 150
70 1 3 AUXILIARY POWER TRANSFORMER
6. SEE RESOURCE DRAWINGS FOR PAD DETAILS.
MAXIMUM WEIGHT: 591,500 POUNDS5.
SHEET E-101 FOR DIMENSIONAL REQUIREMENTS AND DETAILS.
PROVIDE LOW-VOLTAGE BUSHING HOUSINGS AS INDICATED. SEE SECTION H1 ON 4.
ARE NOT INTENDED TO INDICATE THE ACTUAL QUANTITY.
3. THE RADIATORS AS DEPICTED INDICATE THE PERMISSIBLE LOCATIONS, AND
BREATHER, AND BUCHHOLZ RELAY.
SYSTEM MUST BE INCLUDED, SUCH AS A MAINTENACE-FREE DEHYDRATING
REQUIRED IN SECTION 48 19 23.08 26 FOR A CONSTANT OIL PRESERVATION
OIL PRESERVATION SYSTEM IS PROVIDED, ALL ASSOCIATED EQUIPMENT
THE POWERHOUSE EQUIPMENT NEEDED TO FIT THE COPS TANK. IF CONSTANT
CONDUCTORS PER IEEE STD 1427. THERE SHALL BE NO MODIFICATIONS TO
MUST MAINTAIN A MINIMUM OF 105" CLEARANCE FROM THE OVERHEAD 500KV
THE DIMENSIONAL REQUIREMENTS IDENTIFIED MUST BE MET. THE COPS TANK
TRANSFORMER AND/OR A CONSTANT OIL PRESERVATION SYSTEM IS PROVIDED,
DRAWINGS WITH AN INERT-GAS OIL PRESERVATION SYSTEM. IF A CORE-FORM
THE DRAWING SHOWN IS BASED ON THE WESTINGHOUSE SHELL-FORM2.
J. LOCATION OF EMBEDDED CONDUIT
I. MAXIMUM OVERALL LENGTH
H. STRUCTURAL BASE
G. JACKING & LIFTING FACILITIES
F. ANCILLARY DEVICES
E. CONTROL AND POWER CABINETS
VOLTAGE BUS
D. LOW VOLTAGE BUSHING HOUSING DIMENSIONS AND LOCATION OF LOW
C. LOW-VOLTAGE BUSHINGS LOCATIONS AND TERMINAL CONNECTIONS
B. HIGH-VOLTAGE NEUTRAL BUSHING LOCATION AND TERMINAL CONNECTION
A. HIGH-VOLTAGE BUSHING LOCATION AND TERMINAL CONNECTION
INTERCONNECTION:
TRANSFORMER EQUIPMENT ARE CONSIDERED CRITICAL TO ASSURE PROPER
THE TRANSFORMER VAULT. THE LOCATIONS OF THE FOLLOWING
PROPER INTERCONNECTION TO THE EXISTING EQUIPMENT AND INTERFACES IN
FOR THE MANUFACTURER'S USE IN DESIGNING THE TRANSFORMER FOR
1. THE TRANSFORMER LAYOUT AND LIMITING DIMENSIONS HAVE BEEN PROVIDED
GENERAL NOTES
F20 SERIES, SS, CLASS 150
19 1 3 ANALOG TEMPERATURE GAUGES QUALITROL TR6000 SERIES
RADIATOR ISOLATION VALVESAS DES.9 1,2,4
21 1 3 RAPID PRESSURE RISE RELAY WITH 1-1/2-INCH ISOLATION BALL VALVE QUALITROL/MILWAUKEE VALVE 900-FLA &F20 SERIES, SS, CLASS 150
1 3 EXTERNAL GAS EXPANSION TANK
72 4 COVER LOW-VOLTAGE BUSHING HOUSINGS
20 5 3 THERMOWELLS (QTY. 3 - STANDARD, QTY. 2 HEATED)
F20 SERIES, SS, CLASS 150MILWAUKEE VALVE3-INCH MAIN DRAIN325 1
73 2 1 COMBINED JACK PAD, ROCKER, AND LIFTING EYES
SEGMENT 2 SEGMENT 4
BUSHING SIDE)
(LOW-VOLTAGE
SEGMENT 1
BUSHING SIDE)
(HIGH-VOLTAGE
SEGMENT 3
LIFTING EYES FOR UPRIGHTING THE TRANSFORMER3274
S I
D
F
IN
A L
T
L O
W E
R S
N A
K E
R
IV
E R
S P
A R
E T
R A
N S
F O
R M
E R
S
L
IT
T L
E G
O O
S E
L O
C K
A N
D D
A M
W
E F
R A
O C
T O
B E
R
L L
A W
A L
L A
W
A S
H
IN
G T
O N
N
R
D A
V E
W A
L L
A W
A L
L A
D
IS
T R
IC
T
P O
R T
L A
N D
O
R E
G O
N
S
W
S T
A V
E
H Y
D R
O E
L E
C T
R
IC
D E
S
IG
N C
E N
T E
R
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S F
IL
E
N U
M B
E R
F
IL
E N
A M
E
J O
R D
A N
S F
IN
K
P
.E
P O
W E
R A
N D
C O
N T
R O
L C
A B
IN
E
T S
G E
N E
R A
T O
R S
T E
P -U
P T
R A
N S
F O
R M
E R
E-106
P
K L
E
IN
E
P .E
D
F
IL
a E
-1 .d g n
L G
S -1
-6 -1
E
/6
P
K L
E
IN
E
P .E
T
L E
G O
O S
E L
O C
K A
N D
D
DRIP CHANNEL
SHIELD
RAIN AND DRIP
GASKET SEAL
SOLAR SHIELDING
TEMPERED GLASS
RUBBER SEAL
CLAYTONRITE-TYPE
ENCLOSURE PANEL
SECURING STRIP
SEE NOTE 5
LAPTOP TRAY
SEE NOTE 5
DOCUMENT POCKET
SEE NOTE 6
43TF
CABINET
CONTROL
CABINET
POWER
SEE NOTE 5
ISOLATORS
VIBRATION
SEE NOTE 7
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
S U
B M
IT
T
E D
B Y
C H
E C
K E
D B
Y
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
IS
S
U E
D A
T E
S I Z
E
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E
SHEET ID
®of Engineers
US Army Corps
U .S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
R S
G1
ELEVATION - CONTROL AND POWER CABINETS
SCALE: 1 1/2" = 1'-0"
A9
TYPICAL CLAYTONRITE-TYPE WINDOW SEAL
SCALE: NTS
DISPLAY.
A WEATHERPROOF SEAL FOR VIEWING OF A FUTURE INSTALLED ANNUNCIATOR
7. THE RIGHT CONTROL CABINET DOOR IS TO HAVE A TEMPERED GLASS WINDOW WITH
TEMPERATURE MONITOR AND COOLING CONTROL SYSTEM DISPLAY.
WEATHERPROOF SEAL FOR VIEWING OF A FUTURE INSTALLED ELECTRONIC
6. THE LEFT CONTROL CABINET DOOR IS TO HAVE A TEMPERED GLASS WINDOW WITH A
O&M MANUAL DRAWINGS.
WHEN STOWED. THE LEFT DOOR IS TO HAVE A METAL POCKET, SIZED TO HOLD THE
IN A HORIZONTAL POSITION WHEN LOWERED, AND A MEANS FOR LATCHING THE TRAY
OF THE DOOR. THE TRAY IS TO INCLUDE FOLDING HINGES WHICH SECURE THE TRAY
5. THE RIGHT DOOR IS TO HAVE A DROP DOWN LAPTOP TRAY MOUNTED ON THE INSIDE
USING VIBRATION ISOLATORS.
4. THE CONTROL AND POWER CABINETS ARE TO BE MOUNTED TO A FRAME STRUCTURE
POWER CABINETS SHALL ONLY ENTER EACH CABINET THROUGH THE BASE.
3. ALL CONDUIT ROUTING FROM THE TRANSFORMER DEVICES TO THE CONTROL AND
2. SPACE FOR ARC FLASH LABEL (PROVIDED BY THE GOVERNMENT).
BUILT IN ACCORDANCE WITH UL 508A STANDARD.
1. THE TRANSFORMER CONTROL AND POWER CABINETS ARE TO BE DESIGNED AND
COOLING GROUP ON-OFF-AUTO SELECTOR SWITCH43TF
GENERAL NOTES
LEGEND
G8
POWER CABINETS
SIDE VIEW - CONTROL AND
SCALE: 1 1/2" = 1'-0"
G13
TYPICAL CABINET DOOR SEAL
S I
D
F
IN
A L
T
L O
W E
R S
N A
K E
R
IV
E R
S P
A R
E T
R A
N S
F O
R M
E R
S
L
IT
T L
E G
O O
S E
L O
C K
A N
D D
A M
W
E F
R A
O C
T O
B E
R
L L
A W
A L
L A
W
A S
H
IN
G T
O N
N
R
D A
V E
W A
L L
A W
A L
L A
D
IS
T R
IC
T
P O
R T
L A
N D
O
R E
G O
N
S
W
S T
A V
E
H Y
D R
O E
L E
C T
R
IC
D E
S
IG
N C
E N
T E
R
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S F
IL
E
N U
M B
E R
F
IL
E N
A M
E
J O
R D
A N
S F
IN
K
P
.E
C O
N T
R O
L C
A B
IN
E
T L
A Y
O U
T
G E
N E
R A
T O
R S
T E
P -U
P T
R A
N S
F O
R M
E R
E-107
P
K L
E
IN
E
P .E
D
F
IL
a E
-1 .d g n
L G
S -1
-6 -1
E
/7
P
K L
E
IN
E
P .E
T
L E
G O
O S
E L
O C
K A
N D
D
K L
E
IN
E
P
A F
B EC
G
D
B
A
C D E
F
G
5453 55 56
6352 64
59 62
59 62
59 62
CABINET LIGHT
TRANSFORMER MOUNTED CONDUIT
AREA FOR INSTALLATION OF
WIRING TO POWER CABINET
BUSHING FOR 120 VAC
WIREWAY HOLE WITH
INSTALLATION TO POWER PLANT
PLATE FOR CONDUIT
AND GASKETED BOTTOM
REMOVABLE BOLTED
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
S U
B M
IT
T
E D
B Y
C H
E C
K E
D B
Y
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
IS
S
U E
D A
T E
S I Z
E
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E
SHEET ID
®of Engineers
US Army Corps
U .S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
R S
K2
CONTROL CABINET TOP VIEW
SCALE: NTS
A1
CONTROL CABINET LAYOUT
SCALE: NTS
DESCRIPTION
QUALITROL QTMS
MOLDED-CASE CIRCUIT BREAKERS
AUXILIARY RELAYS
INTERPOSING RELAY FOR LOCKOUT RELAY GENERAL ELECTRIC
TERMINAL BLOCKS - CONTROL SIGNAL TYPE
TERMINAL BLOCKS - POWER DISTRIBUTION TYPE
FUSES
FUSEHOLDERS
CABINET HEATER
ELECTROSWITCH SERIES 24
UNDERVOLTAGE RELAY
RECEPTACLE WITH GFCI HUBBELL GFR8300SGW
MARATHON SERIES 142
TIME MARK
BUSSMAN
BUSSMAN
WAUKESHA PTC2
HJL
C26(XX)
HMA
LPJ
JTN600(XX)
TIME DELAY RELAY AGASTAT SERIES 7000
ELECTRONIC COOLING CONTROL (FUTURE)
LOCAL ANNUNCIATOR PANEL (FUTURE) SEL 2533
COOLING GROUP SELECTOR SW. (DEVICE 43TF)
TERMINAL BLOCKS - SHORT CIRCUIT
GROUND BUS BAR - -
AS REQ'D
AS REQ'D
AS REQ'D
AS REQ'D
AS REQ'D
AS REQ'D
AS REQ'D
AS REQ'D
AS REQ'D
AS REQ'D
BILL OF MATERIALS - CONTROL CABINET COMPONENTS
HUMIDISTAT / THERMOSTAT (DEVICE 23-1)
SCHNEIDER ELECTRIC
SQUARE D 8501, TYPE X
STATES TYPE NT, CLASS 250
STATES TYPE NT, CLASS 251-G
HAMMOND MFG SKTH012009-C
ITEM QTY EXAMPLE MODEL NUMBER
6. THE REMOVABLE BOTTOM PLATE THICKNESS IS TO BE 10 GAUGE, MINIMUM.
CABINET.
5. THE GFCI OUTLET IS TO BE ACCESSIBLE ONLY FROM INSIDE OF THE CONTROL
THROUGH A WATERPROOF VIEWING GLASS IN THE RIGHT CONTROL CABINET DOOR.
ANNUNCIATOR MOUNTED ON THE SWING PANEL SO THAT THE FRONT IS VISIBLE
4. THE CONTROL CABINET IS TO BE DESIGNED FOR THE FUTURE INSTALLATION OF ONE
THE LEFT CONTROL CABINET DOOR.
PANEL SO THAT THE FRONT IS VISIBLE THROUGH A WATERPROOF VIEWING GLASS IN
CONTROL CABINET, WITH AN HMI MODULE REMOTELY MOUNTED ON THE SWING
ELECTRONIC COOLING CONTROL SYSTEM IN A REAR MOUNT CHASSIS IN THE
3. THE CONTROL CABINET IS TO BE DESIGNED FOR THE FUTURE INSTALLATION OF AN
THE ACTUAL LAYOUT MAY BE MODIFIED BY THE CONTRACTOR.
2. THE CONTROL CABINET LAYOUT AS SHOWN IS FOR ILLUSTRATIVE PURPOSES ONLY.
BUILT IN ACCORDANCE WITH UL 508A STANDARD.
1. THE TRANSFORMER CONTROL AND POWER CABINETS ARE TO BE DESIGNED AND
LH BACK PANEL RH BACK PANEL RH SIDE PANEL
(FRONT VIEW)
RIGHT SWING PANEL
BLOCKS
TERMINAL
RESISTORS
CALIBRATION
ANALOG WTI
BLOCKS
TERMINAL
BLOCKS
TERMINAL
BLOCKS
TERMINAL
TRANSFORMER
CURRENT
BLOCKS
TERMINAL
BREAKERS
CIRCUIT
DEVICES
RELAYS AND
AUXILIARY
BOTTOM PANEL
COMPONENTS
SYSTEM
COOLING CONTROL
ELECTRONIC
FUTURE
HEATERHEATER
(FRONT VIEW)
LEFT SWING PANEL
LH SIDE PANEL
OUTLET
65 67
GENERAL NOTES
S I
D
F
IN
A L
T
L O
W E
R S
N A
K E
R
IV
E R
S P
A R
E T
R A
N S
F O
R M
E R
S
L
IT
T L
E G
O O
S E
L O
C K
A N
D D
A M
W
E F
R A
O C
T O
B E
R
L L
A W
A L
L A
W
A S
H
IN
G T
O N
N
R
D A
V E
W A
L L
A W
A L
L A
D
IS
T R
IC
T
P O
R T
L A
N D
O
R E
G O
N
S
W
S T
A V
E
H Y
D R
O E
L E
C T
R
IC
D E
S
IG
N C
E N
T E
R
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S F
IL
E
N U
M B
E R
F
IL
E N
A M
E
J O
R D
A N
S F
IN
K
P
W E
R C
A B
IN
E
T L
A Y
O U
T
G E
N E
R A
T O
R S
T E
P -U
P T
R A
N S
F O
R M
E R
E-108
P
K L
E
IN
E
P .E
D
F
IL
a E
-1 .d g n
L G
S -1
-6 -1
E
/8
P
K L
E
IN
E
P .E
T
L E
G O
O S
E L
O C
K A
N D
D
K L
E
IN
E
P
A C
B
D
D
52 71
A B C
59 62
59 62
CABINET
WIRING TO CONTROL
BUSHING FOR 120 VAC
WIREWAY HOLE WITH
CABINET LIGHT
TRANSFORMER MOUNTED CONDUIT
AREA FOR INSTALLATION OF
INSTALLATION TO POWER PLANT
PLATE FOR CONDUIT
GASKETED BOTTOM
REMOVABLE BOLTED AND
63 64
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
S U
B M
IT
T
E D
B Y
C H
E C
K E
D B
Y
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
IS
S
U E
D A
T E
S I Z
E
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E
SHEET ID
®of Engineers
US Army Corps
U .S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
R S
A8
POWER CABINET - TOP VIEW
SCALE: NTS
A13
POWER CABINET LAYOUT
SCALE: NTS
MAGNETIC CONTACTORS
MOLDED-CASE CIRCUIT BREAKERS
TERMINAL BLOCKS - CONTROL SIGNAL TYPE
TERMINAL BLOCKS - POWER DISTRIBUTION TYPE
FUSES
FUSEHOLDERS
CABINET HEATER
MARATHON SERIES 142
BUSSMAN
BUSSMAN
WAUKESHA PTC2
JJL
LPJ
JTN600(XX)
BILL OF MATERIALS - POWER CABINET COMPONENTS
AS REQ'D
AS REQ'D
AS REQ'D
AS REQ'D
AS REQ'D
AS REQ'D
AS REQ'D
AS REQ'D
1 GROUND BUS BAR
66 HUMIDISTAT / THERMOSTAT (DEVICE 23-2)
SQUARE D
STATES TYPE NT, CLASS 250
HAMMOND MFG SKTH012009-C
SQUARE D
ITEM QTY DESCRIPTION EXAMPLE MODEL NUMBER
3. THE REMOVABLE BOTTOM PLATE THICKNESS SHALL BE 10 GAUGE, MINIMUM.
TERMINAL BLOCKS SHALL BE MOUNTED IN THE 480 VAC POWER CABINET.
INCLUDING THE MOLDED-CASE CIRCUIT BREAKERS, CONTACTORS AND POWER
2. ALL 480 VAC PROTECTIVE AND CONTROL EQUIPMENT FOR THE COOLING FANS,
BY THE CONTRACTOR.
1. THE LAYOUT SHOWN IS FOR ILLUSTRATIVE PURPOSES ONLY AND MAY BE MODIFIED
GENERAL NOTES
BOTTOM PANEL
AND FAN CONTROL)
LIGHTS, HEATER
(WIRING FOR
BLOCKS
TERMINAL
120 VAC
CONTACTORS
FAN MOTOR
BREAKERS AND
CIRCUIT
BLOCKS
TERMINAL
BLOCKS
TERMINAL
LH SIDE PANEL RH SIDE PANELBACK PANEL
HEATER
FUSE HOLDERS
FUSES AND
S I
D
F
IN
A L
T
L O
W E
R S
N A
K E
R
IV
E R
S P
A R
E T
R A
N S
F O
R M
E R
S
L
IT
T L
E G
O O
S E
L O
C K
A N
D D
A M
W
E F
R A
O C
T O
B E
R
L L
A W
A L
L A
W
A S
H
IN
G T
O N
N
R
D A
V E
W A
L L
A W
A L
L A
D
IS
T R
IC
T
P O
R T
L A
N D
O
R E
G O
N
S
W
S T
A V
E
H Y
D R
O E
L E
C T
R
IC
D E
S
IG
N C
E N
T E
R
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S F
IL
E
N U
M B
E R
F
IL
E N
A M
E
J O
R D
A N
S F
IN
K
P
.E
L A
Y O
U T
A N
D D
E T
A
IL
S
T R
A N
S F
O R
M E
R M
O U
N T
E D
D E
V
IC
E S
G E
N E
R A
T O
R S
T E
P -U
P T
R A
N S
F O
R M
E R
E-109
P
K L
E
IN
E
P .E
D
F
IL
a E
-1 .d g n
L G
S -1
-6 -1
E
/9
P
K L
E
IN
E
P .E
T
L E
G O
O S
E L
O C
K A
N D
D
K L
E
IN
E
P
FUTURE DGA SYSTEM
LOAD SENSING CT FOR
FUTURE LOCATION OF
TEMPERATURE MONITOR
FUTURE ELECTRONIC
LOAD SENSING CT FOR
FUTURE LOCATION OF
DGA SYSTEM
LOAD SENSING CT FOR
FUTURE LOCATION OF
TEMPERATURE MONITOR
FUTURE ELECTRONIC
LOAD SENSING CT FOR
FUTURE LOCATION OF
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
S U
B M
IT
T
E D
B Y
C H
E C
K E
D B
Y
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
IS
S
U E
D A
T E
S I Z
E
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E
SHEET ID
®of Engineers
US Army Corps
U .S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
R S
A1
THERMOWELLS
CURRENT TRANSFORMERS AND HEAT
SCALE: NTS
(90 C)
SW. #2
(SEE NOTE 2)
SW. #1
(115 C)
SW. #3
(LOW-LOW LEVEL)
SW. #2
(LOW LEVEL)
SW. #1
PRESSURE
LOW
PRESSURE
HIGH
(UNUSED)
SW. #2
(90 C)
SW. #1
(< 200 PSI)
EMPTY CYLINDER
BULB
HEATER
WELL
BULB
TB1:1 TB1:3
ONAN RATING.
BASED UPON THE RESULTS OF THE FACTORY TEMPERATURE RISE TESTS AT THE
2. THE WINDING TEMPERATURE SETTING FOR ENERGIZING THE COOLING FANS IS TO BE
TERMINAL BLOCKS.
WIRING IS TO BE ROUTED TO THE CONTROL CABINET AND TERMINATED ON SHORTING
1. ALL BUSHING CURRENT TRANSFORMERS AND CURRENT TRANSFORMER SECONDARY
(BELOW)
DIAGRAM
SEE CT
(DEVICE 49Q1)
THERMOWELL
HEATED
TOP OIL THERMOWELLS
(DEVICE 26Q1)
THERMOWELL
(DEVICE 26Q2)
WITH NPT PLUG
THERMOWELL
(DEVICE 49WT1)
WINDING TEMPERATURE INDICATOR
(DEVICE 26Q)
OIL TEMPERATURE INDICATOR
BOTTOM OIL THERMOWELL
(DEVICE 26Q3)
THERMOWELL
(DEVICE 30)
(FUTURE)
ANNUNCIATOR
(DEVICE 30)
(FUTURE)
ANNUNCIATOR
(DEVICE 94X)
TRANSFORMER TRIP
63RPR
(DEVICE 63RPR-SI)
SEAL-IN RELAY
RAPID PRESSURE RISE
ALARM (63X1) UNUSED
RAPID PRESSURE RISE
TRIP (63X2)
RAPID PRESSURE RISE
(49WT2)
HEATER
THERMOWELL
WINDINGS ASSEMBLY
TRANSFORMER CORE AND
(TYPICAL)
SEE NOTE 1
BCT-H1
BCT-H4
CT-Y1 49R2 49Q2
H1
Y1
(DEVICE 63PR)
PRESSURE RELIEF DEVICE
(DEVICE 30)
(FUTURE)
ANNUNCIATOR
(ALARM)
SW. #1
(TRIP)
SW. #2
(DEVICE 71Q)
OIL LEVEL INDICATOR
(DEVICE 30)
(FUTURE)
ANNUNCIATOR
TS2
(DEVICE 63NR)
NITROGEN PRESSURE REGULATOR
2 3 1 6 4 5 8 9 7
GOVERNMENT.
DEVICES AND WIRING TO BE INSTALLED IN THE FUTURE BY THE
LOW-VOLTAGE BUSHINGY1
LOW-VOLTAGE BUSHINGX1
TEST SWITCHSTS_
TERMINAL BLOCKSTB_
SWITCHSW
RESISTANCE TEMPERATURE DETECTORRTD
HIGH-VOLTAGE BUSHINGH1
HIGH-VOLTAGE NEUTRAL BUSHINGH0
CURRENT TRANSFORMERSCT_
MULTI-RATIO BUSHING CURRENT TRANSFORMERSBCT_
DISSOLVED GAS ANALYZERDGA
GAS-IN-OIL MONITOR95
TRIP AUXILIARY RELAY94X
OIL LEVEL INDICATOR71Q
RAPID PRESSURE RISE RELAY TRIP63X2
RAPID PRESSURE RISE RELAY ALARM63X1
RAPID PRESSURE RISE RELAY SEAL-IN RELAY63RPR-SI
RAPID PRESSURE RISE RELAY63RPR
PRESSURE RELIEF DEVICE63PR
NITROGEN PRESSURE REGULATOR63NR
ANALOG WINDING TEMPERATURE INDICATORS49WT1,2
CALIBRATION DEVICES49R1,2
HEATED THERMOWELLS49Q1,2
ANNUNCIATOR30
UNDERVOLTAGE RELAY27
THERMOWELLS26Q1,2,3
ANALOG OIL TEMPERATURE INDICATOR26Q
(TO POWERPLANT)
TRANS. TRIP
(BELOW)
DIAGRAM
SEE CT
(DEVICE 49Q2)
THERMOWELL
HEATED
(DEVICE 49WT2)
WINDING TEMPERATURE INDICATOR
(90 C)
SW. #2
(SEE NOTE 2)
SW. #1
(115 C)
SW. #3
BULB
HEATER
WELL
TEMP MONITOR)
(SPARE FOR FUTURE
(DEVICE 26Q2)
WITH NPT PLUG
THERMOWELL
(SPARE)
TEMP MONITOR)
(SPARE FOR FUTURE
FANS
COOLING
(49WT1)
HEATER
THERMOWELL
CT-X149R149Q1
X1
TS1
GENERAL NOTES
LEGEND
A N
N T
B :9
A N
N T
B :8
A N
N T
B
:1
A N
N T
B
:1
1 2 1 2
A N
N T
B :3
A N
N T
B :2
A N
N T
B :3
A N
N T
B :2
1 2 1 2 1 2
A N
N T
B :9
A N
N T
B :8
(DEVICE 30)
(FUTURE)
ANNUNCIATOR
A N
N T
B :5
A N
N T
B :4
(TO POWERPLANT)
TRANS. TRIP
FANS
COOLING
(DEVICE 30)
(FUTURE)
ANNUNCIATOR
A N
N T
B :7
A N
N T
B :6
(DEVICE 30)
(FUTURE)
ANNUNCIATOR
A N
N T
B :3
A N
N T
B :4
1 2 1 2 1 2 1 2 1 2
876 109
ALARM RELAY 1
(DEVICE 95)
GAS-IN-OIL MONITOR
(FUTURE)
14 11/13
(DEVICE 30)
(FUTURE)
ANNUNCIATOR
A N
N T
B :5
A N
N T
B :4
ALARM RELAY 2
14 11/13 12
A N
N T
B :5
A N
N T
B :4
(DEVICE 30)
(FUTURE)
ANNUNCIATOR
(UNUSED)
SW. #2
SW. #1
(DEVICE 27-1)
UNDERVOLTAGE RELAY
1 2 1 2
A N
N T
B
:1
A N
N T
B :1
(DEVICE 30)
(FUTURE)
ANNUNCIATOR
(DEVICE 94X)
TRANSFORMER TRIP
S I
D
F
IN
A L
T
L O
W E
R S
N A
K E
R
IV
E R
S P
A R
E T
R A
N S
F O
R M
E R
S
L
IT
T L
E G
O O
S E
L O
C K
A N
D D
A M
W
E F
R A
O C
T O
B E
R
L L
A W
A L
L A
W
A S
H
IN
G T
O N
N
R
D A
V E
W A
L L
A W
A L
L A
D
IS
T R
IC
T
P O
R T
L A
N D
O
R E
G O
N
S
W
S T
A V
E
H Y
D R
O E
L E
C T
R
IC
D E
S
IG
N C
E N
T E
R
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S F
IL
E
N U
M B
E R
F
IL
E N
A M
E
J O
R D
A N
S F
IN
K
P
.E
C O
N T
R O
L S
C H
E M
A T
IC
S
G E
N E
R A
T O
R S
T E
P -U
P T
R A
N S
F O
R M
E R
E-601
P
K L
E
IN
E
P .E
D
F
IL
a E
-6 .d g n
L G
A -1
-6 -1
E /1
P
K L
E
IN
E
P .E
T
L E
G O
O S
E L
O C
K A
N D
D
K L
E
IN
E
P
480 VAC POWER CABINET
LOCATED IN
POWER CABINET
LOCATED IN 480 VAC
480 VAC POWER CABINET
LOCATED IN
POWER CABINET
ADJACENT TO
MOUNTED ON TANK
LOCATED IN POWERHOUSE
TRIP COIL MONITORING
EXISTING LOCKOUT RELAY WITH
B
C
D
E
F
G
H
J
K
L
M
N
P
S U
B M
IT
T
E D
B Y
C H
E C
K E
D B
Y
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
IS
S
U E
D A
T E
S I Z
E
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E
SHEET ID
®of Engineers
US Army Corps
U .S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
R S
A5
125 VDC CONTROL SCHEMATIC
SCALE: NTS
52-1
DS-1
H T
R
49WT1 49WT2
LT1 LT2 42
23-1
DS-2
H T
R
LT3
23-2
DS-3
LIGHTS
CABINET
CONTROL
52-6
HEATER
CABINET
CONTROL
52-7
27-1
27-1
FUSES
X1
V
LIGHT
CABINET
POWER
52-4
HEATER
CABINET
POWER
52-5
3-PHASE, 60 HZ
POWER 480 VAC,
GOVERNMENT SUPPLY #1
FUSE 86TX
L
IN
E
A
L
IN
C
ANN TB1:12
H T
R
20A
GFCI
OUTLET
RECEPTACLE
CABINET
CONTROL
52-8
(DGA)
POWER
MONITOR
GAS-IN-OIL
FUTURE
GROUP #1
COOLING
V
480VAC - 120VAC
POWER TRANSFORMER
AUXILIARY
H4
H1 X3
SHEILD
ELECTROSTATIC
52-2
3-PHASE, 60 HZ
POWER 480 VAC,
GOVERNMENT SUPPLY #2
L
IN
E
A
L
88 FAN MOTOR
PDB_ POWER DISTRIBUTION BLOCKS
GROUP #2
COOLING
1 1
72-1
P D
B
P D
B
TO POWERHOUSE 86TX
NOTE 1)
(SEE
94X
94X
SYSTEM
MONITORING
ELECTRONIC
FUTURE
V
D C
G O
V E
R N
M E
N T
F U
R N
IS
H
E D
C O
N T
R O
L P
O W
E R
94X
115C
SW. #2
WT1
RESET
63RPR-SI
TB3
PWR
63RPR
86TX LOCKOUT RELAY (LOCATED IN THE POWERHOUSE)
94X TRIP AUXILIARY RELAY
OL OL
30 ANNUNCIATOR
49WT1,2 ANALOG WINDING TEMPERATURE INDICATORS
63RPR RAPID PRESSURE RISE RELAY
63RPR-SI RAPID PRESSURE RISE RELAY SEAL-IN RELAY
DGA DISSOLVED GAS ANALYZER (FUTURE)
27 UNDERVOLTAGE RELAY
52-_ AC MOLDED-CASE CIRCUIT BREAKERS
FCT FAN CURRENT TRANSFORMER
DS CABINET DOOR SWITCH
LT CABINET LIGHT
HTR CABINET HEATER
GFCI GROUND FAULT CIRCUIT INTERRUPTER
INDUSTRIAL GRADE HUMIDISTAT / THERMOSTAT23
42 COOLING GROUP MOTOR CONTACTOR
IN THE POWERHOUSE. SEE SHEET E-603 FOR TERMINAL DETAILS.
4. THE 86TX TRANSFORMER LOCKOUT AND ASSOCIATED CONTACTS ARE LOCATED IN
DESIGN MAY DIFFER FROM VALUES SHOWN.
3. KVA VALUES SHOWN ARE FOR ILLUSTRATION PURPOSES ONLY. THE CONTRACTOR
2. DETAILED WIRING DESIGN SHALL BE PERFORMED BY CONTRACTOR.
OUTPUTS WILL BE WIRED IN PARALLEL WITH THE 49WT CONTACTS IN THE FUTURE.
THE LOCKOUT RELAY SOLENOID EXCEEDS THE RATING OF THE ETM. THE ETM
OUTPUT RELAY CONTACTS THAT WILL BE INSTALLED IN THE FUTURE. THE BURDEN OF
LOCKOUT WITHOUT OVERLOADING THE…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .