This is a detailed design document for spare transformers at the Little Goose Lock and Dam, part of the Lower Snake River project for the US Army Corps of Engineers Walla Walla District. The document provides comprehensive technical specifications for a 500 kV Generator Step-Up (GSU) transformer with a 164,000/218,666 kVA rating, designed for ONAN/ONAF cooling. Key specifications include a maximum weight of 591,500 pounds, maximum oil quantity of 15,539 gallons, and a temperature rise of 65°C. The transformer will feature multiple cooling fans, hot-dip galvanized radiators, and a nitrogen blanket or constant oil pressure preservation system. The design includes detailed schematics for control and power cabinets, current transformers, annunciation systems, and external connections, with provisions for future electronic monitoring and diagnostic equipment.

View the file

Other files

File Type Posted
Solicitation Amendment W912EF26RA0030009 SF 30.pdf PDF
W912EF26RA003 Amendment 0008 JDA_and_LSR_Average_Impedance.pdf PDF
W912EF26RA003 Amendment 8 Westinghouse Test Report for 7000374 7000942 and 7001750.pdf PDF
Solicitation Amendment W912EF26RA0030008 SF 30.pdf PDF
26RA003 - Amend-007 - Transformer Design Specs.pdf PDF
Solicitation Amendment W912EF26RA0030007 SF 30.pdf PDF
26RA003 - Amend-007 - VOL. 1 - T1 Redlines.pdf PDF
26RA003 - Amend-007 - VOL. 2 - T2 Redlines.pdf PDF
Solicitation Amendment W912EF26RA0030006 SF 30.pdf PDF
Solicitation Amendment W912EF26RA0030005 SF 30.pdf PDF
Solicitation Amendment W912EF26RA0030004 SF 30.pdf PDF
Solicitation Amendment W912EF26RA0030004 SF 30.pdf PDF
Solicitation Amendment W912EF26RA0030003 SF 30.pdf PDF
26RA003 - Tech Specs Amendment 0003.pdf PDF
Solicitation Amendment W912EF26RA0030002 SF 30.pdf PDF
Solicitation Amendment W912EF26RA0030001 SF 30.pdf PDF
26RA003_Plans_V2.pdf PDF
26RA003 Solicitation Tech Specs.pdf PDF
Past Performance Questionnaire Form.pdf PDF
NWW_JA Sole Source Determination ABB-Hitachi Bushings_Signed_Print_Redacted.pdf PDF
Small Business Participation Proposal.pdf PDF
26RA003_Supplemental_Drawings_V2.pdf PDF
26RA003_Supplemental_Drawings_V1.pdf PDF
Solicitation - W912EF26RA003.pdf PDF
Show all 24

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

VOLUME 1 - SPARE TRANSFORMERS T1

VOLUME 2 - SPARE TRANSFORMERS T2

A N

S I

D

F

IN

A L

T

L O

W E

R S

N A

K E

R

IV

E R

S P

A R

E T

R A

N S

F O

R M

E R

S

L

IT

T L

E G

O O

S E

L O

C K

A N

D D

A M

W

E F

R A

O C

T O

B E

R

W A

L L

A W

A L

L A

W

A S

H

IN

G T

O N

N

R

D A

V E

W A

L L

A W

A L

L A

D

IS

T R

IC

T

P O

R T

L A

N D

O

R E

G O

N

S

W

S T

A V

E

H Y

D R

O E

L E

C T

R

IC

D E

S

IG

N C

E N

T E

R

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S F

IL

E

N U

M B

E R

F

IL

E N

A M

E

J O

R D

A N

S F

IN

K

P

.E

P R

O

JE

C T

L O

C A

T

IO

N

V

IC

IN

IT

Y M

A P

S

G-001

P

K L

E

IN

E

P .E

D

F

IL

E

L G a G

-0 .d g n

L G

S -1

-6 -0

-A /1

P

K L

E

IN

E

P .E

VOLUME 1

T1

LOWER SNAKE RIVER SPARE TRANSFORMERS

LITTLE GOOSE LOCK AND DAM

W912EF26RA003

OCTOBER 2025

WALLA WALLA DISTRICT

PLAN

NORTH

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

S U

B M

IT

T

E D

B Y

C H

E C

K E

D B

Y

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

IS

S

U E

D A

T E

S I Z

E

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

SHEET ID

®of Engineers

US Army Corps

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

SEE LOCATION

MAP

SPOKANE

OREGON

CLEARWATER R.

EUGENE

BOISE

P A

C

IF

IC

O

C E

A N

WASHINGTON

IDAHO

R

IV

E

REVERETT

C O

L U

M B

IA

SNAKE R.

PASCO

SEATTLE

PORTLAND

SALEM

THE

OLYMPIA

DALLES

WALLA WALLA

PENDLETON

VANCOUVER

PROJECT

LOCATION

Washtucna

Riparia

GOOSE

DAM

LITTLE

F la t

ID

A

H O

P A L O

U S E

B. N.

C. P. RR.

C r.

C r.

Alkali

E A

K

IV

E

R

SN

Cr ee kD ry

Waitsburg

R

Pomeroy

R

Flat

Union

N O

N

Cr.

As oti n

TUCAN

Camp Wooten

R

PENDLETON

WALLA WALLA

PASCO

KENNEWICK

COLFAX

GRANITE

LOWER

PULLMAN

DAM

RICHLAND

DAM

OREGON

WASHINGTON

HARBOR

ICE

CLARKSTON

YA

K

A

IM

Farrington

R

McNARY

R

IV

E R

LEWISTON

DAM

CO

U

M L

IA

B Cr

RIVER

R O

N D E

GRANDE

U M

ATILLA

C

r. U

. P . R

R

. RIVER

B u tt e r

Elgin Wallowa

Athena

Weston

Hermiston

Anatone

Asotin

M ill

R.

WALLA

T O

U C

H E T

Touchet

Milton-Freewater

R.

Wallula

B.N.

Kahlotus

Umatilla

Plymouth

Dayton

Almota

Ferry

Starbuck

BishopCentral

MONUMENTAL

LOWER Dodge

DAM

W A

L L

A

N

NAVIGATION LOCK

N. 5000

POWERHOUSE

N. 6000

SPILLWAY

TO STARBUCK

STORAGE YARD

UNIT

UNIT

UNIT

NAV LOCK BRIDGE

500 KV TRANSMISSION LINE

UNIT

UNIT

UNIT

BAY 2

BAY 1

X

BAY 5

BAY 4

BAY 3

X

X X

BAY 6

E

E

0Lower Monumental Pool EL. 540

E

N. 7000

S N A K E

BAY 8

BAY 7

TO RIPARIA

Camas Prairie Railroad

R I V E R of Engineers

US Army Corps

D1

VICINITY MAP

SCALE: NTS

N

D7

LOCATION MAP

SCALE: NTS

SUBMITTED BY:

SUBMITTED BY:

APPROVED BY: APPROVED BY:

HYDROELECTRIC DESIGN CENTER

DIRECTOR OF

JORDAN S. FINK, P.E.

WALLA WALLA DISTRICT

CHIEF OF DESIGN BRANCH

MARCUS PALMER, P.E.

WALLA WALLA DISTRICT

CHIEF OF ENGINEERING & CONST DIV.

DWAYNE WESTON, P.E.

DESIGNATIONS OF INDIVIDUALS APPEAR ON THESE PROJECT DOCUMENTS WITHIN THE SCOPE OF THEIR EMPLOYMENT AS REQUIRED BY ER 1110-1-8152.

THIS PROJECT WAS DESIGNED BY THE HYDROELECTRIC DESIGN CENTER OF THE U.S. ARMY CORPS OF ENGINEERS. THE INITIALS OR SIGNATURES AND REGISTRATION

WALLA WALLA DISTRICT

CHIEF OF ELECTRICAL DESIGN SECTION

LEVI VAN STEDUM, P.E.

SUBMITTED BY:

HYDROELECTRIC DESIGN CENTER

CHIEF OF ELECTRICAL BRANCH

JOHN Z. YEN, P.E.

SOLICITATION NO.:

CONTRACT NO.:

ISSUE DATE:

DAM ENTRANCE ROAD

G13

SITE MAP

SCALE: NTS

VOLUME NO.: 1

N

S I

D

F

IN

A L

T

L O

W E

R S

N A

K E

R

IV

E R

S P

A R

E T

R A

N S

F O

R M

E R

S

L

IT

T L

E G

O O

S E

L O

C K

A N

D D

A M

W

E F

R A

O C

T O

B E

R

L L

A W

A L

L A

W

A S

H

IN

G T

O N

N

R

D A

V E

W A

L L

A W

A L

L A

D

IS

T R

IC

T

P O

R T

L A

N D

O

R E

G O

N

S

W

S T

A V

E

H Y

D R

O E

L E

C T

R

IC

D E

S

IG

N C

E N

T E

R

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S F

IL

E

N U

M B

E R

F

IL

E N

A M

E

J O

R D

A N

S F

IN

K

P

D

A W

IN

G

S I

N D

E X

G-002

P

K L

E

IN

E

P .E

D

F

IL

a G

-0 .d g n

L G

S -1

-6 -0

-A /2

P

K L

E

IN

E

P .E

VOLUME 1

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

S U

B M

IT

T

E D

B Y

C H

E C

K E

D B

Y

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

IS

S

U E

D A

T E

S I Z

E

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

SHEET ID

®of Engineers

US Army Corps

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

DRAWING INDEXDRAWING INDEX

GENERAL

DRAWING NUMBER

NO

SHEET

TITLE

ELECTRICAL

FILE NUMBER TITLE

S I

D

F

IN

A L

T

L O

W E

R S

N A

K E

R

IV

E R

S P

A R

E T

R A

N S

F O

R M

E R

S

L

IT

T L

E G

O O

S E

L O

C K

A N

D D

A M

W

E F

R A

O C

T O

B E

R

L L

A W

A L

L A

W

A S

H

IN

G T

O N

N

R

D A

V E

W A

L L

A W

A L

L A

D

IS

T R

IC

T

P O

R T

L A

N D

O

R E

G O

N

S

W

S T

A V

E

H Y

D R

O E

L E

C T

R

IC

D E

S

IG

N C

E N

T E

R

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S F

IL

E

N U

M B

E R

F

IL

E N

A M

E

J O

R D

A N

S F

IN

K

P

T

A N

S F

O R

M E

R S

IT

E

D E

L

IV

E R

Y A

N D

S T

O R

A G

E L

O C

A T

IO

N

G-003

P

K L

E

IN

E

P .E

D

F

IL

a G

-0 .d g n

L G

S -1

-6 -0

-A /3

P

K L

E

IN

E

P .E

VOLUME 1

PLAN

NORTH

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

S U

B M

IT

T

E D

B Y

C H

E C

K E

D B

Y

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

IS

S

U E

D A

T E

S I Z

E

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

SHEET ID

®of Engineers

US Army Corps

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

E

NAVIGATION LOCK

XX

X

X

S P

IL

L

W A

Y

P O

W E

R H

O U

S E

TO RIPARIA

STORAGE YARD

TO STARBUCK

SPARE TRANSFORMER STORAGE LOCATION

NOT PART OF THIS CONTRACT

FUTURE STORAGE BUILDINGS

A1

TRANSFORMER SITE

S I

D

F

IN

A L

T

L O

W E

R S

N A

K E

R

IV

E R

S P

A R

E T

R A

N S

F O

R M

E R

S

L

IT

T L

E G

O O

S E

L O

C K

A N

D D

A M

W

E F

R A

O C

T O

B E

R

L L

A W

A L

L A

W

A S

H

IN

G T

O N

N

R

D A

V E

W A

L L

A W

A L

L A

D

IS

T R

IC

T

P O

R T

L A

N D

O

R E

G O

N

S

W

S T

A V

E

H Y

D R

O E

L E

C T

R

IC

D E

S

IG

N C

E N

T E

R

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S F

IL

E

N U

M B

E R

F

IL

E N

A M

E

J O

R D

A N

S F

IN

K

P

A N

S F

O R

M E

R E

Q U

IP

M

E N

T S

U M

M A

R Y

S H

E E

T

G-004

P

K L

E

IN

E

P .E

D

F

IL

a G

-0 .d g n

L G

S -1

-6 -0

-A /4

P

K L

E

IN

E

P .E

VOLUME 1

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

S U

B M

IT

T

E D

B Y

C H

E C

K E

D B

Y

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

IS

S

U E

D A

T E

S I Z

E

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

SHEET ID

®of Engineers

US Army Corps

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

NAMEPLATE DATA:

TANK AND CONSTRUCTION:

ACCESSORIES:

BUSHINGS:

INSULATING OIL:

SEPARATE CONTROL AND POWER CABINETS:

SPARE PARTS:

FACTORY ASSEMBLY AND PAINT:

FACTORY ACCEPTANCE TESTS (F.A.T.):

REQUIREMENTS SUMMARY SHEET

LITTLE GOOSE 500 KV SPARE GSU TRANSFORMER

(REFERENCE SPECIFICATION SECTION 48 19 23.08 26)

∙ TYPE: NAPTHENIC BASE - ASTM D 3487 TYPE II; 0.3% BY MASS OF OXIDATION INHIBITOR

(4) COMPLETELY ASSEMBLED AND WITNESSING OF FACTORY ACCEPTANCE TESTS

TRANSFORMER)

(3) COMPLETED CORE/COIL ASSEMBLY, BUT PRIOR TO TANKING (IF PROVIDING A CORE TYPE

(2) AFTER COMPLETION OF WINDINGS BUT PRIOR TO LANDING ON CORE

(1) DESIGN REVIEW MEETING

∙ INSPECTIONS: GOVERNMENT INSPECTIONS PERFORMED DURING

FOR ONE WEEK PRIOR TO OIL FILLING.

∙ INTERIOR PAINT: PRIMER COAT, OIL-RESISTANT FINISH COAT - WHITE. ALLOW TO CURE

STEEL CABINETS, SHALL REMAIN UNPAINTED. COVER TO RECEIVE A NON-SLIP COATING.

5BG 7/0.4 HIGH-GLOSS (ANSI NO. 70 GRAY). CORROSION RESISTANT SURFACES, AND STAINLESS

∙ EXTERIOR PAINT: PRIMER COAT, EPOXY BASE COAT, POLYURETHANE TOP COAT - MUNSELL

MATCH-MARKED FOR EASE OF REASSEMBLY.

∙ ASSEMBLY: TRANSFORMER TO BE FULLY ASSEMBLED, WITH REMOVABLE COMPONENTS

15,539 GALLONS∙ MAXIMUM OIL QUANTITY:

591,500 POUNDS∙ MAXIMUM WEIGHT:

∙ FREQUENCY: 60 HZ

∙ MAXIMUM LOAD LOSSES: 314 KW

∙ MAXIMUM NO-LOAD LOSSES: 165 KW

∙ MAXIMUM SOUND LEVEL (ONAF): 80 DB

∙ OIL PRESERVATION SYSTEM: NITROGEN BLANKET (PREFERRED) OR CONSTANT OIL PRESSURE SYSTEM

∙ TEMPERATURE RISE: 65 ºC

∙ SECONDARY WINDING (H) DETC: 5 TAPS; 3 @ +2.5%, 1 @ -2.5% OF NOMINAL 500 KV TAP

∙ IMPEDANCE: 17.7% @ 82,000 KVA (H-X & H-Y),

∙ PHASING: SINGLE-PHASE

∙ BIL LEVELS, KV: 1,425 (H) / 110 (X & Y) / 150 (H0)

∙ VOLTAGE RATINGS: 500,000 GRDY (H) - 13,200 DELTA (X) 13,200 DELTA (Y)

∙ KVA RATING: 164,000 / 218,666

∙ COOLING CLASS: ONAN/ONAF

∙ TYPE: CLASS II GSU POWER TRANSFORMER

∙ ANALOG TEMPERATURE GAGE FUNCTIONAL VERIFICATION

∙ BUSHING CURRENT TRANSFORMER ROUTINE TESTS

AND POWER FACTOR TESTS DURING TRANSFORMER F.A.T.

∙ EACH HIGH-VOLTAGE AND HIGH-VOLTAGE NEUTRAL BUSHING SHALL UNDERGO CAPACITANCE

∙ ALL ELECTRICAL AND ELECTO-MECHANICAL DEVICES SHALL BE FUNCTIONALLY TESTED

∙ DE-ENERGIZED TAP CHANGER MECHANICAL OPERATIONAL TEST (5 COMPLETE CYCLES)

SHIPPING CONFIGURATION

- ONE SFRA TEST TO BE PERFORMED WITH THE TRANSFORMER IN THE

OIL FILLED

- ONE SFRA TEST TO BE PERFORMED WITH THE TRANSFORMER FULLY ASSEMBLED AND

- CABLE INTEGRITY TEST REQUIRED

∙ SWEEP FREQUENCY RESPONSE ANALYSIS (WITH ELECTRONIC DATA FILES)

∙ LEAKAGE REACTANCE (WITH ELECTRONIC DATA FILES)

ONE HOUR LEVEL: 300 PC

∙ INDUCED VOLTAGE TEST ACCEPTANCE CRITERIA: 7,200 CYCLE ENHANCEMENT LEVEL: 500 PC;

∙ AUDIBLE SOUND LEVEL TESTS SHALL BE PERFORMED

∙ LIGHTNING IMPULSE TESTS

∙ TEMPERATURE RISE TESTS SHALL BE PERFORMED AT EACH COOLING STAGE

∙ ALL 'ROUTINE' TESTS (IEEE C57.12.00, TABLE 17)

THE ISOPHASE BUS WHEN PERMENTLY INSTALLING THE SPARE AT A PROJECT

THE GOVERNMENT WILL USE THE EXISTING COPPER BUS BARS THAT CONNECT THE LV BUSHING TO

∙ PROVIDE LOW-VOLTAGE HOUSINGS TO CONNECT THE TRANSFORMER TO THE ISOPHASE BUS COVER

∙ COOLING FANS: HORTIZONTAL-DRAFT

∙ RADIATORS: HOT-DIP GALVANIZED.

STEEL. MAXIMUM DESIGN FLUX DENSITY OF 1.75 TESLA. STEP-LAP CONSTRUCTION.

∙ CORE: LAMINATIONS MAXIMUM THICKNESS OF 0.270MM, COLD-ROLLED, GRAIN-ORIENTED

∙ SEISMIC: SEISMIC CALCULATIONS REQUIRED FOR MAIN TANK AND ALL MAJOR COMPONENTS.

∙ LIFTING EYES: DESIGN LOADS FOR EACH EYE SHALL BE TWO TIMES THE ACTUAL LOAD.

∙ BASE: DESIGNED FOR PAD MOUNTING WITH SEISMIC WELDING TO STEEL PLATES.

CONSISTING OF A SINGLE ANCHOR POST, SHALL BE PROVIDED.

WITH A NON-SLIP MATERIAL, THE SAME COLOR AS THE TANK WALLS. A FALL PROTECTION SYSTEM, ∙ PERSONAL FALL ARREST SYSTEM: THE TOP OF THE TRANSFORMER TANK SHALL BE COVERED

∙ VALVES: STAINLESS STEEL BALL-TYPE (RADIATORS MAY USE BUTTERFLY-TYPE)

O-RING GASKETS SHALL NOT BE USED FOR GASKET GROOVES OF RECTANGULAR CROSS-SECTION.

THAT THE LOW-VOLTAGE BUSHING GASKETS SHALL BE FLURORELASTOMERIC RUBER.

∙ GASKETS: NITRILE NBR (BUNA-N), DURO 50-60, 25% COMPRESSION, WITH THE EXCEPTION

∙ MAN-HOLE: 24-INCH DIAMETER (MINIMUM TWO)

∙ (QTY 1): VALVE OF EACH SIZE AND TYPE

∙ (QTY 1): BUCHHOLZ RELAY (IF SUPPLYING A COPS TYPE OIL PRESERVATION SYSTEM)

∙ (QTY 1): PRESSURE REGULATOR (IF SUPPLYING NITROGEN BLANKET TYPE OIL PRESERVATION SYSTEM)

∙ (QTY 1): FUSE OF EACH TYPE AND RATING

∙ (QTY 3): FIBER OPTIC EXTENSION CABLE THAT CONNECTS THE FEED-THROUGH WALL PLATE LEFT UNCONNECTED

∙ (QTY 1): CRATED RADIATOR, COMPLETE WITH INLET AND OUTLET ISOLATION VALVES, VENT AND DRAIN VALVES

∙ (QTY 2): COOLING FAN COMPLETE WITH MOTOR, CABLES AND CONNECTORS

∙ (QTY 1): ONE RAPID PRESSURE RELAY AND SEAL IN RELAY

∙ (QTY 1): BUSHING CURRENT TRANSFORMER OF EACH TYPE AND RATING

∙ (QTY 1): OIL TEMPERATURE INDICATOR

∙ (QTY 1): WINDING TEMPERATURE INDICATOR

∙ (QTY 1): LIQUID LEVEL INDICATOR

∙ (QTY 1): PRESSURE RELIEF DEVICE

∙ (QTY 1): RELAY AND CONTACTOR OF EACH TYPE AND RATING

∙ (QTY 1): SET OF GASKETS FOR TRANSFORMER REASSEMBLY

∙ (QTY 1): COMPLETE GASKET SET

OR STAINLESS STEEL WITH ENGRAVED BLACK LETTERING.

NAMEPLATES WITHIN THE CONTROL AND POWER CABINETS SHALL BE ANODIZED ALUMINUM

LOW-VOLTAGE BUSHINGS MADE OF STAINLESS STEEL WITH BLACK LETTERING. DEVICE

PROVIDED. EQUIPMENT NAMEPLATES SHALL BE PROVIDED FOR THE HIGH-VOLTAGE BUSHINGS AND

AN ADDITIONAL DIAGRAM NAMEPLATE FOR SLING LOCATIONS AND LIFT POSITIONS SHALL ALSO BE

AND VACUUM THE TANK WILL WITHSTAND, DRY WEIGHT OF THE INSULATION, AND CALCULATED X/R RATIO.

MANUFACTURING DATE, PLANT LOCATION, GOVERNMENT CONTRACT NUMBER, PRESSURE

∙ NAMEPLATES: CAST BRONZE OR STAINLESS STEEL; IEEE C57.12.00, TABLE 7, INCLUDING

- FOLD-DOWN MAINTENANCE TRAY ON INSIDE OF CONTROL CABINET DOOR.

GRADE HUMIDISTAT / THERMOSTAT CONTROL.

- PTC RESISTOR DESIGN ENCLOSURE HEATERS WITH INTEGRAL FANS, AND INDUSTRIAL

CABINET.

- 120 V AC, 20 A HOSPITAL GRADE GFCI RECEPTACLE MOUNTED INSIDE THE CONTROL

- 120 V AC, 1,000 LUMEN LED TYPE A19 LAMPS WITH DOOR-ACTUATED SWITCH.

IN POWER CABINET.

- ALL CIRCUITS, WIRING AND EQUIPMENT RATED GREATER THAN 120 V AC TO BE MOUNTED

∙ SPECIAL FEATURES:

- 125 AND 250 V DC CIRCUITS - RATED 125/250 OR 250 V DC, AND 10,000 A INTERRUPTING

- 120 V AC CIRCUITS - RATED 250 V DC AND 120/240 OR 240 V AC, AND 10,000 A INTERRUPTING

- 480 V AC CIRCUITS - RATED 600 V AC AND 18,000 A INTERRUPTING AT 480 VAC

∙ MOLDED-CASE CIRCUIT BREAKERS:

120 V AC CIRCUITS - 10 A

- SINGLE-BREAK INDUCTIVE LOAD INTERRUPTING RATING: 125 V DC CIRCUITS - 1.5 A;

- RATED FOR 600 V AC OR 250 V DC

∙ SWITCHES:

120 V AC CIRCUITS - 6.0 A

- SINGLE-CONTACT INDUCTIVE LOAD INTERRUPTING CAPACITY: 125 V DC CIRCUITS - 1.0 A;

- RATED FOR 125 V DC OR 120 V AC; MEETS REQUIREMENTS OF NEMA ICS5; 10 A CONTACTS

∙ AUXILIARY RELAYS:

∙ TERMINAL BLOCKS: 600 V, 30 A MINIMUM, 90 ºC RATED TERMINATIONS.

NFPA 70.

WITH CAST COVERS AND LIQUID-TIGHT HUBS. CONDUIT FILL SHALL BE IN ACCORDANCE WITH

JOINT COMPOUND APPLIED. OUTLET AND JUNCTION BOXES SHALL BE MALLEABLE CAST IRON

CHANNELS NOT ALLOWED. ALL CONDUIT THREADED JOINTS SHALL HAVE A CONDUCTIVE

∙ CONDUIT: ALL WIRING TO BE RUN IN CONDUIT. WIRE RUNS THROUGH TANK REINFORCING

GROUND - GREEN/YELLOW

PHASE B - ORANGE; PHASE C - YELLOW; GROUNDED NEUTRAL - WHITE; INSULATED

∙ WIRING: XLPE; 3-PHASE POWER CONDUCTORS COLOR CODED: PHASE A - BROWN;

POWER - 125 V DC; COOLING FANS - 480 V AC, 3-WIRE, 3-PHASE, 60 HZ

∙ GOVERNMENT-FURNISHED POWER: CONTROL POWER - 125 V DC; ANNUNCIATION

IN CONTROL CABINET. SOLAR SHIELDING ON TOP, FRONT AND SIDE PANELS OF ENCLOSURES.

PROVISIONS. WINDOWS FOR VIEWING THE FUTURE TEMPERATURE MONITOR AND ANNUNCIATOR

∙ CABINET MATERIAL: WEATHER-PROOF TYPE 304 STAINLESS STEEL WITH LOCKING

∙ TRANSFORMER EMBEDDED FIBER-OPTIC WINDING TEMPERATURE MEASUREMENT PROBES

∙ DIRECTED-FLOW PRESSURE RELIEF DEVICE WITH METAL DISCHARGE PIPING

∙ WTI AND OTI GAUGES WITH RTDS - HARDENED FOR HARSH WEATHER CONDITIONS

∙ CORE GROUNDS: 2.5 KV CLASS, 45 KV BIL, 100 AMP

T025W0412ATHITACHI TYPE O+ C

∙ NEUTRAL (H0): 25 KV CLASS, MINIMUM 150 KV BIL, 1,200 AMP

INDICATING EQUIPMENT)

(BUSHING CURRENT TRANSFORMERS AS REQUIRED FOR THE WINDING TEMPERATURE

HITACHI TYPE RJ T025B1000DS

BULK-TYPE, LOW-CORONA, LIGHT CONTAMINATION, 125 ºC TEMPERATURE RISE RATING

∙ PRIMARY WINDING: 25 KV CLASS, MINIMUM 150 KV BIL, 10,000 AMP, PORCELAIN CONSTRUCTION, (TWO 1200:5 MRCT)

T550W2000VVHITACHI TYPE O+ C

∙ SECONDARY WINDING (H1): 500 KV CLASS, MINIMUM 1,500 KV BIL, 1,600 AMP, OIL-FILLED BUSHING

S I

D

F

IN

A L

T

L O

W E

R S

N A

K E

R

IV

E R

S P

A R

E T

R A

N S

F O

R M

E R

S

L

IT

T L

E G

O O

S E

L O

C K

A N

D D

A M

W

E F

R A

O C

T O

B E

R

L L

A W

A L

L A

W

A S

H

IN

G T

O N

N

R

D A

V E

W A

L L

A W

A L

L A

D

IS

T R

IC

T

P O

R T

L A

N D

O

R E

G O

N

S

W

S T

A V

E

H Y

D R

O E

L E

C T

R

IC

D E

S

IG

N C

E N

T E

R

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S F

IL

E

N U

M B

E R

F

IL

E N

A M

E

J O

R D

A N

S F

IN

K

P

G

IO

N A

L T

E M

P E

R A

T U

R E

A N

N U

A L

S U

M M

A R

Y

G-005

P

K L

E

IN

E

P .E

D

F

IL

a G

-0 .d g n

L G

S -1

-6 -0

-A /5

P

K L

E

IN

E

P .E

VOLUME 1

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

S U

B M

IT

T

E D

B Y

C H

E C

K E

D B

Y

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

IS

S

U E

D A

T E

S I Z

E

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

SHEET ID

®of Engineers

US Army Corps

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

S

S I

D

F

IN

A L

T

L O

W E

R S

N A

K E

R

IV

E R

S P

A R

E T

R A

N S

F O

R M

E R

S

L

IT

T L

E G

O O

S E

L O

C K

A N

D D

A M

W

E F

R A

O C

T O

B E

R

L L

A W

A L

L A

W

A S

H

IN

G T

O N

N

R

D A

V E

W A

L L

A W

A L

L A

D

IS

T R

IC

T

P O

R T

L A

N D

O

R E

G O

N

S

W

S T

A V

E

H Y

D R

O E

L E

C T

R

IC

D E

S

IG

N C

E N

T E

R

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S F

IL

E

N U

M B

E R

F

IL

E N

A M

E

J O

R D

A N

S F

IN

K

P

IT

E L

O C

A T

IO

N

P H

O T

O G

R A

P H

S

G-006

N

B E

E M

D

F

IL

a G

-0 .d g n

L G

S -1

-6 -0

-A /6

P

K L

E

IN

E

P .E

VOLUME 1

STORAGE YARD

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

S U

B M

IT

T

E D

B Y

C H

E C

K E

D B

Y

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

IS

S

U E

D A

T E

S I Z

E

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

SHEET ID

®of Engineers

US Army Corps

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

H3

STORAGE YARD MAP VIEW

SCALE: NTS

H13

STORAGE YARD

SCALE: NTS

B2

TRANSFORMER INTAKE DECK

SCALE: NTS

B13

ACROSS INTAKE BRIDGE AT LITTLE GOOSE

PREVIOUS SPARE TRANSFORMER MOVEMENT

SEGMENT 2 SEGMENT 4

BUSHING SIDE)

(LOW-VOLTAGE

SEGMENT 1

BUSHING SIDE)

(HIGH-VOLTAGE

SEGMENT 3

M A

X O

V E

R A

L L

L E

N G

T H

/4

MAX OVERALL WIDTH 309"

JACKING CENTERS

47"47"

72"72"

50" CENTERLINE TO CENTER OF ITEM 2

144"

L V

B U

S H

IN

G

S

C

E N

T E

R

/4

T O

C E

N T

E R

O F

H

B U

S H

IN

G

T E

R M

IN

A

L 5

/2

L V

H O

U S

IN

G

S C

E N

T E

R O

F

CENTERLINE OF ITEM 7394"

7" 7"

13 1/4 "

26 1/2 "

7" 7"

2 1/2 "

6 1/2 "

/2

/4

/2

/8

9 1/4 "

/4

18" 14 11/16 " 14 11/16 " 18"

A N

S I

D

F

IN

A L

T

L O

W E

R S

N A

K E

R

IV

E R

S P

A R

E T

R A

N S

F O

R M

E R

S

L

IT

T L

E G

O O

S E

L O

C K

A N

D D

A M

W

E F

R A

O C

T O

B E

R

L L

A W

A L

L A

W

A S

H

IN

G T

O N

N

R

D A

V E

W A

L L

A W

A L

L A

D

IS

T R

IC

T

P O

R T

L A

N D

O

R E

G O

N

S

W

S T

A V

E

H Y

D R

O E

L E

C T

R

IC

D E

S

IG

N C

E N

T E

R

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S F

IL

E

N U

M B

E R

F

IL

E N

A M

E

J O

R D

A N

S F

IN

K

P

P V

IE

W

G E

N E

R A

T O

R S

T E

P -U

P T

R A

N S

F O

R M

E R

E-101

P

K L

E

IN

E

P .E

D

F

IL

a E

-1 .d g n

L G

S -1

-6 -1

E

/1

P

K L

E

IN

E

P .E

REQUIREMENTS

DETAIL H1 FOR

SEE NOTE 4 AND

C E

N T

E R

O F

H B

U S

H

IN

G T

O X

F M

R C

E N

T E

R L

IN

E

X-1

X-2

Y-1

Y-2

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

S U

B M

IT

T

E D

B Y

C H

E C

K E

D B

Y

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

IS

S

U E

D A

T E

S I Z

E

M A

R K

D E

S C

R

IP

T

IO

N D

A T

SHEET ID

/8

B A

S E

EXISTING

COPPER BARS

TO ISOPHASE BUS

CL

CL

COVER

XFMR

EXISTING

COVER

XFMR

EXISTING

CL OF LV BUSHING

LV BUSHING

CL OF

ACCESS COVER

LV HOUSING

OF HOUSING

WELD TO INSIDE

3/8X NUTS TOTAL

SEGMENT

1 HIGH-VOLTAGE (H1) BUSHING1

QTYITEM DESCRIPTION

1.5-INCH UPPER FILTER VALVE

3-INCH VACUUM VALVE

RADIATORS (TYPICAL)

RADIATOR ISOLATION VALVES

HIGH-VOLTAGE NEUTRAL (H0) BUSHING

LOW-VOLTAGE BUSHINGS

COVER

COVER

COVER

OIL LEVEL INDICATOR

AS DES.

AS DES.

CONTROL CABINET

COVER

3-INCH MAIN OIL DRAIN VALVE

1.5-INCH LOWER FILTER VALVE

COVER

EXAMPLE MODEL NUMBER

33 4, COVER

HITACHI

HITACHI

QUALITROL XPRDPRESSURE RELIEF DEVICE WITH DISCHARGE PIPING

MILWAUKEE VALVE F20 SERIES, SS, CLASS 150

MILWAUKEE VALVE

MILWAUKEE VALVE

MILWAUKEE VALVE

MILWAUKEE VALVE

QUALITROL 042 SERIES

35 COVER MANHOLE ACCESS COVER

45 AS DES. COVER FALL ARREST SYSTEM MOUNTING BRACKETS DBI-SALA 8517412

CORE & CORE FRAME GROUND BUSHINGS (SEE FIGURE 2)

AS DES.

BILL OF MATERIALS

BULK, TYPE RJ T025B1000DS

1, 2, 4

1, 2, 4

15 1 2 DUAL TANK NITROGEN REGULATOR CABINET ABB RND2

2 2-INCH GAS-IN-OIL MONITOR INTERFACE VALVES

5 THERMOWELLS (QTY. 3 - STANDARD, QTY. 2 - HEATED)

TYPE O + C T550W2000VV

10 1, 2, 4 HORIZONTAL DRAFT COOLING FANS KRENZ-VENTAS DES.

1 POWER CABINET17 3

70 1 3 AUXILIARY POWER TRANSFORMER

GENERAL NOTES

PROTECTIVE COVER

CORE

(#4 AWG)

GROUNDING CABLE

BUSHING

CORE GROUND

GROUND BUSHING

CORE FRAME

TANK COVER

CORE FRAME

(#4 AWG)

GROUNDING CABLE

TANK COVER

CL

E10

CORE AND CORE FRAME GROUNDING

SCALE: NTS

A17

SEGMENT IDENTIFICATION (TOP VIEW)

TRANSFORMER TANK

SCALE: NTS

A1

TRANSFORMER COVER

3/8"=1'-0"SCALE:

A9

EXISTING LV BUSHING BUS BARS

SCALE: NTS

HITACHI

TYPE O + C T025W0412AT

H1

LOW-VOLTAGE BUSHING HOUSINGS

SCALE: 1/2" = 1'-0"

21 1 3 RAPID PRESSURE RISE RELAY WITH 1-1/2-INCH ISOLATION VALVE QUALITROL/MILWAUKEE VALVE

F20 SERIES, SS, CLASS 150

F20 SERIES, SS, CLASS 150

F20 SERIES, SS, CLASS 150

900-FLA & F20 SERIES, SS, CLASS 150

®of Engineers

US Army Corps

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

6. SEE RESOURCE DRAWINGS FOR PAD DETAILS.

5. MAXIMUM WEIGHT: 591,500 POUNDS

FLEXIBLE CONDUCTORS. SEE SECTION H1 AND A9.

BARS WILL BE REUSED TO CONNECT THE BUSHING TO THE ISOPHASE BUS AND

CABLES THAT CONNECT TO THE ISOPHASE BUS. THE EXISTING COPPER BUS

TO REMOVE AND ALLOWS ACCESS TO THE LV BUSHINGS AND THE FLEXIBLE

4. PROVIDE WEATHER PROOF LV HOUSINGS WITH ACCESS COVER THAT ARE EASY

ARE NOT INTENDED TO INDICATE THE ACTUAL QUANTITY.

3. THE RADIATORS AS DEPICTED INDICATE THE PERMISSIBLE LOCATIONS, AND

BREATHER, AND BUCHHOLZ RELAY.

SYSTEM MUST BE INCLUDED, SUCH AS A MAINTENACE-FREE DEHYDRATING

REQUIRED IN SECTION 48 19 23.08 26 FOR A CONSTANT OIL PRESERVATION

OIL PRESERVATION SYSTEM IS PROVIDED, ALL ASSOCIATED EQUIPMENT

THE POWERHOUSE EQUIPMENT NEEDED TO FIT THE COPS TANK. IF CONSTANT

CONDUCTORS PER IEEE STD 1427. THERE SHALL BE NO MODIFICATIONS TO

MUST MAINTAIN A MINIMUM OF 105" CLEARANCE FROM THE OVERHEAD 500KV

THE DIMENSIONAL REQUIREMENTS IDENTIFIED MUST BE MET. THE COPS TANK

TRANSFORMER AND/OR A CONSTANT OIL PRESERVATION SYSTEM IS PROVIDED,

DRAWINGS WITH AN INERT-GAS OIL PRESERVATION SYSTEM. IF A CORE-FORM

THE DRAWING SHOWN IS BASED ON THE WESTINGHOUSE SHELL-FORM2.

J. MAXIMUM OVERALL LENGTH

I. MAXIMUM OVERALL WIDTH

H. STRUCTURAL BASE

G. JACKING & LIFTING FACILITIES

F. ANCILLARY DEVICES

E. CONTROL AND POWER CABINETS

VOLTAGE BUS

D. LOW-VOLTAGE BUSHING HOUSING DIMENSIONS AND LOCATION OF LOW-

C. HIGH-VOLTAGE NEUTRAL BUSHING LOCATION AND TERMINAL CONNECTION

B. LOW-VOLTAGE BUSHINGS LOCATIONS AND TERMINAL CONNECTIONS

A. HIGH-VOLTAGE BUSHING LOCATION AND TERMINAL CONNECTION

INTERCONNECTION:

TRANSFORMER EQUIPMENT ARE CONSIDERED CRITICAL TO ASSURE PROPER

THE TRANSFORMER VAULT. THE LOCATIONS OF THE FOLLOWING

PROPER INTERCONNECTION TO THE EXISTING EQUIPMENT AND INTERFACES IN

FOR THE MANUFACTURER'S USE IN DESIGNING THE TRANSFORMER FOR

1. THE TRANSFORMER LAYOUT AND LIMITING DIMENSIONS HAVE BEEN PROVIDED

72 4 COVER LOW-VOLTAGE BUSHING HOUSINGS (SEE H1 AND A9)

73 2 1 COMBINATION JACKING PAD, ROCKER, AND LIFTING EYES

42 2 3 COMBINATION JACKING PAD AND LIFTING EYES

75 1 3 EXTERNAL GAS EXPANSION TANK

AS DES.

/8

T O

T O

P O

F L

V B

U S

H

IN

G

/2

T

O T

H E

C E

N T

E R

O F

T H

E T

O P

O F

T H

E H

V B

U S

H

IN

G T

E R

M

IN

A L

/8

T

O T

O P

O F

L V

H O

U S

IN

G

/8

T O

C E

N T

E R

O F

L V

B U

S

MAXIMUM OVERALL WIDTH 309"

CENTERLINE OF ITEM 42

10'-10 1/2 "

1'-6"

7'-10"

A N

S I

D

F

IN

A L

T

L O

W E

R S

N A

K E

R

IV

E R

S P

A R

E T

R A

N S

F O

R M

E R

S

L

IT

T L

E G

O O

S E

L O

C K

A N

D D

A M

W

E F

R A

O C

T O

B E

R

L L

A W

A L

L A

W

A S

H

IN

G T

O N

N

R

D A

V E

W A

L L

A W

A L

L A

D

IS

T R

IC

T

P O

R T

L A

N D

O

R E

G O

N

S

W

S T

A V

E

H Y

D R

O E

L E

C T

R

IC

D E

S

IG

N C

E N

T E

R

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S F

IL

E

N U

M B

E R

F

IL

E N

A M

E

J O

R D

A N

S F

IN

K

P

.E

S E

G M

E N

T

L A

Y O

U T

A N

D L

IM

IT

IN

G

D

IM

E N

S

IO

N S

G E

N E

R A

T O

R S

T E

P -U

P T

R A

N S

F O

R M

E R

E-102

P

K L

E

IN

E

P .E

D

F

IL

a E

-1 .d g n

L G

S -1

-6 -1

E

/2

P

K L

E

IN

E

P .E

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

B

C

D

E

F

G

H

J

K

L

M

N

P

S U

B M

IT

T

E D

B Y

C H

E C

K E

D B

Y

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

IS

S

U E

D A

T E

S I Z

E

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

SHEET ID

®of Engineers

US Army Corps

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

SEE NOTE 4

DECK LEVEL

A13

SEGMENT IDENTIFICATION (TOP VIEW)

FIGURE 1 - TRANSFORMER TANK

SCALE: NTS

SEGMENT

1 HIGH-VOLTAGE (H1) BUSHING1

QTYITEM DESCRIPTION

3-INCH VACUUM VALVE

RADIATORS (TYPICAL)

RADIATOR ISOLATION VALVES

LOW-VOLTAGE BUSHINGS

COVER

COVER

AS DES.

AS DES.

COVER

EXAMPLE MODEL NUMBER

HITACHI

HITACHI

MILWAUKEE VALVE F20 SERIES, SS, CLASS 150

BILL OF MATERIALS

BULK, TYPE RJ T025B1000DS

1, 2, 4

1, 2, 4

TYPE O+ C T550W2000VV

HORIZONTAL DRAFT COOLING FANSAS DES.10 1, 2, 4 KRENZ-VENT

27 1 1 1.5-INCH UPPER FILTER VALVE MILWAUKEE VALVE F20 SERIES, SS, CLASS 150

6. SEE RESOURCE DRAWINGS FOR PAD DETAILS.

MAXIMUM WEIGHT: 591,500 POUNDS5.

SHEET E-101 FOR DIMENSIONAL REQUIREMENTS AND DETAILS.

PROVIDE LOW-VOLTAGE BUSHING HOUSINGS AS INDICATED. SEE SECTION H1 ON 4.

ARE NOT INTENDED TO INDICATE THE ACTUAL QUANTITY.

3. THE RADIATORS AS DEPICTED INDICATE THE PERMISSIBLE LOCATIONS, AND

BREATHER, AND BUCHHOLZ RELAY.

SYSTEM MUST BE INCLUDED, SUCH AS A MAINTENACE-FREE DEHYDRATING

REQUIRED IN SECTION 48 19 23.08 26 FOR A CONSTANT OIL PRESERVATION

OIL PRESERVATION SYSTEM IS PROVIDED, ALL ASSOCIATED EQUIPMENT

THE POWERHOUSE EQUIPMENT NEEDED TO FIT THE COPS TANK. IF CONSTANT

CONDUCTORS PER IEEE STD 1427. THERE SHALL BE NO MODIFICATIONS TO

MUST MAINTAIN A MINIMUM OF 105" CLEARANCE FROM THE OVERHEAD 500KV

THE DIMENSIONAL REQUIREMENTS IDENTIFIED MUST BE MET. THE COPS TANK

TRANSFORMER AND/OR A CONSTANT OIL PRESERVATION SYSTEM IS PROVIDED,

DRAWINGS WITH AN INERT-GAS OIL PRESERVATION SYSTEM. IF A CORE-FORM

THE DRAWING SHOWN IS BASED ON THE WESTINGHOUSE SHELL-FORM2.

I. MAXIMUM OVERALL WIDTH

H. STRUCTURAL BASE

G. JACKING & LIFTING FACILITIES

F. ANCILLARY DEVICES

E. CONTROL AND POWER CABINETS

VOLTAGE BUS

D. LOW VOLTAGE BUSHING HOUSING DIMENSIONS AND LOCATION OF LOW

C. LOW-VOLTAGE BUSHINGS LOCATIONS AND TERMINAL CONNECTIONS

B. HIGH-VOLTAGE NEUTRAL BUSHING LOCATION AND TERMINAL CONNECTION

A. HIGH-VOLTAGE BUSHING LOCATION AND TERMINAL CONNECTION

INTERCONNECTION:

TRANSFORMER EQUIPMENT ARE CONSIDERED CRITICAL TO ASSURE PROPER

THE TRANSFORMER VAULT. THE LOCATIONS OF THE FOLLOWING

PROPER INTERCONNECTION TO THE EXISTING EQUIPMENT AND INTERFACES IN

FOR THE MANUFACTURER'S USE IN DESIGNING THE TRANSFORMER FOR

1. THE TRANSFORMER LAYOUT AND LIMITING DIMENSIONS HAVE BEEN PROVIDED

GENERAL NOTES

SEGMENT 2 SEGMENT 4

BUSHING SIDE)

(LOW-VOLTAGE

SEGMENT 1

BUSHING SIDE)

(HIGH-VOLTAGE

SEGMENT 3

49 4 1,3 GROUNDING PADS (TYPICAL)

A1

TRANSFORMER ELEVATION VIEW- SEGMENT 1

SCALE: 3/8" = 1'-0"

COVER72 4 LOW-VOLTAGE BUSHING HOUSINGS

73 2 1 COMBINATION JACKING PAD, ROCKER AND LIFTING EYES

43 AS DES. BASE STRUCTURAL BASE

/8

T O

C E

N T

E R

L

IN

E O

F L

V B

U S

/4

T

O T

O P

O F

H V

N E

U T

R A

L B

U S

H

IN

G

21'-3 3/4 " MAXIMUM LENGTH

LV BUSHINGS

2'-11" CENTER OF

OF LV BUS

3'-4" CENTER

MAXIMUM OVER OPEN DOOR10'-2 3/8 "

7'-11 3/4 " TO EXISTING EMBEDDED CONDUIT

/2

T

O T

H E

C E

N T

E R

O F

T H

E T

O P

O F

T H

E H

V B

U S

H

IN

G T

E R

M

IN

A L

A N

S I

D

F

IN

A L

T

L O

W E

R S

N A

K E

R

IV

E R

S P

A R

E T

R A

N S

F O

R M

E R

S

L

IT

T L

E G

O O

S E

L O

C K

A N

D D

A M

W

E F

R A

O C

T O

B E

R

L L

A W

A L

L A

W

A S

H

IN

G T

O N

N

R

D A

V E

W A

L L

A W

A L

L A

D

IS

T R

IC

T

P O

R T

L A

N D

O

R E

G O

N

S

W

S T

A V

E

H Y

D R

O E

L E

C T

R

IC

D E

S

IG

N C

E N

T E

R

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S F

IL

E

N U

M B

E R

F

IL

E N

A M

E

J O

R D

A N

S F

IN

K

P

.E

S E

G M

E N

T

L A

Y O

U T

A N

D L

IM

IT

IN

G

D

IM

E N

S

IO

N S

G E

N E

R A

T O

R S

T E

P -U

P T

R A

N S

F O

R M

E R

E-103

P

K L

E

IN

E

P .E

D

F

IL

a E

-1 .d g n

L G

S -1

-6 -1

E

/3

P

K L

E

IN

E

P .E

B

C

D

E

F

G

H

J

K

L

M

N

P

S U

B M

IT

T

E D

B Y

C H

E C

K E

D B

Y

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

IS

S

U E

D A

T E

S I Z

E

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

SHEET ID

®of Engineers

US Army Corps

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

DECK LEVEL

SEE NOTE 4

DECK LEVEL

DECK LEVEL

A1

TRANSFORMER ELEVATION VIEW - SEGMENT 2

SCALE: 1/2"=1'-0" A16

IDENTIFICATION (TOP VIEW)

FIGURE 1 - TRANSFORMER TANK SEGMENT

SCALE: NTS

SEGMENT

1 HIGH-VOLTAGE (H1) BUSHING1

QTYITEM DESCRIPTION

RADIATORS (TYPICAL)

HIGH-VOLTAGE NEUTRAL (H0) BUSHING

COVER

COVER

AS DES.

POWER CABINET

EXAMPLE MODEL NUMBER

17 3

HITACHI

HITACHI

MILWAUKEE VALVE

BILL OF MATERIALS

1, 2, 4

32 2-INCH GAS-IN-OIL MONITOR INTERFACE VALVES

TYPE O + C T550W2000VV

10 1, 2, 4 HORIZONTAL DRAFT COOLING FANS KRENZ-VENTAS DES.

16 1 3 CONTROL CABINET

20 5 3 THERMOWELLS (QTY. 3 - STANDARD, QTY. 2 - HEATED)

21 1 3 RAPID PRESSURE RISE RELAY WITH 1-1/2-INCH ISOLATION VALVE QUALITROL/MILWAUKEE VALVE 900-FLA & F20 SERIES, SS, CLASS 150

43 AS DES. BASE STRUCTURAL BASE

27 1 1 1.5-INCH UPPER FILTER VALVE MILWAUKEE VALVE

6. SEE RESOURCE DRAWINGS FOR PAD DETAILS.

MAXIMUM WEIGHT: 591,500 POUNDS5.

SHEET E-101 FOR DIMENSIONAL REQUIREMENTS AND DETAILS.

PROVIDE LOW-VOLTAGE BUSHING HOUSINGS AS INDICATED. SEE SECTION H1 ON 4.

ARE NOT INTENDED TO INDICATE THE ACTUAL QUANTITY.

3. THE RADIATORS AS DEPICTED INDICATE THE PERMISSIBLE LOCATIONS, AND

BREATHER, AND BUCHHOLZ RELAY.

SYSTEM MUST BE INCLUDED, SUCH AS A MAINTENACE-FREE DEHYDRATING

REQUIRED IN SECTION 48 19 23.08 26 FOR A CONSTANT OIL PRESERVATION

OIL PRESERVATION SYSTEM IS PROVIDED, ALL ASSOCIATED EQUIPMENT

THE POWERHOUSE EQUIPMENT NEEDED TO FIT THE COPS TANK. IF CONSTANT

CONDUCTORS PER IEEE STD 1427. THERE SHALL BE NO MODIFICATIONS TO

MUST MAINTAIN A MINIMUM OF 105" CLEARANCE FROM THE OVERHEAD 500KV

THE DIMENSIONAL REQUIREMENTS IDENTIFIED MUST BE MET. THE COPS TANK

TRANSFORMER AND/OR A CONSTANT OIL PRESERVATION SYSTEM IS PROVIDED,

DRAWINGS WITH AN INERT-GAS OIL PRESERVATION SYSTEM. IF A CORE-FORM

THE DRAWING SHOWN IS BASED ON THE WESTINGHOUSE SHELL-FORM2.

AND POWER CABINET

I. LOCATION OF EXISTING EMBEDDED CONDUIT COMPARED TO THE CONTROL

H. MAXIMUM OVERALL LENGTH

H. STRUCTURAL BASE

G. JACKING & LIFTING FACILITIES

F. ANCILLARY DEVICES

E. CONTROL AND POWER CABINETS

VOLTAGE BUS

D. LOW-VOLTAGE BUSHING HOUSINGS DIMENSIONS AND LOCATIONS OF LOW-

C. HIGH-VOLTAGE NEUTRAL BUSHING LOCATION AND TERMINAL CONNECTION

B. LOW-VOLTAGE BUSHING LOCATIONS AND TERMINAL CONNECTIONS

A. HIGH-VOLTAGE BUSHING LOCATION AND TERMINAL CONNECTION

EQUIPMENT ARE CONSIDERED CRITICAL TO ASSURE PROPER INTERCONNECTION:

. THE LOCATIONS OF THE FOLLOWING TRANSFORMER TRANSFORMER VAULT

INTERFACES IN THE INTERCONNECTION TO THE EXISTING EQUIPMENT AND

THE MANUFACTURER'S USE IN DESIGNING THE TRANSFORMERS FOR PROPER

1. THE TRANSFORMER LAYOUT AND LIMITING DIMENSIONS HAVE BEEN PROVIDED FOR

GENERAL NOTES

SEGMENT 2 SEGMENT 4

BUSHING SIDE)

(LOW-VOLTAGE

SEGMENT 1

BUSHING SIDE)

(HIGH-VOLTAGE

SEGMENT 3

TYPE O + C TO25W0412AT

19 3 3 ANALOG TEMPERATURE INDICATORS

18 1 3 OIL LEVEL INDICATOR

72 4 COVER LOW-VOLTAGE BUSHING HOUSINGS

75 1 3 EXTERNAL GAS EXPANSION TANK

7 COVER CORE & CORE FRAME GROUND BUSHINGS

15 1 1 DUAL TANK NITROGEN REGULATOR CABINET ABB RND2

42 2 3 COMBINATION JACKING PAD, AND LIFTING EYES

25 1 3 3-INCH MAIN OIL DRAIN VALVE MILWAUKEE VALVE

RADIATOR ISOLATION VALVES1, 2, 4AS DES.9

QUALITROL 042 SERIES

F20 SERIES, SS, CLASS 150

F20 SERIES, SS, CLASS 150

F20 SERIES, SS, CLASS 150

QUALITROL TR6000 SERIES

73 2 1 COMBINATION JACKING PAD, ROCKER, & LIFTING EYES

74 2 3 LIFTING EYES FOR UPRIGHTING THE TRANSFORMER

XRPDQUALITROLPRESSURE RELIEF DEVICE WITH DISCHARGE PIPING33 1 4, COVER

JACKING CENTERS

1'-0" 3'-5"

7'-10"

/2

T

O T

H E

C E

N T

E R

O F

T H

E T

O P

O V

T H

E H

V B

U S

H

IN

G T

E R

M

IN

A L

/8

T

O T

O P

O F

L V

H O

U S

IN

G

2'-2 1/8 "

MAXIMUM OVERAL WIDTH 309"

12'-0"

C E

N T

E R

L

IN

E O

F L

V B

U S

T O

T O

P O

F L

V B

U S

H

IN

G

/4

T

O P

O F

H V

N E

U T

R A

L B

U S

H

IN

G

10'-10 1/2 "

A N

S I

D

F

IN

A L

T

L O

W E

R S

N A

K E

R

IV

E R

S P

A R

E T

R A

N S

F O

R M

E R

S

L

IT

T L

E G

O O

S E

L O

C K

A N

D D

A M

W

E F

R A

O C

T O

B E

R

L L

A W

A L

L A

W

A S

H

IN

G T

O N

N

R

D A

V E

W A

L L

A W

A L

L A

D

IS

T R

IC

T

P O

R T

L A

N D

O

R E

G O

N

S

W

S T

A V

E

H Y

D R

O E

L E

C T

R

IC

D E

S

IG

N C

E N

T E

R

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S F

IL

E

N U

M B

E R

F

IL

E N

A M

E

J O

R D

A N

S F

IN

K

P

.E

S E

G M

E N

T

L A

Y O

U T

A N

D L

IM

IT

IN

G

D

IM

E N

S

IO

N S

G E

N E

R A

T O

R S

T E

P -U

P T

R A

N S

F O

R M

E R

E-104

P

K L

E

IN

E

P .E

D

F

IL

a E

-1 .d g n

L G

S -1

-6 -1

E

/4

P

K L

E

IN

E

P .E

DECK LEVEL

SEE NOTE 4

DECK LEVELDECK LEVEL

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

S U

B M

IT

T

E D

B Y

C H

E C

K E

D B

Y

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

IS

S

U E

D A

T E

S I Z

E

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

SHEET ID

®of Engineers

US Army Corps

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

A16

IDENTIFICATION (TOP VIEW)

FIGURE 1 - TRANSFORMER TANK SEGMENT

SCALE: NTS

ARE NOT INTENDED TO INDICATE THE ACTUAL QUANTITY.

3. THE RADIATORS AS DEPICTED INDICATE THE PERMISSIBLE LOCATIONS, AND

BREATHER, AND BUCHHOLZ RELAY.

SYSTEM MUST BE INCLUDED, SUCH AS A MAINTENACE-FREE DEHYDRATING

REQUIRED IN SECTION 48 19 23.08 26 FOR A CONSTANT OIL PRESERVATION

OIL PRESERVATION SYSTEM IS PROVIDED, ALL ASSOCIATED EQUIPMENT

THE POWERHOUSE EQUIPMENT NEEDED TO FIT THE COPS TANK. IF CONSTANT

CONDUCTORS PER IEEE STD 1427. THERE SHALL BE NO MODIFICATIONS TO

MUST MAINTAIN A MINIMUM OF 105" CLEARANCE FROM THE OVERHEAD 500KV

THE DIMENSIONAL REQUIREMENTS IDENTIFIED MUST BE MET. THE COPS TANK

TRANSFORMER AND/OR A CONSTANT OIL PRESERVATION SYSTEM IS PROVIDED,

DRAWINGS WITH AN INERT-GAS OIL PRESERVATION SYSTEM. IF A CORE-FORM

THE DRAWING SHOWN IS BASED ON THE WESTINGHOUSE SHELL-FORM2.

I. MAXIMUM OVERAL WIDTH

H. STRUCTURAL BASE INCLUDING WIDTH

G. JACKING FACILITIES

F. ANCILLARY DEVICES

E. CONTROL AND POWER CABINETS

LOW VOLTAGE BUS

D. LOW-VOLTAGE BUSHING HOUSING DIMENSIONS AND LOCATION OF

CONNECTION

C. HIGH-VOLTAGE NEUTRAL BUSHING LOCATION AND TERMINAL

B. LOW-VOLTAGE BUSHING LOCATIONS AND TERMINAL CONNECTIONS

A. HIGH-VOLTAGE BUSHING LOCATION AND TERMINAL CONNECTION

EQUIPMENT ARE CONSIDERED CRITICAL TO ASSURE PROPER INTERCONNECTION:

. THE LOCATIONS OF THE FOLLOWING TRANSFORMER TRANSFORMER VAULT

INTERFACES IN THE INTERCONNECTION TO THE EXISTING EQUIPMENT AND

PROPER THE MANUFACTURER'S USE IN DESIGNING THE TRANSFORMER FOR

1. THE TRANSFORMER LAYOUT AND LIMITING DIMENSIONS HAVE BEEN PROVIDED FOR

GENERAL NOTES

SEGMENT 2 SEGMENT 4

BUSHING SIDE)

(LOW-VOLTAGE

SEGMENT 1

BUSHING SIDE)

(HIGH-VOLTAGE

SEGMENT 3

SEGMENT

1 HIGH-VOLTAGE (H1) BUSHING1

QTYITEM DESCRIPTION

RADIATORS (TYPICAL)

RADIATOR ISOLATION VALVES

HIGH-VOLTAGE NEUTRAL (H0) BUSHING

LOW-VOLTAGE BUSHINGS

COVER

COVER

COVER

OIL LEVEL INDICATOR

AS DES

AS DES

CONTROL CABINET

3-INCH MAIN OIL DRAIN VALVE

1.5-INCH LOWER FILTER VALVE

EXAMPLE MODEL NUMBER

33 4, COVER

HITACHI

HITACHI

HITACHI

PRESSURE RELIEF DEVICE WITH DISCHARGE PIPING

MILWAUKEE VALVE

MILWAUKEE VALVE

QUALITROL 042 SERIES

BILL OF MATERIALS

BULK, TYPE RJ TO25B1000DS

1, 2, 4

1, 2, 4

35 THERMOWELLS (QTY 3 - STANDARD, QTY 2 - HEATED)

TYPE O + C T550W2000VV

QUALITROL

17 1 3 POWER CABINET

19 3 3 ANALOG TEMPERATURE GAUGES

21 1 3 RAPID PRESSURE RISE RELAY WITH 1-1/2-INCH ISOLATION VALVE QUALITROL/MILWAUKEE VALVE 900-FLA & F20 SERIES, SS, CLASS 150

38 1 3 TRANSFORMER NAMEPLATE

42 2 3 COMBINATION JACKING PAD, AND LIFTING EYES

43 AS DES BASE STRUCTURAL BASE

70 1 3 AUXILIARY POWER TRANSFORMER

EXTERNAL GAS EXPANSION TANK1 375

LOW-VOLTAGE BUSHING HOUSINGS4 COVER72

TYPE O + C T025W0412AT

15 1 2 DUAL TANK NITROGEN REGULATOR CABINET

22 2 2 MOUNTING BRACKETS FOR FUTURE ON-LINE DGA MONITOR

XRPD

30 2 3 2-INCH GAS-IN-OIL MONITOR ISOLATION VALVES MILWAUKEE VALVE

ABB RND2

F20 SERIES, SS, CLASS 150

F20 SERIES, SS, CLASS 150

F20 SERIES, SS, CLASS 150

QUALITROL TR6000 SERIES

49 GROUNDING PADS (TYPICAL)1,34

A1

SEGMENT 3

3/8"=1'-0"SCALE:

GENERAL NOTES (CONT)

6. SEE RESOURCE DRAWINGS FOR PAD DETAILS.

MAXIMUM WEIGHT: 591,500 POUNDS5.

SHEET E-101 FOR DIMENSIONAL REQUIREMENTS AND DETAILS.

4. PROVIDE LOW-VOLTAGE BUSHING HOUSINGS AS INDICATED. SEE DETAIL H1 ON

74 2 3 LIFTING EYES FOR UPRIGHTING THE TRANSFORMER

LV BUSHINGS

2'-11" CENTER OF

3'-4" CENTER OF BUS

/4

T

O T

O P

O F

H O

B U

S H

IN

G

/2

T

O T

O P

O F

T H

E H

B

U S

H

IN

G T

E R

M

IN

A L

21'-3 3/4 " MAXIMUM OVERALL LENGTH

7'-11 3/4 " TO EXISTING EMBEDDED CONDUIT

/8

16 17

SEE NOTE 4

A N

S I

D

F

IN

A L

T

L O

W E

R S

N A

K E

R

IV

E R

S P

A R

E T

R A

N S

F O

R M

E R

S

L

IT

T L

E G

O O

S E

L O

C K

A N

D D

A M

W

E F

R A

O C

T O

B E

R

L L

A W

A L

L A

W

A S

H

IN

G T

O N

N

R

D A

V E

W A

L L

A W

A L

L A

D

IS

T R

IC

T

P O

R T

L A

N D

O

R E

G O

N

S

W

S T

A V

E

H Y

D R

O E

L E

C T

R

IC

D E

S

IG

N C

E N

T E

R

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S F

IL

E

N U

M B

E R

F

IL

E N

A M

E

J O

R D

A N

S F

IN

K

P

.E

S E

G M

E N

T

L A

Y O

U T

A N

D L

IM

IT

IN

G

D

IM

E N

S

IO

N S

G E

N E

R A

T O

R S

T E

P -U

P T

R A

N S

F O

R M

E R

E-105

P

K L

E

IN

E

P .E

D

F

IL

a E

-1 .d g n

L G

S -1

-6 -1

E

/5

P

K L

E

IN

E

P .E

T

L E

G O

O S

E L

O C

K A

N D

D

M

B

C

D

E

F

G

H

J

K

L

M

N

P

S U

B M

IT

T

E D

B Y

C H

E C

K E

D B

Y

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

IS

S

U E

D A

T E

S I Z

E

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

SHEET ID

®of Engineers

US Army Corps

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

DECK LEVEL

A2

TRANSFORMER ELEVATION VIEW - SEGMENT 4

SCALE: 1/2"=1'-0"

A13

IDENTIFICATION (TOP VIEW)

FIGURE 1 - TRANSFORMER TANK SEGMENT

SCALE: NTS

SEGMENT

1 HIGH-VOLTAGE (H1) BUSHING1

QTYITEM DESCRIPTION

RADIATORS (TYPICAL)

HIGH-VOLTAGE NEUTRAL (H0) BUSHING

CORE & CORE FRAME GROUND BUSHINGS

COVER

COVER

COVER

OIL LEVEL INDICATOR

AS DES.

POWER CABINET

EXAMPLE MODEL NUMBER

ABB-HITACHI

ABB-HITACHI

MILWAUKEE VALVE

QUALITROL 042 SERIES

42 2 3 COMBINED JACK PAD, AND LIFTING EYES

BILL OF MATERIALS

1,2,4

32 2-INCH DISSOLVED GAS-IN-OIL MONITOR INTERFACE VALVES

TYPE O + C T550W2000VV

10 COVER HORIZONTAL DRAFT COOLING FANS (TYPICAL) KRENZ-VENTAS DES.

16 1 3 CONTROL CABINET

22 2 3 MOUNTING BRACKETS FOR FUTURE ON-LINE DGA MONITOR

43 AS DES. BASE STRUCTURAL BASE

TYPE O + C T025W0412AT

33 QUALITROL XPRD4,COVER1 PRESSURE RELIEF DEVICE WITH DISCHARGE PIPING

27 1 1 1-1/2-INCH UPPER FILTER VALVE MILWAUKEE VALVE F20 SERIES, SS, CLASS 150

70 1 3 AUXILIARY POWER TRANSFORMER

6. SEE RESOURCE DRAWINGS FOR PAD DETAILS.

MAXIMUM WEIGHT: 591,500 POUNDS5.

SHEET E-101 FOR DIMENSIONAL REQUIREMENTS AND DETAILS.

PROVIDE LOW-VOLTAGE BUSHING HOUSINGS AS INDICATED. SEE SECTION H1 ON 4.

ARE NOT INTENDED TO INDICATE THE ACTUAL QUANTITY.

3. THE RADIATORS AS DEPICTED INDICATE THE PERMISSIBLE LOCATIONS, AND

BREATHER, AND BUCHHOLZ RELAY.

SYSTEM MUST BE INCLUDED, SUCH AS A MAINTENACE-FREE DEHYDRATING

REQUIRED IN SECTION 48 19 23.08 26 FOR A CONSTANT OIL PRESERVATION

OIL PRESERVATION SYSTEM IS PROVIDED, ALL ASSOCIATED EQUIPMENT

THE POWERHOUSE EQUIPMENT NEEDED TO FIT THE COPS TANK. IF CONSTANT

CONDUCTORS PER IEEE STD 1427. THERE SHALL BE NO MODIFICATIONS TO

MUST MAINTAIN A MINIMUM OF 105" CLEARANCE FROM THE OVERHEAD 500KV

THE DIMENSIONAL REQUIREMENTS IDENTIFIED MUST BE MET. THE COPS TANK

TRANSFORMER AND/OR A CONSTANT OIL PRESERVATION SYSTEM IS PROVIDED,

DRAWINGS WITH AN INERT-GAS OIL PRESERVATION SYSTEM. IF A CORE-FORM

THE DRAWING SHOWN IS BASED ON THE WESTINGHOUSE SHELL-FORM2.

J. LOCATION OF EMBEDDED CONDUIT

I. MAXIMUM OVERALL LENGTH

H. STRUCTURAL BASE

G. JACKING & LIFTING FACILITIES

F. ANCILLARY DEVICES

E. CONTROL AND POWER CABINETS

VOLTAGE BUS

D. LOW VOLTAGE BUSHING HOUSING DIMENSIONS AND LOCATION OF LOW

C. LOW-VOLTAGE BUSHINGS LOCATIONS AND TERMINAL CONNECTIONS

B. HIGH-VOLTAGE NEUTRAL BUSHING LOCATION AND TERMINAL CONNECTION

A. HIGH-VOLTAGE BUSHING LOCATION AND TERMINAL CONNECTION

INTERCONNECTION:

TRANSFORMER EQUIPMENT ARE CONSIDERED CRITICAL TO ASSURE PROPER

THE TRANSFORMER VAULT. THE LOCATIONS OF THE FOLLOWING

PROPER INTERCONNECTION TO THE EXISTING EQUIPMENT AND INTERFACES IN

FOR THE MANUFACTURER'S USE IN DESIGNING THE TRANSFORMER FOR

1. THE TRANSFORMER LAYOUT AND LIMITING DIMENSIONS HAVE BEEN PROVIDED

GENERAL NOTES

F20 SERIES, SS, CLASS 150

19 1 3 ANALOG TEMPERATURE GAUGES QUALITROL TR6000 SERIES

RADIATOR ISOLATION VALVESAS DES.9 1,2,4

21 1 3 RAPID PRESSURE RISE RELAY WITH 1-1/2-INCH ISOLATION BALL VALVE QUALITROL/MILWAUKEE VALVE 900-FLA &F20 SERIES, SS, CLASS 150

1 3 EXTERNAL GAS EXPANSION TANK

72 4 COVER LOW-VOLTAGE BUSHING HOUSINGS

20 5 3 THERMOWELLS (QTY. 3 - STANDARD, QTY. 2 HEATED)

F20 SERIES, SS, CLASS 150MILWAUKEE VALVE3-INCH MAIN DRAIN325 1

73 2 1 COMBINED JACK PAD, ROCKER, AND LIFTING EYES

SEGMENT 2 SEGMENT 4

BUSHING SIDE)

(LOW-VOLTAGE

SEGMENT 1

BUSHING SIDE)

(HIGH-VOLTAGE

SEGMENT 3

LIFTING EYES FOR UPRIGHTING THE TRANSFORMER3274

S I

D

F

IN

A L

T

L O

W E

R S

N A

K E

R

IV

E R

S P

A R

E T

R A

N S

F O

R M

E R

S

L

IT

T L

E G

O O

S E

L O

C K

A N

D D

A M

W

E F

R A

O C

T O

B E

R

L L

A W

A L

L A

W

A S

H

IN

G T

O N

N

R

D A

V E

W A

L L

A W

A L

L A

D

IS

T R

IC

T

P O

R T

L A

N D

O

R E

G O

N

S

W

S T

A V

E

H Y

D R

O E

L E

C T

R

IC

D E

S

IG

N C

E N

T E

R

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S F

IL

E

N U

M B

E R

F

IL

E N

A M

E

J O

R D

A N

S F

IN

K

P

.E

P O

W E

R A

N D

C O

N T

R O

L C

A B

IN

E

T S

G E

N E

R A

T O

R S

T E

P -U

P T

R A

N S

F O

R M

E R

E-106

P

K L

E

IN

E

P .E

D

F

IL

a E

-1 .d g n

L G

S -1

-6 -1

E

/6

P

K L

E

IN

E

P .E

T

L E

G O

O S

E L

O C

K A

N D

D

DRIP CHANNEL

SHIELD

RAIN AND DRIP

GASKET SEAL

SOLAR SHIELDING

TEMPERED GLASS

RUBBER SEAL

CLAYTONRITE-TYPE

ENCLOSURE PANEL

SECURING STRIP

SEE NOTE 5

LAPTOP TRAY

SEE NOTE 5

DOCUMENT POCKET

SEE NOTE 6

43TF

CABINET

CONTROL

CABINET

POWER

SEE NOTE 5

ISOLATORS

VIBRATION

SEE NOTE 7

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

S U

B M

IT

T

E D

B Y

C H

E C

K E

D B

Y

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

IS

S

U E

D A

T E

S I Z

E

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

SHEET ID

®of Engineers

US Army Corps

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

G1

ELEVATION - CONTROL AND POWER CABINETS

SCALE: 1 1/2" = 1'-0"

A9

TYPICAL CLAYTONRITE-TYPE WINDOW SEAL

SCALE: NTS

DISPLAY.

A WEATHERPROOF SEAL FOR VIEWING OF A FUTURE INSTALLED ANNUNCIATOR

7. THE RIGHT CONTROL CABINET DOOR IS TO HAVE A TEMPERED GLASS WINDOW WITH

TEMPERATURE MONITOR AND COOLING CONTROL SYSTEM DISPLAY.

WEATHERPROOF SEAL FOR VIEWING OF A FUTURE INSTALLED ELECTRONIC

6. THE LEFT CONTROL CABINET DOOR IS TO HAVE A TEMPERED GLASS WINDOW WITH A

O&M MANUAL DRAWINGS.

WHEN STOWED. THE LEFT DOOR IS TO HAVE A METAL POCKET, SIZED TO HOLD THE

IN A HORIZONTAL POSITION WHEN LOWERED, AND A MEANS FOR LATCHING THE TRAY

OF THE DOOR. THE TRAY IS TO INCLUDE FOLDING HINGES WHICH SECURE THE TRAY

5. THE RIGHT DOOR IS TO HAVE A DROP DOWN LAPTOP TRAY MOUNTED ON THE INSIDE

USING VIBRATION ISOLATORS.

4. THE CONTROL AND POWER CABINETS ARE TO BE MOUNTED TO A FRAME STRUCTURE

POWER CABINETS SHALL ONLY ENTER EACH CABINET THROUGH THE BASE.

3. ALL CONDUIT ROUTING FROM THE TRANSFORMER DEVICES TO THE CONTROL AND

2. SPACE FOR ARC FLASH LABEL (PROVIDED BY THE GOVERNMENT).

BUILT IN ACCORDANCE WITH UL 508A STANDARD.

1. THE TRANSFORMER CONTROL AND POWER CABINETS ARE TO BE DESIGNED AND

COOLING GROUP ON-OFF-AUTO SELECTOR SWITCH43TF

GENERAL NOTES

LEGEND

G8

POWER CABINETS

SIDE VIEW - CONTROL AND

SCALE: 1 1/2" = 1'-0"

G13

TYPICAL CABINET DOOR SEAL

S I

D

F

IN

A L

T

L O

W E

R S

N A

K E

R

IV

E R

S P

A R

E T

R A

N S

F O

R M

E R

S

L

IT

T L

E G

O O

S E

L O

C K

A N

D D

A M

W

E F

R A

O C

T O

B E

R

L L

A W

A L

L A

W

A S

H

IN

G T

O N

N

R

D A

V E

W A

L L

A W

A L

L A

D

IS

T R

IC

T

P O

R T

L A

N D

O

R E

G O

N

S

W

S T

A V

E

H Y

D R

O E

L E

C T

R

IC

D E

S

IG

N C

E N

T E

R

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S F

IL

E

N U

M B

E R

F

IL

E N

A M

E

J O

R D

A N

S F

IN

K

P

.E

C O

N T

R O

L C

A B

IN

E

T L

A Y

O U

T

G E

N E

R A

T O

R S

T E

P -U

P T

R A

N S

F O

R M

E R

E-107

P

K L

E

IN

E

P .E

D

F

IL

a E

-1 .d g n

L G

S -1

-6 -1

E

/7

P

K L

E

IN

E

P .E

T

L E

G O

O S

E L

O C

K A

N D

D

K L

E

IN

E

P

A F

B EC

G

D

B

A

C D E

F

G

5453 55 56

6352 64

59 62

59 62

59 62

CABINET LIGHT

TRANSFORMER MOUNTED CONDUIT

AREA FOR INSTALLATION OF

WIRING TO POWER CABINET

BUSHING FOR 120 VAC

WIREWAY HOLE WITH

INSTALLATION TO POWER PLANT

PLATE FOR CONDUIT

AND GASKETED BOTTOM

REMOVABLE BOLTED

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

S U

B M

IT

T

E D

B Y

C H

E C

K E

D B

Y

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

IS

S

U E

D A

T E

S I Z

E

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

SHEET ID

®of Engineers

US Army Corps

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

K2

CONTROL CABINET TOP VIEW

SCALE: NTS

A1

CONTROL CABINET LAYOUT

SCALE: NTS

DESCRIPTION

QUALITROL QTMS

MOLDED-CASE CIRCUIT BREAKERS

AUXILIARY RELAYS

INTERPOSING RELAY FOR LOCKOUT RELAY GENERAL ELECTRIC

TERMINAL BLOCKS - CONTROL SIGNAL TYPE

TERMINAL BLOCKS - POWER DISTRIBUTION TYPE

FUSES

FUSEHOLDERS

CABINET HEATER

ELECTROSWITCH SERIES 24

UNDERVOLTAGE RELAY

RECEPTACLE WITH GFCI HUBBELL GFR8300SGW

MARATHON SERIES 142

TIME MARK

BUSSMAN

BUSSMAN

WAUKESHA PTC2

HJL

C26(XX)

HMA

LPJ

JTN600(XX)

TIME DELAY RELAY AGASTAT SERIES 7000

ELECTRONIC COOLING CONTROL (FUTURE)

LOCAL ANNUNCIATOR PANEL (FUTURE) SEL 2533

COOLING GROUP SELECTOR SW. (DEVICE 43TF)

TERMINAL BLOCKS - SHORT CIRCUIT

GROUND BUS BAR - -

AS REQ'D

AS REQ'D

AS REQ'D

AS REQ'D

AS REQ'D

AS REQ'D

AS REQ'D

AS REQ'D

AS REQ'D

AS REQ'D

BILL OF MATERIALS - CONTROL CABINET COMPONENTS

HUMIDISTAT / THERMOSTAT (DEVICE 23-1)

SCHNEIDER ELECTRIC

SQUARE D 8501, TYPE X

STATES TYPE NT, CLASS 250

STATES TYPE NT, CLASS 251-G

HAMMOND MFG SKTH012009-C

ITEM QTY EXAMPLE MODEL NUMBER

6. THE REMOVABLE BOTTOM PLATE THICKNESS IS TO BE 10 GAUGE, MINIMUM.

CABINET.

5. THE GFCI OUTLET IS TO BE ACCESSIBLE ONLY FROM INSIDE OF THE CONTROL

THROUGH A WATERPROOF VIEWING GLASS IN THE RIGHT CONTROL CABINET DOOR.

ANNUNCIATOR MOUNTED ON THE SWING PANEL SO THAT THE FRONT IS VISIBLE

4. THE CONTROL CABINET IS TO BE DESIGNED FOR THE FUTURE INSTALLATION OF ONE

THE LEFT CONTROL CABINET DOOR.

PANEL SO THAT THE FRONT IS VISIBLE THROUGH A WATERPROOF VIEWING GLASS IN

CONTROL CABINET, WITH AN HMI MODULE REMOTELY MOUNTED ON THE SWING

ELECTRONIC COOLING CONTROL SYSTEM IN A REAR MOUNT CHASSIS IN THE

3. THE CONTROL CABINET IS TO BE DESIGNED FOR THE FUTURE INSTALLATION OF AN

THE ACTUAL LAYOUT MAY BE MODIFIED BY THE CONTRACTOR.

2. THE CONTROL CABINET LAYOUT AS SHOWN IS FOR ILLUSTRATIVE PURPOSES ONLY.

BUILT IN ACCORDANCE WITH UL 508A STANDARD.

1. THE TRANSFORMER CONTROL AND POWER CABINETS ARE TO BE DESIGNED AND

LH BACK PANEL RH BACK PANEL RH SIDE PANEL

(FRONT VIEW)

RIGHT SWING PANEL

BLOCKS

TERMINAL

RESISTORS

CALIBRATION

ANALOG WTI

BLOCKS

TERMINAL

BLOCKS

TERMINAL

BLOCKS

TERMINAL

TRANSFORMER

CURRENT

BLOCKS

TERMINAL

BREAKERS

CIRCUIT

DEVICES

RELAYS AND

AUXILIARY

BOTTOM PANEL

COMPONENTS

SYSTEM

COOLING CONTROL

ELECTRONIC

FUTURE

HEATERHEATER

(FRONT VIEW)

LEFT SWING PANEL

LH SIDE PANEL

OUTLET

65 67

GENERAL NOTES

S I

D

F

IN

A L

T

L O

W E

R S

N A

K E

R

IV

E R

S P

A R

E T

R A

N S

F O

R M

E R

S

L

IT

T L

E G

O O

S E

L O

C K

A N

D D

A M

W

E F

R A

O C

T O

B E

R

L L

A W

A L

L A

W

A S

H

IN

G T

O N

N

R

D A

V E

W A

L L

A W

A L

L A

D

IS

T R

IC

T

P O

R T

L A

N D

O

R E

G O

N

S

W

S T

A V

E

H Y

D R

O E

L E

C T

R

IC

D E

S

IG

N C

E N

T E

R

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S F

IL

E

N U

M B

E R

F

IL

E N

A M

E

J O

R D

A N

S F

IN

K

P

W E

R C

A B

IN

E

T L

A Y

O U

T

G E

N E

R A

T O

R S

T E

P -U

P T

R A

N S

F O

R M

E R

E-108

P

K L

E

IN

E

P .E

D

F

IL

a E

-1 .d g n

L G

S -1

-6 -1

E

/8

P

K L

E

IN

E

P .E

T

L E

G O

O S

E L

O C

K A

N D

D

K L

E

IN

E

P

A C

B

D

D

52 71

A B C

59 62

59 62

CABINET

WIRING TO CONTROL

BUSHING FOR 120 VAC

WIREWAY HOLE WITH

CABINET LIGHT

TRANSFORMER MOUNTED CONDUIT

AREA FOR INSTALLATION OF

INSTALLATION TO POWER PLANT

PLATE FOR CONDUIT

GASKETED BOTTOM

REMOVABLE BOLTED AND

63 64

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

S U

B M

IT

T

E D

B Y

C H

E C

K E

D B

Y

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

IS

S

U E

D A

T E

S I Z

E

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

SHEET ID

®of Engineers

US Army Corps

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

A8

POWER CABINET - TOP VIEW

SCALE: NTS

A13

POWER CABINET LAYOUT

SCALE: NTS

MAGNETIC CONTACTORS

MOLDED-CASE CIRCUIT BREAKERS

TERMINAL BLOCKS - CONTROL SIGNAL TYPE

TERMINAL BLOCKS - POWER DISTRIBUTION TYPE

FUSES

FUSEHOLDERS

CABINET HEATER

MARATHON SERIES 142

BUSSMAN

BUSSMAN

WAUKESHA PTC2

JJL

LPJ

JTN600(XX)

BILL OF MATERIALS - POWER CABINET COMPONENTS

AS REQ'D

AS REQ'D

AS REQ'D

AS REQ'D

AS REQ'D

AS REQ'D

AS REQ'D

AS REQ'D

1 GROUND BUS BAR

66 HUMIDISTAT / THERMOSTAT (DEVICE 23-2)

SQUARE D

STATES TYPE NT, CLASS 250

HAMMOND MFG SKTH012009-C

SQUARE D

ITEM QTY DESCRIPTION EXAMPLE MODEL NUMBER

3. THE REMOVABLE BOTTOM PLATE THICKNESS SHALL BE 10 GAUGE, MINIMUM.

TERMINAL BLOCKS SHALL BE MOUNTED IN THE 480 VAC POWER CABINET.

INCLUDING THE MOLDED-CASE CIRCUIT BREAKERS, CONTACTORS AND POWER

2. ALL 480 VAC PROTECTIVE AND CONTROL EQUIPMENT FOR THE COOLING FANS,

BY THE CONTRACTOR.

1. THE LAYOUT SHOWN IS FOR ILLUSTRATIVE PURPOSES ONLY AND MAY BE MODIFIED

GENERAL NOTES

BOTTOM PANEL

AND FAN CONTROL)

LIGHTS, HEATER

(WIRING FOR

BLOCKS

TERMINAL

120 VAC

CONTACTORS

FAN MOTOR

BREAKERS AND

CIRCUIT

BLOCKS

TERMINAL

BLOCKS

TERMINAL

LH SIDE PANEL RH SIDE PANELBACK PANEL

HEATER

FUSE HOLDERS

FUSES AND

S I

D

F

IN

A L

T

L O

W E

R S

N A

K E

R

IV

E R

S P

A R

E T

R A

N S

F O

R M

E R

S

L

IT

T L

E G

O O

S E

L O

C K

A N

D D

A M

W

E F

R A

O C

T O

B E

R

L L

A W

A L

L A

W

A S

H

IN

G T

O N

N

R

D A

V E

W A

L L

A W

A L

L A

D

IS

T R

IC

T

P O

R T

L A

N D

O

R E

G O

N

S

W

S T

A V

E

H Y

D R

O E

L E

C T

R

IC

D E

S

IG

N C

E N

T E

R

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S F

IL

E

N U

M B

E R

F

IL

E N

A M

E

J O

R D

A N

S F

IN

K

P

.E

L A

Y O

U T

A N

D D

E T

A

IL

S

T R

A N

S F

O R

M E

R M

O U

N T

E D

D E

V

IC

E S

G E

N E

R A

T O

R S

T E

P -U

P T

R A

N S

F O

R M

E R

E-109

P

K L

E

IN

E

P .E

D

F

IL

a E

-1 .d g n

L G

S -1

-6 -1

E

/9

P

K L

E

IN

E

P .E

T

L E

G O

O S

E L

O C

K A

N D

D

K L

E

IN

E

P

FUTURE DGA SYSTEM

LOAD SENSING CT FOR

FUTURE LOCATION OF

TEMPERATURE MONITOR

FUTURE ELECTRONIC

LOAD SENSING CT FOR

FUTURE LOCATION OF

DGA SYSTEM

LOAD SENSING CT FOR

FUTURE LOCATION OF

TEMPERATURE MONITOR

FUTURE ELECTRONIC

LOAD SENSING CT FOR

FUTURE LOCATION OF

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

S U

B M

IT

T

E D

B Y

C H

E C

K E

D B

Y

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

IS

S

U E

D A

T E

S I Z

E

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

SHEET ID

®of Engineers

US Army Corps

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

A1

THERMOWELLS

CURRENT TRANSFORMERS AND HEAT

SCALE: NTS

(90 C)

SW. #2

(SEE NOTE 2)

SW. #1

(115 C)

SW. #3

(LOW-LOW LEVEL)

SW. #2

(LOW LEVEL)

SW. #1

PRESSURE

LOW

PRESSURE

HIGH

(UNUSED)

SW. #2

(90 C)

SW. #1

(< 200 PSI)

EMPTY CYLINDER

BULB

HEATER

WELL

BULB

TB1:1 TB1:3

ONAN RATING.

BASED UPON THE RESULTS OF THE FACTORY TEMPERATURE RISE TESTS AT THE

2. THE WINDING TEMPERATURE SETTING FOR ENERGIZING THE COOLING FANS IS TO BE

TERMINAL BLOCKS.

WIRING IS TO BE ROUTED TO THE CONTROL CABINET AND TERMINATED ON SHORTING

1. ALL BUSHING CURRENT TRANSFORMERS AND CURRENT TRANSFORMER SECONDARY

(BELOW)

DIAGRAM

SEE CT

(DEVICE 49Q1)

THERMOWELL

HEATED

TOP OIL THERMOWELLS

(DEVICE 26Q1)

THERMOWELL

(DEVICE 26Q2)

WITH NPT PLUG

THERMOWELL

(DEVICE 49WT1)

WINDING TEMPERATURE INDICATOR

(DEVICE 26Q)

OIL TEMPERATURE INDICATOR

BOTTOM OIL THERMOWELL

(DEVICE 26Q3)

THERMOWELL

(DEVICE 30)

(FUTURE)

ANNUNCIATOR

(DEVICE 30)

(FUTURE)

ANNUNCIATOR

(DEVICE 94X)

TRANSFORMER TRIP

63RPR

(DEVICE 63RPR-SI)

SEAL-IN RELAY

RAPID PRESSURE RISE

ALARM (63X1) UNUSED

RAPID PRESSURE RISE

TRIP (63X2)

RAPID PRESSURE RISE

(49WT2)

HEATER

THERMOWELL

WINDINGS ASSEMBLY

TRANSFORMER CORE AND

(TYPICAL)

SEE NOTE 1

BCT-H1

BCT-H4

CT-Y1 49R2 49Q2

H1

Y1

(DEVICE 63PR)

PRESSURE RELIEF DEVICE

(DEVICE 30)

(FUTURE)

ANNUNCIATOR

(ALARM)

SW. #1

(TRIP)

SW. #2

(DEVICE 71Q)

OIL LEVEL INDICATOR

(DEVICE 30)

(FUTURE)

ANNUNCIATOR

TS2

(DEVICE 63NR)

NITROGEN PRESSURE REGULATOR

2 3 1 6 4 5 8 9 7

GOVERNMENT.

DEVICES AND WIRING TO BE INSTALLED IN THE FUTURE BY THE

LOW-VOLTAGE BUSHINGY1

LOW-VOLTAGE BUSHINGX1

TEST SWITCHSTS_

TERMINAL BLOCKSTB_

SWITCHSW

RESISTANCE TEMPERATURE DETECTORRTD

HIGH-VOLTAGE BUSHINGH1

HIGH-VOLTAGE NEUTRAL BUSHINGH0

CURRENT TRANSFORMERSCT_

MULTI-RATIO BUSHING CURRENT TRANSFORMERSBCT_

DISSOLVED GAS ANALYZERDGA

GAS-IN-OIL MONITOR95

TRIP AUXILIARY RELAY94X

OIL LEVEL INDICATOR71Q

RAPID PRESSURE RISE RELAY TRIP63X2

RAPID PRESSURE RISE RELAY ALARM63X1

RAPID PRESSURE RISE RELAY SEAL-IN RELAY63RPR-SI

RAPID PRESSURE RISE RELAY63RPR

PRESSURE RELIEF DEVICE63PR

NITROGEN PRESSURE REGULATOR63NR

ANALOG WINDING TEMPERATURE INDICATORS49WT1,2

CALIBRATION DEVICES49R1,2

HEATED THERMOWELLS49Q1,2

ANNUNCIATOR30

UNDERVOLTAGE RELAY27

THERMOWELLS26Q1,2,3

ANALOG OIL TEMPERATURE INDICATOR26Q

(TO POWERPLANT)

TRANS. TRIP

(BELOW)

DIAGRAM

SEE CT

(DEVICE 49Q2)

THERMOWELL

HEATED

(DEVICE 49WT2)

WINDING TEMPERATURE INDICATOR

(90 C)

SW. #2

(SEE NOTE 2)

SW. #1

(115 C)

SW. #3

BULB

HEATER

WELL

TEMP MONITOR)

(SPARE FOR FUTURE

(DEVICE 26Q2)

WITH NPT PLUG

THERMOWELL

(SPARE)

TEMP MONITOR)

(SPARE FOR FUTURE

FANS

COOLING

(49WT1)

HEATER

THERMOWELL

CT-X149R149Q1

X1

TS1

GENERAL NOTES

LEGEND

A N

N T

B :9

A N

N T

B :8

A N

N T

B

:1

A N

N T

B

:1

1 2 1 2

A N

N T

B :3

A N

N T

B :2

A N

N T

B :3

A N

N T

B :2

1 2 1 2 1 2

A N

N T

B :9

A N

N T

B :8

(DEVICE 30)

(FUTURE)

ANNUNCIATOR

A N

N T

B :5

A N

N T

B :4

(TO POWERPLANT)

TRANS. TRIP

FANS

COOLING

(DEVICE 30)

(FUTURE)

ANNUNCIATOR

A N

N T

B :7

A N

N T

B :6

(DEVICE 30)

(FUTURE)

ANNUNCIATOR

A N

N T

B :3

A N

N T

B :4

1 2 1 2 1 2 1 2 1 2

876 109

ALARM RELAY 1

(DEVICE 95)

GAS-IN-OIL MONITOR

(FUTURE)

14 11/13

(DEVICE 30)

(FUTURE)

ANNUNCIATOR

A N

N T

B :5

A N

N T

B :4

ALARM RELAY 2

14 11/13 12

A N

N T

B :5

A N

N T

B :4

(DEVICE 30)

(FUTURE)

ANNUNCIATOR

(UNUSED)

SW. #2

SW. #1

(DEVICE 27-1)

UNDERVOLTAGE RELAY

1 2 1 2

A N

N T

B

:1

A N

N T

B :1

(DEVICE 30)

(FUTURE)

ANNUNCIATOR

(DEVICE 94X)

TRANSFORMER TRIP

S I

D

F

IN

A L

T

L O

W E

R S

N A

K E

R

IV

E R

S P

A R

E T

R A

N S

F O

R M

E R

S

L

IT

T L

E G

O O

S E

L O

C K

A N

D D

A M

W

E F

R A

O C

T O

B E

R

L L

A W

A L

L A

W

A S

H

IN

G T

O N

N

R

D A

V E

W A

L L

A W

A L

L A

D

IS

T R

IC

T

P O

R T

L A

N D

O

R E

G O

N

S

W

S T

A V

E

H Y

D R

O E

L E

C T

R

IC

D E

S

IG

N C

E N

T E

R

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S F

IL

E

N U

M B

E R

F

IL

E N

A M

E

J O

R D

A N

S F

IN

K

P

.E

C O

N T

R O

L S

C H

E M

A T

IC

S

G E

N E

R A

T O

R S

T E

P -U

P T

R A

N S

F O

R M

E R

E-601

P

K L

E

IN

E

P .E

D

F

IL

a E

-6 .d g n

L G

A -1

-6 -1

E /1

P

K L

E

IN

E

P .E

T

L E

G O

O S

E L

O C

K A

N D

D

K L

E

IN

E

P

480 VAC POWER CABINET

LOCATED IN

POWER CABINET

LOCATED IN 480 VAC

480 VAC POWER CABINET

LOCATED IN

POWER CABINET

ADJACENT TO

MOUNTED ON TANK

LOCATED IN POWERHOUSE

TRIP COIL MONITORING

EXISTING LOCKOUT RELAY WITH

B

C

D

E

F

G

H

J

K

L

M

N

P

S U

B M

IT

T

E D

B Y

C H

E C

K E

D B

Y

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

IS

S

U E

D A

T E

S I Z

E

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

SHEET ID

®of Engineers

US Army Corps

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

A5

125 VDC CONTROL SCHEMATIC

SCALE: NTS

52-1

DS-1

H T

R

49WT1 49WT2

LT1 LT2 42

23-1

DS-2

H T

R

LT3

23-2

DS-3

LIGHTS

CABINET

CONTROL

52-6

HEATER

CABINET

CONTROL

52-7

27-1

27-1

FUSES

X1

V

LIGHT

CABINET

POWER

52-4

HEATER

CABINET

POWER

52-5

3-PHASE, 60 HZ

POWER 480 VAC,

GOVERNMENT SUPPLY #1

FUSE 86TX

L

IN

E

A

L

IN

C

ANN TB1:12

H T

R

20A

GFCI

OUTLET

RECEPTACLE

CABINET

CONTROL

52-8

(DGA)

POWER

MONITOR

GAS-IN-OIL

FUTURE

GROUP #1

COOLING

V

480VAC - 120VAC

POWER TRANSFORMER

AUXILIARY

H4

H1 X3

SHEILD

ELECTROSTATIC

52-2

3-PHASE, 60 HZ

POWER 480 VAC,

GOVERNMENT SUPPLY #2

L

IN

E

A

L

88 FAN MOTOR

PDB_ POWER DISTRIBUTION BLOCKS

GROUP #2

COOLING

1 1

72-1

P D

B

P D

B

TO POWERHOUSE 86TX

NOTE 1)

(SEE

94X

94X

SYSTEM

MONITORING

ELECTRONIC

FUTURE

V

D C

G O

V E

R N

M E

N T

F U

R N

IS

H

E D

C O

N T

R O

L P

O W

E R

94X

115C

SW. #2

WT1

RESET

63RPR-SI

TB3

PWR

63RPR

86TX LOCKOUT RELAY (LOCATED IN THE POWERHOUSE)

94X TRIP AUXILIARY RELAY

OL OL

30 ANNUNCIATOR

49WT1,2 ANALOG WINDING TEMPERATURE INDICATORS

63RPR RAPID PRESSURE RISE RELAY

63RPR-SI RAPID PRESSURE RISE RELAY SEAL-IN RELAY

DGA DISSOLVED GAS ANALYZER (FUTURE)

27 UNDERVOLTAGE RELAY

52-_ AC MOLDED-CASE CIRCUIT BREAKERS

FCT FAN CURRENT TRANSFORMER

DS CABINET DOOR SWITCH

LT CABINET LIGHT

HTR CABINET HEATER

GFCI GROUND FAULT CIRCUIT INTERRUPTER

INDUSTRIAL GRADE HUMIDISTAT / THERMOSTAT23

42 COOLING GROUP MOTOR CONTACTOR

IN THE POWERHOUSE. SEE SHEET E-603 FOR TERMINAL DETAILS.

4. THE 86TX TRANSFORMER LOCKOUT AND ASSOCIATED CONTACTS ARE LOCATED IN

DESIGN MAY DIFFER FROM VALUES SHOWN.

3. KVA VALUES SHOWN ARE FOR ILLUSTRATION PURPOSES ONLY. THE CONTRACTOR

2. DETAILED WIRING DESIGN SHALL BE PERFORMED BY CONTRACTOR.

OUTPUTS WILL BE WIRED IN PARALLEL WITH THE 49WT CONTACTS IN THE FUTURE.

THE LOCKOUT RELAY SOLENOID EXCEEDS THE RATING OF THE ETM. THE ETM

OUTPUT RELAY CONTACTS THAT WILL BE INSTALLED IN THE FUTURE. THE BURDEN OF