26RA003_Plans_V2.pdf

PDF 19 MB Posted

Attached to
Spare Transformers for the Lower Snake River Plants
Solicitation number
W912EF26RA003
Issued by

About this file

This is a solicitation document for the Lower Snake River Spare Transformers project at Little Goose Lock and Dam, issued by the U.S. Army Corps of Engineers Walla Walla District. The project involves procuring a 500 kV spare Generator Step-Up (GSU) transformer for the hydroelectric facility, with detailed technical specifications for a single-phase transformer rated at 82,000/109,334 KVA with ONAN/ONAF cooling. The transformer will have specific requirements including a 65°C temperature rise, nitrogen blanket oil preservation system, horizontal draft cooling fans, and comprehensive testing protocols including sweep frequency response analysis, leakage reactance testing, and factory acceptance tests.

The solicitation includes extensive technical documentation across multiple volumes, with detailed drawings and schematics covering transformer layout, control and power cabinet configurations, current transformer and thermowells placement, and electrical connection schematics. The project is located in Washington state at the Little Goose Lock and Dam facility, with a solicitation number of W912EF26RA003 and an issue date of October 2025. The technical specifications are extremely precise, covering everything from bushing characteristics and grounding requirements to cabinet design, wiring specifications, and future-proofing provisions for electronic monitoring systems.

View the file

Other files

File Type Posted
Solicitation Amendment W912EF26RA0030009 SF 30.pdf PDF
W912EF26RA003 Amendment 8 Westinghouse Test Report for 7000374 7000942 and 7001750.pdf PDF
Solicitation Amendment W912EF26RA0030008 SF 30.pdf PDF
W912EF26RA003 Amendment 0008 JDA_and_LSR_Average_Impedance.pdf PDF
Solicitation Amendment W912EF26RA0030007 SF 30.pdf PDF
26RA003 - Amend-007 - VOL. 1 - T1 Redlines.pdf PDF
26RA003 - Amend-007 - VOL. 2 - T2 Redlines.pdf PDF
26RA003 - Amend-007 - Transformer Design Specs.pdf PDF
Solicitation Amendment W912EF26RA0030006 SF 30.pdf PDF
Solicitation Amendment W912EF26RA0030005 SF 30.pdf PDF
Solicitation Amendment W912EF26RA0030004 SF 30.pdf PDF
Solicitation Amendment W912EF26RA0030004 SF 30.pdf PDF
Solicitation Amendment W912EF26RA0030003 SF 30.pdf PDF
26RA003 - Tech Specs Amendment 0003.pdf PDF
Solicitation Amendment W912EF26RA0030002 SF 30.pdf PDF
Solicitation Amendment W912EF26RA0030001 SF 30.pdf PDF
26RA003_Supplemental_Drawings_V2.pdf PDF
26RA003_Supplemental_Drawings_V1.pdf PDF
Solicitation - W912EF26RA003.pdf PDF
NWW_JA Sole Source Determination ABB-Hitachi Bushings_Signed_Print_Redacted.pdf PDF
Small Business Participation Proposal.pdf PDF
26RA003_Plans_V1.pdf PDF
26RA003 Solicitation Tech Specs.pdf PDF
Past Performance Questionnaire Form.pdf PDF
Show all 24

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

F

IN

A L

F

IL

E N

U M

B E

R

F

IL

E N

A M

E

D S

P

D

:2

:5

P

M

/2 /2

L G

G

-0

.d g n

A N

S I

D

F

IN

A L

T

L O

W E

R S

N A

K E

R

IV

E R

S P

A R

E T

R A

N S

F O

R M

E R

S

L

IT

T L

E G

O O

S E

L O

C K

A N

D D

A M

W

E F

R A

W

L L

A W

A L

L A

W

A S

H

IN

G T

O N

N

R

D A

V E

W A

L L

A W

A L

L A

D

IS

T R

IC

T

P O

R T

L A

N D

O

R E

G O

N

S

W

S T

A V

E

H Y

D R

O E

L E

C T

R

IC

D E

S

IG

N C

E N

T E

R

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

J O

R D

A N

S F

IN

K

P

.E

P R

O

JE

C T

L O

C A

T

IO

N A

N D

V

IC

IN

IT

Y M

A P

G-001

M

G U

N D

R U

M

S

C O

T N

E R

P

G

G

-0 .d g n

L G

P -1

-0 -A

-0 /1

T

C A

S P

E R

P

.E

VOLUME 2

G13

SCALE: NTS

SITE MAP

O C

T O

B E

R

T2

LOWER SNAKE RIVER SPARE TRANSFORMERS

LITTLE GOOSE LOCK AND DAM

W912EF26RA003

OCTOBER 2025

WALLA WALLA DISTRICT

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

S U

B M

IT

T

E D

B Y

C H

E C

K E

D B

Y

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

IS

S

U E

D A

T E

S I Z

E

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

®of Engineers

US Army Corps

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

SHEET ID

SEE LOCATION

MAP

SPOKANE

OREGON

CLEARWATER R.

EUGENE

BOISE

P A

C

IF

IC

O

C E

A N

WASHINGTON

IDAHO

R

IV

E

REVERETT

C O

L U

M B

IA

SNAKE R.

PASCO

SEATTLE

PORTLAND

SALEM

THE

OLYMPIA

DALLES

WALLA WALLA

PENDLETON

VANCOUVER

PROJECT

LOCATION

Washtucna

Riparia

GOOSE

DAM

LITTLE

F la t

ID

A

H O

P A L O

U S E

B. N.

C. P. RR.

C r.

C r.

Alkali

E A

K

IV

E

R

SN

Cr ee kD ry

Waitsburg

R

Pomeroy

R

Flat

Union

N O

N

Cr.

As oti n

TUCAN

Camp Wooten

R

PENDLETON

WALLA WALLA

PASCO

KENNEWICK

COLFAX

GRANITE

LOWER

PULLMAN

DAM

RICHLAND

DAM

OREGON

WASHINGTON

HARBOR

ICE

CLARKSTON

YA

K

A

IM

Farrington

R

McNARY

R

IV

E R

LEWISTON

DAM

CO

U

M L

IA

B Cr

RIVER

R O

N D E

GRANDE

U M

ATILLA

C

r. U

. P . R

R

. RIVER

B u tt e r

Elgin Wallowa

Athena

Weston

Hermiston

Anatone

Asotin

M ill

R.

WALLA

T O

U C

H E T

Touchet

Milton-Freewater

R.

Wallula

B.N.

Kahlotus

Umatilla

Plymouth

Dayton

Almota

Ferry

Starbuck

BishopCentral

MONUMENTAL

LOWER Dodge

DAM

W A

L L

A

N

NAVIGATION LOCK

N. 5000

POWERHOUSE

NAV LOCK BRIDGE

N. 6000

SPILLWAY

TO STARBUCK

STORAGE YARD

FISH LADDER

UNIT

UNIT

UNIT

500 KV TRANSMISSION LINE

UNIT

UNIT

UNIT

BAY 2

BAY 1

X

BAY 5

BAY 4

BAY 3

X

X X

BAY 6

E

E

0Lower Monumental Pool EL. 540

E

N. 7000

S N A K E

BAY 8

BAY 7

TO RIPARIA

Camas Prairie Railroad

R I V E R

D1

VICINITY MAP

SCALE: NTS

N

D7

LOCATION MAP

SCALE: NTS

SUBMITTED BY:

SUBMITTED BY:

APPROVED BY: APPROVED BY:

HYDROELECTRIC DESIGN CENTER

DIRECTOR OF

JORDAN S. FINK, P.E.

WALLA WALLA DISTRICT

CHIEF OF DESIGN BRANCH

MARCUS PALMER, P.E.

WALLA WALLA DISTRICT

CHIEF OF ENGINEERING & CONST DIV.

DWAYNE WESTON, P.E.

DESIGNATIONS OF INDIVIDUALS APPEAR ON THESE PROJECT DOCUMENTS WITHIN THE SCOPE OF THEIR EMPLOYMENT AS REQUIRED BY ER 1110-1-8152.

THIS PROJECT WAS DESIGNED BY THE HYDROELECTRIC DESIGN CENTER OF THE U.S. ARMY CORPS OF ENGINEERS. THE INITIALS OR SIGNATURES AND REGISTRATION

WALLA WALLA DISTRICT

CHIEF OF ELECTRICAL DESIGN SECTION

LEVI VAN STEDUM, P.E.

SUBMITTED BY:

HYDROELECTRIC DESIGN CENTER

CHIEF OF ELECTRICAL BRANCH

JOHN Z. YEN, P.E.

NORTH

PLAN

SOLICITATION NO.:

CONTRACT NO.:

ISSUE DATE:

of Engineers

US Army Corps

2VOLUME NO.:

VOLUME 1 - SPARE TRANSFORMERS T1

VOLUME 2 - SPARE TRANSFORMERS T2

DAM ENTRANCE ROAD

STORAGE YARD

A L

F

IL

E N

U M

B E

R

F

IL

E N

A M

E

D S

P

D

:4

:3

A

M

/1 /2

L G

G

-0

.d g n

F

IN

J O

R D

A N

S F

IN

K

P

D

A W

IN

G

I N

D E

X

G-002

M

G U

N D

R U

M

S

C O

T N

E R

P

G

-0 .d g n

L G

P -1

-0 -A

-0 /2

T

C A

S P

E R

P

.E

N

S I

L O

W E

R S

N A

K E

R

IV

E R

S P

A R

E T

R A

N S

F O

R M

E R

S

L

IT

T L

E G

O O

S E

L O

C K

A N

D D

A M

W

E F

R A

O C

T O

B E

R

L L

A W

A L

L A

W

A S

H

IN

G T

O N

N

R

D A

V E

W A

L L

A W

A L

L A

D

IS

T R

IC

T

P O

R T

L A

N D

O

R E

G O

N

S

W

S T

A V

E

H Y

D R

O E

L E

C T

R

IC

D E

S

IG

N C

E N

T E

R

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

G-002

J O

R D

A N

S F

IN

K

P

A W

IN

G

I N

D E

X

M

G U

N D

R U

M

S

C O

T N

E R

P

G

-0 .d g n

L G

P -1

-0 -A

-0 /2

T

C A

S P

E R

P

.E

VOLUME 2

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

S U

B M

IT

T

E D

B Y

C H

E C

K E

D B

Y

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

IS

S

U E

D A

T E

S I Z

E

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

®of Engineers

US Army Corps

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

SHEET IDSHEET ID

DRAWING INDEX

GENERAL

DRAWING NUMBER

NO.

SHEET

TITLE

ELECTRICAL

TITLEDRAWING NUMBER

NUMBER

SHEET

DRAWING INDEX

A L

F

IL

E N

U M

B E

R

F

IL

E N

A M

E

D S

P

D

:4

:3

A

M

/1 /2

L G

G

-0

.d g n

A N

S I

D

F

IN

L O

W E

R S

N A

K E

R

IV

E R

S P

A R

E T

R A

N S

F O

R M

E R

S

L

IT

T L

E G

O O

S E

L O

C K

A N

D D

A M

W

E F

R A

L L

A W

A L

L A

W

A S

H

IN

G T

O N

N

R

D A

V E

W A

L L

A W

A L

L A

D

IS

T R

IC

T

P O

R T

L A

N D

O

R E

G O

N

S

W

S T

A V

E

H Y

D R

O E

L E

C T

R

IC

D E

S

IG

N C

E N

T E

R

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

J O

R D

A N

S F

IN

K

P

A N

S F

O R

M E

R S

IT

E

D E

L

IV

E R

Y A

N D

S T

O R

A G

E L

O C

A T

IO

N

G-003

M

G U

N D

R U

M

S

C O

T N

E R

P

G

-0 .d g n

L G

P -1

-0 -A

-0 /3

T

C A

S P

E R

P

.E

PLAN

NORTH

O C

T O

B E

R

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

S U

B M

IT

T

E D

B Y

C H

E C

K E

D B

Y

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

IS

S

U E

D A

T E

S I Z

E

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

®of Engineers

US Army Corps

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

SHEET ID

E

NAVIGATION LOCK

XX

X

X

S P

IL

L

W A

Y

P O

W E

R H

O U

S E

TO RIPARIA

STORAGE YARD

TO STARBUCK

SPARE TRANSFORMER STORAGE LOCATION

NOT PART OF THIS CONTRACT

FUTURE STORAGE BUILDINGS

A1

TRANSFORMER SITE

A L

F

IL

E N

U M

B E

R

F

IL

E N

A M

E

D S

P

D

:4

:4

A

M

/1 /2

L G

G

-0 d g n .d g n

A N

S I

D

F

IN

L O

W E

R S

N A

K E

R

IV

E R

S P

A R

E T

R A

N S

F O

R M

E R

S

L

IT

T L

E G

O O

S E

L O

C K

A N

D D

A M

W

E F

R A

L L

A W

A L

L A

W

A S

H

IN

G T

O N

N

R

D A

V E

W A

L L

A W

A L

L A

D

IS

T R

IC

T

P O

R T

L A

N D

O

R E

G O

N

S

W

S T

A V

E

H Y

D R

O E

L E

C T

R

IC

D E

S

IG

N C

E N

T E

R

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

J O

R D

A N

S F

IN

K

P

A N

S F

O R

M E

R R

E Q

U

IR

E M

E N

T S

S U

M M

A R

Y S

H E

E T

G-004

M

G U

N D

R U

M

S

C O

T N

E R

P

G

-0 d g n

.d g n

L G

P -1

-0 -A

-0 /4

T

C A

S P

E R

P

.E

C

T O

B E

R

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

S U

B M

IT

T

E D

B Y

C H

E C

K E

D B

Y

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

IS

S

U E

D A

T E

S I Z

E

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

®of Engineers

US Army Corps

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

SHEET ID

NAMEPLATE DATA:

TANK AND CONSTRUCTION:

ACCESSORIES:

BUSHINGS:

INSULATING OIL:

SEPARATE CONTROL AND POWER CABINETS:

SPARE PARTS:

FACTORY ASSEMBLY AND PAINT:

FACTORY ACCEPTANCE TESTS (F.A.T.):

REQUIREMENTS SUMMARY SHEET

LITTLE GOOSE 500 KV SPARE GSU TRANSFORMER

(REFERENCE SPECIFICATION SECTION 48 19 23.04 26)

∙ TYPE: NAPTHENIC BASE - ASTM D 3487 TYPE II; 0.3% BY MASS OF OXIDATION INHIBITOR

(4) COMPLETELY ASSEMBLED AND WITNESSING OF FACTORY ACCEPTANCE TESTS

TRANSFORMER)

(3) COMPLETED CORE/COIL ASSEMBLY, BUT PRIOR TO TANKING (IF PROVIDING A CORE TYPE

(2) AFTER COMPLETION OF WINDINGS BUT PRIOR TO LANDING ON CORE

(1) DESIGN REVIEW MEETING

∙ INSPECTIONS: GOVERNMENT INSPECTIONS PERFORMED DURING

FOR ONE WEEK PRIOR TO OIL FILLING.

∙ INTERIOR PAINT: PRIMER COAT, OIL-RESISTANT FINISH COAT - WHITE. ALLOW TO CURE

STEEL CABINETS, SHALL REMAIN UNPAINTED. COVER TO RECEIVE A NON-SLIP COATING.

5BG 7/0.4 HIGH-GLOSS (ANSI NO. 70 GRAY). CORROSION RESISTANT SURFACES, AND STAINLESS

∙ EXTERIOR PAINT: PRIMER COAT, EPOXY BASE COAT, POLYURETHANE TOP COAT - MUNSELL

MATCH-MARKED FOR EASE OF REASSEMBLY.

∙ ASSEMBLY: TRANSFORMER TO BE FULLY ASSEMBLED, WITH REMOVABLE COMPONENTS

10,667 GALLONS∙ MAXIMUM OIL QUANTITY:

352,000 POUNDS∙ MAXIMUM WEIGHT:

∙ FREQUENCY: 60 HZ

∙ MAXIMUM LOAD LOSSES: 175 KW

∙ MAXIMUM NO-LOAD LOSSES: 52 KW

∙ MAXIMUM SOUND LEVEL (ONAF): 74 DB

∙ OIL PRESERVATION SYSTEM: NITROGEN BLANKET (PREFERRED) OR CONSERVATOR TANK

∙ TEMPERATURE RISE: 65 ºC

∙ SECONDARY WINDING (H) DETC: 5 TAPS; 3 @ +2.5%, 1 @ -2.5% OF NOMINAL 500 KV TAP

∙ IMPEDANCE: 9.2% @ 41,000 KVA (H-X & H-Y), 20.9% @ 41,000 KVA (X-Y)

∙ PHASING: SINGLE-PHASE

∙ BIL LEVELS, KV: 1,425 (H) / 110 (X & Y) / 150 (H0)

∙ VOLTAGE RATINGS: 500,000 GRDY (H) - 13,200 DELTA (X) 13,200 DELTA (Y)

∙ KVA RATING: 82,000 / 109,334

∙ COOLING CLASS: ONAN/ONAF

∙ TYPE: CLASS II GSU POWER TRANSFORMER

∙ ANALOG TEMPERATURE GAGE FUNCTIONAL VERIFICATION

∙ BUSHING CURRENT TRANSFORMER ROUTINE TESTS

AND POWER FACTOR TESTS DURING TRANSFORMER F.A.T.

∙ EACH HIGH-VOLTAGE AND HIGH-VOLTAGE NEUTRAL BUSHING SHALL UNDERGO CAPACITANCE

∙ ALL ELECTRICAL AND ELECTO-MECHANICAL DEVICES SHALL BE FUNCTIONALLY TESTED

∙ DE-ENERGIZED TAP CHANGER MECHANICAL OPERATIONAL TEST (5 COMPLETE CYCLES)

SHIPPING CONFIGURATION

- ONE SFRA TEST TO BE PERFORMED WITH THE TRANSFORMER IN THE

OIL FILLED

- ONE SFRA TEST TO BE PERFORMED WITH THE TRANSFORMER FULLY ASSEMBLED AND

- CABLE INTEGRITY TEST REQUIRED

∙ SWEEP FREQUENCY RESPONSE ANALYSIS (WITH ELECTRONIC DATA FILES)

∙ LEAKAGE REACTANCE (WITH ELECTRONIC DATA FILES)

ONE HOUR LEVEL: 300 PC

∙ INDUCED VOLTAGE TEST ACCEPTANCE CRITERIA: 7,200 CYCLE ENHANCEMENT LEVEL: 500 PC;

∙ AUDIBLE SOUND LEVEL TESTS SHALL BE PERFORMED

∙ LIGHTNING IMPULSE TESTS

∙ TEMPERATURE RISE TESTS SHALL BE PERFORMED AT EACH COOLING STAGE

∙ ALL 'ROUTINE' TESTS (IEEE C57.12.00, TABLE 17)

∙ COOLING FANS: HORTIZONTAL-DRAFT

∙ RADIATORS: HOT-DIP GALVANIZED.

STEEL. MAXIMUM DESIGN FLUX DENSITY OF 1.75 TESLA. STEP-LAP CONSTRUCTION.

∙ CORE: LAMINATIONS MAXIMUM THICKNESS OF 0.270MM, COLD-ROLLED, GRAIN-ORIENTED

∙ SEISMIC: SEISMIC CALCULATIONS REQUIRED FOR MAIN TANK AND ALL MAJOR COMPONENTS.

∙ LIFTING EYES: DESIGN LOADS FOR EACH EYE SHALL BE TWO TIMES THE ACTUAL LOAD.

∙ BASE: DESIGNED FOR PAD MOUNTING WITH SEISMIC WELDING TO STEEL PLATES.

CONSISTING OF A SINGLE ANCHOR POST, SHALL BE PROVIDED.

WITH A NON-SLIP MATERIAL, THE SAME COLOR AS THE TANK WALLS. A FALL PROTECTION SYSTEM, ∙ PERSONAL FALL ARREST SYSTEM: THE TOP OF THE TRANSFORMER TANK SHALL BE COVERED

∙ VALVES: STAINLESS STEEL BALL-TYPE (RADIATORS MAY USE BUTTERFLY-TYPE)

BE USED FOR GASKET GROOVES OF RECTANGULAR CROSS-SECTION.

THAT THE LOW-VOLTAGE BUSHING GASKETS WILL BE VITON. O-RING GASKETS SHALL NOT

∙ GASKETS: NITRILE NBR (BUNA-N), DURO 50-60, 25% COMPRESSION, WITH THE EXCEPTION

∙ MAN-HOLE: 24-INCH DIAMETER (MINIMUM TWO)

∙ (QTY 1): SET OF GASKETS FOR TRANSFORMER REASSEMBLY

∙ (QTY 1): COMPLETE GASKET SET

IF PROVIDING A CONSERVATOR TANK SYSTEMBUCHHOLZ RELAY ∙ (QTY 1): ONE

∙ (QTY 1): VALVE OF EACH SIZE AND TYPE

∙ (QTY 1): PRESSURE REGULATOR IF PROVIDING A NITROGEN GAS SYSTEM

∙ (QTY 1): FUSE OF EACH TYPE AND RATING

PLATE LEFT UNCONNECTED

∙ (QTY 3): FIBER OPTIC EXTENSION CABLE THAT CONNECTS THE FEED-THROUGH WALL

∙ (QTY 1): CRATED RADIATOR

∙ (QTY 2): COOLING FAN COMPLETE WITH MOTOR

∙ (QTY 1): BUSHING CURRENT TRANSFORMER OF EACH TYPE AND RATING

∙ (QTY 1): OIL TEMPERATURE INDICATOR

∙ (QTY 1): WINDING TEMPERATURE INDICATOR

∙ (QTY 1): LIQUID LEVEL INDICATOR

∙ (QTY 1): PRESSURE RELIEF DEVICE

∙ (QTY 1): RELAY AND CONTACTOR OF EACH TYPE AND RATINGOR STAINLESS STEEL WITH ENGRAVED BLACK LETTERING.

NAMEPLATES WITHIN THE CONTROL AND POWER CABINETS SHALL BE ANODIZED ALUMINUM

LOW-VOLTAGE BUSHINGS MADE OF STAINLESS STEEL WITH BLACK LETTERING. DEVICE

PROVIDED. EQUIPMENT NAMEPLATES SHALL BE PROVIDED FOR THE HIGH-VOLTAGE BUSHINGS AND

AN ADDITIONAL DIAGRAM NAMEPLATE FOR SLING LOCATIONS AND LIFT POSITIONS SHALL ALSO BE

AND VACUUM THE TANK WILL WITHSTAN, DRY WEIGHT OF THE INSULATION, AND CALCULATED X/R RATIO.

MANUFACTURING DATE, PLANT LOCATION, GOVERNMENT CONTRACT NUMBER, PRESSURE

∙ NAMEPLATES: CAST BRONZE OR STAINLESS STEEL; IEEE C57.12.00, TABLE 7, INCLUDING

- FOLD-DOWN MAINTENANCE TRAY ON INSIDE OF CONTROL CABINET DOOR.

GRADE HUMIDISTAT / THERMOSTAT CONTROL.

- PTC RESISTOR DESIGN ENCLOSURE HEATERS WITH INTEGRAL FANS, AND INDUSTRIAL

CABINET.

- 120 V AC, 20 A HOSPITAL GRADE GFCI RECEPTACLE MOUNTED INSIDE THE CONTROL

- 120 V AC, 1,000 LUMEN LED TYPE A19 LAMPS WITH DOOR-ACTUATED SWITCH.

IN POWER CABINET.

- ALL CIRCUITS, WIRING AND EQUIPMENT RATED GREATER THAN 120 V AC TO BE MOUNTED

∙ SPECIAL FEATURES:

- 125 AND 250 V DC CIRCUITS - RATED 125/250 OR 250 V DC, AND 10,000 A INTERRUPTING

- 120 V AC CIRCUITS - RATED 250 V DC AND 120/240 OR 240 V AC, AND 10,000 A INTERRUPTING

- 480 V AC CIRCUITS - RATED 600 V AC AND 35,000 A INTERRUPTING AT 480 VAC

∙ MOLDED-CASE CIRCUIT BREAKERS:

120 V AC CIRCUITS - 10 A

- SINGLE-BREAK INDUCTIVE LOAD INTERRUPTING RATING: 125 V DC CIRCUITS - 1.5 A;

- RATED FOR 600 V AC OR 250 V DC

∙ SWITCHES:

120 V AC CIRCUITS - 6.0 A

- SINGLE-CONTACT INDUCTIVE LOAD INTERRUPTING CAPACITY: 125 V DC CIRCUITS - 1.0 A;

- RATED FOR 125 V DC OR 120 V AC; MEETS REQUIREMENTS OF NEMA ICS5; 10 A CONTACTS

∙ AUXILIARY RELAYS:

∙ TERMINAL BLOCKS: 600 V, 30 A MINIMUM, 90 ºC RATED TERMINATIONS.

WITH CAST COVERS AND LIQUID-TIGHT HUBS.

JOINT COMPOUND APPLIED. OUTLET AND JUNCTION BOXES SHALL BE MALLEABLE CAST IRON

CHANNELS NOT ALLOWED. ALL CONDUIT THREADED JOINTS SHALL HAVE A CONDUCTIVE

∙ CONDUIT: ALL WIRING TO BE RUN IN CONDUIT. WIRE RUNS THROUGH TANK REINFORCING

GROUND - GREEN/YELLOW

PHASE B - ORANGE; PHASE C - YELLOW; GROUNDED NEUTRAL - WHITE; INSULATED

∙ WIRING: XLPE; 3-PHASE POWER CONDUCTORS COLOR CODED: PHASE A - BROWN;

POWER - 125 V DC; COOLING FANS - 480 V AC, 3-WIRE, 3-PHASE, 60 HZ

∙ GOVERNMENT-FURNISHED POWER: CONTROL POWER - 125 V DC; ANNUNCIATION

IN CONTROL CABINET. SOLAR SHIELDING ON TOP, FRONT AND SIDE PANELS OF ENCLOSURES.

PROVISIONS. WINDOWS FOR VIEWING THE TEMPERATURE MONITOR AND ANNUNCIATOR

∙ CABINET MATERIAL: WEATHER-PROOF TYPE 304 STAINLESS STEEL WITH LOCKING

∙ TRANSFORMER EMBEDDED FIBER-OPTIC WINDING TEMPERATURE MEASUREMENT PROBES

∙ DIRECTED-FLOW PRESSURE RELIEF DEVICE WITH METAL DISCHARGE PIPING

∙ WTI AND OTI GAUGES WITH RTDS - HARDENED FOR HARSH WEATHER CONDITIONS

∙ CORE GROUNDS: 2.5 KV CLASS, 45 KV BIL, 100 AMP

HITACHI TYPE O+ C T025W0412AT

∙ NEUTRAL (H0): 25 KV CLASS, MINIMUM 150 KV BIL, 1,200 AMP

INDICATING EQUIPMENT)

(BUSHING CURRENT TRANSFORMERS AS REQUIRED FOR THE WINDING TEMPERATURE

HITACH TYPE RJ T025B0750EC

BULK-TYPE, LOW-CORONA, LIGHT CONTAMINATION, 125 ºC TEMPERATURE RISE RATING

∙ PRIMARY WINDING (X): 25 KV CLASS, MINIMUM 150 KV BIL, 7,500 AMP, PORCELAIN CONSTRUCTION, (TWO 1200:5 MRCT)

HITACHI TYPE O+ C T550W2000VV

∙ SECONDARY WINDING (H): 500 KV CLASS, MINIMUM 1,500 KV BIL, 1,600 AMP, OIL-FILLED BUSHING

A L

F

IL

E N

U M

B E

R

F

IL

E N

A M

E

D S

P

D

:4

:4

A

M

/1 /2

L G

G

-0

.d g n

E

G

IO

N A

L T

E M

P E

R A

T U

R E

A N

N U

A L

S U

M M

A

Y

N

S

L O

W E

R S

N A

K E

R

IV

E R

S P

A R

E T

R A

N S

F O

R M

E R

S

L

IT

T L

E G

O O

S E

L O

C K

A N

D D

A M

W

E F

R A

O C

T O

B E

R

L L

A W

A L

L A

W

A S

H

IN

G T

O N

N

R

D A

V E

W A

L L

A W

A L

L A

D

IS

T R

IC

T

P O

R T

L A

N D

O

R E

G O

N

S

W

S T

A V

E

H Y

D R

O E

L E

C T

R

IC

D E

S

IG

N C

E N

T E

R

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

J O

R D

A N

S F

IN

K

P

.E

J

R O

S E

N T

H A

L

S

C O

T N

E R

P

.E

L G

G

-0 .d g n

L G

P -1

-0 -A

-0 /5

T

C A

S P

E R

P

.E

G-005

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

S U

B M

IT

T

E D

B Y

C H

E C

K E

D B

Y

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

IS

S

U E

D A

T E

S I Z

E

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

®of Engineers

US Army Corps

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

SHEET ID

A L

F

IL

E N

U M

B E

R

F

IL

E N

A M

E

D S

P

D

:4

:5

A

M

/1 /2

L G

G

-0

.d g n

A N

S I

D

F

IN

L O

W E

R S

N A

K E

R

IV

E R

S P

A R

E T

R A

N S

F O

R M

E R

S

L

IT

T L

E G

O O

S E

L O

C K

A N

D D

A M

W

E F

R A

L L

A W

A L

L A

W

A S

H

IN

G T

O N

N

R

D A

V E

W A

L L

A W

A L

L A

D

IS

T R

IC

T

P O

R T

L A

N D

O

R E

G O

N

S

W

S T

A V

E

H Y

D R

O E

L E

C T

R

IC

D E

S

IG

N C

E N

T E

R

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

J O

R D

A N

S F

IN

K

P

H

E E

T

S

IT

E L

O C

A T

IO

N

S P

H O

T O

G R

A P

H S

G-006

M

G U

N D

R U

M

S

C O

T N

E R

P

G

-0 .d g n

L G

P -1

-0 -A

-0 /6

T

C A

S P

E R

P

.E

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

B

C

D

E

F

G

H

J

K

L

M

N

P

S U

B M

IT

T

E D

B Y

C H

E C

K E

D B

Y

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

IS

S

U E

D A

T E

S I Z

E

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

®of Engineers

US Army Corps

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

SHEET ID

H1

STORAGE YARD MAP VIEW

SCALE: NTS

H6

STORAGE YARD

SCALE: NTS

H14

SPARE TRANSFORMER FOUNDATION PAD VIEW 1

SCALE: NTS

A1

SPARE TRANSFORMER FOUNDATION PAD VIEW 2

SCALE: NTS

A8

POWER

SPARE TRANSFORMER FOUNDATION PAD

SCALE: NTS

A13

TRANSFORMER INTAKE DECK

SCALE: NTS

ALL PHOTOS SHOW EQUIPMENT AND STORAGE YARD AT LITTLE GOOSE DAM. 1.

GENERAL NOTES

O C

T O

B E

R

A L

F

IL

E N

U M

B E

R

F

IL

E N

A M

E

D S

P

D

:5

:0

A

M

/1 /2

L G

G

-0

.d g n

A N

S

L O

W E

R S

N A

K E

R

IV

E R

S P

A R

E T

R A

N S

F O

R M

E R

S

L

IT

T L

E G

O O

S E

L O

C K

A N

D D

A M

W

E F

R A

L L

A W

A L

L A

W

A S

H

IN

G T

O N

N

R

D A

V E

W A

L L

A W

A L

L A

D

IS

T R

IC

T

P O

R T

L A

N D

O

R E

G O

N

S

W

S T

A V

E

H Y

D R

O E

L E

C T

R

IC

D E

S

IG

N C

E N

T E

R

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

J O

R D

A N

S F

IN

K

P

H

E E

T

S

IT

E L

O C

A T

IO

N

S P

H O

T O

G R

A P

H S

G-007

M

G U

N D

R U

M

S

C O

T N

E R

P

G

-0 .d g n

L G

P -1

-0 -A

-0 /7

T

C A

S P

E R

P

.E

T O

B E

R

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

S U

B M

IT

T

E D

B Y

C H

E C

K E

D B

Y

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

IS

S

U E

D A

T E

S I Z

E

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

®of Engineers

US Army Corps

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

SHEET ID

D1

BRIDGE MAP VIEW

LITTLE GOOSE INTAKE

SCALE: NTS D11

AT LITTLE GOOSE

MOVEMENT ACROSS INTAKE BRIDGE

PREVIOUS SPARE TRANSFORMER

A L

F

IL

E N

U M

B E

R

F

IL

E N

A M

E

D S

P

D

:5

:1

A

M

/1 /2

L G

E

-1 .d g n

A N

S I

D

T

L O

W E

R S

N A

K E

R

IV

E R

S P

A R

E T

R A

N S

F O

R M

E R

S

L

IT

T L

E G

O O

S E

L O

C K

A N

D D

A M

W

E F

R A

L L

A W

A L

L A

W

A S

H

IN

G T

O N

N

R

D A

V E

W A

L L

A W

A L

L A

D

IS

T R

IC

T

P O

R T

L A

N D

O

R E

G O

N

S

W

S T

A V

E

H Y

D R

O E

L E

C T

R

IC

D E

S

IG

N C

E N

T E

R

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

J O

R D

A N

S F

IN

K

P

.E

C O

V E

R

IN

S

T A

L L

L A

Y O

U T

A N

D L

IM

IT

IN

G

D

IM

E N

S

IO

N S

G S

U T

R A

N S

F O

R M

E R

E-101

M

G U

N D

R U

M

S

C O

T N

E R

P

M

R C

H

E

-1

.d g n

L G

P -1

-6 -1

A /1

P

K L

E

IN

E

P

2'-5" OD

2'-3 1/4 " BOLT CIRCLE

2'-0" ID

° ON A 27-1/4" DIAMETER BOLT CIRCLE

12 TOTAL EQUALLY SPACED

3/8-16 TAPPED HOLES

(#4 AWG)

GROUNDING CABLE

BUSHING

CORE GROUND

PROTECTIVE COVER

GROUND BUSHING

CORE FRAME

CORE FRAME

(#4 AWG)

GROUNDING CABLE

O C

T O

B E

R

SEE DETAIL A11

20'-1" MAXIMUM OVERALL LENGTH

/2

/2

/2

3'-10"

E M

B E

D D

E D

C O

N D

U

IT

/4

C

L T

O C

E N

T E

R O

F C

U S

T O

M E

'S

3'-4" 3'-4"

9'-7 1/4 " LIFTING AND JACKING CENTERS

CUSTOMER WALL

EXISTING 2

/4

L

IF

T

IN

G A

N D

J A

C K

IN

G

C E

N T

E R

S

/4

DETAIL A11)

FLANGE (SEE

LV HOUSING

Y

Y

X

X

H

H

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

S U

B M

IT

T

E D

B Y

C H

E C

K E

D B

Y

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

IS

S

U E

D A

T E

S I Z

E

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

®of Engineers

US Army Corps

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

SHEET ID

SEGMENT 2 SEGMENT 4

BUSHING SIDE)

(LOW-VOLTAGE

SEGMENT 1

BUSHING SIDE)

(HIGH-VOLTAGE

SEGMENT 3

SEGMENT

1 HIGH-VOLTAGE (H1) BUSHING1

QTYITEM DESCRIPTION

1.5-INCH UPPER FILTER VALVE

3-INCH VACUUM VALVE

RADIATOR (TYPICAL)

HIGH-VOLTAGE NEUTRAL (H0) BUSHING

LOW-VOLTAGE BUSHINGS

COVER

COVER

COVER

OIL LEVEL INDICATOR

AS DES.

CONTROL CABINET

COVER

3-INCH MAIN OIL DRAIN VALVE

1.5-INCH LOWER FILTER VALVE

COVER

EXAMPLE MODEL NUMBER

33 4, COVER

ABB-HITACHI

ABB-HITACHI

ABB-HITACHI

QUALITROL XPRDPRESSURE RELIEF DEVICE WITH DISCHARGE PIPING

MILWAUKEE VALVE F20SS, CLASS 150

MILWAUKEE VALVE F20SS, CLASS 150

MILWAUKEE VALVE F20SS, CLASS 150

MILWAUKEE VALVE F20SS, CLASS 150

MILWAUKEE VALVE F20SS, CLASS 150

QUALITROL SERIES 042

35 COVER MANHOLE ACCESS COVER

45 AS DES. COVER FALL ARREST SYSTEM MOUNTING BRACKETS DBI-SALA 8517412

CORE & CORE FRAME GROUND BUSHINGS (SEE DETAIL F15)

AS DES.

BILL OF MATERIALS

TYPE RJ BUSHING T025B0750EC

1,4

15 1 1 DUAL TANK NITROGEN REGULATOR CABINET ABB RND2

2 2-INCH GAS-IN-OIL MONITOR INTERFACE VALVES

5 THERMOWELLS (QTY. 3 - STANDARD, QTY. 2 - HEATED)

TYPE O+ C BUSHING T550W2000VV

CORE

TANK COVER

TANK COVER

CL

F15

CORE AND CORE FRAME GROUNDING

SCALE: NTS

10 2,4 HORIZONTAL DRAFT COOLING FANS KRENZ-VENTAS DES.

1 POWER CABINET17 3

SEE RESOURCE DRAWINGS FOR PAD DETAILS5.

352,000 POUNDS4. MAXIMUM WEIGHT:

ARE NOT INTENDED TO INDICATE THE ACTUAL QUANTITY.

3. THE RADIATORS AS DEPICTED INDICATE THE PERMISSIBLE LOCATIONS, AND

BREATHER, AND BUCHHOLZ RELAY.

SYSTEM MUST BE INCLUDED, SUCH AS A MAINTENACE-FREE DEHYDRATING

REQUIRED IN SECTION 48 19 23.04 26 FOR A CONSTANT OIL PRESERVATION

OIL PRESERVATION SYSTEM IS PROVIDED, ALL ASSOCIATED EQUIPMENT

THE POWERHOUSE EQUIPMENT NEEDED TO FIT THE COPS TANK. IF CONSTANT

CONDUCTORS PER IEEE STD 1427. THERE SHALL BE NO MODIFICATIONS TO

MUST MAINTAIN A MINIMUM OF 105" CLEARANCE FROM THE OVERHEAD 500KV

THE DIMENSIONAL REQUIREMENTS IDENTIFIED MUST BE MET. THE COPS TANK

TRANSFORMER AND/OR A CONSTANT OIL PRESERVATION SYSTEM IS PROVIDED,

DRAWINGS WITH AN INERT-GAS OIL PRESERVATION SYSTEM. IF A CORE-FORM

THE DRAWING SHOWN IS BASED ON THE WESTINGHOUSE SHELL-FORM2.

J. MAXIMUM OVERALL LENGTH

I. MAXIMUM OVERALL WIDTH

H. STRUCTURAL BASE

G. JACKING & LIFTING FACILITIES

F. ANCILLARY DEVICES

E. CONTROL AND POWER CABINETS

D. LOW-VOLTAGE BUSHING HOUSING FLANGE DIMENSION AND LOCATION

C. HIGH-VOLTAGE NEUTRAL BUSHING LOCATION AND TERMINAL CONNECTION

B. LOW-VOLTAGE BUSHINGS LOCATIONS AND TERMINAL CONNECTIONS

A. HIGH-VOLTAGE BUSHING LOCATION AND TERMINAL CONNECTION

INTERCONNECTION:

TRANSFORMER EQUIPMENT ARE CONSIDERED CRITICAL TO ASSURE PROPER

IN THE TRANSFORMER VAULT. THE LOCATIONS OF THE FOLLOWING

PROPER INTERCONNECTION TO THE EXISTING EQUIPMENT AND INTERFACES

FOR THE MANUFACTURER'S USE IN DESIGNING THE TRANSFORMER FOR

1. THE TRANSFORMER LAYOUT AND LIMITING DIMENSIONS HAVE BEEN PROVIDED

GENERAL NOTES

A16

SEGMENT IDENTIFICATION (TOP VIEW)

TRANSFORMER TANK

SCALE: NTS

A11

HOUSING FLANGE DETAILS

LOW-VOLTAGE BUSHING

SCALE: NTS

72 2 1 STABALIZING EYES

73 3 1, 3 COMBINATION JACKING PAD, PULLING EYE AND LIFTING EYES

74 1 3 COMBINATION UPRIGHTING AND LIFTING EYES FOR UPRIGHTING AND LIFTING COMPLETE UNIT

21 31 RAPID PRESSURE RISE RELAY AND 1.5-INCH ISOLATION VALVE QUALITROL & MILWAUKEE VALVE 900-003-01 & F20SS, CLASS 150

A2

TRANSFORMER PLAN VIEW - COVER

1/2"=1'-0"SCALE:

CL CL

CL

CL

77 1 3 EXTERNAL GAS EXPANSION TANK

TYPE O+ C BUSHING T025W0412AT

AS DES.

A L

F

IL

E N

U M

B E

R

F

IL

E N

A M

E

D S

P

D

:5

:1

A

M

/1 /2

L G

E

-1 .d g n

A N

S

L O

W E

R S

N A

K E

R

IV

E R

S P

A R

E T

R A

N S

F O

R M

E R

S

L

IT

T L

E G

O O

S E

L O

C K

A N

D D

A M

W

E F

R A

L L

A W

A L

L A

W

A S

H

IN

G T

O N

N

R

D A

V E

W A

L L

A W

A L

L A

D

IS

T R

IC

T

P O

R T

L A

N D

O

R E

G O

N

S

W

S T

A V

E

H Y

D R

O E

L E

C T

R

IC

D E

S

IG

N C

E N

T E

R

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

J O

R D

A N

S F

IN

K

P

.E

S E

G M

E N

T

IN

S T

A L

L

L A

Y O

U T

A N

D L

IM

IT

IN

G

D

IM

E N

S

IO

N S

G S

U T

R A

N S

F O

R M

E R

E-102

M

G U

N D

R U

M

S

C O

T N

E R

P

M

R C

H

E

-1

.d g n

L G

P -1

-6 -1

A /2

P

K L

E

IN

E

P .E

76 43

T

O T

O P

O F

H V

N E

U T

R A

L B

U S

H

IN

G

20'-1" MAXIMUM WIDTH

T O

T O

P O

F L

V B

U S

H

IN

G

/2

O C

T O

B E

R

T

O T

H E

T O

P O

F T

H E

L V

H O

U S

IN

G

F L

A N

G E

T

O T

H E

C E

N T

E R

O F

T H

E T

O P

O F

T H

E H

V B

U S

H

IN

G T

E R

M

IN

A L

11'-0"

3'- 1/2 "2'-5 1/2 " 3'- 1/2 " 2'-5 1/2 "

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

S U

B M

IT

T

E D

B Y

C H

E C

K E

D B

Y

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

IS

S

U E

D A

T E

S I Z

E

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

®of Engineers

US Army Corps

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

SHEET ID

SEGMENT 2 SEGMENT 4

BUSHING SIDE)

(LOW-VOLTAGE

SEGMENT 1

BUSHING SIDE)

(HIGH-VOLTAGE

SEGMENT 3

SEGMENT

1 HIGH-VOLTAGE (H1) BUSHING1

QTYITEM DESCRIPTION

3-INCH VACUUM VALVE

RADIATORS (TYPICAL)

RADIATOR ISOLATION VALVES (TYPICAL)

HIGH-VOLTAGE NEUTRAL (H0) BUSHING

LOW-VOLTAGE BUSHINGS

COVER

COVER

COVER

AS DES.

AS DES.

COVER & 4

EXAMPLE MODEL NUMBER

ABB-HITACHI

ABB-HITACHI

ABB-HITACHI

MILWAUKEE VALVE F20SS, CLASS 150

BILL OF MATERIALS

TYPE RJ BUSHING T025B0750EC

1,4

1,4

15 1 1 DUAL TANK NITROGEN REGULATOR CABINET ABB RND2

TYPE O+ C BUSHING T550W2000VV

HORIZONTAL DRAFT COOLING FAN (TYPICAL)AS DES.10 2,4 KRENZ-VENT

22 2 1 MOUNTING BRACKETS FOR FUTURE ON-LINE DGA

27 1 1 1.5-INCH UPPER FILTER VALVE MILWAUKEE VALVE F20SS, CLASS 150

30 2 1 2-INCH GAS-IN-OIL MONITOR INTERFACE VALVES MILWAUKEE VALVE F20SS, CLASS 150

49 4 1, 3 GROUNDING PADS (TYPICAL)

TYPE O+ C BUSHING T025W0412AT

A17

IDENTIFICATION (TOP VIEW)

TRANSFORMER TANK SEGMENT

SCALE: NTS

5. SEE RESOURCE DRAWINGS FOR PAD DETAILS.

352,000 POUNDS4. MAXIMUM WEIGHT:

ARE NOT INTENDED TO INDICATE THE ACTUAL QUANTITY.

3. THE RADIATORS AS DEPICTED INDICATE THE PERMISSIBLE LOCATIONS, AND

BREATHER, AND BUCHHOLZ RELAY.

SYSTEM MUST BE INCLUDED, SUCH AS A MAINTENACE-FREE DEHYDRATING

REQUIRED IN SECTION 48 19 23.04 26 FOR A CONSTANT OIL PRESERVATION

OIL PRESERVATION SYSTEM IS PROVIDED, ALL ASSOCIATED EQUIPMENT

THE POWERHOUSE EQUIPMENT NEEDED TO FIT THE COPS TANK. IF CONSTANT

CONDUCTORS PER IEEE STD 1427. THERE SHALL BE NO MODIFICATIONS TO

MUST MAINTAIN A MINIMUM OF 105" CLEARANCE FROM THE OVERHEAD 500KV

THE DIMENSIONAL REQUIREMENTS IDENTIFIED MUST BE MET. THE COPS TANK

TRANSFORMER AND/OR A CONSTANT OIL PRESERVATION SYSTEM IS PROVIDED,

DRAWINGS WITH AN INERT-GAS OIL PRESERVATION SYSTEM. IF A CORE-FORM

THE DRAWING SHOWN IS BASED ON THE WESTINGHOUSE SHELL-FORM2.

I. MAXIMUM OVERALL WIDTH

H. STRUCTURAL BASE

G. JACKING & LIFTING FACILITIES

F. ANCILLARY DEVICES

E. CONTROL AND POWER CABINETS

D. LOW VOLTAGE BUSHING HOUSING FLANGE DIMENSIONS AND LOCATION

C. LOW-VOLTAGE BUSHINGS LOCATIONS AND TERMINAL CONNECTIONS

B. HIGH-VOLTAGE NEUTRAL BUSHING LOCATION AND TERMINAL CONNECTION

A. HIGH-VOLTAGE BUSHING LOCATION AND TERMINAL CONNECTION

INTERCONNECTION:

TRANSFORMER EQUIPMENT ARE CONSIDERED CRITICAL TO ASSURE PROPER

THE TRANSFORMER VAULT. THE LOCATIONS OF THE FOLLOWING

PROPER INTERCONNECTION TO THE EXISTING EQUIPMENT AND INTERFACES IN

FOR THE MANUFACTURER'S USE IN DESIGNING THE TRANSFORMER FOR

1. THE TRANSFORMER LAYOUT AND LIMITING DIMENSIONS HAVE BEEN PROVIDED

GENERAL NOTES

33 1 COVER PRESSURE RELIEF DEVICE WITH DISCHARGE PIPING

1, 3 COMBINATION JACKING PAD, PULLING EYE AND LIFTING EYES473

1 COMBINATION ROCKER AND JACKING PADS276

TRANSFORMER ELEVATION VIEW - SEGMENT 1

1/2"=1'-0"SCALE:

43 AS DES. BASE STRUCTURAL BASE

A L

F

IL

E N

U M

B E

R

F

IL

E N

A M

E

D S

P

D

:5

:2

A

M

/1 /2

L G

E

-1 .d g n

A N

S

L O

W E

R S

N A

K E

R

IV

E R

S P

A R

E T

R A

N S

F O

R M

E R

S

L

IT

T L

E G

O O

S E

L O

C K

A N

D D

A M

W

E F

R A

L L

A W

A L

L A

W

A S

H

IN

G T

O N

N

R

D A

V E

W A

L L

A W

A L

L A

D

IS

T R

IC

T

P O

R T

L A

N D

O

R E

G O

N

S

W

S T

A V

E

H Y

D R

O E

L E

C T

R

IC

D E

S

IG

N C

E N

T E

R

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

J O

R D

A N

S F

IN

K

P

.E

S E

G M

E N

T

IN

S T

A L

L

L A

Y O

U T

A N

D L

IM

IT

IN

G

D

IM

E N

S

IO

N S

G S

U T

R A

N S

F O

R M

E R

E-103

M

G U

N D

R U

M

S

C O

T N

E R

P

E

-1

.d g n

L G

P -1

-6 -1

A /3

P

K L

E

IN

E

P

/8

T O

C E

N T

E R

O F

T H

E T

O P

O F

T H

E H

V B

U S

H

IN

G T

E R

M

IN

A L

/8

T O

T O

P O

F L

V H

O U

S

IN

G F

L A

N G

E

/4

T O

T O

P O

F H

V N

E U

T R

A L

B U

S H

IN

G

/2

T O

T O

P O

F L

V B

U S

H

IN

G

CUSTOMER'S EMBEDDED CONDUIT

7'-10 3/4 " TO CENTER OF

O C

T O

B E

R

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

S U

B M

IT

T

E D

B Y

C H

E C

K E

D B

Y

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

IS

S

U E

D A

T E

S I Z

E

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

®of Engineers

US Army Corps

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

SHEET ID

SEGMENT 2 SEGMENT 4

BUSHING SIDE)

(LOW-VOLTAGE

SEGMENT 1

BUSHING SIDE)

(HIGH-VOLTAGE

SEGMENT 3

SEGMENT

1 HIGH-VOLTAGE (H1) BUSHING1

QTYITEM DESCRIPTION

RADIATORS (TYPICAL)

HIGH-VOLTAGE NEUTRAL (H0) BUSHING

LOW-VOLTAGE BUSHINGS

COVER

COVER

COVER

AS DES

POWER CABINET

EXAMPLE MODEL NUMBER

17 3

ABB-HITACHI

ABB-HITACHI

ABB-HITACHI

MILWAUKEE VALVE F20SS, CLASS 150

43 AS DES BASE STRUCTURAL BASE

BILL OF MATERIALS

TYPE RJ BUSHING T025B0750EC

2,4

15 1 1 DUAL TANK NITROGEN REGULATOR CABINET ABB RND2

2 2-INCH DISSOLVED GAS-IN-OIL MONITOR INTERFACE VALVES

TYPE O+ C BUSHING T550W2000VV

A2

SEGMENT 2TRANSFORMER ELEVATION -

1/2"=1'-0"SCALE:

10 COVER HORIZONTAL DRAFT COOLING FANS (TYPICAL) KRENZ-VENTAS DES

16 1 3 CONTROL CABINET

20 5 3 THERMOWELLS (QTY 3 - STANDARD, QTY 2 - HEATED)

21 1 3 RAPID PRESSURE RISE RELAY QUALITROL 900-003-01

CL

TYPE O+ C BUSHING T025W0412AT

72 2 1 STABALIZING EYES

C L

27 1 1 1.5-INCH UPPER FILTER VALVE MILWAUKEE VALVE F20SS, CLASS 150

5. SEE RESOURCE DRAWINGS FOR PAD DETAILS

MAXIMUM WEIGHT: 352,000 POUNDS4.

ARE NOT INTENDED TO INDICATE THE ACTUAL QUANTITY.

3. THE RADIATORS AS DEPICTED INDICATE THE PERMISSIBLE LOCATIONS, AND

BREATHER, AND BUCHHOLZ RELAY.

SYSTEM MUST BE INCLUDED, SUCH AS A MAINTENACE-FREE DEHYDRATING

REQUIRED IN SECTION 48 19 23.04 26 FOR A CONSTANT OIL PRESERVATION

OIL PRESERVATION SYSTEM IS PROVIDED, ALL ASSOCIATED EQUIPMENT

THE POWERHOUSE EQUIPMENT NEEDED TO FIT THE COPS TANK. IF CONSTANT

CONDUCTORS PER IEEE STD 1427. THERE SHALL BE NO MODIFICATIONS TO

MUST MAINTAIN A MINIMUM OF 105" CLEARANCE FROM THE OVERHEAD 500KV

THE DIMENSIONAL REQUIREMENTS IDENTIFIED MUST BE MET. THE COPS TANK

TRANSFORMER AND/OR A CONSTANT OIL PRESERVATION SYSTEM IS PROVIDED,

DRAWINGS WITH AN INERT-GAS OIL PRESERVATION SYSTEM. IF A CORE-FORM

THE DRAWING SHOWN IS BASED ON THE WESTINGHOUSE SHELL-FORM2.

CONTROL AND POWER CABINET

I. LOCATION OF EXISTING EMBEDDED CONDUIT COMPARED TO THE

H. MAXIMUM OVERALL LENGTH

H. STRUCTURAL BASE

G. JACKING & LIFTING FACILITIES

F. ANCILLARY DEVICES

E. CONTROL AND POWER CABINETS

D. LOW-VOLTAGE BUSHING HOUSINGS FLANGE LOCATION AND DIMENSIONS

CONNECTION

C. HIGH-VOLTAGE NEUTRAL BUSHING LOCATION AND TERMINAL

B. LOW-VOLTAGE BUSHING LOCATIONS AND TERMINAL CONNECTIONS

A. HIGH-VOLTAGE BUSHING LOCATION AND TERMINAL CONNECTION

INTERCONNECTION:

TRANSFORMER EQUIPMENT ARE CONSIDERED CRITICAL TO ASSURE PROPER

. THE LOCATIONS OF THE FOLLOWING THE TRANSFORMER VAULT

INTERFACES IN PROPER INTERCONNECTION TO THE EXISTING EQUIPMENT AND

FOR THE MANUFACTURER'S USE IN DESIGNING THE TRANSFORMERS FOR

1. THE TRANSFORMER LAYOUT AND LIMITING DIMENSIONS HAVE BEEN PROVIDED

GENERAL NOTES

A13

IDENTIFICATION (TOP VIEW)

FIGURE 1 - TRANSFORMER TANK SEGMENT

SCALE: NTS

COMBINATION JACKING PAD, PULLING EYE, AND LIFTING EYES473

COMBINATION UPRIGHTING AND LIFTING EYES FOR UPRIGHTING AND LIFTING COMPLETE UNIT274

HORIZONTAL LIFTING EYES FOR LIFTING COMPLETE UNIT WHEN IN HORIZONTAL POSITION275

COMBINATION ROCKER AND JACKING PADS FOR UPRIGHTING AND JACKING THE COMPLETE UNIT276

EXTERNAL GAS EXPANSION TANK177

1, 3

F20SS, CLASS 150MILWAUKEE VALVE3-INCH DRAIN VALVE1 325

A L

F

IL

E N

U M

B E

R

F

IL

E N

A M

E

D S

P

D

:5

:2

A

M

/1 /2

L G

E

-1 .d g n

A N

S

L O

W E

R S

N A

K E

R

IV

E R

S P

A R

E T

R A

N S

F O

R M

E R

S

L

IT

T L

E G

O O

S E

L O

C K

A N

D D

A M

W

E F

R A

L L

A W

A L

L A

W

A S

H

IN

G T

O N

N

R

D A

V E

W A

L L

A W

A L

L A

D

IS

T R

IC

T

P O

R T

L A

N D

O

R E

G O

N

S

W

S T

A V

E

H Y

D R

O E

L E

C T

R

IC

D E

S

IG

N C

E N

T E

R

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

J O

R D

A N

S F

IN

K

P

.E

S E

G M

E N

T

IN

S T

A L

L

L A

Y O

U T

A N

D L

IM

IT

IN

G

D

IM

E N

S

IO

N S

G S

U T

R A

N S

F O

R M

E R

E-104

M

G U

N D

R U

M

S

C O

T N

E R

P

E

-1

.d g n

L G

P -1

-6 -1

A /4

P

K L

E

IN

E

P

18 20

1'-11 5/8 "

11'-0"

3'-5 3/4 "

20'-1" MAXIMUM WIDTH

/8

T O

T H

E C

E N

T E

R O

F T

H E

T O

P O

F T

H E

H V

B U

S H

IN

G

T E

R M

IN

/4

T

O T

H E

T O

P O

F T

H E

H V

N E

U T

R A

L B

U S

H

IN

G

3'-5 3/4 " 2'- 1/4 "2'- 1/4 "

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

S U

B M

IT

T

E D

B Y

C H

E C

K E

D B

Y

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

IS

S

U E

D A

T E

S I Z

E

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

®of Engineers

US Army Corps

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

SHEET ID

SEGMENT 2 SEGMENT 4

BUSHING SIDE)

(LOW-VOLTAGE

SEGMENT 1

BUSHING SIDE)

(HIGH-VOLTAGE

SEGMENT 3

SEGMENT

1 HIGH-VOLTAGE (H1) BUSHING1

QTYITEM DESCRIPTION

RADIATORS (TYPICAL)

RADIATOR ISOLATION VALVES (TYPICAL)

HIGH-VOLTAGE NEUTRAL (H0) BUSHING

LOW-VOLTAGE BUSHINGS

COVER

COVER

COVER

OIL LEVEL INDICATOR

AS DES.

AS DES.

CONTROL CABINET

3-INCH MAIN OIL DRAIN VALVE

1.5-INCH LOWER FILTER VALVE

EXAMPLE MODEL NUMBER

33 4, COVER

ABB-HITACHI

ABB-HITACHI

XPRDPRESSURE RELIEF DEVICE WITH DISCHARGE PIPING

MILWAUKEE VALVE F20SS, CLASS 150

MILWAUKEE VALVE F20SS, CLASS 150

QUALITROL SERIES 042

BILL OF MATERIALS

TYPE RJ BUSHING T025B0750EC

2,4

2,4

35 THERMOWELLS (QTY. 3 - STANDARD, QTY. 2 - HEATED)

TYPE O+ C BUSHING T550W2000VV

MILWAUKEE VALVE

A2

SEGMENT 3TRANSFORMER ELEVATION VIEW -

1/2"=1'-0"SCALE:

17 1 3 POWER CABINET

19 3 3 ANALOG TEMPERATURE GAUGES QUALITROL

21 1 3 RAPID PRESSURE RISE RELAY QUALITROL 900-003-01

38 1 3 TRANSFORMER NAMEPLATE

49 4 1, 3 GROUNDING PADS (TYPICAL)

70 1 3 AUXILIARY POWER TRANSFORMER

SEE RESOURCE DRAWINGS FOR THE MOUNTING PAD DETAILS5.

MAXIMUM WEIGHT: 352,000 POUNDS4.

ARE NOT INTENDED TO INDICATE THE ACTUAL QUANTITY.

3. THE RADIATORS AS DEPICTED INDICATE THE PERMISSIBLE LOCATIONS, AND

BREATHER, AND BUCHHOLZ RELAY.

SYSTEM MUST BE INCLUDED, SUCH AS A MAINTENACE-FREE DEHYDRATING

REQUIRED IN SECTION 48 19 23.08 26 FOR A CONSTANT OIL PRESERVATION

OIL PRESERVATION SYSTEM IS PROVIDED, ALL ASSOCIATED EQUIPMENT

THE POWERHOUSE EQUIPMENT NEEDED TO FIT THE COPS TANK. IF CONSTANT

CONDUCTORS PER IEEE STD 1427. THERE SHALL BE NO MODIFICATIONS TO

MUST MAINTAIN A MINIMUM OF 105" CLEARANCE FROM THE OVERHEAD 500KV

THE DIMENSIONAL REQUIREMENTS IDENTIFIED MUST BE MET. THE COPS TANK

TRANSFORMER AND/OR A CONSTANT OIL PRESERVATION SYSTEM IS PROVIDED,

DRAWINGS WITH AN INERT-GAS OIL PRESERVATION SYSTEM. IF A CORE-FORM

THE DRAWING SHOWN IS BASED ON THE WESTINGHOUSE SHELL-FORM2.

I. MAXIMUM OVERAL WIDTH

H. STRUCTURAL BASE INCLUDING WIDTH

G. JACKING FACILITIES

F. ANCILLARY DEVICES

E. CONTROL AND POWER CABINETS

LOW VOLTAGE BUS

D. LOW-VOLTAGE BUSHING HOUSING DIMENSIONS AND LOCATION OF

CONNECTION

C. HIGH-VOLTAGE NEUTRAL BUSHING LOCATION AND TERMINAL

B. LOW-VOLTAGE BUSHING LOCATIONS AND TERMINAL CONNECTIONS

A. HIGH-VOLTAGE BUSHING LOCATION AND TERMINAL CONNECTION

TO ASSURE PROPER INTERCONNECTION:

OF THE FOLLOWING TRANSFORMER EQUIPMENT ARE CONSIDERED CRITICAL

. THE LOCATIONSIN THE TRANSFORMER VAULT

INTERFACES PROPER INTERCONNECTION TO THE EXISTING EQUIPMENT AND

FOR THE MANUFACTURER'S USE IN DESIGNING THE TRANSFORMER FOR

1. THE TRANSFORMER LAYOUT AND LIMITING DIMENSIONS HAVE BEEN PROVIDED

GENERAL NOTES

CL

CL

A16

IDENTIFICATION (TOP VIEW)

FIGURE 1 - TRANSFORMER TANK SEGMENT

SCALE: NTS

CL

O C

T O

B E

R

COMBINATION JACKING PAD, PULLING EYE AND LIFTING EYES73 4 1, 3

COMBINATION UPRIGHTING AND LIFTING EYES FOR UPRIGHTING AND LIFTING COMPLETE UNIT74 2 3

HORIZONTAL LIFTING EYES FOR LIFTING COMPLETE UNIT WHEN IN HORIZONTAL POSITION75 2 3

77 1 3 EXTERNAL GAS EXPANSION TANK

ABB-HITACHI

TYPE O+ C BUSHING T025W0412AT

43 AS DES. BASE SKID-TYPE STRUCTURAL BASE

A L

F

IL

E N

U M

B E

R

F

IL

E N

A M

E

D S

P

D

:5

:3

A

M

/1 /2

L G

E

-1 .d g n

A N

S

L O

W E

R S

N A

K E

R

IV

E R

S P

A R

E T

R A

N S

F O

R M

E R

S

L

IT

T L

E G

O O

S E

L O

C K

A N

D D

A M

W

E F

R A

L L

A W

A L

L A

W

A S

H

IN

G T

O N

N

R

D A

V E

W A

L L

A W

A L

L A

D

IS

T R

IC

T

P O

R T

L A

N D

O

R E

G O

N

S

W

S T

A V

E

H Y

D R

O E

L E

C T

R

IC

D E

S

IG

N C

E N

T E

R

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

J O

R D

A N

S F

IN

K

P

.E

S E

G M

E N

T

IN

S T

A L

L

L A

Y O

U T

A N

D L

IM

IT

IN

G

D

IM

E N

S

IO

N S

G S

U T

R A

N S

F O

R M

E R

E-105

M

G U

N D

R U

M

S

C O

T N

E R

P

E

-1

.d g n

L G

P -1

-6 -1

A /5

P

K L

E

IN

E

P

O C

T O

B E

R

/8

T O

T H

E C

E N

T E

R O

F T

H E

T O

P O

F T

H E

H V

B U

S H

IN

G

T E

R M

IN

A

L

/4

T

O T

O P

O F

T H

E H

V N

E U

T R

A L

B U

S H

IN

G

/2

T

O T

O P

O F

L V

B U

S H

IN

G

T E

R M

IN

A

L

/8

T

O T

O P

O F

L V

H O

U S

IN

G

F L

A N

G E

EMBEDDED CONDUIT

7' 10 3/4 " TO CENTER OF CUSTOMER'S

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

S U

B M

IT

T

E D

B Y

C H

E C

K E

D B

Y

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

IS

S

U E

D A

T E

S I Z

E

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

®of Engineers

US Army Corps

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

SHEET ID

SEGMENT 2 SEGMENT 4

BUSHING SIDE)

(LOW-VOLTAGE

SEGMENT 1

BUSHING SIDE)

(HIGH-VOLTAGE

SEGMENT 3

A1

SEGMENT 4TRANSFORMER ELEVATION VIEW -

1/2"=1'-0"SCALE:

SEGMENT

1 HIGH-VOLTAGE (H1) BUSHING1

QTYITEM DESCRIPTION

RADIATORS (TYPICAL)

HIGH-VOLTAGE NEUTRAL (H0) BUSHING

LOW-VOLTAGE BUSHINGS

COVER

COVER

COVER

OIL LEVEL INDICATOR

AS DES.

POWER CABINET

EXAMPLE MODEL NUMBER

ABB-HITACHI

ABB-HITACHI

MILWAUKEE VALVE F20SS, CLASS 150

QUALITROL SERIES 042

BILL OF MATERIALS

TYPE RJ BUSHING T025B0750EC

2,4

15 1 1 DUAL TANK NITROGEN REGULATOR CABINET ABB RND2

2 2-INCH DISSOLVED GAS-IN-OIL MONITOR INTERFACE VALVES

TYPE O+ C BUSHING T550W2000VV

10 COVER HORIZONTAL DRAFT COOLING FANS (TYPICAL) KRENZ-VENTAS DES.

16 1 3 CONTROL CABINET

21 1 3 RAPID PRESSURE RISE RELAY QUALITROL 900-003-01

43 AS DES. BASE STRUCTURAL BASE

TYPE O+ C BUSHING T025W0412AT

49 4 2,4 GROUNDING PAD (TYPICAL)

33 QUALITROL XPRD4,COVER1 PRESSURE RELIEF DEVICE WITH DISCHARGE PIPING

CL

27 1 1 1.5-INCH LOWER FILTER VALVE MILWAUKEE VALVE F20SS, CLASS 150

70 1 3 AUXILIARY POWER TRANSFORMER

A16

IDENTIFICATION (TOP VIEW)

FIGURE 1 - TRANSFORMER TANK SEGMENT

SCALE: NTS

5. SEE RESOURCE DRAWINGS FOR PAD DETAILS.

4. MAXIMUM WEIGHT: 352,000 POUNDS

ARE NOT INTENDED TO INDICATE THE ACTUAL QUANTITY.

3. THE RADIATORS AS DEPICTED INDICATE THE PERMISSIBLE LOCATIONS, AND

BREATHER, AND BUCHHOLZ RELAY.

SYSTEM MUST BE INCLUDED, SUCH AS A MAINTENACE-FREE DEHYDRATING

REQUIRED IN SECTION 48 19 23.04 26 FOR A CONSTANT OIL PRESERVATION

OIL PRESERVATION SYSTEM IS PROVIDED, ALL ASSOCIATED EQUIPMENT

THE POWERHOUSE EQUIPMENT NEEDED TO FIT THE COPS TANK. IF CONSTANT

CONDUCTORS PER IEEE STD 1427. THERE SHALL BE NO MODIFICATIONS TO

MUST MAINTAIN A MINIMUM OF 105" CLEARANCE FROM THE OVERHEAD 500KV

THE DIMENSIONAL REQUIREMENTS IDENTIFIED MUST BE MET. THE COPS TANK

TRANSFORMER AND/OR A CONSTANT OIL PRESERVATION SYSTEM IS PROVIDED,

DRAWINGS WITH AN INERT-GAS OIL PRESERVATION SYSTEM. IF A CORE-FORM

THE DRAWING SHOWN IS BASED ON THE WESTINGHOUSE SHELL-FORM2.

J. LOCATION OF EMBEDDED CONDUIT

I. MAXIMUM OVERALL LENGTH

H. STRUCTURAL BASE

G. JACKING & LIFTING FACILITIES

F. ANCILLARY DEVICES

E. CONTROL AND POWER CABINETS

D. LOW VOLTAGE BUSHING HOUSING FLANGE DIMENSIONS AND LOCATION

C. LOW-VOLTAGE BUSHINGS LOCATIONS AND TERMINAL CONNECTIONS

B. HIGH-VOLTAGE NEUTRAL BUSHING LOCATION AND TERMINAL CONNECTION

A. HIGH-VOLTAGE BUSHING LOCATION AND TERMINAL CONNECTION

INTERCONNECTION:

TRANSFORMER EQUIPMENT ARE CONSIDERED CRITICAL TO ASSURE PROPER

THE TRANSFORMER VAULT. THE LOCATIONS OF THE FOLLOWING

PROPER INTERCONNECTION TO THE EXISTING EQUIPMENT AND INTERFACES IN

FOR THE MANUFACTURER'S USE IN DESIGNING THE TRANSFORMER FOR

1. THE TRANSFORMER LAYOUT AND LIMITING DIMENSIONS HAVE BEEN PROVIDED

GENERAL NOTES

72 2 1 STABILIZING EYES

73 4 1, 3 COMBINATION JACKING PAD, PULLING EYE, AND LIFTING EYES

74 2 3 COMBINATION UPRIGHTING AND LIFTING EYES FOR UPRIGHTING AND LIFTING COMPLETE UNIT

75 2 3 HORIZONTAL LIFTING EYES FOR LIFTING COMPLETE UNIT WHEN IN HORIZONTAL POSITION

76 2 1 COMBINATION ROCKER AND JACKING PADS FOR UPRIGHTING AND JACKING COMPLETE UNIT

77 1 3 EXTERNAL GAS EXPANSION TANK

26 MILWAUKEE VALVE F20SS, CLASS 15031 2-INCH DISSOLVED GAS-IN-OIL MONITOR INTERFACE VALVE

25 1 3 3-INCH MAIN OIL DRAIN VALVE MILWAUKEE VALVE F20SS, CLASS 150

ABB-HITACHI

19 1 3 QUALITROL TR6000 SERIES

CL

ANALOG TEMPERATURE GAUGES

CORE & CORE FRAME GROUND BUSHINGSCOVER7 AS DES.

A L

F

IL

E N

U M

B E

R

F

IL

E N

A M

E

D S

P

D

:5

:3

A

M

/1 /2

L G

E

-1 .d g n

A N

S I

D

F

IN

L O

W E

R S

N A

K E

R

IV

E R

S P

A R

E T

R A

N S

F O

R M

E R

S

L

IT

T L

E G

O O

S E

L O

C K

A N

D D

A M

W

E F

R A

L L

A W

A L

L A

W

A S

H

IN

G T

O N

N

R

D A

V E

W A

L L

A W

A L

L A

D

IS

T R

IC

T

P O

R T

L A

N D

O

R E

G O

N

S

W

S T

A V

E

H Y

D R

O E

L E

C T

R

IC

D E

S

IG

N C

E N

T E

R

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

J O

R D

A N

S F

IN

K

P

.E

IN

S

T A

W E

R A

N D

C O

N T

R O

L C

A B

IN

E

T S

E-106

M

G U

N D

R U

M

S

C O

T N

E R

P

E

-1

.d g n

L G

P -1

-6 -1

A /6

P

K L

E

IN

E

P

TEMPERED GLASS

RUBBER SEAL

CLAYTONRITE-TYPE

ENCLOSURE PANEL

SECURING STRIP

SEE NOTE 2

SEE DETAIL A7

WINDOW SEAL

DOOR)

(INSIDE CABINET

COMPUTER TRAY

FOLD-DOWN

43TF

FRAMEWORK

CABINET MOUNTING

FRAMEWORK

CABINET MOUNTING

TANK SIDEWALL

TRANSFORMER

DRIP CHANNEL

SHIELD

RAIN AND DRIP

GASKET SEAL

SHIELDING

SOLAR

DOOR

INSIDE CABINET

DRAWING POCKET

O C

T O

B E

R

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

S U

B M

IT

T

E D

B Y

C H

E C

K E

D B

Y

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

IS

S

U E

D A

T E

S I Z

E

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

®of Engineers

US Army Corps

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

SHEET ID

120 VAC & 125 VDC CONTROL CABINET480 VAC POWER CABINET

(FUTURE)

TO POWER PLANT

CONNECTIONS

CONDUIT

EXTERNAL

CONTROL CABINETS

POWER AND

DISPLAY.

A WEATHERPROOF SEAL FOR VIEWING OF A FUTURE INSTALLED ANNUNCIATOR

8. THE RIGHT CONTROL CABINET DOOR IS TO HAVE A TEMPERED GLASS WINDOW WITH

TEMPERATURE MONITOR AND COOLING CONTROL SYSTEM DISPLAY.

WEATHERPROOF SEAL FOR VIEWING OF A FUTURE INSTALLED ELECTRONIC

7. THE LEFT CONTROL CABINET DOOR IS TO HAVE A TEMPERED GLASS WINDOW WITH A

MANUAL DRAWINGS.

WHEN STOWED. THE LEFT DOOR IS TO HAVE A POCKET SIZED TO HOLD THE O&M

IN A HORIZONTAL POSITION WHEN LOWERED, AND A MEANS FOR LATCHING THE TRAY

OF THE DOOR. THE TRAY IS TO INCLUDE FOLDING HINGES WHICH SECURE THE TRAY

6. THE RIGHT DOOR IS TO HAVE A DROP DOWN LAPTOP TRAY MOUNTED ON THE INSIDE

USING VIBRATION ISOLATORS.

. THE CONTROL AND POWER CABINETS ARE TO BE MOUNTED TO A FRAME STRUCTURE5

POWER CABINETS SHALL ONLY ENTER EACH CABINET THROUGH THE BASE.

4. ALL CONDUIT ROUTING FROM THE TRANSFORMER DEVICES TO THE CONTROL AND

CONDUIT.

GASKETED REMOVABLE PLATES FOR THE PURPOSES OF FUTURE FIELD FITTING OF

REPRESENTATIVE PURPOSES ONLY. THE BASE OF EACH CABINET IS TO HAVE

3. EXTERNAL CONDUIT CONNECTIONS TO THE POWER PLANT ARE SHOWN FOR

2. SPACE FOR ARC FLASH LABEL (PROVIDED BY THE GOVERNMENT).

BUILT IN ACCORDANCE WITH UL 508A STANDARD.

1. THE TRANSFORMER CONTROL AND POWER CABINETS ARE TO BE DESIGNED AND

COOLING GROUP ON-OFF-AUTO SELECTOR SWITCH43TF

G1

FRONT VIEW

CONTROL AND POWER CABINETS

SCALE: NTS

G8

SIDE VIEW

CONTROL AND POWER CABINETS

SCALE: NTS

G15

DOOR SEAL

TYPICAL CABINET

SCALE: NTS

A8

WINDOWS SEAL

TYPICAL CLAYTONRITE-TYPE

SCALE: NTS

GENERAL NOTES

LEGEND

A L

F

IL

E N

U M

B E

R

F

IL

E N

A M

E

D S

P

D

:5

:4

A

M

/1 /2

L G

E

-1 .d g n

A N

S

L O

W E

R S

N A

K E

R

IV

E R

S P

A R

E T

R A

N S

F O

R M

E R

S

L

IT

T L

E G

O O

S E

L O

C K

A N

D D

A M

W

E F

R A

L L

A W

A L

L A

W

A S

H

IN

G T

O N

N

R

D A

V E

W A

L L

A W

A L

L A

D

IS

T R

IC

T

P O

R T

L A

N D

O

R E

G O

N

S

W

S T

A V

E

H Y

D R

O E

L E

C T

R

IC

D E

S

IG

N C

E N

T E

R

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

J O

R D

A N

S F

IN

K

P

.E

IN

S

T A

N T

R O

L C

A B

IN

E

T L

A Y

O U

T

E-107

M

G U

N D

R U

M

S

C O

T N

E R

P

E

-1

.d g n

L G

P -1

-6 -1

A /7

P

K L

E

IN

E

P

A F

B EC

G

D

B

A

C D E

F

G

5453 55 56

6352 64

59 62

59 62

59 62

CABINET LIGHT

TRANSFORMER MOUNTED CONDUIT

AREA FOR INSTALLATION OF

WIRING TO POWER CABINET

BUSHING FOR 120 VAC

WIREWAY HOLE WITH

INSTALLATION TO POWER PLANT

PLATE FOR CONDUIT

AND GASKETED BOTTOM

REMOVABLE BOLTED

O C

T O

B E

R

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

S U

B M

IT

T

E D

B Y

C H

E C

K E

D B

Y

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

IS

S

U E

D A

T E

S I Z

E

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

®of Engineers

US Army Corps

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

SHEET ID

DESCRIPTION

QUALITROL QTMS

MOLDED-CASE CIRCUIT BREAKERS

AUXILIARY RELAYS

INTERPOSING RELAY FOR LOCKOUT RELAY GENERAL ELECTRIC

TERMINAL BLOCKS - CONTROL SIGNAL TYPE

TERMINAL BLOCKS - POWER DISTRIBUTION TYPE

FUSES

FUSEHOLDERS

CABINET HEATER

ELECTROSWITCH SERIES 24

UNDERVOLTAGE RELAY

RECEPTACLE WITH GFCI HUBBELL GFR8300SGW

MARATHON SERIES 142

TIME MARK

BUSSMAN

BUSSMAN

WAUKESHA PTC2

FAL

C26(XX)

HMA

LPJ

JTN600(XX)

TIME DELAY RELAY AGASTAT SERIES 7000

ELECTRONIC COOLING CONTROL (FUTURE)

LOCAL ANNUNCIATOR PANEL (FUTURE) SEL 2533

COOLING GROUP SELECTOR SW (DEVICE 43TF)

TERMINAL BLOCKS - SHORT CIRCUIT

GROUND BUS BAR - -

AS REQ'D

AS REQ'D

AS REQ'D

AS REQ'D

AS REQ'D

AS REQ'D

AS REQ'D

AS REQ'D

AS REQ'D

AS REQ'D

BILL OF MATERIALS - CONTROL CABINET COMPONENTS

HUMIDISTAT / THERMOSTAT (DEVICE 23-1)

SQUARE D

SQUARE D 8501, TYPE X

STATES TYPE NT, CLASS 250

STATES TYPE NT, CLASS 251-G

HAMMOND MFG SKTH012009-C

ITEM QTY EXAMPLE MODEL NUMBER

6. THE REMOVABLE BOTTOM PLATE THICKNESS IS TO BE 10 GAUGE, MINIMUM.

CABINET.

5. THE GFCI OUTLET IS TO BE ACCESSIBLE ONLY FROM INSIDE OF THE CONTROL

THROUGH A WATERPROOF VIEWING GLASS IN THE RIGHT CONTROL CABINET DOOR.

ANNUNCIATOR MOUNTED ON THE SWING PANEL SO THAT THE FRONT IS VISIBLE

4. THE CONTROL CABINET IS TO BE DESIGNED FOR THE FUTURE INSTALLATION OF ONE

THE LEFT CONTROL CABINET DOOR.

PANEL SO THAT THE FRONT IS VISIBLE THROUGH A WATERPROOF VIEWING GLASS IN

CONTROL CABINET, WITH AN HMI MODULE REMOTELY MOUNTED ON THE SWING

ELECTRONIC COOLING CONTROL SYSTEM IN A REAR MOUNT CHASSIS IN THE

3. THE CONTROL CABINET IS TO BE DESIGNED FOR THE FUTURE INSTALLATION OF AN

THE ACTUAL LAYOUT MAY BE MODIFIED BY THE CONTRACTOR.

2. THE CONTROL CABINET LAYOUT AS SHOWN IS FOR ILLUSTRATIVE PURPOSES ONLY.

BUILT IN ACCORDANCE WITH UL 508A STANDARD.

1. THE TRANSFORMER CONTROL AND POWER CABINETS ARE TO BE DESIGNED AND

LH BACK PANEL RH BACK PANEL RH SIDE PANEL

(FRONT VIEW)

RIGHT SWING PANEL

BLOCKS

TERMINAL

RESISTORS

CALIBRATION

ANALOG WTI

BLOCKS

TERMINAL

BLOCKS

TERMINAL

BLOCKS

TERMINAL

TRANSFORMER

CURRENT

BLOCKS

TERMINAL

BREAKERS

CIRCUIT

DEVICES

RELAYS AND

AUXILIARY

BOTTOM PANEL

COMPONENTS

SYSTEM

COOLING CONTROL

ELECTRONIC

FUTURE

HEATERHEATER

(FRONT VIEW)

LEFT SWING PANEL

LH SIDE PANEL

OUTLET

65 67

GENERAL NOTES

K2

CONTROL CABINET TOP VIEW

SCALE: NTS

A1

CONTROL CABINET LAYOUT

A L

F

IL

E N

U M

B E

R

F

IL

E N

A M

E

D S

P

D

:5

:4

A

M

/1 /2

L G

E

-1 .d g n

A N

S I

D

F

IN

L O

W E

R S

N A

K E

R

IV

E R

S P

A R

E T

R A

N S

F O

R M

E R

S

L

IT

T L

E G

O O

S E

L O

C K

A N

D D

A M

W

E F

R A

L L

A W

A L

L A

W

A S

H

IN

G T

O N

N

R

D A

V E

W A

L L

A W

A L

L A

D

IS

T R

IC

T

P O

R T

L A

N D

O

R E

G O

N

S

W

S T

A V

E

H Y

D R

O E

L E

C T

R

IC

D E

S

IG

N C

E N

T E

R

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

J O

R D

A N

S F

IN

K

P

.E

IN

S

T A

W E

R C

A B

IN

E

T L

A Y

O U

T

E-108

M

G U

N D

R U

M

S

C O

T N

E R

P

E

-1

.d g n

L G

P -1

-6 -1

A /8

P

K L

E

IN

E

P

A C

B

D

52 71

A B C

59 62

59 62

CABINET

WIRING TO CONTROL

BUSHING FOR 120 VAC

WIREWAY HOLE WITH

CABINET LIGHT

TRANSFORMER MOUNTED CONDUIT

AREA FOR INSTALLATION OF

INSTALLATION TO POWER PLANT

PLATE FOR CONDUIT

GASKETED BOTTOM

REMOVABLE BOLTED AND

63 64

O C

T O

B E

R

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

S U

B M

IT

T

E D

B Y

C H

E C

K E

D B

Y

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

IS

S

U E

D A

T E

S I Z

E

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

®of Engineers

US Army Corps

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

SHEET ID

MAGNETIC CONTACTORS

MOLDED-CASE CIRCUIT BREAKERS

TERMINAL BLOCKS - CONTROL SIGNAL TYPE

TERMINAL BLOCKS - POWER DISTRIBUTION TYPE

FUSES

FUSEHOLDERS

CABINET HEATER

MARATHON SERIES 142

BUSSMAN

BUSSMAN

WAUKESHA PTC2

KHL

LPJ

JTN600(XX)

BILL OF MATERIALS - POWER CABINET COMPONENTS

AS REQ'D

AS REQ'D

AS REQ'D

AS REQ'D

AS REQ'D

AS REQ'D

AS REQ'D

AS REQ'D

1 GROUND BUS BAR - -

66 HUMIDISTAT / THERMOSTAT (DEVICE 23-2)

SQUARE D

STATES TYPE NT, CLASS 250

HAMMOND MFG SKTH012009-C

SQUARE D

ITEM QTY DESCRIPTION EXAMPLE MODEL NUMBER

3. THE REMOVABLE BOTTOM PLATE THICKNESS SHALL BE 10 GAUGE, MINIMUM.

TERMINAL BLOCKS SHALL BE MOUNTED IN THE 480 VAC POWER CABINET.

INCLUDING THE MOLDED-CASE CIRCUIT BREAKERS, CONTACTORS AND POWER

2. ALL 480 VAC PROTECTIVE AND CONTROL EQUIPMENT FOR THE COOLING FANS,

BY THE CONTRACTOR.

1. THE LAYOUT SHOWN IS FOR ILLUSTRATIVE PURPOSES ONLY AND MAY BE MODIFIED

BOTTOM PANEL

AND FAN CONTROL)

LIGHTS, HEATER

(WIRING FOR

BLOCKS

TERMINAL

120 VAC

CONTACTORS

FAN MOTOR

BREAKERS AND

CIRCUIT

BLOCKS

TERMINAL

BLOCKS

TERMINAL

LH SIDE PANEL RH SIDE PANELBACK PANEL

HEATER

FUSE HOLDERS

FUSES AND

A7

POWER CABINET - TOP VIEW

SCALE: NTS

A12

POWER CABINET LAYOUT

A L

F

IL

E N

U M

B E

R

F

IL

E N

A M

E

D S

P

D

:5

:5

A

M

/1 /2

L G

E

-1 .d g n

A N

S

L O

W E

R S

N A

K E

R

IV

E R

S P

A R

E T

R A

N S

F O

R M

E R

S

L

IT

T L

E G

O O

S E

L O

C K

A N

D D

A M

W

E F

R A

L L

A W

A L

L A

W

A S

H

IN

G T

O N

N

R

D A

V E

W A

L L

A W

A L

L A

D

IS

T R

IC

T

P O

R T

L A

N D

O

R E

G O

N

S

W

S T

A V

E

H Y

D R

O E

L E

C T

R

IC

D E

S

IG

N C

E N

T E

R

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

J O

R D

A N

S F

IN

K

P

.E

IN

S

T A

L L

L A

Y O

U T

A N

D D

E T

A

IL

S

T R

A N

S F

O R

M E

R M

O U

N T

E D

D E

V

IC

E S

E-109

M

G U

N D

R U

M

S

C O

T N

E R

P

E

-1

.d g n

L G

P -1

-6 -1

A /9

P

K L

E

IN

E

P

FUTURE DGA SYSTEM

LOAD SENSING CT FOR

FUTURE LOCATION OF

DGA SYSTEM

LOAD SENSING CT FOR

FUTURE LOCATION OF

TEMPERATURE MONITOR

FUTURE ELECTRONIC

LOAD SENSING CT FOR

FUTURE LOCATION OF

TEMPERATURE MONITOR

FUTURE ELECTRONIC

LOAD SENSING CT FOR

FUTURE LOCATION OF

O C

T O

B E

R

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

S U

B M

IT

T

E D

B Y

C H

E C

K E

D B

Y

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

IS

S

U E

D A

T E

S I Z

E

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

®of Engineers

US Army Corps

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

SHEET ID

(90 C)

SW. #2

(SEE NOTE 2)

SW. #1

(117 C)

SW. #3

(LOW-LOW LEVEL)

SW. #2

(LOW LEVEL)

SW. #1

PRESSURE

LOW

PRESSURE

HIGH

(UNUSED)

SW. #2

(90 C)

SW. #1

(< 200 PSI)

EMPTY CYLINDER

BULB

HEATER

WELL

BULB NOT REQUIRED, AND ALARMS FOR BUCHHOLZ RELAY SHALL BE INCLUDED.

TANK SYSTEM IS PROVIDED, THE ALARMS FOR NITROGEN PRESSURE SYSTEM ARE

THE DRAWINGS SHOWN ARE FOR A NITROGEN SYSTEM. IF A CONSERVATOR3.

ONAN RATING.

BE BASED UPON THE RESULTS OF THE FACTORY TEMPERATURE RISE TESTS AT THE

2. THE WINDING TEMPERATURE SETTING FOR ENERGIZING THE COOLING FANS IS TO

TERMINATED ON SHORTING TERMINAL BLOCKS.

SECONDARY WIRING IS TO BE ROUTED TO THE CONTROL CABINET AND

1. ALL BUSHING CURRENT TRANSFORMERS AND CURRENT TRANSFORMER

(BELOW)

DIAGRAM

SEE CT

(DEVICE 49Q1)

THERMOWELL

HEATED

TOP OIL THERMOWELLS

(DEVICE 26Q1)

THERMOWELL

(DEVICE 26Q2)

WITH NPT PLUG

THERMOWELL

(DEVICE 49WT1)

WINDING TEMPERATURE INDICATOR

(DEVICE 26Q)

OIL TEMPERATURE INDICATOR

BOTTOM OIL THERMOWELL

(DEVICE 26Q3)

THERMOWELL

63RPR

(49WT2)

HEATER

THERMOWELL

WINDINGS ASSEMBLY

TRANSFORMER CORE AND

(TYPICAL)

SEE NOTE 1

BCT-H1

BCT-H4

CT-Y1 49R2 49Q2

H1

Y1

(DEVICE 63PR)

PRESSURE RELIEF DEVICE

(ALARM)

SW. #1

(TRIP)

SW. #2

(DEVICE 71Q)

OIL LEVEL INDIATOR

TS2

(DEVICE 63NR)

NITROGEN PRESSURE REGULATOR

2 3 1 6 4 5 8 9 7

GOVERNMENT

DEVICES AND WIRING TO BE INSTALLED IN THE FUTURE BY THE

LOW-VOLTAGE BUSHINGY1

LOW-VOLTAGE BUSHINGX1

TEST SWITCHTS_

TERMINAL BLOCKSTB_

SWITCHSW

RESISTANCE TEMPERATURE DETECTORRTD

HIGH-VOLTAGE BUSHINGH1

HIGH-VOLTAGE NEUTRAL BUSHINGH0

CURRENT TRANSFORMERSCT_

MULTI-RATIO BUSHING CURRENT TRANSFORMERSBCT_

DISSOLVED GAS ANALYZERDGA

GAS-IN-OIL MONITOR95

TRIP AUXILIARY RELAY94X

OIL LEVEL INDICATOR71Q

RAPID PRESSURE RISE RELAY TRIP63X2

RAPID PRESSURE RISE RELAY ALARM63X1

RAPID PRESSURE RISE RELAY SEAL-IN RELAY63RPR-SI

RAPID PRESSURE RISE RELAY63RPR

PRESSURE RELIEF DEVICE63PR

NITROGEN PRESSURE REGULATOR63NR

ANALOG WINDING TEMPERATURE INDICATORS49WT1,2

CALIBRATION DEVICES49R1,2

HEATED THERMOWELLS49Q1,2

ANNUNCIATOR30

UNDERVOLTAGE RELAY27

THERMOWELLS26Q1,2,3

ANALOG OIL TEMPERATURE INDICATOR26Q

(BELOW)

DIAGRAM

SEE CT

(DEVICE 49Q2)

THERMOWELL

HEATED

(DEVICE 49WT2)

WINDING TEMPERATURE INDICATOR

(90 C)

SW. #2

(SEE NOTE 2)

SW. #1

(117 C)

SW. #3

BULB

HEATER

WELL

TEMP MONITOR)

(SPARE FOR FUTURE

(DEVICE 26Q2)

WITH NPT PLUG

THERMOWELL

(SPARE)

TEMP MONITOR)

(SPARE FOR FUTURE

(49WT1)

HEATER

THERMOWELL

CT-X149R149Q1

X1

TS1

A1

THERMOWELLS

CURRENT TRANSFORMERS AND HEAT

SCALE: NTS

GENERAL NOTES

LEGEND

(DEVICE 30)

(FUTURE)

ANNUNCIATOR

(TO POWERPLANT)

TRANS. TRIP

A N

N T

B :4

A N

N T

B :5

FANS

COOLING

(TO POWERPLANT)

TRANS. TRIP

FANS

COOLING

(DEVICE 30)

(FUTURE)

ANNUNCIATOR

A N

N T

B :7

A N

N T

B :6

(DEVICE 30)

(FUTURE)

ANNUNCIATOR

A N

N T

B :4

A N

N T

B :3

(DEVICE 30)

(FUTURE)

ANNUNCIATOR

A N

N T

B :1

A N

N T

B

:1

(UNUSED)

SW. #2

SW. #1

(DEVICE 27-1)

UNDERVOLTAGE RELAY

1 2 1 2

(DEVICE 30)

(FUTURE)

ANNUNCIATOR

A N

N T

B :8

A N

N T

B :9

A N

N T

B

:1

A N

N T

B

:1

(DEVICE 30)

(FUTURE)

ANNUNCIATOR

(DEVICE 30)

(FUTURE)

ANNUNCIATOR

(DEVICE 30)

(FUTURE)

ANNUNCIATOR

A N

N T

B :3

A N

N T

B :2

A N

N T

B :3

A N

N T

B :2

TB1:1 TB1:3

(DEVICE 94X)

TRANSFORMER TRIP

(DEVICE 63RPR-SI)

SEAL-IN RELAY

RAPID PRESSURE RISE

ALARM (63X1) UNUSED

RAPID PRESSURE RISE

TRIP (63X2)

RAPID PRESSURE RISE

876 109

ALARM RELAY 1

(DEVICE 95)

GAS-IN-OIL MONITOR

(FUTURE)

14 11/13

A N

N T

B :5

A N

N T

B :4

ALARM RELAY 2

14 11/13 12

A N

N T

B :5

A N

N T

B :4

(DEVICE 30)

(FUTURE)

ANNUNCIATOR

(DEVICE 30)

(FUTURE)

ANNUNCIATOR

A L

F

IL

E N

U M

B E

R

F

IL

E N

A M

E

D S

P

D

:5

:5

A

M

/1 /2

L G

E

-6 .d g n

A N

S

L O

W E

R S

N A

K E

R

IV

E R

S P

A R

E T

R A

N S

F O

R M

E R

S

L

IT

T L

E G

O O

S E

L O

C K

A N

D D

A M

W

E F

R A

O C

T O

B E

R

L L

A W

A L

L A

W

A S

H

IN

G T

O N

N

R

D A

V E

W A

L L

A W

A L

L A

D

IS

T R

IC

T

P O

R T

L A

N D

O

R E

G O

N

S

W

S T

A V

E

H Y

D R

O E

L E

C T

R

IC

D E

S

IG

N C

E N

T E

R

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

J O

R D

A N

S F

IN

K

P

.E

IN

S

T A

N T

R O

L S

C H

E M

A T

IC

S

E-601

M

G U

N D

R U

M

S

C O

T N

E R

P

E

-6

.d g n

L G

P -1

-6 -1

A /1

P

K L

E

IN

E

P

480 VAC POWER CABINET

LOCATED IN

POWER CABINET

ADJACENT TO

MOUNTED ON TANK

LOCATED IN POWERHOUSE

TRIP COIL MONITORING

EXISTING LOCKOUT RELAY WITH

480 VAC POWER CABINET

LOCATED IN

POWER CABINET

LOCATED IN 480 VAC

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

S U

B M

IT

T

E D

B Y

C H

E C

K E

D B

Y

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

IS

S

U E

D A

T E

S I Z

E

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

®of Engineers

US Army Corps

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

SHEET ID

DS-1

H T

R

LT1 LT2

23-1

DS-2

H T

R

LT3

23-2

DS-3

LIGHTS

CABINET

CONTROL

52-6

HEATER

CABINET

CONTROL

52-7

27-1

X1

V

LIGHT

CABINET

POWER

52-4

HEATER

CABINET

POWER

52-5

FUSE

H T

R

20A

GFCI

OUTLET

RECEPTACLE

CABINET

CONTROL

52-8

(DGA)

POWER

MONITOR

GAS-IN-OIL

FUTURE

V

480VAC - 120VAC

POWER TRANSFORMER

AUXILIARY

H4

H1 X3

SHEILD

ELECTROSTATIC

72-1

P D

B

P D

B

42 TO POWERHOUSE 86TX

NOTE 1)

(SEE

94X

94X

SYSTEM

MONITORING

ELECTRONIC

FUTURE

V

D C

G O

V E

R N

M E

N T

F U

R N

IS

H

E D

C O

N T

R O

L P

O W

E R

94X POWERHOUSE 86TX

125C

WT1

RESET

63RPR-SI

TB3

PWR

63RPR

86TX 23

IN THE POWERHOUSE. SEE SHEET E-603 FOR TERMINAL DETAILS.

4. THE 86TX TRANSFORMER LOCKOUT AND ASSOCIATED CONTACTS ARE LOCATED IN

DESIGN MAY DIFFER FROM VALUES SHOWN.

3. KVA VALUES SHOWN ARE FOR ILLUSTRATION PURPOSES ONLY. THE CONTRACTOR

2. DETAILED WIRING DESIGN SHALL BE PERFORMED BY CONTRACTOR.

OUTPUTS WILL BE WIRED IN PARALLEL WITH THE 49WT CONTACTS IN THE FUTURE.

THE LOCKOUT RELAY SOLENOID EXCEEDS THE RATING OF THE ETM. THE ETM

OUTPUT RELAY CONTACTS THAT WILL BE INSTALLED IN THE FUTURE. THE BURDEN OF

LOCKOUT WITHOUT OVERLOADING THE ELECTRONIC TEMPERATURE MONITOR (ETM)

1. THE PURPOSE OF THE 94X AUXILIARY RELAY IS TO ALLOW FOR TRIPPING OF THE 86T

RISE

FAST PRESSURE

RISE

SLOW PRESSURE

125C

WT2

TX

TX

HR

(FUTURE)

RELAY

ETM

(15A)

DGA

52-9

(5A)

ETM

72-2

A6

125 VDC CONTROL SCHEMATIC

SCALE: NTS

G5

COOLING AND CONTROL SCHEMATIC

SCALE: NTS

GENERAL NOTESLEGENDLEGEND CONT

88 FAN MOTOR

PDB POWER DISTRIBUTION BLOCK

LOCKOUT RELAY (LOCATED IN THE POWERHOUSE)

94X TRIP AUXILIARY RELAY

DGA DISSOLVED GAS ANALYZER (FUTURE)

FCT FAN CURRENT TRANSFORMER

DS CABINET DOOR SWITCH

LT CABINET LIGHT

HTR CABINET HEATER

GFCI GROUND FAULT CIRCUIT…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .