Solicitation Amendment W912EF26BA0010002 SF 30.pdf

PDF 3 MB Posted

Attached to
Ice Harbor Dam Navigation Lock Upstream Tainter Gate Federal contract opportunity
Solicitation number
W912EF26BA001
Issued by
Department of the Army Corps of Engineers Engineering District Walla Walla

About this file

This document is a Standard Form 30 Amendment of Solicitation/Modification of Contract issued by the US Army Engineer District Walla Walla for solicitation W912EF26BA001. The amendment, dated 01 DEC 2025, updates Technical Specifications (Attachment 1), specifically sections related to Governmental Safety Requirements and Resident Management System Contract Mode. The Plans (Attachment 2) have also been updated with revisions to specific drawings, including SHEET S-S02, SHEET S-506, and SHEET S-S07.

The amendment modifies the List of Attachments to include new documents: Amendment 0002_Summary of Changes, ATTACHMENT 1 - TECHNICAL SPECIFICATIONS_AMENDMENT 0002 (38 pages), and ATTACHMENT 2 - PLANS_AMENDMENT 0002 (4 pages). These new attachments were added to the contract documents, changing the page counts for the respective documents. All other terms and conditions remain unchanged and in full force and effect.

View the file

Other files for this federal contract opportunity

Show all 16

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER.

If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

16C. DATE SIGNED

Previous edition unusable STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES

2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

Section J - List of Attachments

The attachments table has changed from:

Identifier Document Name Document Description Reference Identifier

Date Line Item Page Numbers

Document Type

Provided Under Separate Cover

ATTACHMENT 1

- TECHNICAL

SPECIFICATIONS

Specification 24 Oct 2025 252 Attachment No

ATTACHMENT 2

- PLANS

Plans 24 Oct 2025 16 Attachment No

ATTACHMENT 3

SUPPLEMENTAL

DRAWINGS

Drawings 24 Oct 2025 15 Attachment No

ATTACHMENT 4

- SITE VISIT

INSTRUCTIONS

Site Visit 31 Oct 2025 3 Attachment No

Amendment 0001_Summary of Changes

Summary of Changes 01 Dec 2025 Attachment No

ATTACHMENT 1

- TECHNICAL SPE

CIFICATIONS_AM

ENDMENT 0001

Specification 01 Dec 2025 Attachment No

To:

Identifier Document Name Document Description Reference Identifier

Date Line Item Page Numbers

Document Type

Provided Under Separate Cover

ATTACHMENT 1

- TECHNICAL

SPECIFICATIONS

Specification 24 Oct 2025 252 Attachment No

ATTACHMENT 2

- PLANS

Plans 24 Oct 2025 16 Attachment No

ATTACHMENT 3

SUPPLEMENTAL

DRAWINGS

Drawings 24 Oct 2025 15 Attachment No

ATTACHMENT 4

- SITE VISIT

INSTRUCTIONS

Site Visit 31 Oct 2025 3 Attachment No

Amendment 0001_Summary of Changes

Summary of Changes 01 Dec 2025 1 Attachment No

ATTACHMENT 1

- TECHNICAL SPE

CIFICATIONS_AM

ENDMENT 0001

Specification 01 Dec 2025 44 Attachment No

Amendment 0002_Summary of Changes

Summary of Changes 04 Dec 2025 1 Attachment No

ATTACHMENT 1

- TECHNICAL SPE

CIFICATIONS_AM

ENDMENT 0002

Specification 04 Dec 2025 38 Attachment No

ATTACHMENT 2

- PLANS_AMEND

MENT 0002

Plans 04 Dec 2025 4 Attachment No

W912EF26BA0010002

The following contract documents were added:

ATTACHMENT 1 - TECHNICAL SPECIFICATIONS_AMENDMENT 0002

ATTACHMENT 2 - PLANS_AMENDMENT 0002

Amendment 0002_Summary of Changes

The following contract documents Page Counts were changed:

DOCUMENT PAGE COUNTS

DOCUMENT NAME FROM TO

Amendment 0002_Summary of Changes none 1

ATTACHMENT 1 - TECHNICAL SPECIFICATIONS_AMENDMENT 0002 none 38

ATTACHMENT 2 - PLANS_AMENDMENT 0002 none 4

W912EF26BA0010002

IDCode: J
Page: 1
Pages: 3
AmendNo: 0002
EffDate: 01 DEC 2025
ReqNo:
ProjNo:
IssCode: W912EF
AdmCode:
IssuedBy: US ARMY ENGINEER DISTRICT WALLA WAL

KO CONTRACTING DIVISION, 201 NORTH 3RD AVE

WALLA WALLA, WA 99362-1876

UNITED STATES

MARY SEINER, EMAIL: MARY.L.SEINER@USACE.ARMY.MIL TELEPHONE: 509-527-7228

AdminBy:

SCD: PAS:

ContractorNameAdd:
Code:
FacCode:
SolChg: 1
SolNo: W912EF26BA001
SolDate: 07 NOV 2025
AwardChg: Off
AwardNo:
AwardDate:
Amended: 1
OffrExt: Off
OffrNoEx: 1
NoCopies: 1
ApprData: SEE SECTION G - CONTRACT ADMINISTRATION DATA
ChgeOrd: Off
ChgeOrder:
Modify: Off
SuppAgre: Off
SuppAuth:
ModOthr: Off
OthrSpec:
NoReq: Off
Require: Off
Copies:
Descript: The purpose of this amendment is to update the Technical Specifications (Attachment 1), specifically sections 01 35 29.10 28 GOVERNMENTAL SAFETY REQUIREMENTS and 01 45 01.00 28 RESIDENT MANAGEMENT SYSTEM CONTRACTOR MODE (RMS CM). The Plans (Attachment 2) have also been updated with revisions to the following drawings: SHEET S-301, SHEET S-502, SHEET S-506, and SHEET S-507.

All other terms and conditions remain unchanged.

ContNameTitle:
CoNameTitle: BROOKE N. MOORE
ContDate:
CODate: 05 DEC 2025

File details come from the government source that posted it. Updated .