Amendment 0003_Summary of Changes.pdf
PDF 74 KB Posted
- Attached to
- Ice Harbor Dam Navigation Lock Upstream Tainter Gate Federal contract opportunity
- Solicitation number
- W912EF26BA001
About this file
This document is an Amendment (-0003) for the Ice Harbor Navlock Upstream Tainter Gate Supply contract (W912EF26BA001) issued by the U.S. Army Corps of Engineers. The amendment details specific revisions to three technical specification sections: SECTION 01 11 01.00 28 Supplementary Requirements (navigation lock tainter gate delivery requirements), SECTION 01 45 04.00 28 Contractor Quality Control (CQC System Manager), and SECTION 35 20 16.44 28 Tainter Gate Fabrication, Delivery and Storage (fencing requirements). Additionally, two technical drawings (S-001 and S-504) have been revised, with changes highlighted by clouded areas on the documents.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Solicitation Amendment W912EF26BA0010003 SF 30.pdf | ||
| ATTACHMENT 2 - PLANS_AMENDMENT 0003.pdf | ||
| ATTACHMENT 1 - TECHNICAL SPECIFICATIONS_AMENDMENT 0003.pdf | ||
| ATTACHMENT 2 - PLANS_AMENDMENT 0002.pdf | ||
| ATTACHMENT 1 - TECHNICAL SPECIFICATIONS_AMENDMENT 0002.pdf | ||
| Amendment 0002_Summary of Changes.pdf | ||
| Solicitation Amendment W912EF26BA0010002 SF 30.pdf | ||
| Solicitation Amendment W912EF26BA0010001 SF 30.pdf | ||
| Amendment 0001_Summary of Changes.pdf | ||
| ATTACHMENT 1 - TECHNICAL SPECIFICATIONS_AMENDMENT 0001.pdf | ||
| Solicitation - W912EF26BA001.pdf | ||
| ATTACHMENT 3 - SUPPLEMENTAL DRAWINGS.pdf | ||
| Brand Name Justification and Approval_Redacted.pdf | ||
| ATTACHMENT 4 - SITE VISIT INSTRUCTIONS.pdf | ||
| ATTACHMENT 2 - PLANS.pdf | ||
| ATTACHMENT 1 - TECHNICAL SPECIFICATIONS.pdf |
Show all 16
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Summary of changes for Amendment -0003 Ice Harbor Navlock Upstream Tainter Gate - SUPPLY
W912EF26BA001
1. Revised the following Specifications (See revised specification for details):
a. SECTION 01 11 01.00 28 SUPPLEMENTARY REQUIREMENTS.
• Revised Paragraph 1.9 “NAVIGATION LOCK TAINTER GATE DELIVERY REQUIREMENTS ”, item a.
b. SECTION 01 45 04.00 28 CONTRACTOR QUALITY CONTROL.
• Revised Paragraph 3.4.2 “CQC System Manager”.
c. SECTION 35 20 16.44 28 TAINTER GATE FABRICATION, DELIVERY AND
STORAGE
• Revised Paragraph 3.6 “FENCING”, item a.
2. Revised the following Drawings (See clouded areas for revisions).
a. S-001
b. S-504