Amendment 0001_Summary of Changes.pdf
PDF 73 KB Posted
- Attached to
- Ice Harbor Dam Navigation Lock Upstream Tainter Gate Federal contract opportunity
- Solicitation number
- W912EF26BA001
About this file
This document is an amendment summary for the Ice Harbor Navlock Upstream Tainter Gate - SUPPLY contract (W912EF26BA001) issued by the U.S. Army Corps of Engineers. The amendment details revisions to three specific specification sections: Supplementary Requirements, Contractor Quality Control, and Painting for Hydraulic Structures.
Key changes include updates to paragraphs within each section, specifically modifying requirements for the Project Superintendent, Post-Award Conference, CQC System Manager, Initial and Preparatory Phases, and qualifications for Shop Painting Contractors and Certification Test Procedures. The amendment indicates modifications to contractual and technical specifications without fundamentally altering the overall scope of the supply contract for the navigation lock project.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Solicitation Amendment W912EF26BA0010003 SF 30.pdf | ||
| Amendment 0003_Summary of Changes.pdf | ||
| ATTACHMENT 2 - PLANS_AMENDMENT 0003.pdf | ||
| ATTACHMENT 1 - TECHNICAL SPECIFICATIONS_AMENDMENT 0003.pdf | ||
| ATTACHMENT 2 - PLANS_AMENDMENT 0002.pdf | ||
| ATTACHMENT 1 - TECHNICAL SPECIFICATIONS_AMENDMENT 0002.pdf | ||
| Amendment 0002_Summary of Changes.pdf | ||
| Solicitation Amendment W912EF26BA0010002 SF 30.pdf | ||
| Solicitation Amendment W912EF26BA0010001 SF 30.pdf | ||
| ATTACHMENT 1 - TECHNICAL SPECIFICATIONS_AMENDMENT 0001.pdf | ||
| Solicitation - W912EF26BA001.pdf | ||
| ATTACHMENT 3 - SUPPLEMENTAL DRAWINGS.pdf | ||
| Brand Name Justification and Approval_Redacted.pdf | ||
| ATTACHMENT 4 - SITE VISIT INSTRUCTIONS.pdf | ||
| ATTACHMENT 2 - PLANS.pdf | ||
| ATTACHMENT 1 - TECHNICAL SPECIFICATIONS.pdf |
Show all 16
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Summary of changes for Amend -0001 Ice Harbor Navlock Upstream Tainter Gate - SUPPLY
W912EF26BA001
1. Revised the following Specifications (See revised specification for details):
a. SECTION 01 11 01.00 28 SUPPLEMENTARY REQUIREMENTS:
• Revised Paragraph 1.14 PROJECT SUPERINTENDENT:
• Revised Paragraph 1.17.1 “Post-Award Conference”.
b. SECTION 01 45 04.00 28 CONTRACTOR QUALITY CONTROL:
• Revised Paragraph 3.4.2 “CQC System Manager”.
• Revised Paragraph 3.6.2 “Initial Phase”.
• Revised Paragraph 3.6.4 “Additional Preparatory and Initial Phases”.
c. SECTION 09 97 02.00 28 PAINTING: HYDRAULIC STRUCTURES:
• Revised Paragraph 1.3.1 “Qualified Shop Painting Contractor”.
• Revised Paragraph 1.3.2.1 “Certification Test Procedure”.