Amendment 0002_Summary of Changes.pdf
PDF 73 KB Posted
- Attached to
- Ice Harbor Dam Navigation Lock Upstream Tainter Gate Federal contract opportunity
- Solicitation number
- W912EF26BA001
About this file
This document is an amendment summary (Amendment -0002) for the Ice Harbor Navlock Upstream Tainter Gate - SUPPLY contract with solicitation number W912EF26BA001. The amendment introduces two primary sets of changes: specification revisions and drawing updates. Specifically, the specification changes include modifications to the Governmental Safety Requirements section, revising Paragraph 1.10.1 on "Safe Clearance Training", and updates to the Resident Management System Contractor Mode section by adding a new Paragraph 1.7.2.2.1 for "End of Fiscal Year Payment Schedule".
The amendment also includes revisions to four engineering drawing sheets: S-301, S-502, S-506, and S-507, with changes marked by clouded areas on the respective sheets. These modifications suggest ongoing refinements to the technical specifications and design details for the navlock upstream tainter gate supply project, likely managed by the U.S. Army Corps of Engineers (based on the contract number prefix W912).
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment 0003_Summary of Changes.pdf | ||
| ATTACHMENT 2 - PLANS_AMENDMENT 0003.pdf | ||
| ATTACHMENT 1 - TECHNICAL SPECIFICATIONS_AMENDMENT 0003.pdf | ||
| Solicitation Amendment W912EF26BA0010003 SF 30.pdf | ||
| ATTACHMENT 1 - TECHNICAL SPECIFICATIONS_AMENDMENT 0002.pdf | ||
| Solicitation Amendment W912EF26BA0010002 SF 30.pdf | ||
| ATTACHMENT 2 - PLANS_AMENDMENT 0002.pdf | ||
| Solicitation Amendment W912EF26BA0010001 SF 30.pdf | ||
| Amendment 0001_Summary of Changes.pdf | ||
| ATTACHMENT 1 - TECHNICAL SPECIFICATIONS_AMENDMENT 0001.pdf | ||
| Solicitation - W912EF26BA001.pdf | ||
| ATTACHMENT 3 - SUPPLEMENTAL DRAWINGS.pdf | ||
| Brand Name Justification and Approval_Redacted.pdf | ||
| ATTACHMENT 4 - SITE VISIT INSTRUCTIONS.pdf | ||
| ATTACHMENT 2 - PLANS.pdf | ||
| ATTACHMENT 1 - TECHNICAL SPECIFICATIONS.pdf |
Show all 16
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Summary of changes for Amend -0002 Ice Harbor Navlock Upstream Tainter Gate - SUPPLY
W912EF26BA001
1. Revised the following Specifications (See revised specification for details):
a. SECTION 01 35 29.10 28 GOVERNMENTAL SAFETY REQUIREMENTS.
• Revised Paragraph 1.10.1 “Safe Clearance Training”.
b. SECTION 01 45 01.00 28 RESIDENT MANAGEMENT SYSTEM CONTRACTOR
MODE (RMS CM).
• Added Paragraph 1.7.2.2.1 “End of Fiscal Year Payment Schedule”.
2. Revised the following Drawings (See clouded areas for revisions).
a. SHEET S-301.
b. SHEET S-502.
c. SHEET S-506.
d. SHEET S-507.
File details come from the government source that posted it. Updated .