TECHSPECS_25RA001_amd0005_9Jun25.pdf
PDF 275 KB Posted
- Solicitation number
- W912EF25RA010
About this file
This technical specification details the requirements for a hydraulic system upgrade for the Lower Granite Dam turbine intake gates. The project involves replacing the existing hydraulic systems for six main units, including complete replacement of hydraulic cylinders, power units, control stations, flexible hoses, and associated components. The upgrade encompasses 19 total hydraulic cylinders (18 for installation and 1 spare), with each cylinder designed to be single-acting, gravity-extend, and pressure-retract.
Key technical specifications include system design parameters such as a rated system pressure of 3000 psi, normal operating pressure of 2000 psi, and specific requirements for gate closing speeds, cylinder dimensions, and operational environments. The project requires comprehensive testing protocols, including shop testing, pressure testing, functional testing, and operational testing for each component and system. Additional requirements include detailed documentation, training for project staff, and preparation of operation and maintenance manuals. The contract involves multiple phases of work, including pre-main unit outage, main unit outage, and post-main unit outage activities, with specific payment structures for each phase of work.
View the file
Other files
Show all 29
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Lower Granite Turbine Intake Gate Hydraulic System Upgrade W912EF25RA010 amd 0005
PROJECT TABLE OF CONTENTS
DIVISION 01 - GENERAL REQUIREMENTS
01 00 00.00 28 GENERAL REQUIREMENTS
01 11 00.00 28 SUMMARY OF WORK
01 11 01.00 28 SUPPLEMENTARY REQUIREMENTS
01 12 16.00 26 WORK SEQUENCE
01 14 00.10 28 PROJECT SITE RESTRICTIONS
01 14 00.90 28 INTEGRATING ANTITERRORISM (AT) AND OPERATIONS SECURITY
(OPSEC)
01 20 00.00 20 PRICE AND PAYMENT PROCEDURES
01 22 00.00 28 MEASUREMENT AND PAYMENT
01 32 01.00 28 PROJECT SCHEDULE
01 33 00 SUBMITTAL PROCEDURES
01 35 29.10 28 GOVERNMENTAL SAFETY REQUIREMENTS
01 42 00 SOURCES FOR REFERENCE PUBLICATIONS
01 45 01.00 28 RESIDENT MANAGEMENT SYSTEM CONTRACTOR MODE (RMS CM)
01 45 04.00 28 CONTRACTOR QUALITY CONTROL
01 51 00.00 28 TEMPORARY UTILITIES
01 55 10.00 28 CONTRACTOR WORK, ACCESS AND STORAGE AREAS
01 57 20.00 28 ENVIRONMENTAL PROTECTION
01 78 00.00 28 CLOSEOUT SUBMITTALS
01 78 23.00 28 OPERATION AND MAINTENANCE DATA
01 79 00.00 28 DEMONSTRATION AND TRAINING
01 91 00.00 26 SYSTEMS TESTING AND COMMISSIONING
DIVISION 02 - EXISTING CONDITIONS
02 82 13.01 28 CLASS II ASBESTOS ABATEMENT
02 83 33.14 28 REMOVAL/CONTROL AND DISPOSAL OF PAINT WITH LEAD - SHORT
VERSION
DIVISION 03 - CONCRETE
03 45 33.00 28 PRECAST STRUCTURAL CONCRETE
03 60 00.01 26 CONCRETE DEMOLITION, REPAIR OF CONCRETE SURFACES, AND
MINOR EQUIPMENT FOUNDATIONS
DIVISION 05 - METALS
05 05 23.17 26 WELDING (STEEL), FABRICATION, AND MACHINE WORK
05 50 04.00 26 METALS: MATERIALS, PRODUCTS, AND MISCELLANEOUS ITEMS
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
07 84 00.00 28 FIRESTOPPING
07 92 00.00 28 JOINT SEALANTS
DIVISION 09 - FINISHES
09 97 02.13 26 PAINTING - STEEL STRUCTURES
DIVISION 13 - SPECIAL CONSTRUCTION
13 48 00.00 26 SEISMIC RESTRAINT FOR MECHANICAL AND ELECTRICAL EQUIPMENT
DIVISION 25 - INTEGRATED AUTOMATION
PROJECT TABLE OF CONTENTS Page 1
25 05 11.01 26 CYBERSECURITY FOR CONTROL SYSTEMS
DIVISION 26 - ELECTRICAL
26 05 00.00 26 BASIC ELECTRICAL MATERIALS AND METHODS
26 05 19.00 26 INSULATED WIRE AND CABLE
26 05 26.00 26 GROUNDING
26 05 36.00 26 CABLE TRAYS FOR ELECTRICAL SYSTEMS
26 42 14.01 26 CATHODIC PROTECTION BY SACRIFICIAL ANODES
DIVISION 27 - COMMUNICATIONS
27 21 10.00 26 FIBER OPTIC DATA TRANSMISSION SYSTEM
DIVISION 33 - UTILITIES
33 56 53.00 26 HYDRAULIC FLUID STORAGE TANK
DIVISION 35 - WATERWAY AND MARINE CONSTRUCTION
35 05 40.14 26 HYDRAULIC POWER SYSTEMS FOR CIVIL WORKS STRUCTURES
35 05 40.15 26 HYDRAULIC FLUID
DIVISION 40 - PROCESS INTERCONNECTIONS
40 05 13.96 26 WELDING: PIPING AND PRESSURIZED SYSTEMS
40 95 13.00 26 PROCESS CONTROL PANELS AND HARDWARE
40 95 23.00 26 PROGRAMMABLE LOGIC CONTROLLER HARDWARE
DIVISION 41 - MATERIAL PROCESSING AND HANDLING EQUIPMENT
41 22 13.75 26 NEW SUPPORT BEAMS AND LIFTING DEVICES
-- End of Project Table of Contents --
PROJECT TABLE OF CONTENTS Page 2
SECTION TABLE OF CONTENTS
DIVISION 01 - GENERAL REQUIREMENTS
SECTION 01 22 00.00 28
MEASUREMENT AND PAYMENT
PART 1 GENERAL
1.1 RETAINAGE OF PAYMENT
1.2 PRE-MAIN UNIT OUTAGE CLINS
1.2.1 CLIN 0001 Pre-Main Unit Outage Work
1.2.2 CLIN 0002 New Hydraulic Fluid For Pre-Main Unit Outage Work
1.3 MAIN UNIT OUTAGE CLINS
1.3.1 CLIN 0003 Replace Intake Gate Hydraulics of Main Unit 6
1.3.2 CLIN 0004 Replace Intake Gate Hydraulics of Main Unit 5
1.3.3 CLIN 0005 Replace Intake Gate Hydraulics of Main Unit 4
1.3.4 CLIN 0006 Replace Intake Gate Hydraulics of Main Unit 3
1.3.5 CLIN 0007 Replace Intake Gate Hydraulics of Main Unit 2
1.3.6 CLIN 0008 Replace Intake Gate Hydraulics of Main Unit 1
1.3.7 CLIN 0009 New Hydraulic Fluid for Main Unit Outage
1.3.8 CLIN 0010 Training
1.3.9 CLIN 0011 Spare Parts
1.4 POST-MAIN UNIT OUTAGE CLINS
1.4.1 CLIN 0012 Other Hydraulic System Work
1.4.2 CLIN 0013 New Hydraulic Fluid for Post-Main Unit Outage
PART 2 PRODUCTS (Not Applicable)
PART 3 EXECUTION (Not Applicable)
-- End of Section Table of Contents --
SECTION 01 22 00.00 28 Page 1
THIS PAGE INTENTIONALLY LEFT BLANK
SECTION 01 22 00.00 28 Page 2
SECTION 01 22 00.00 28
MEASUREMENT AND PAYMENT
PART 1 GENERAL
In each instance, the contract price for an item shall constitute full compensation for furnishing all plant, labor, equipment, and materials, and for performing all operations required to complete the work included in the item as herein specified, or as otherwise approved.
1.1 RETAINAGE OF PAYMENT
For retainage purposes, this project will be tracked as distinct work windows as outlined below. They are:
1. Window #1: Pre-Main Unit Outage.
2. Window #2: Main Unit Outage.
3. Window #3: Post-Main Unit Outage.
Retainage in the amount of 10% of the CLINs associated with Window #1 and 5% for Windows #2-3 will be withheld until the applicable final submittals, listed below, associated with each window have been approved by the Government for that work window. The retainage for final submittals will start once the Contractor has earned 90 percent for Window #1 or 95% for Windows #2&3 of the original contract value associated with these work windows.
See SECTION 01 78 00.00 28 "CLOSEOUT SUBMITTALS" and SECTION 01 78 23.00 28 "OPERATION AND MAINTENANCE DATA" for additional information.
a. Final Shop Drawings.
b. Final As-built Drawings.
c. Final Record Drawings.
d. Return of Government Issued Items.
e. Final Operation and Maintenance Manuals and Parts Catalogs.
f. Final Spare Parts submission.
g. Complete all required training.
1.2 PRE-MAIN UNIT OUTAGE CLINS
1.2.1 CLIN 0001 Pre-Main Unit Outage Work
Pre-main unit outage work will be measured for payment as a complete pay item (JOB). Payment will be made at the lump sum price for CLIN 0001, "Pre-Main Unit Outage Work," which price and payment shall be full compensation for all work required for construction of the pre-main unit outage work, complete, as specified and approved. Features included with this item shall include, but not be limited to the following:
a. New Hydraulic Power Unit - Includes all effort for submittals, fabrication, delivery, installation, and field testing.
b. New Hydraulic Fluid Headers - Includes all effort for submittals, fabrication, delivery to the site, installation, cleaning, and initial
SECTION 01 22 00.00 28 Page 3 field testing. Supply of new hydraulic fluid to fill the headers is paid under a separate CLIN.
c. New Hydraulic Cylinders - Includes all effort for submittals, fabrication, shop testing, and delivery to site for all 19 cylinders, including the spare cylinder and all associated lifting devices.
Supply of the new hydraulic fluid to fill the cylidners is paid under a separate CLIN. Installation and field testing of the new cylinders is paid under a separate CLIN.
d. New Support Beams - Includes all effort for submittals, fabrication, shop testing and delivery to site for all 19 support beams, including the spare. Installation of the support beams is paid under a separate CLIN.
e. New Control Stations - Includes all effort for submittals, fabrication, shop testing and delivery to site for six control stations. Installation and field testing of the control stations is paid under a separate CLIN.
f. New Hydraulic Hoses - Includes all effort for submittals, fabrication, and delivery to site for six new hydraulic hose assemblies.
g. New Electrical Controls and Indication - Includes all effort for submittals, fabrication, installation and testing of the new control system, including intake gate and HPU RTU cabinets, except the final connections to the individual control station and the testing of the control station functions, which are covered under separate CLINs.
h. Hydraulic Fluid Tank - Includes all effort to remove the existing hydraulic fluid tank, install the temporary fluid storage tank for the existing fluid and all required appurtenances, dispose of existing fluid, and provide the new hydraulic fluid tank and fire protection structure.
i. New Stub Piston Rod and Coupling Assemblies - Includes all effort for submittals, fabrication, shop testing and delivery to site for all 19 stub piston rod and coupling assemblies and the piston shaft stub lifting device. Installation of the stub piston rod and coupling assemblies is paid under a separate CLIN.
1.2.2 CLIN 0002 New Hydraulic Fluid For Pre-Main Unit Outage Work
Providing new hydraulic fluid will be measured for payment as the number of gallons (GAL) provided. Payment will be made at the unit price for CLIN 0002, "New Hydraulic Fluid For Pre-Main Unit Outage Work," which price and payment shall be full compensation for all work required to provide the new hydraulic fluid, complete, as specified and approved, including all filtering. Provide hydraulic fluid in the quantity needed to fill the following equipment:
a. 19 new hydraulic cylinders
b. New hydraulic fluid headers
SECTION 01 22 00.00 28 Page 4
1.3 MAIN UNIT OUTAGE CLINS
1.3.1 CLIN 0003 Replace Intake Gate Hydraulics of Main Unit 6
Replacement of the intake gate hydraulics will be measured for payment as a complete pay item (JOB). Payment will be made at the lump sum price for CLIN 0003, "Replace Intake Gate Hydraulics of Main Unit 6", which price and payment shall be full compensation for all hydraulic-related work required as specified and approved. Features included with this item shall include, but not be limited to the following:
a. Disposal of Existing Equipment - Includes all effort to remove and dispose of the existing three cylinders, six hydraulic hoses, control station, and hydraulic fluid contained within all equipment, and any additional hydraulic-related appurtenances and accessories designated for removal.
b. Installation of New Equipment - Includes all effort for the installation of three new hydraulic cylinders, three support beams, three hydraulic hose assemblies, three stub piston rod and coupling assemblies, one control station, associated miscellaneous hydraulic piping, connections and appurtenances, and final electrical connections. New makeup hydraulic oil to fill the system is paid for under a separate CLIN.
c. Gate Position Indicator System - Includes all effort for the rehabilitation of three gate position indicators.
g. Hydraulic System Commissioning - Includes all effort to perform testing and commissioning of the new hydraulic system including, but not limited to, pressure testing of the hydraulics, functional testing of the hydraulics, and electrical and control system testing.
1.3.2 CLIN 0004 Replace Intake Gate Hydraulics of Main Unit 5
Replacement of the intake gate hydraulics will be measured for payment as a complete pay item (JOB). Payment will be made at the lump sum price for CLIN 0004, "Replace Intake Gate Hydraulics of Main Unit 5", which price and payment shall be full compensation for all hydraulic-related work required complete, as specified and approved. Features included with this item are identical to CLIN 0003.
1.3.3 CLIN 0005 Replace Intake Gate Hydraulics of Main Unit 4
Replacement of the intake gate hydraulics will be measured for payment as a complete pay item (JOB). Payment will be made at the lump sum price for CLIN 0005, "Replace Intake Gate Hydraulics of Main Unit 4", which price and payment shall be full compensation for all hydraulic-related work required complete, as specified and approved. Features included with this item are identical to CLIN 0003.
1.3.4 CLIN 0006 Replace Intake Gate Hydraulics of Main Unit 3
Replacement of the intake gate hydraulics will be measured for payment as a complete pay item (JOB). Payment will be made at the lump sum price for CLIN 0006, "Replace Intake Gate Hydraulics of Main Unit 3", which price and payment shall be full compensation for all hydraulic-related work required complete, as specified and approved. Features included with this item are identical to CLIN 0003.
SECTION 01 22 00.00 28 Page 5
1.3.5 CLIN 0007 Replace Intake Gate Hydraulics of Main Unit 2
Replacement of the intake gate hydraulics will be measured for payment as a complete pay item (JOB). Payment will be made at the lump sum price for CLIN 0007, "Replace Intake Gate Hydraulics of Main Unit 2", which price and payment shall be full compensation for all hydraulic-related work required complete, as specified and approved. Features included with this item are identical to CLIN 0003.
1.3.6 CLIN 0008 Replace Intake Gate Hydraulics of Main Unit 1
Replacement of the intake gate hydraulics will be measured for payment as a complete pay item (JOB). Payment will be made at the lump sum price for CLIN 0008, "Replace Intake Gate Hydraulics of Main Unit 1", which price and payment shall be full compensation for all hydraulic-related work required complete, as specified and approved. Features included with this item are identical to CLIN 0003.
1.3.7 CLIN 0009 New Hydraulic Fluid for Main Unit Outage
Providing new hydraulic fluid for main unit outage will be measured for payment as the number of gallons (GAL) provided. Payment will be made at the unit price for CLIN 0009, "New Hydraulic Fluid for Main Unit Outage," which price and payment shall be full compensation for all work required to provide new hydraulic fluid, complete, as specified and approved, including all filtering. Provide hydraulic fluid in the quantity needed to fill the following equipment:
a. 18 sets of new hydraulic hoses
b. 3 header accumulator tanks
c. Make-up oil to fill the volume of the piping between the headers and the new hydrualic hoses.
1.3.8 CLIN 0010 Training
Training of Government personnel will be measured for payment as a complete pay item (JOB). Payment will be made at the lump sum price for CLIN 0010, "Training," which price and payment shall be full compensation for all work required to train Government personnel on the new and rehabilitated systems, complete, as specified and approved. See Section
35 05 40.14 26 HYDRAULIC POWER SYSTEMS FOR CIVIL WORKS STRUCTURES,
paragraph TRAINING for specifics.
1.3.9 CLIN 0011 Spare Parts
Providing spare parts and new hydraulic power unit will be measured for payment as a complete pay item (JOB). Payment will be made at the lump sum price for CLIN 0011, "Spare Parts" which price and payment shall be full compensation for all work required for providing all spare parts excluding the complete hydraulic cylinder assembly , complete, as specified and approved.
SECTION 01 22 00.00 28 Page 6
G4EDDMTJ
Line
1.4 POST-MAIN UNIT OUTAGE CLINS
1.4.1 CLIN 0012 Other Hydraulic System Work
Other Hydraulic System Work will be measured for payment as a complete pay item (JOB). Payment will be made at the lump sum price for CLIN 0012, "Other Hydraulic System Work," which price and payment shall be full compensation for all work required for other hydraulic system work, complete, as specified and approved. Features included with this item shall include, but not be limited to the following:
a. Existing Hydraulic Power Unit - Includes all effort to remove and dispose of the existing hydraulic power unit, including all existing hydraulic fluid contained within.
b. Existing Hydraulic Fluid Headers and Transfer Piping - Includes all effort to remove and dispose of remaining existing hydraulic fluid headers, including all existing hydraulic fluid contained within.
c. Hydraulic Fluid Storage Tank - Includes all effort to remove the temporary fluid storage tank and dispose of any remaining old hydraulic fluid.
1.4.2 CLIN 0013 New Hydraulic Fluid for Post-Main Unit Outage
Providing new hydraulic fluid for post-main unit outage will be measured for payment as the number of gallons (GAL) provided. Payment will be made at the unit price for CLIN 0013 "New Hydraulic Fluid for Post-Main Unit Outage," which price and payment shall be full compensation for all work required to provide new hydraulic fluid, complete, as specified and approved, including all filtering. Provide hydraulic fluid in the quantity needed to fill the following equipment:
a. Hydraulic fluid reservoir tank
b. Additional make-up oil
PART 2 PRODUCTS (Not Applicable)
PART 3 EXECUTION (Not Applicable)
-- End of Section --
SECTION 01 22 00.00 28 Page 7
SECTION 01 22 00.00 28 Page 8
SECTION TABLE OF CONTENTS
DIVISION 35 - WATERWAY AND MARINE CONSTRUCTION
SECTION 35 05 40.14 26
HYDRAULIC POWER SYSTEMS FOR CIVIL WORKS STRUCTURES
PART 1 GENERAL
1.1 SUMMARY
1.2 REFERENCES
1.3 SUBMITTALS
1.4 DESIGN AND PERFORMANCE REQUIREMENTS
1.4.1 Definitions
1.4.2 System Summary
1.4.3 Design Parameters
1.4.4 Allowable Stresses
1.4.4.1 Load Cases and Allowable Stresses
1.4.4.2 Stress Concentration Factors
1.4.5 Corrosivity Environment Category
1.4.6 Connections
1.4.6.1 Pinned Connections
1.4.6.2 Shop Connections
1.4.6.3 Welded Connections
1.5 QUALITY ASSURANCE
1.5.1 Hydraulic System Designer Qualifications
1.5.2 Submittal Packages
1.5.2.1 Submittal Package General Requirements
1.5.2.2 Submittal Package Contents
1.5.2.3 Initial Conference
1.5.3 Drawings
1.5.3.1 General Drawing Requirements
1.5.3.2 Fabrication Drawings
1.5.3.3 Hydraulic Cylinder Drawings
1.5.3.4 Hydraulic Power Unit Drawings
1.5.3.5 Piping Drawings
1.5.3.6 Control Drawings
1.5.3.7 Hydraulic Schematic
1.5.3.8 Electrical Drawings
1.5.3.9 3D Computer Model
1.5.4 Product Data
1.5.5 Calculations
1.5.5.1 Calculation Requirements
1.5.5.2 Calculation Packages
1.6 COMPONENT AND FLUID COMPATIBILITY
1.6.1 General Compatibility Requirements
1.6.2 Manufacturer's Published Ratings
1.6.3 Compatibility Testing
1.7 QUALITY CONTROL
PART 2 PRODUCTS
2.1 MATERIALS AND MECHANICAL EQUIPMENT
SECTION 35 05 40.14 26 Page 1
2.1.1 General
2.1.2 Standard Products
2.2 HYDRAULIC FLUID
2.3 HYDRAULIC CYLINDERS
2.3.1 General Design and Configuration
2.3.2 End Configurations
2.3.2.1 Rod End
2.3.2.2 Cylinder End
2.3.2.3 Cylinder Support
2.3.3 Cylinders
2.3.4 Piston Rods
2.3.4.1 Piston Rod General Requirements
2.3.4.2 Piston Rod Coating Data
2.3.5 Pistons
2.3.6 Seals, O-Rings And Bearing Materials
2.3.6.1 Serviceability
2.3.6.2 Material Compatibility
2.3.6.3 Temperature Ranges
2.3.6.4 Piston Wear Rings
2.3.6.5 Piston Seal Rings
2.3.6.6 O-Ring Seals
2.3.6.7 Rod Wiper/Scraper
2.3.6.8 Piston Rod Seals
2.3.7 Rod Seal Gland
2.3.8 Anodes
2.4 HOIST POSITION TRANSDUCER
2.5 HOIST LOCKING DEVICE
2.5.1 Hoist Locking Device General Requirements
2.5.2 Hoist Locking Device Load Cases and Allowable Stresses
2.5.3 Hoist Locking Device Materials
2.6 CYLINDER HANDLING DEVICE
2.7 STUB PISTON RODS AND COUPLINGS
2.7.1 Stub Piston Rods and Coupling General Requirements
2.7.2 Stub Piston Rods and Couplings Quantity
2.7.3 Stub Piston Rods and Couplings Materials
2.7.4 Stub Piston Rods and Couplings Load Cases and Allowable
Stresses
2.8 HYDRAULIC POWER UNIT (HPU)
2.8.1 HPU Arrangement
2.8.2 General - HPU
2.8.3 Gauges
2.8.4 Control Equipment
2.8.5 Pumps
2.8.6 Pump Motors
2.8.7 Manifold Block
2.8.8 Low-Pressure Return Filters/Strainers
2.8.9 High-Pressure Discharge Filters
2.8.10 Skid
2.8.11 Connection to Headers
2.9 CONTROL STATION
2.9.1 General
2.9.2 Manifold Block
2.9.3 Valves
2.9.4 Gauges
2.9.5 Control Panel
2.10 ACCUMULATOR TANKS
2.11 MANIFOLD BLOCKS
2.12 PIPING
2.12.1 General - Piping
SECTION 35 05 40.14 26 Page 2
2.12.2 Pipe Sizing
2.12.3 Pipe
2.12.4 Pipe Fittings
2.12.5 Unions and Assembly Joints
2.12.6 Expansion Fittings
2.13 TUBING
2.13.1 Use of Tubing
2.13.2 Tube
2.13.3 Tube Fittings
2.14 VALVES
2.14.1 General - Valves
2.14.2 In-line Shutoff Valves
2.14.3 Manifold Mounted Shutoff Valves
2.14.4 Spring Loaded Check Valves
2.14.5 Swing Check Valves
2.14.6 Pressure Compensated Flow Control Valves
2.14.7 Screw-In Cartridge Valves
2.14.8 Slip-In Cartridge Valves
2.14.9 Directional Control Valves (Solenoid Operated)
2.14.10 Pressure Relief Valves
2.14.11 Unloading Valves
2.14.12 Bleeder Valves
2.15 INSTRUMENTS AND APPURTENANCES
2.15.1 Pressure Switches
2.15.2 Pressure Snubbers
2.15.3 Pressure Gauges
2.16 FLEXIBLE HOSES
2.16.1 General
2.16.2 Flexible Hose
2.16.3 Flexible Hose Fittings
2.17 PIPE AND TUBING SUPPORTS
2.18 FASTENERS
2.19 NAMEPLATES
2.20 ELECTRICAL EQUIPMENT
2.21 SPECIAL TOOLS
2.22 SPARE PARTS
PART 3 EXECUTION
3.1 EXAMINATION
3.2 FABRICATION
3.2.1 Welding
3.2.2 Metal Work
3.2.3 Painting
3.2.4 Hydraulic Cylinders
3.2.4.1 Cylinder Manufacturers QC Procedures
3.2.4.2 Dimensions to Verify
3.2.4.3 Dimensional Verification Procedure
3.2.4.4 Dimensional Verification Report
3.3 SHOP ASSEMBLY AND TESTING
3.3.1 Shop Assembly
3.3.2 Protection During Assembly
3.3.3 Cleaning and Protection During Assembly
3.3.4 Flushing
3.3.5 Shop Testing
3.3.5.1 General - Shop Testing
3.3.5.2 Notification of Shop Testing
3.3.5.3 Cylinder Tests
3.3.5.4 Hydraulic Power Unit Tests
SECTION 35 05 40.14 26 Page 3
3.3.5.5 Control Station Tests
3.3.5.6 Draining of Fluid
3.3.5.7 Shop Testing Plan
3.3.5.8 Shop Testing Report
3.4 SHIPPING, DELIVERY, STORAGE, AND HANDLING
3.4.1 Preparation for shipping
3.4.2 Packaging
3.4.3 Packaging Requirements for Hydraulic Cylinders
3.4.4 Shipping and Storage On-Site
3.4.5 Cylinders Designated for Long Term Storage
3.5 ON-SITE REMOVAL AND INSTALLATION
3.5.1 Sequence Of Work
3.5.2 Removal Procedures
3.5.3 Installation Procedures
3.5.4 Removal Of Existing Equipment
3.5.4.1 Repair of Surfaces
3.5.4.2 Existing Hydraulic Fluid
3.5.4.3 Existing Hydraulic Fluid Storage Tank
3.5.4.4 Existing HPU
3.5.4.5 Existing Distribution Headers
3.5.4.6 Existing Hydraulic Fluid Storage Tank Piping
3.5.4.7 Existing Hydraulic Cylinders
3.5.4.8 Existing Hydraulic Hoses
3.5.4.9 Existing Control Stations
3.5.4.10 Gate Position Indicators
3.5.5 Installation of New Equipment
3.5.5.1 HPU
3.5.5.2 Distribution Header Piping
3.5.5.3 Hydraulic Cylinders
3.5.5.4 Flexible Hoses
3.5.5.5 Control Stations
3.6 IDENTIFICATION OF PIPING AND VALVES
3.7 CLEANING AND FLUSHING
3.7.1 Cleaning and Flushing Procedures and Results
3.7.2 Flushing Piping
3.7.3 Flushing Manifolds and Hoses
3.7.4 System Cleanliness
3.8 FILLING AND BLEEDING THE SYSTEM
3.9 ERECTION ENGINEER
3.10 ON-SITE TESTING AND INSPECTION
3.10.1 On-Site Testing General Requirements.
3.10.1.1 Government Witness
3.10.1.2 Unit Watering Status for Testing
3.10.2 Hydraulic Cylinder Dry Pressure and Operational Testing
3.10.2.1 Hydraulic Cylinder Testing Requirements
3.10.2.2 Hydraulic Cylinder Testing Plan
3.10.2.3 Hydraulic Cylinder Testing Report
3.10.3 Pressure Testing
3.10.3.1 Pressure Testing Requirements
3.10.3.2 Pressure Testing Plan
3.10.3.3 Pressure Testing Report
3.10.4 Functional Testing
3.10.4.1 General - Functional Testing
3.10.4.2 HPU Functional Testing
3.10.4.3 Control Station and Gate Functional Testing
3.10.4.4 Functional Testing Plan
3.10.4.5 Functional Test Report
3.10.5 Operational Testing
3.10.5.1 General - Operational Testing
SECTION 35 05 40.14 26 Page 4
3.10.5.2 Hydraulic System Operational Testing
3.10.5.3 Operational Testing Plan
3.10.5.4 Operational Testing Report
3.11 CLEAN-UP
3.12 TRAINING
3.12.1 Training Requirements
3.12.2 Training Instructor
3.12.3 Recording of Training Sessions
3.13 OPERATION AND MAINTENANCE
-- End of Section Table of Contents --
SECTION 35 05 40.14 26 Page 5
SECTION 35 05 40.14 26 Page 6
SECTION 35 05 40.14 26
HYDRAULIC POWER SYSTEMS FOR CIVIL WORKS STRUCTURES
PART 1 GENERAL
1.1 SUMMARY
The work covered by this section consists of detailed requirements for the design, fabrication, shop assembly, testing, delivery, and installation of the new hydraulic power system, including new cylinders, for operation of the intake gates.
1.2 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
AMERICAN SOCIETY OF MECHANICAL ENGINEERS (ASME)
ASME A13.1 (2023) Scheme for the Identification of Piping Systems
ASME B1.20.1 (2013; R 2018) Pipe Threads, General Purpose (Inch)
ASME B16.5 (2020) Pipe Flanges and Flanged Fittings NPS 1/2 Through NPS 24 Metric/Inch Standard
AMERICAN WATER WORKS ASSOCIATION (AWWA)
AWWA C508 (2017) Swing-Check Valves for Waterworks Service, 2 In. Through 48-In. (50-mm Through 1,200-mm) NPS
AMERICAN WELDING SOCIETY (AWS)
AWS D1.1/D1.1M (2020; Errata 1 2021) Structural Welding Code - Steel
AMERICAN SOCIETY OF MECHANICAL ENGINEERS (ASME)
ASME B16.11 (2022) Forged Fittings, Socket-Welding and Threaded
ASME B30.20 (2018) Below-the-Hook Lifting Devices
ASME B31.1 (2022) Power Piping
ASME B36.19M (2022) Welded and Seamless Wrought Stainless Steel Pipe
ASME B40.100 (2013) Pressure Gauges and Gauge Attachments
SECTION 35 05 40.14 26 Page 7
ASME BPVC (2010) Boiler and Pressure Vessels Code
ASME BPVC SEC IX (2017; Errata 2018) BPVC Section IX-Welding, Brazing and Fusing Qualifications
ASME BTH-1 (2014) Design of Below-the-Hook Lifting Devices
ASTM INTERNATIONAL (ASTM)
ASTM A36/A36M (2019) Standard Specification for Carbon Structural Steel
ASTM A105/A105M (2021) Standard Specification for Carbon Steel Forgings for Piping Applications
ASTM A106/A106M (2019a) Standard Specification for Seamless Carbon Steel Pipe for High-Temperature Service
ASTM A108 (2013) Standard Specification for Steel Bar, Carbon and Alloy, Cold-Finished
ASTM A182/A182M (2022) Standard Specification for Forged or Rolled Alloy and Stainless Steel Pipe Flanges, Forged Fittings, and Valves and Parts for High-Temperature Service
ASTM A193/A193M (2023) Standard Specification for Alloy-Steel and Stainless Steel Bolting Materials for High-Temperature Service and Other Special Purpose Applications
ASTM A194/A194M (2023) Standard Specification for Carbon Steel, Alloy Steel, and Stainless Steel Nuts for Bolts for High-Pressure or High-Temperature Service, or Both
ASTM A216/A216M (2021) Standard Specification for Steel Castings, Carbon, Suitable for Fusion Welding, for High-Temperature Service
ASTM A217/A217M (2022) Standard Specification for Steel Castings, Martensitic Stainless and Alloy, for Pressure-Containing Parts, Suitable for High-Temperature Service
ASTM A234/A234M (2022) Standard Specification for Piping Fittings of Wrought Carbon Steel and Alloy Steel for Moderate and High Temperature Service
ASTM A240/A240M (2023a) Standard Specification for Chromium and Chromium-Nickel Stainless Steel Plate, Sheet, and Strip for Pressure Vessels and for General Applications
ASTM A266/A266M (2021) Standard Specification for Carbon
SECTION 35 05 40.14 26 Page 8
Steel Forgings for Pressure Vessel Components
ASTM A269/A269M (2015; R 2019) Standard Specification for Seamless and Welded Austenitic Stainless Steel Tubing for General Service
ASTM A312/A312M (2021) Standard Specification for Seamless, Welded, and Heavily Cold Worked Austenitic Stainless Steel Pipes
ASTM A516/A516M (2017) Standard Specification for Pressure Vessel Plates, Carbon Steel, for Moderate-and Lower-Temperature Service
ASTM A536 (1984; R 2019; E 2019) Standard Specification for Ductile Iron Castings
ASTM A572/A572M (2021; E 2021) Standard Specification for High-Strength Low-Alloy Columbium-Vanadium Structural Steel
ASTM B209 (2014) Standard Specification for Aluminum and Aluminum-Alloy Sheet and Plate
ASTM B505/B505M (2022) Standard Specification for Copper Alloy Continuous Castings
ASTM B733 (2022) Standard Specification For Autocatalytic (Electroless) Nickel-Phosphorus Coatings On Metal
ASTM D7647 (2010; R 2018) Standard Test Method for Automatic Particle Counting of Lubricating and Hydraulic Fluids Using Dilution Techniques to Eliminate the Contribution of Water and Interfering Soft Particles by Light Extinction
ASTM G48 (2011; R 2015) Standard Test Methods for Pitting and Crevice Corrosion Resistance of Stainless Steels and Related Alloys by Use of Ferric Chloride Solution
INTERNATIONAL ORGANIZATION FOR STANDARDIZATION (ISO)
ISO 1219-1 (2012; Amd 1 2016) Fluid Power Systems and Components Graphic Symbols and Circuit Diagrams - Part 1: Graphic Symbols for Conventional Use and Data-Processing Applications
ISO 1219-2 (2012) Fluid Power Systems and Components Graphic Symbols and Circuit Diagrams - Part 2: Circuit Diagrams
ISO 1817 (2015) Rubber, Vulcanized or Thermoplastic
- Determination of the Effect of Liquids - Sixth Edition
SECTION 35 05 40.14 26 Page 9
ISO 4287 (1997, Amd 1 2009)Geometrical Product Specifications (GPS) - Surface Texture:
Profile Method - Terms, Definitions and Surface Texture Parameters - First Edition
ISO 4288 (1996, Corr 1 1998)Geometrical Product Specifications (GPS) - Surface Texture:
Profile Method - Rules and Procedures for the Assessment of Surface Texture - Second Edition
ISO 4401 (2005) Hydraulic Fluid Power - Four-port Directional Control Valves - Mounting Surfaces
ISO 4406 (2021) Hydraulic Fluid Power - Fluids - Method for Coding the Level of Contamination by Solid Particles
ISO 4413 (2010) Hydraulic Fluid Power — General Rules and Safety Requirements for Systems and Their Components
ISO 5817 (2014) Welding - Fusion-Welded Joints in Steel, Nickel, Titanium And Their Alloys (Beam Welding Excluded) - Quality Levels For Imperfections - Third Edition
ISO 6507 (2018) Metallic Materials -- Vickers Hardness Test -- Part 1: Test Method - Fourth Edition
ISO 7368 (2016) Hydraulic Fluid Power - Two-port slip-in cartridge valves - Cavities
ISO 7789 (2007) Hydraulic Fluid Power - Two-, Three-, and Four-port Screw-In Cartridge Valves - Cavities
ISO 9001 (2015) Quality Management Systems- Requirements
ISO 9223 (2012) Corrosion of Metals and Alloys — Corrosivity of Atmospheres — Classification, Determination and Estimation - Second Edition
ISO 15614-7 (2016) Specification and Qualification of Welding Procedures for Metallic Materials
- Welding Procedure Test - Part 7: Overlay Welding - Second Edition
MANUFACTURERS STANDARDIZATION SOCIETY OF THE VALVE AND FITTINGS
INDUSTRY (MSS)
MSS SP-58 (2018) Pipe Hangers and Supports - Materials, Design and Manufacture, Selection, Application, and Installation
SECTION 35 05 40.14 26 Page 10
NATIONAL ELECTRICAL MANUFACTURERS ASSOCIATION (NEMA)
NEMA MG 1 (2021) Motors and Generators
SOCIETY OF AUTOMOTIVE ENGINEERS INTERNATIONAL (SAE)
SAE J514 (2012) Hydraulic Tube Fittings
SAE J517 (2020) Hydraulic Hose
SAE J518-1 (2013) Hydraulic Flanged Tube, Pipe, and Hose Connections, 4-Screw Flange Connection Part 1: 3.5 MPa to 35 MPa (Code 61)
SAE J1273 (2020) Recommended Practices for Hydraulic Hose Assemblies.
1.3 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals having an "I" designation are for information only. A designation following the "G" or "I" designation identifies the office that will review the submittal for the Government. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
SD-01 Preconstruction Submittals
Notification Of Shop Testing ; I HDC
Shop Testing Plan ; G, HDC
Pressure Testing Plan ; G, HDC
Functional Testing Plan ; G, HDC
Hydraulic Cylinder Packaging Plan ; I, HDC
Cylinders Designated For Long Term Storage ; I, HDC
Hydraulic Cylinder Shop Testing Plan ; G, HDC
Hydraulic Power Unit Shop Testing Plan ; G, HDC
Control Station Shop Testing Plan ; G, HDC
Installation Procedures ; G, HDC
Removal Procedures ; G, HDC
Dimensional Verification Procedure ; G, HDC
Cylinder Manufacturers Qc Procedures ; I, HDC
On-Site Storage Plan ; I, HDC
Operational Testing Plan ; G, HDC
SECTION 35 05 40.14 26 Page 11
Manifold Plating Procedure
Spill Protection, Controls And Countermeasures Plan (Testing) ; G, HDC, C
Hydraulic Cylinder Testing Plan ; G, HDC
Initial Conference
SD-02 Shop Drawings
SD-03 Product Data
Electrical Equipment ; G, HDC
Design and Performance Requirements ; G, HDC
Cleaning and Flushing ; G, HDC
Seals, O-Rings, and Bearing Material ; G, HDC
Rod Coating Data ; G, HDC
Component And Fluid Compatibility ; G, HDC
SD-05 Design Data
Packaging Details ; G, HDC
Nameplates ; G, HDC
Hydraulic Cylinders ; G, HDC
Cylinder Handling Device ; G, HDC
Hydraulic Power Unit ; G, HDC
Control Station ; G, HDC
Piping System ; G, HDC
Pipe Supports ; G, HDC
Stub Piston Rods And Couplings ; G, HDC
Miscellaneous Equipment ; G, HDC
3D Computer Model
SD-06 Test Reports
Shop Testing Report ; G, HDC
Pressure Testing Report ; G, HDC
Operational Testing Report ; G, HDC
Dimensional Verification Report ; I, HDC
SECTION 35 05 40.14 26 Page 12
Functional Test Report ; G, HDC
Cylinder Handling Device Load Test Report ; I, HDC
Post-Plating Quality Control Report ; G, HDC
Hydraulic Cylinder Testing Report ; G, HDC
SD-07 Certificates
Erection Engineer ; G, HDC
Training Instructor ; G, HDC
Registered Professional Mechanical Engineer ; G, HDC
SD-10 Operation and Maintenance Data
Sample Training Course Materials ; G, HDC
1.4 DESIGN AND PERFORMANCE REQUIREMENTS
The Contract drawings indicate the general arrangement and conceptual design of the hydraulic power system and other pertinent features.
Finalize the design with selected hydraulic components and equipment in accordance with the requirements of this SECTION and with ISO 4413 .
1.4.1 Definitions
The following terms are used throughout this specification SECTION:
a. High Pressure - That part of the system between the outlet of each pump and the pressure side of the single action gate cylinders, including, but not limited to: All piping between pump outlets, supply distribution header, control manifolds, and all piping and hoses connected to the high pressure side of the cylinder.
b. Low Pressure - That part of the system between the return side of the single action cylinders to the pump inlet, including but not limited to: all piping and hoses between the the return side of the cylinder and the return header, return header piping, oil storage tanks, and pump supply piping.
c. Normal Operating Pressure - The pressure required to raise the gate under balanced head conditions.
d. System Rated Pressure - Maximum pressure in the system during regular operation. Pressure used for selecting catalog/off-the-shelf components.
1.4.2 System Summary
The following paragraphs provide a brief narrative of how the hydraulic power system is configured and operated. It is a summary and is not an inclusive description of all features or operating conditions.
The intake gate hydraulic system operates the intake gates for the 6 main units. Each main unit has 3 intake gates. Intake gates are supported in each gate slot by a support beam and operated with one cylinder. The
SECTION 35 05 40.14 26 Page 13 intake gates are connected to the cylinders by stub piston rods and couplings. All intake gates, support beams, stub shafts, and cylinders are interchangeable.
A centralized hydraulic power unit (HPU) is shared by all units.
Hydraulic fluid is distributed through a system of two headers. A hydraulic fluid reservoir tank is positioned on the intake deck and provides make-up fluid and storage capacity. Control stations at each unit are used to control the gates for that unit. Gates are raised using hydraulic pressure from the HPU and lower under gravity. Flow control valves at the control stations limit the closing speed.
The gates are typically operated using the local controls at the control stations. This Contract adds remote control, to the powerhouse control room, for an automated closure scheme.
Under normal operating conditions, the gates are suspended in the raised position using pressurized oil. The pressurization pump automatically activates based off pressure switches to ensure the gates do not drift under gravity.
1.4.3 Design Parameters
The principal design parameters for the hydraulic power system are as follows and were developed at the minimum operating temperature and utilizing the hydraulic fluid as specified:
a. System Rated Pressure: 3000 psi
b. Normal Operating Pressure: 2000 psi
c. Load Due to Crane Maximum Motor Torque: 568 kip
d. Minimum Cylinder Stroke: 47 feet - 4.75 inches, contractor to verify
e. Cylinder Piston Area (high pressure side): 143.5 square inches, minimum
f. Cylinder Maximum Outer Diameter: 26 inches
g. Lowering Flow Rate: To be determined based off cylinder dimensions and speed listed below.
h. Raising flow rate: 13 gpm, per gate, minimum
i. Lowering Speed:
1) Normal: 12 feet per minute (+/- 10%)
2) Cushion Zones: 7 feet per minute (+/- 10%)
3) Safety Orifice: 40 feet per minute (maximum)
j. Minimum Ambient Temperature: 0 degrees F
SECTION 35 05 40.14 26 Page 14
1.4.4 Allowable Stresses
1.4.4.1 Load Cases and Allowable Stresses
When selecting off the shelf components, size using the system rated pressure. For design of items not governed by a referenced code or specified otherwise, use all of the following load cases and allowable stresses:
a. Load Case 1 (LC1) - Stresses resulting from forces due to normal operating pressure of the system: 20 percent of the ultimate tensile strength of the materials involved.
b. Load Case 2 (LC2) - Stresses resulting from forces due to the the rated pressure of the system: 50 percent of the material yield strength.
c. Load Case 3 (LC3) - Stresses resulting from forces due to the maximum motor torque of the intake crane while raising the cylinder/intake gate assembly: 75 percent of the yield strength of the materials involved. The hoist load due to a maximum motor event is 568 kips. Note this load case only applies to the load path through the piston rod and hoist locking device when removing the cylinder gate assembly from the slot and is not applicable to the components.
1.4.4.2 Stress Concentration Factors
Use stress concentration factors where applicable. Reduction of allowable stresses to compensate for repeated cycles of loading is not required.
1.4.5 Corrosivity Environment Category
Design hydraulic cylinders, cylinder rods and components to meet the corrosivity category CX in accordance with ISO 9223 to meet anticipated atmospheric environment the cylinders and piston rods will be operating within.
1.4.6 Connections
1.4.6.1 Pinned Connections
Design pinned hydraulic cylinder connections for field assembly.
1.4.6.2 Shop Connections
Design shop connections for assembly by means of welding or by bolting.
1.4.6.3 Welded Connections
a. Design welded connections, for components not subject to being pressurized, in accordance with AWS D1.1/D1.1M except that provisions for repeated stress is not required.
b. Design welds for hydraulic cylinders in accordance with ASME BPVC.
c. Design welds for piping in accordance with ASME B31.1 .
d. U-stamp requirements per ASME BPVC are waived.
SECTION 35 05 40.14 26 Page 15
1.5 QUALITY ASSURANCE
1.5.1 Hydraulic System Designer Qualifications
All calculations and drawings for the hydraulic system and hoist, including the hoist locking device, stub piston rod, and couplings must be prepared, or fully reviewed, and stamped by a Registered Professional Mechanical Engineer ; submit qualifications for the engineer(s) who will be stamping these submittals. Additionally, each Professional Mechanical Engineer must minimum of five years experience designing the equipment or system(s) they are responsible for ( e.g. i.e. the hydraulic cylinder designer must have five years of specific hydraulic cylinder design experience). The submittal must include evidence or documentation, such as a resume.
1.5.2 Submittal Packages
1.5.2.1 Submittal Package General Requirements
Submit comprehensive and complete submittal packages for each of the following components or system of components:
a. Hydraulic Cylinders , including hoist locking device
b. Cylinder Handling Device
c. Hydraulic Power Unit
d. Control Station
e. Piping System including new high- and low- pressure headers
f. Pipe Supports
g. Stub Piston Rods and Couplings
For any equipment not covered by the above, submit Miscellaneous Equipment submittal package.
1.5.2.2 Submittal Package Contents
Submittal Packages must be complete and include all relevant information and data for the equipment being submitted. Submittal Packages that are not complete will be returned to the Contractor for corrections without further review. Submittal packages must include the following elements, at a minimum. The requirements for each element are described in the paragraphs that follow:
a. Drawings, including fabrication drawings, shop drawings, and/or schematics
b. Product data
c. Calculations
1.5.2.3 Initial Conference
For each Submittal Package identified above, the Contractor must schedule an Initial Conference. The purpose of the Initial Conference is to allow
SECTION 35 05 40.14 26 Page 16 the Contractor opportunity solicit feedback on the design progress and resolve any outstanding issues or questions prior to finalizing the design. The Contractor shall provide notification to the Government a minimum of 14 days prior to the proposed date.
Include the following in the notification, as applicable and for information only:
a. Draft submittals
b. 3-dimensional models in a format that is viewable/readable through an Internet browser.
c. Questions for the Government regarding the Contract Requirements
d. Potential variance requests including complete justification
Initial Conferences must be scheduled to last no more than 4 hours. The Contractor should assume that each conference will be held in a remote/virtual environment such as Microsoft Teams or Webex. The Contractor is responsible for keeping and publishing minutes from each conference. Meeting minutes shall be published within 24 hours of the meeting.
1.5.3 Drawings
1.5.3.1 General Drawing Requirements
In addition to the requirements in SECTION 01 33 00 SUBMITTAL PROCEDURES, the following requirements apply to all drawing packages that are submitted:
a. Provide a drawing index for each drawing package submitted.
b. Provide a bill of materials or parts list with each drawing package.
c. Drawing index and bill of materials must have a title block, border, and sheet number compatible with the drawing set.
d. For the bill of materials, provide a cross reference between manufacturer data and shop drawings.
e. Provide the weight of components and/or assemblies of components.
When components can be filled with hydraulic fluid, provide weights full and empty.
f. Symbology and terminology across ALL drawings and schematics must be identical and cohesive, regardless of whether they are prepared by the same supplier or sub-contractor.
1.5.3.2 Fabrication Drawings
Where fabrication drawings are required, they must provide the complete details for each component including materials of construction, dimensions, tolerances, machined surface finishes, connections, weld details, and coating requirements. All weld detail callouts must include annotation referencing the appropriate welding procedure specification, non-destructive examination requirements, and notation to differentiate shop welds from field welds.
SECTION 35 05 40.14 26 Page 17
1.5.3.3 Hydraulic Cylinder Drawings
Submit detailed assembly drawings for the hydraulic cylinders that show the following:
a. Longitudinal section through the cylinder showing the complete assembly.
b. Installation and connection details of the cylinder to the support beam and intake gate, including lifting procedure via the intake crane.
c. Installation and connection details of the cylinder to the supply and return piping.
d. Fabrication drawings for each component in the hydraulic cylinder.
e. Transportation, handling and lifting drawings, including proper support and restraints during shipping and transport as well as instructions to take cylinders from the horizontal-to-vertical position and vertical-to-horizontal position.
1.5.3.4 Hydraulic Power Unit Drawings
Submit detailed assembly drawings for hydraulic power units (HPU) showing the following:
a. General arrangement of components and outline dimensions of unit.
Label all valves and ports and identify all line sizes.
b. Detail drawings of the connection between the HPU and the piping system.
c. Detail drawings of the HPU control panel installation and orientation.
d. Fabrication drawings for each component in the HPU.
1.5.3.5 Piping Drawings
Submit drawings for all new piping and tubing systems that show the following:
a. General arrangement of new piping and appurtenances including new high and low-pressure headers, connections between the headers and the control stations, connections between the accumulators and the headers, connection between the new HPU and the headers, and connection between the headers and the hydraulic fluid storage tank.
Label all valves and ports and identify all line sizes.
b. Fabrication drawings for each new piping or tube segment.
c. Fabrication drawings for each new hose.
d. Fabrication and assembly drawings for new pipe supports.
1.5.3.6 Control Drawings
Submit detailed drawings for the new control stations that show the
SECTION 35 05 40.14 26 Page 18 following:
a. General arrangement of the new control stations showing all components in their installed arrangement and orientation.
b. Detail drawings for of the control station installation.
b. Fabrication drawings for each component. Include section views of the manifold blocks to show all internal passageways.
1.5.3.7 Hydraulic Schematic
Submit hydraulic schematics for all portions of the hydraulic system.
Prepare schematics in accordance with ISO 1219-1 and ISO 1219-2 and the following additional requirements:
a. Show all, and clearly identify and label, hydraulic components including valves and pumps.
b. Indicate all setpoint and size parameters for each component.
c. The new hydraulic schematics must incorporate all existing components that will remain and all new or replaced components and devices. Clearly differentiate between new and existing components.
d. Where schematics are split over multiple drawing sheets, break lines or continuation lines must be clearly identified.
e. Provide a key or legend for each schematic that identifies all equipment included in that schematic.
1.5.3.8 Electrical Drawings
Provide electrical as-built and submittal drawings, as required per Section 26 05 00.00 26 , BASIC ELECTRICAL MATERIALS AND METHODS.
1.5.3.9 3D Computer Model
If 3D computer modeling is employed for the design of any component of the intake gate hydraulic system, submit the 3D Computer Model files for all modeled components and assemblies to the government. Submit the 3D Computer Model files in a file type compatible with government software, unless otherwise approved.
1.5.4 Product Data
Submit complete descriptive literature with drawings and specifications of each product or system of products provided. Product data literature shall include legible manufacturer's cut sheets and data sheets to clearly indicate physical construction, operation, mechanical, electrical and structural characteristics and associated hardware, as applicable.
For sheets with extraneous data, clearly indicate which data applies by crossing out non-applicable models, circling the correct options, etc.
Include manufacturer's catalog numbers and designations, and clearly cross-reference with shop drawings as appropriate.
For product data submitted for approval, clearly show conformance with these specifications, including, but not limited to product manufacturers'
SECTION 35 05 40.14 26 Page 19 declarations of conformance to applicable technical standards. Product data will be used for supporting approval of components shown or listed on the drawings.
1.5.5 Calculations
1.5.5.1 Calculation Requirements
All submitted calculations must show that the component or system of components conform the the requirements of the specifications. Submitted calculations must conform to the following requirements:
a. Write calculations in an explicit, step-by-step logical order with a full narrative description.
b. State all assumptions that are made.
c. Clearly define all equations, constants and variables, with sources cited.
d. Note all specified or assumed efficiencies and factors of safety.
e. Include free body diagrams, or sketches of each load case.
When FEA data is submitted, it shall be submitted in addition to, not instead of, the above calculations . FEA shall be presented in report format. FEA report shall include clear indication of all load scenarios, visual and narrative description of load location and application, boundary conditions / fixtures, global mesh attributes, detailed mesh attributes where mesh refinement is required, reasoning for mesh refinement, verification that actual material is consistent with material used in the model, narrative explanation of any peak stresses noted, and narrative explanation of any peak deflections noted. Submit electronic files of the model, preprocessing and post-processing files for any FEA performed.
1.5.5.2 Calculation Packages
In additional to the general requirements above, there are the following requirements for specific packages:
a. Hydraulic Power Unit Design Calculations including, pump sizing, piping selection, frame structural calculations, frame lifting point calculations.
b. Control Station Design Calculations, including sizing of flow paths/ports.
c. Piping Design Calculations including headers, gate piping, miscellaneous piping, and accumulator tanks installed on the headers.
1.6 COMPONENT AND FLUID COMPATIBILITY
1.6.1 General Compatibility Requirements
Any component that comes into contact with the hydraulic fluid must be rated by the component manufacturer for use with the class/type of fluid specified in this contract or satisfactory performance must be proven by testing. No corrosion, material deterioration, or functional impact of the
SECTION 35 05 40.14 26 Page 20 component is to occur due to its exposure to the specified and provide hydraulic fluid. Submit manufacturer's ratings and/or testing results as part of the applicable product data package(s).
Additional compatibility requirements specific to certain components are listed under the PARAGRAPHS for those component.
1.6.2 Manufacturer's Published Ratings
If the manufacturer has published ratings or catalog data that show compatibility with the specified fluid type, that published data may be submitted as sufficient proof of component compatibility.
1.6.3 Compatibility Testing
If manufacturer's published data regarding compatibility does not exist, perform compatibility testing to prove compatibility. Relevant tests include, but may not be limited to: material absorption, swell, and degradation (including corrosion). Testing must be performed in accordance with ASTM or other similar published test methods. Clearly indicate what standard tests were used to prove compatibility, including what metrics were used to define the range of allowable/acceptable results.
1.7 QUALITY CONTROL
In addition to the requirements of Section 01 45 04.00 28 CONTRACTOR QUALITY CONTROL, establish and maintain quality control for operations to assure compliance with Contract requirements and maintain records of quality control for all materials, fabricated parts, equipment, and construction operations.