25R0003 - Amendment-0004 Tech Specs.pdf
PDF 98 KB Posted
- Attached to
- Mill Creek Diversion Dam Fish Ladder
- Solicitation number
- W912EF25R0003
About this file
This is a technical specification section (32 84 23.00 28) detailing requirements for underground sprinklers at the Mill Creek Diversion Dam Fish Ladder project for the US Army Corps of Engineers Walla Walla District. The specification covers the repair, relocation and installation of sprinkler system components at Rook's Park, where existing underground sprinkler lines vary from 3/4" to 4" in size.
The document outlines detailed requirements for PVC pipe materials (Schedule 40 or SDR 21 Class 200), fittings, solvent cement, and installation procedures. Key requirements include: 5-day advance notice to the Contracting Officer before work near sprinkler systems, use of expansive coupling for repairs, reuse of existing sprinkler heads when possible, installation after site grading completion, pressure testing before backfilling, and specific installation parameters including temperature restrictions (above 40°F) and serpentine pipe laying for expansion/contraction. The specification requires solvent-cemented joints per ASTM D2855 standards and mandates clean water flushing of all pipes until free of foreign materials, with Contracting Officer witness and acceptance of the cleaning process.
View the file
Other files
Show all 28
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Mill Creek Diversion Dam Fish Ladder W912EF25R0003
MCL475720DDFL
PROJECT TABLE OF CONTENTS
DI VI SI ON 01 - GENERAL REQUI REMENTS
01 00 00.00 28 GENERAL REQUIREMENTS
01 11 01.00 28 SUPPLEMENTARY REQUIREMENTS
01 14 00.10 28 PROJECT SITE RESTRICTIONS
01 14 00.30 28 SURFACE FINISH REQUIREMENTS - BIOLOGICAL
01 14 00.90 28 INTEGRATING ANTITERRORISM (AT) AND OPERATIONS SECURITY
(OPSEC)
01 22 00.00 28 MEASUREMENT AND PAYMENT
01 32 01.00 28 PROJECT SCHEDULE
01 33 00 SUBMITTAL PROCEDURES
01 35 29.10 28 GOVERNMENTAL SAFETY REQUIREMENTS
01 42 00 SOURCES FOR REFERENCE PUBLICATIONS
01 45 01.00 28 RESIDENT MANAGEMENT SYSTEM CONTRACTOR MODE (RMS CM)
01 45 04.00 28 CONTRACTOR QUALITY CONTROL
01 51 00.00 28 TEMPORARY UTILITIES
01 54 19.10 28 MOBILE CRANE REQUIREMENTS
01 55 10.00 28 CONTRACTOR WORK, ACCESS AND STORAGE AREAS
01 57 20.00 28 ENVIRONMENTAL PROTECTION
01 71 23.01 28 CONTRACTOR SURVEYS AND REMOTE SENSING DATA COLLECTION
01 78 00.00 28 CLOSEOUT SUBMITTALS
01 78 23.00 28 OPERATION AND MAINTENANCE DATA
01 91 00.00 28 SYSTEMS TESTING AND COMMISSIONING
DI VI SI ON 02 - EXI STI NG CONDI TI ONS
02 24 10.30 28 TRAPPED FISH CAPTURE AND RELEASE
02 24 20.00 28 WATER QUALITY MONITORING
02 32 13.00 28 SUBSURFACE DRILLING AND SAMPLING
02 41 00.00 28 DEMOLITION
DI VI SI ON 03 - CONCRETE
03 30 00.00 28 CAST-IN-PLACE CONCRETE
03 60 00.00 28 CONCRETE CORING, DRILLING, AND CUTTING
DI VI SI ON 05 - METALS
05 05 20.00 28 POST-INSTALLED CONCRETE ANCHORS
05 05 23.00 28 STRUCTURAL STEEL, METALWORK FABRICATION, AND WELDING
DI VI SI ON 06 - WOOD, PLASTI CS, AND COMPOSI TES
06 82 14.00 28 FIBERGLASS REINFORCED PLASTIC (FRP) WALKWAYS
DI VI SI ON 14 - CONVEYI NG EQUI PMENT
14 84 23.20 28 GATE HOISTING EQUIPMENT
DI VI SI ON 25 - I NTEGRATED AUTOMATI ON
25 05 11.00 28 CYBERSECURITY
25 31 00.01 28 ELECTRICAL CONTROL AND RELAY PANEL
DI VI SI ON 26 - ELECTRI CAL
26 05 00.00 28 GENERAL ELECTRICAL WORK
PROJECT TABLE OF CONTENTS Page 1 Amendment - 0004
26 05 19.00 28 INSULATED WIRE AND CABLE
26 05 26.11 28 GROUNDING
26 05 33.11 28 RACEWAYS AND BOXES FOR ELECTRICAL SYSTEMS
26 05 71.11 28 LOW VOLTAGE OVERCURRENT PROTECTIVE DEVICES
26 20 00.00 28 INTERIOR DISTRIBUTION SYSTEM
26 24 16.11 28 PANELBOARDS
26 56 00.00 28 EXTERIOR LIGHTING
DI VI SI ON 28 - ELECTRONI C SAFETY AND SECURI TY
28 05 26.11 28 GROUNDING AND BONDING FOR ELECTRONIC SAFETY AND SECURITY
DI VI SI ON 31 - EARTHWORK
31 00 00.00 28 EARTHWORK
31 11 00.00 28 CLEARING AND GRUBBING
31 23 19.11 28 DIVERSION AND CARE OF WATER
DI VI SI ON 32 - EXTERI OR I MPROVEMENTS
32 12 16.11 28 ASPHALT PAVING
32 17 23.00 28 PAVEMENT MARKINGS
32 31 13.00 28 CHAIN LINK FENCES AND GATES
32 84 23.00 28 UNDERGROUND SPRINKLERS
32 92 23.00 28 SODDING
32 93 00.00 28 EXTERIOR PLANTS
DI VI SI ON 33 - UTI LI TI ES
33 51 43.00 28 INSTRUMENTATION AND PERFORMANCE MONITORING OF STRUCTURES
33 71 02.00 28 UNDERGROUND ELECTRICAL DISTRIBUTION
DI VI SI ON 35 - WATERWAY AND MARI NE CONSTRUCTI ON
35 20 16.00 28 SLIDE GATES AND ACTUATORS
35 20 20.00 28 ELECTRICAL EQUIPMENT FOR GATE HOIST
DI VI SI ON 40 - PROCESS I NTERCONNECTI ONS
40 92 13.10 28 MOTORIZED GATE AND VALVE ACTUATORS
40 94 43.01 28 PROCESS CONTROLLERS - PROGRAMMABLE LOGIC CONTROLLERS (PLC)
-- End of Project Table of Contents --
PROJECT TABLE OF CONTENTS Page 2 Amendment - 0004 g4ecctgh Line Amendment-0004 - Section 32 84 23.00 28 "UNDERGROUND SPRINKLERS"
SECTION TABLE OF CONTENTS
DIVISION 32 - EXTERIOR IMPROVEMENTS
SECTION 32 84 23.00 28
UNDERGROUND SPRINKLERS
PART 1 GENERAL
1.1 REFERENCES
1.2 SUBMITTALS
1.3 SYSTEM DESCRIPTION
1.3.1 Repair and Relocation of Sprinkler Irrigation Piping
1.4 DELIVERY, STORAGE, AND HANDLING
PART 2 PRODUCTS
2.1 MATERIALS
2.2 PIPING MATERIALS
2.2.1 Polyvinyl Chloride (PVC) Pipe, Fittings and Solvent Cement
2.2.1.1 PVC Pipe
2.2.1.2 PVC Fittings
2.2.1.3 Solvent Cement
2.3 SPRINKLER HEADS
PART 3 EXECUTION
3.1 EXAMINATION
3.2 INSTALLATION
3.2.1 Piping Installation
3.2.1.1 Polyvinyl Chloride (PVC) Pipe
3.2.2 Sprinklers
3.2.3 Adjustment
3.2.4 Cleaning of Piping
3.3 FIELD TESTS
3.3.1 Operation Test
3.4 CLEANUP
-- End of Section Table of Contents --
SECTION 32 84 23.00 28 Page 1 Amendment - 0004 g4ecctgh Line Amendment-0004 - Section 32 84 23.00 28 - Article 1.3 "SYSTEM DESCRIPTION" g4ecctgh
Amendment-0004 - Section 32 84 23.00 28 - Paragraph 1.3.1 "Repair and Relocation of Sprinkler Irrigation Piping"
THIS PAGE INTENTIONALLY LEFT BLANK
SECTION 32 84 23.00 28 Page 2
SECTION 32 84 23.00 28
UNDERGROUND SPRINKLERS
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
ASTM INTERNATIONAL (ASTM)
ASTM D1785 (2015; E 2018) Standard Specification for Poly(Vinyl Chloride) (PVC), Plastic Pipe, Schedules 40, 80, and 120
ASTM D2241 (2015) Standard Specification for Poly(Vinyl Chloride) (PVC) Pressure-Rated Pipe (SDR Series)
ASTM D2464 (2015) Standard Specification for Threaded Poly(Vinyl Chloride) (PVC) Plastic Pipe Fittings, Schedule 80
ASTM D2466 (2017) Standard Specification for Poly(Vinyl Chloride) (PVC) Plastic Pipe Fittings, Schedule 40
ASTM D2564 (2020) Standard Specification for Solvent Cements for Poly(Vinyl Chloride) (PVC) Plastic Piping Systems
ASTM D2774 (2021) Underground Installation of Thermoplastic Pressure Piping
ASTM D2855 (2015) Standard Practice for Making Solvent-Cemented Joints with Poly(Vinyl Chloride) (PVC) Pipe and Fittings
1.2 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals having an "I" designation are for information only. When used, a designation following the "G" or "I" designation identifies the office that will review the submittal for the Government. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
SD-03 Product Data
Pvc Pipe ; I, C
Pvc Fittings ; I, C
SECTION 32 84 23.00 28 Page 3
Solvent Cement ; I, C
SD-06 Test Reports
Operation Test ; G, C
1.3 SYSTEM DESCRIPTION
Rook's Park has an existing underground sprinkler system. Lines vary in size from 3/4" to 4". The Contractor shall notify the Contracting Officer a minimum of 5 days prior to excavating construction activities in the vicinity of the sprinkler system to ensure the sprinkler systems are turned off prior to beginning the work. To the extent practicable, the Contractor shall locate sprinkler lines prior to excavations.
1.3.1 Repair and Relocation of Sprinkler Irrigation Piping
Sprinkler lines damaged during trenching , or other construction activities, shall be repaired using expansive coupling per manufacturer's recommendations. Only adhesives approved by the manufacturer for the type of sprinkler line encountered shall be used.
Where sprinkler lines are to be relocated, or replaced due to damage, the Contractor shall install new piping in accordance with these specifications and to be compatible with the existing system. Existing sprinkler heads shall be reused unless damaged.
1.4 DELIVERY, STORAGE, AND HANDLING
Protect all materials from the weather, excessive humidity, and temperature variation; direct sunlight (in the case of plastic or rubber materials); and dirt, dust, or other contaminants.
PART 2 PRODUCTS
2.1 MATERIALS
Provide materials compatible with the existing irrigation system.
2.2 PIPING MATERIALS
2.2.1 Polyvinyl Chloride (PVC) Pipe, Fittings and Solvent Cement
2.2.1.1 PVC Pipe
Pipe shall conform to the requirements of ASTM D1785, PVC 1120 Schedule 40; or ASTM D2241, PVC 1120 SDR 21, Class 200.
2.2.1.2 PVC Fittings
Solvent welded socket type fittings shall conform to requirements of ASTM D2466, Schedule 40. Threaded type fittings shall conform to requirements of ASTM D2464, Schedule 80.
2.2.1.3 Solvent Cement
Solvent cement shall conform to the requirements of ASTM D2564.
SECTION 32 84 23.00 28 Page 4 Amendment - 0004 g4ecctgh Line Amendment-0004 - Section 32 84 23.00 28 - Article 1.3 g4ecctgh Line Amendment-0004 - Section 32 84 23.00 28 - Paragraph 1.3.1 g4ecctgh
Amendment-0004 - Section 32 84 23.00 28 - Paragraph 1.3.1 (Continued)
2.3 SPRINKLER HEADS
Existing sprinkler heads shall be salvaged and reused to the extent practicable.
PART 3 EXECUTION
3.1 EXAMINATION
After becoming familiar with all details of the work verify all dimensions in the field and advise the Contracting Officer of any discrepancy before performing the work.
3.2 INSTALLATION
Install sprinkler system components after site grading has been completed. Perform excavation, trenching, and backfilling in accordance with the applicable provisions of Section 31 00 00.00 28 EARTHWORK.
3.2.1 Piping Installation
3.2.1.1 Polyvinyl Chloride (PVC) Pipe
a. Solvent-cemented joints shall conform to the requirements of
ASTM D2855.
b. Threaded joints shall be full cut with a maximum of three threads remaining exposed on pipe and nipples. Threaded joints shall be made tight without recourse to wicks or fillers, other than polytetrafluoroethylene thread tape.
c. Piping shall be joined to conform with requirements of ASTM D2774 or ASTM D2855, and pipe manufacturer's instructions. Pipe shall be installed in a serpentine (snaked) manner to allow for expansion and contraction in trench before backfilling. Pipes shall be installed at temperatures over 40 degrees F .
3.2.2 Sprinklers
Sprinklers shall be installed plumb and level with terrain.
3.2.3 Adjustment
After grading, seeding, and rolling of planted areas, sprinkler heads shall be adjusted flush with finished grade. Adjustments shall be made by providing new nipples of proper length or by use of heads having an approved device, integral with head, which will permit adjustment in height of head without changing piping.
3.2.4 Cleaning of Piping
The interior of the pipe shall be flushed with clean water until pipe is free of all foreign materials. Flushing and cleaning out of system pipe, valves, and components shall not be considered completed until witnessed and accepted by Contracting Officer.
SECTION 32 84 23.00 28 Page 5
3.3 FIELD TESTS
3.3.1 Operation Test
Test the sprinkler line prior to backfilling by turning on the valve for that line, running water through the line, and visually inspecting the joint to verify there is no leakage.
3.4 CLEANUP
Upon completion of installation of system, all debris and surplus materials resulting from the work shall be removed.
-- End of Section --