Attachment_8Tech_Review_Document_12-17-15.doc

DOC document 182 KB Posted

Attached to
Lodging Buy, Pacific Region Federal contract opportunity
Solicitation number
W912DY-17-T-0241
Issued by
Department of the Army Corps of Engineers Engineering Support Center Huntsville

About this file

Attachment 8, Technical Document

View the file

Other files for this federal contract opportunity

Other files attached to Lodging Buy, Pacific Region, newest first.
File Type Posted
RFQ_Amendment_2.pdf PDF
090517_Bidders_Questions_Pacific_Region_Lodging_FY17.pdf PDF
082917_Bidders_Questions_Pacific_Region_Lodging_FY17.pdf PDF
AMD_082517_Att_1_Korea_Camp_Carroll_Army_Lodging_Pacific_Region_FY17.xlsx XLSX spreadsheet
AMD_082517_Att_1_Korea_Camp_Casey_Army_Lodging_Pacific_Region_FY17.xlsx XLSX spreadsheet
RFQ_Amendment_1.pdf PDF
AMD_082517_Att_2-FID-Army_Lodging_Pacific_Region_FY17.pdf PDF
082517_Bidders_Questions_Pacific_Region_Lodging_FY17.pdf PDF
AMD_082517_Att_1_Japan_Camp_Zama_Army_Lodging_Pacific_Region_FY17.xlsx XLSX spreadsheet
AMD_082517_Att_1_Korea_Camp_Humphreys_Army_Lodging_Pacific_Region_FY17.xlsx XLSX spreadsheet
Att_1_Korea_Camp_Humphreys_Army_Lodging_Pacific_Region_FY17.xlsx XLSX spreadsheet
Att_3_-_SOW_FY17_Lodging_Camp_Carroll.pdf PDF
Att_3_-_SOW_FY17_Lodging_Camp_Humphreys.pdf PDF
Att_3_-_SOW_FY17_Lodging_Camp_Casey.pdf PDF
Redacted_-_JA_FY17_Lodging_PACIFIC_25July2017_Redacted.pdf PDF
Att_3_-_SOW_FY17_Lodging_Camp_Zama.pdf PDF
Att_1_Japan_Camp_Zama_Army_Lodging_Pacific_Region_FY17.xlsx XLSX spreadsheet
Att_1_Korea_Camp_Carroll_Army_Lodging_Pacific_Region_FY17.xlsx XLSX spreadsheet
Att_1_Korea_Camp_Casey_Army_Lodging_Pacific_Region_FY17.xlsx XLSX spreadsheet
RFQ_W912DY-17-T-0241.pdf PDF
Att_2-FID-Army_Lodging_Pacific_Region_FY17.docx DOCX document
Show all 21

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

UH Technical Review Round # Camp Carroll, Camp Casey, Camp Humphreys, Korea and Camp Zama, Japan, Lodging Buy

Vendor Directions: The Technical Documents Checklist section (below) must be completed and returned in Word format by the contractor performing as the lead quoter. A quote that is submitted without the necessary documents compliance may not be considered for award. Each vendor shall demonstrate in written form how they are meeting the FID requirements. A blanket statement that vendor is meeting the FID requirements will not be acceptable. Manufacturer’s published catalogs and CAD drawings are acceptable forms of demonstrations.

Technical Documents Checklist

Vendor or Lead Quoter:

Point of Contact for this RFQ:

Email Address:

Telephone Number:

1. Are beds specified in this RFQ’s Attachment 2, Furniture Item Description (FID)?

Yes

If Yes, please continue to question 1a.

No

If No, please skip to question 2.

1a. Is a copy of the applicable pages of the quoter’s and teaming partner’s GSA Contracts and all modifications (or GSA correspondence showing modification is pending) with the approved bed model number and GSA-approved testing results, provided with the quote and highlighted?

Yes

If No, please do not continue; to be considered for award, technical documents shall be complete and formatted as stated above.

Bed frames that accommodate 53” or wider mattresses are exempt from the requirement for GSA approval of testing documents.

2. Are underbed drawers required in this RFQ’s FID?

Yes

If Yes, please continue to question 2a.

No

If No, please skip to question 3.

2a. Is a copy of the applicable pages of the quoter’s and teaming partner’s GSA Contracts and all modifications (or GSA correspondence showing modification is pending) with approved underbed drawer model number and GSA-approved testing results, provided with the quote and highlighted?

Yes

If No, please do not continue; to be considered for award, technical documents shall be complete and formatted as stated above.

3. Are wooden casegoods required in this RFQ’s FID?

Yes

If Yes, please continue to question 3a and 3b.

No

If No, please skip to question 4.

3a. Is GSA-approved documentation provided with the quote, which shows contractor meets Department of Army-UH Furnishings Program Specifications?

Yes

If No, please do not continue; Vendor is not eligible to provide furnishings for a procurement that may result from this RFQ.

3b. Is a copy of the applicable pages of the quoter’s and teaming partner’s GSA Contracts and All Modifications (or GSA correspondence showing modification is pending) with the quote, and highlighted to show model numbers and salient features to meet the FID?

Yes

If No, please do not continue; to be considered for award, technical documents shall be complete and formatted as stated above.

4. Are metal casegoods required in this RFQ’s FID?

Yes

If Yes, please continue to question 4a and 4b.

No

If No, please do not complete this section

4a. Is a copy of the applicable pages of the quoter’s and teaming partner’s GSA Contracts and all modifications (or GSA correspondence showing modification is pending) with the quote, and highlighted to show model numbers and salient features to meet the FID?

Yes

If No, please do not continue; to be considered for award, technical documents shall be complete and formatted as stated above.

4b. Is the manufacturer’s metal casegood specifications, along with salient features highlighted, provided with the contractor’s quote?

Yes

If No, please do not continue; to be considered for award, technical documents shall be complete and formatted as stated above.

5. Are technical documents organized sequentially according to the Furniture Item Descriptions (FID)?

Yes

No

If No, please do not continue; to be considered for award, technical documents shall be organized sequentially according to the FID.

Vendors: Do not go beyond this point unless requested by the Government during clarifications or communications.

Vendor Technical Review of Quoted Items

FID Items Requiring Clarification
HNC Clarifications:

Vendor Reply: (Green Shaded Area)

HNC

Accept

(Yes/No)

1.

1st Round HNC:

1st Round Vendor:

2nd Round HNC:

2nd Round Vendor:

3rd Round HNC:

3rd Round Vendor:

2.

1st Round HNC:

1st Round Vendor:

2nd Round HNC:

2nd Round Vendor:

3rd Round HNC:

3rd Round Vendor:

3.

1st Round HNC:

1st Round Vendor:

2nd Round HNC:

2nd Round Vendor:

3rd Round HNC:

3rd Round Vendor:

4.

1st Round HNC:

1st Round Vendor:

2nd Round HNC:

2nd Round Vendor:

3rd Round HNC:

3rd Round Vendor:

5.

1st Round HNC:

1st Round Vendor:

2nd Round HNC:

2nd Round Vendor:

3rd Round HNC:

3rd Round Vendor:

6.

1st Round HNC:

1st Round Vendor:

2nd Round HNC:

2nd Round Vendor:

3rd Round HNC:

3rd Round Vendor:

7.

1st Round HNC:

1st Round Vendor:

2nd Round HNC:

2nd Round Vendor:

3rd Round HNC:

3rd Round Vendor:

8.

1st Round HNC:

1st Round Vendor:

2nd Round HNC:

2nd Round Vendor:

3rd Round HNC:

3rd Round Vendor:

9.

1st Round HNC:

1st Round Vendor:

2nd Round HNC:

2nd Round Vendor:

3rd Round HNC:

3rd Round Vendor:

10.

1st Round HNC:

1st Round Vendor:

2nd Round HNC:

2nd Round Vendor:

3rd Round HNC:

3rd Round Vendor:

11.

1st Round HNC:

1st Round Vendor:

2nd Round HNC:

2nd Round Vendor:

3rd Round HNC:

3rd Round Vendor:

12.

1st Round HNC:

1st Round Vendor:

2nd Round HNC:

2nd Round Vendor:

3rd Round HNC:

3rd Round Vendor:

13.

1st Round HNC:

1st Round Vendor:

2nd Round HNC:

2nd Round Vendor:

3rd Round HNC:

3rd Round Vendor:

14.

1st Round HNC:

1st Round Vendor:

2nd Round HNC:

2nd Round Vendor:

3rd Round HNC:

3rd Round Vendor:

To be filled in by HNC only:

1st Round Technical Review

Technically Acceptable:
Yes:

No:

Date:

HNC Technical Evaluator:

Comments:

2nd Round Technical Review

Technically Acceptable:
Yes:

No:

Date:

HNC Technical Evaluator:

Comments:

3rd Round Technical Review

Technically Acceptable:
Yes:

No:

Date:

HNC Technical Evaluator:

Comments:

Attachment 8

Tech Review Document 12-17-15.doc

File details come from the government source that posted it. Updated .