ATTACHMENT_H_-_Schedule_B_worksheet-HNC_180611.XLS
XLS spreadsheet 139 KB Posted
- Attached to
- OE Design Center For Robotics Services
- Solicitation number
- W912DY-16-R-0046
About this file
This synopsis announces an indefinite delivery contract for robotics services to support military munitions responses and other munitions-related services. The U.S. Army Corps of Engineers seeks proposals for a single-award task order contract to locate, identify, recover, evaluate, manage, and dispose of material potentially containing explosive hazards and munitions debris at sites across the contiguous U.S., Alaska, Hawaii, and U.S. territories. Work may include assessments, investigations, remedial actions, data management, training, permitting, and logistical support. Offerors must be capable of performing conventional munitions responses and hazardous waste remediation. The period of performance is two base years with three one-year options. The NAICS code is 562910 and proposals are due by May 4th, 2018. Awards will be made based on technical capability, technical approach, past performance, and price. The solicitation will be available on FedBizOpps on May 7th, 2018.
ATTACHMENT H - Schedule B
View the file
Other files
Show all 29
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Base Year FFP
| FFP CEILING BURDENED HOURLY RATES EXCLUDING PROFIT - BASE YEAR | ||||||
| Labor Category | Hourly Rate | Overtime Rate | 4% Hazard | 8% Hazard | O/T + 4% Hazard | O/T + 8% Hazard |
| Program Manager | HAZARD PAY IS NOT GENERALLY APPLCABLE TO THESE LABOR CATEGORIES | |||||
| Project Manager | ||||||
| Robotics Operations Manager | ||||||
| Robotics Operations Onsite Supervisor | ||||||
| Corp Quality Manager | ||||||
| Safety and Health Manager | ||||||
| Certified Safety Professional | ||||||
| Certified Health Physicist | ||||||
| Certified Industrial Hygienist | ||||||
| Industrial Hygienist | ||||||
| Program Property Manager | ||||||
| Senior Contracts Manager | ||||||
| Senior Geophysicist | ||||||
| Geophysicist | ||||||
| Biologist | ||||||
| GIS Manager | ||||||
| Surveyor | ||||||
| Scientist I | ||||||
| Scientist II | ||||||
| Scientist III | ||||||
| Engineer I | ||||||
| Engineer II | ||||||
| Engineer III | ||||||
| Administrative (Field Office) | ||||||
| Administrative (Home Office) | ||||||
| Operations Supervisor | ||||||
| Principal Engineer I | ||||||
| Principal Software Engineer I | ||||||
| Senior Buyer | ||||||
| Senior Electrical Engineer II | ||||||
| Senior Machinist I | ||||||
| Senior Manufacturing Engineer I | ||||||
| Senior Mechanical Engineer II | ||||||
| Senior Principal SME | ||||||
| Senior Quality Assurance Analyst I | ||||||
| Senior Software Engineer I | ||||||
| Staff Designer I | ||||||
| Staff Electrical Engineer I | ||||||
| Staff Electrical Engineer II | ||||||
| Staff Manufacturing Operations Supervisor | ||||||
| Staff Manufacturing Technican II | ||||||
| Staff Mechnical Technican II | ||||||
| Staff Production Control Coordinator II | ||||||
| UXO Senior Supervisor | ||||||
| UXO Sweep Personnel | ||||||
| UXO Tech I | ||||||
| UXO Tech II | ||||||
| UXO Tech III | ||||||
| UXO Safety Officer | ||||||
| UXO Quality Control Specialist | ||||||
| Subcontract Handling Charge Rate | % | |||||
| MSE Handling Charge Rate | % | |||||
| General & Administration (G&A) Rate | % | |||||
| Other Indirect Costs (FCCM, Fringe, etc.) Provide a breakout and explain | % |
Opt Yr 1 FFP
| FFP CEILING BURDENED HOURLY RATES EXCLUDING PROFIT - OPTION YEAR 1 | ||||||
| Labor Category | Hourly Rate | Overtime Rate | 4% Hazard | 8% Hazard | O/T + 4% Hazard | O/T + 8% Hazard |
| Program Manager | HAZARD PAY IS NOT GENERALLY APPLCABLE TO THESE LABOR CATEGORIES | |||||
| Project Manager | ||||||
| Robotics Operations Manager | ||||||
| Robotics Operations Onsite Supervisor | ||||||
| Corp Quality Manager | ||||||
| Safety and Health Manager | ||||||
| Certified Safety Professional | ||||||
| Certified Health Physicist | ||||||
| Certified Industrial Hygienist | ||||||
| Industrial Hygienist | ||||||
| Program Property Manager | ||||||
| Senior Contracts Manager | ||||||
| Senior Geophysicist | ||||||
| Geophysicist | ||||||
| Biologist | ||||||
| GIS Manager | ||||||
| Surveyor | ||||||
| Scientist I | ||||||
| Scientist II | ||||||
| Scientist III | ||||||
| Engineer I | ||||||
| Engineer II | ||||||
| Engineer III | ||||||
| Administrative (Field Office) | ||||||
| Administrative (Home Office) | ||||||
| Operations Supervisor | ||||||
| Principal Engineer I | ||||||
| Principal Software Engineer I | ||||||
| Senior Buyer | ||||||
| Senior Electrical Engineer II | ||||||
| Senior Machinist I | ||||||
| Senior Manufacturing Engineer I | ||||||
| Senior Mechanical Engineer II | ||||||
| Senior Principal SME | ||||||
| Senior Quality Assurance Analyst I | ||||||
| Senior Software Engineer I | ||||||
| Staff Designer I | ||||||
| Staff Electrical Engineer I | ||||||
| Staff Electrical Engineer II | ||||||
| Staff Manufacturing Operations Supervisor | ||||||
| Staff Manufacturing Technican II | ||||||
| Staff Mechnical Technican II | ||||||
| Staff Production Control Coordinator II | ||||||
| UXO Senior Supervisor | ||||||
| UXO Sweep Personnel | ||||||
| UXO Tech I | ||||||
| UXO Tech II | ||||||
| UXO Tech III | ||||||
| UXO Safety Officer | ||||||
| UXO Quality Control Specialist | ||||||
| Subcontract Handling Charge Rate | % | |||||
| MSE Handling Charge Rate | % | |||||
| General & Administration (G&A) Rate | % | |||||
| Other Indirect Costs (FCCM, Fringe, etc.) Provide a breakout and explain | % |
Opt Yr 2 FFP
| FFP CEILING BURDENED HOURLY RATES EXCLUDING PROFIT - OPTION YEAR 2 | ||||||
| Labor Category | Hourly Rate | Overtime Rate | 4% Hazard | 8% Hazard | O/T + 4% Hazard | O/T + 8% Hazard |
| Program Manager | HAZARD PAY IS NOT GENERALLY APPLCABLE TO THESE LABOR CATEGORIES | |||||
| Project Manager | ||||||
| Robotics Operations Manager | ||||||
| Robotics Operations Onsite Supervisor | ||||||
| Corp Quality Manager | ||||||
| Safety and Health Manager | ||||||
| Certified Safety Professional | ||||||
| Certified Health Physicist | ||||||
| Certified Industrial Hygienist | ||||||
| Industrial Hygienist | ||||||
| Program Property Manager | ||||||
| Senior Contracts Manager | ||||||
| Senior Geophysicist | ||||||
| Geophysicist | ||||||
| Biologist | ||||||
| GIS Manager | ||||||
| Surveyor | ||||||
| Scientist I | ||||||
| Scientist II | ||||||
| Scientist III | ||||||
| Engineer I | ||||||
| Engineer II | ||||||
| Engineer III | ||||||
| Administrative (Field Office) | ||||||
| Administrative (Home Office) | ||||||
| Operations Supervisor | ||||||
| Principal Engineer I | ||||||
| Principal Software Engineer I | ||||||
| Senior Buyer | ||||||
| Senior Electrical Engineer II | ||||||
| Senior Machinist I | ||||||
| Senior Manufacturing Engineer I | ||||||
| Senior Mechanical Engineer II | ||||||
| Senior Principal SME | ||||||
| Senior Quality Assurance Analyst I | ||||||
| Senior Software Engineer I | ||||||
| Staff Designer I | ||||||
| Staff Electrical Engineer I | ||||||
| Staff Electrical Engineer II | ||||||
| Staff Manufacturing Operations Supervisor | ||||||
| Staff Manufacturing Technican II | ||||||
| Staff Mechnical Technican II | ||||||
| Staff Production Control Coordinator II | ||||||
| UXO Senior Supervisor | ||||||
| UXO Sweep Personnel | ||||||
| UXO Tech I | ||||||
| UXO Tech II | ||||||
| UXO Tech III | ||||||
| UXO Safety Officer | ||||||
| UXO Quality Control Specialist | ||||||
| Subcontract Handling Charge Rate | % | |||||
| MSE Handling Charge Rate | % | |||||
| General & Administration (G&A) Rate | % | |||||
| Other Indirect Costs (FCCM, Fringe, etc.) Provide a breakout and explain | % |
Opt Yr 3 FFP
| FFP CEILING BURDENED HOURLY RATES EXCLUDING PROFIT - OPTION YEAR 3 | ||||||
| Labor Category | Hourly Rate | Overtime Rate | 4% Hazard | 8% Hazard | O/T + 4% Hazard | O/T + 8% Hazard |
| Program Manager | HAZARD PAY IS NOT GENERALLY APPLCABLE TO THESE LABOR CATEGORIES | |||||
| Project Manager | ||||||
| Robotics Operations Manager | ||||||
| Robotics Operations Onsite Supervisor | ||||||
| Corp Quality Manager | ||||||
| Safety and Health Manager | ||||||
| Certified Safety Professional | ||||||
| Certified Health Physicist | ||||||
| Certified Industrial Hygienist | ||||||
| Industrial Hygienist | ||||||
| Program Property Manager | ||||||
| Senior Contracts Manager | ||||||
| Senior Geophysicist | ||||||
| Geophysicist | ||||||
| Biologist | ||||||
| GIS Manager | ||||||
| Surveyor | ||||||
| Scientist I | ||||||
| Scientist II | ||||||
| Scientist III | ||||||
| Engineer I | ||||||
| Engineer II | ||||||
| Engineer III | ||||||
| Administrative (Field Office) | ||||||
| Administrative (Home Office) | ||||||
| Operations Supervisor | ||||||
| Principal Engineer I | ||||||
| Principal Software Engineer I | ||||||
| Senior Buyer | ||||||
| Senior Electrical Engineer II | ||||||
| Senior Machinist I | ||||||
| Senior Manufacturing Engineer I | ||||||
| Senior Mechanical Engineer II | ||||||
| Senior Principal SME | ||||||
| Senior Quality Assurance Analyst I | ||||||
| Senior Software Engineer I | ||||||
| Staff Designer I | ||||||
| Staff Electrical Engineer I | ||||||
| Staff Electrical Engineer II | ||||||
| Staff Manufacturing Operations Supervisor | ||||||
| Staff Manufacturing Technican II | ||||||
| Staff Mechnical Technican II | ||||||
| Staff Production Control Coordinator II | ||||||
| UXO Senior Supervisor | ||||||
| UXO Sweep Personnel | ||||||
| UXO Tech I | ||||||
| UXO Tech II | ||||||
| UXO Tech III | ||||||
| UXO Safety Officer | ||||||
| UXO Quality Control Specialist | ||||||
| Subcontract Handling Charge Rate | % | |||||
| MSE Handling Charge Rate | % | |||||
| General & Administration (G&A) Rate | % | |||||
| Other Indirect Costs (FCCM, Fringe, etc.) Provide a breakout and explain | % |
Burdens on CPFF Rates Base Year
| INSTRUCTIONS - Prepare a table substantially similar to this one to show how you reached your burdened rate. Your firm's accounting system may differ from the approach depicted below, so you are free to substitute a different table in accordance with your accounting system. | ||||||||||||||||||
| Labor Category | CPFF Ceiling Unburdened Hourly Base Year Rates | |||||||||||||||||
| Base Wage | Overtime Rate | 4% Hazard | 8% Hazard | O/T + 4% Hazard | O/T + 8% Hazard | FICA Payroll Taxes | FUTA | Subtotal before fringes | Fringes | Holiday & Vacation | Subtotal before Indirects | Other allowable Overheads rate (describe) | Overhead Costs | Base & Overhead Subtotal | G&A rate | G&A Cost | Total Straight-Time Rate | |
| Program Manager | HAZARD PAY IS NOT GENERALLY APPLCABLE TO THESE LABOR CATEGORIES | |||||||||||||||||
| Project Manager | ||||||||||||||||||
| Robotics Operations Manager | ||||||||||||||||||
| Robotics Operations Onsite Supervisor | ||||||||||||||||||
| Corp Quality Manager | ||||||||||||||||||
| Safety and Health Manager | ||||||||||||||||||
| Certified Safety Professional | ||||||||||||||||||
| Certified Health Physicist | ||||||||||||||||||
| Certified Industrial Hygienist | ||||||||||||||||||
| Industrial Hygienist | ||||||||||||||||||
| Program Property Manager | ||||||||||||||||||
| Senior Contracts Manager | ||||||||||||||||||
| Senior Geophysicist | ||||||||||||||||||
| Geophysicist | ||||||||||||||||||
| Biologist | ||||||||||||||||||
| GIS Manager | ||||||||||||||||||
| Surveyor | ||||||||||||||||||
| Scientist I | ||||||||||||||||||
| Scientist II | ||||||||||||||||||
| Scientist III | ||||||||||||||||||
| Engineer I | ||||||||||||||||||
| Engineer II | ||||||||||||||||||
| Engineer III | ||||||||||||||||||
| Administrative (Field Office) | ||||||||||||||||||
| Administrative (Home Office) | ||||||||||||||||||
| Operations Supervisor | ||||||||||||||||||
| Principal Engineer I | ||||||||||||||||||
| Principal Software Engineer I | ||||||||||||||||||
| Senior Buyer | ||||||||||||||||||
| Senior Electrical Engineer II | ||||||||||||||||||
| Senior Machinist I | ||||||||||||||||||
| Senior Manufacturing Engineer I | ||||||||||||||||||
| Senior Mechanical Engineer II | ||||||||||||||||||
| Senior Principal SME | ||||||||||||||||||
| Senior Quality Assurance Analyst I | ||||||||||||||||||
| Senior Software Engineer I | ||||||||||||||||||
| Staff Designer I | ||||||||||||||||||
| Staff Electrical Engineer I | ||||||||||||||||||
| Staff Electrical Engineer II | ||||||||||||||||||
| Staff Manufacturing Operations Supervisor | ||||||||||||||||||
| Staff Manufacturing Technican II | ||||||||||||||||||
| Staff Mechnical Technican II | ||||||||||||||||||
| Staff Production Control Coordinator II | ||||||||||||||||||
| UXO Senior Supervisor | ||||||||||||||||||
| UXO Sweep Personnel | ||||||||||||||||||
| UXO Tech I | ||||||||||||||||||
| UXO Tech II | ||||||||||||||||||
| UXO Tech III | ||||||||||||||||||
| UXO Safety Officer | ||||||||||||||||||
| UXO Quality Control Specialist |
Burdens CPFF Rates Opt Yr 1
| INSTRUCTIONS - Prepare a table substantially similar to this one to show how you reached your burdened rate. Your firm's accounting system may differ from the approach depicted below, so you are free to substitute a different table in accordance with your accounting system. | ||||||||||||||||||
| Labor Category | CPFF Ceiling Unburdened Hourly Option Year 1 Rates | |||||||||||||||||
| Base Wage | Overtime Rate | 4% Hazard | 8% Hazard | O/T + 4% Hazard | O/T + 8% Hazard | FICA Payroll Taxes | FUTA | Subtotal before fringes | Fringes | Holiday & Vacation | Subtotal before Indirects | Other allowable Overheads rate (describe) | Overhead Costs | Base & Overhead Subtotal | G&A rate | G&A Cost | Total Straight-Time Rate | |
| Program Manager | HAZARD PAY IS NOT GENERALLY APPLCABLE TO THESE LABOR CATEGORIES | |||||||||||||||||
| Project Manager | ||||||||||||||||||
| Robotics Operations Manager | ||||||||||||||||||
| Robotics Operations Onsite Supervisor | ||||||||||||||||||
| Corp Quality Manager | ||||||||||||||||||
| Safety and Health Manager | ||||||||||||||||||
| Certified Safety Professional | ||||||||||||||||||
| Certified Health Physicist | ||||||||||||||||||
| Certified Industrial Hygienist | ||||||||||||||||||
| Industrial Hygienist | ||||||||||||||||||
| Program Property Manager | ||||||||||||||||||
| Senior Contracts Manager | ||||||||||||||||||
| Senior Geophysicist | ||||||||||||||||||
| Geophysicist | ||||||||||||||||||
| Biologist | ||||||||||||||||||
| GIS Manager | ||||||||||||||||||
| Surveyor | ||||||||||||||||||
| Scientist I | ||||||||||||||||||
| Scientist II | ||||||||||||||||||
| Scientist III | ||||||||||||||||||
| Engineer I | ||||||||||||||||||
| Engineer II | ||||||||||||||||||
| Engineer III | ||||||||||||||||||
| Administrative (Field Office) | ||||||||||||||||||
| Administrative (Home Office) | ||||||||||||||||||
| Operations Supervisor | ||||||||||||||||||
| Principal Engineer I | ||||||||||||||||||
| Principal Software Engineer I | ||||||||||||||||||
| Senior Buyer | ||||||||||||||||||
| Senior Electrical Engineer II | ||||||||||||||||||
| Senior Machinist I | ||||||||||||||||||
| Senior Manufacturing Engineer I | ||||||||||||||||||
| Senior Mechanical Engineer II | ||||||||||||||||||
| Senior Principal SME | ||||||||||||||||||
| Senior Quality Assurance Analyst I | ||||||||||||||||||
| Senior Software Engineer I | ||||||||||||||||||
| Staff Designer I | ||||||||||||||||||
| Staff Electrical Engineer I | ||||||||||||||||||
| Staff Electrical Engineer II | ||||||||||||||||||
| Staff Manufacturing Operations Supervisor | ||||||||||||||||||
| Staff Manufacturing Technican II | ||||||||||||||||||
| Staff Mechnical Technican II | ||||||||||||||||||
| Staff Production Control Coordinator II | ||||||||||||||||||
| UXO Senior Supervisor | ||||||||||||||||||
| UXO Sweep Personnel | ||||||||||||||||||
| UXO Tech I | ||||||||||||||||||
| UXO Tech II | ||||||||||||||||||
| UXO Tech III | ||||||||||||||||||
| UXO Safety Officer | ||||||||||||||||||
| UXO Quality Control Specialist |
Burdens CPFF Rates Opt Yr 2
| INSTRUCTIONS - Prepare a table substantially similar to this one to show how you reached your burdened rate. Your firm's accounting system may differ from the approach depicted below, so you are free to substitute a different table in accordance with your accounting system. | ||||||||||||||||||
| Labor Category | CPFF Ceiling Unburdened Hourly Option Year 2 Rates | |||||||||||||||||
| Base Wage | Overtime Rate | 4% Hazard | 8% Hazard | O/T + 4% Hazard | O/T + 8% Hazard | FICA Payroll Taxes | FUTA | Subtotal before fringes | Fringes | Holiday & Vacation | Subtotal before Indirects | Other allowable Overheads rate (describe) | Overhead Costs | Base & Overhead Subtotal | G&A rate | G&A Cost | Total Straight-Time Rate | |
| Program Manager | HAZARD PAY IS NOT GENERALLY APPLCABLE TO THESE LABOR CATEGORIES | |||||||||||||||||
| Project Manager | ||||||||||||||||||
| Robotics Operations Manager | ||||||||||||||||||
| Robotics Operations Onsite Supervisor | ||||||||||||||||||
| Corp Quality Manager | ||||||||||||||||||
| Safety and Health Manager | ||||||||||||||||||
| Certified Safety Professional | ||||||||||||||||||
| Certified Health Physicist | ||||||||||||||||||
| Certified Industrial Hygienist | ||||||||||||||||||
| Industrial Hygienist | ||||||||||||||||||
| Program Property Manager | ||||||||||||||||||
| Senior Contracts Manager | ||||||||||||||||||
| Senior Geophysicist | ||||||||||||||||||
| Geophysicist | ||||||||||||||||||
| Biologist | ||||||||||||||||||
| GIS Manager | ||||||||||||||||||
| Surveyor | ||||||||||||||||||
| Scientist I | ||||||||||||||||||
| Scientist II | ||||||||||||||||||
| Scientist III | ||||||||||||||||||
| Engineer I | ||||||||||||||||||
| Engineer II | ||||||||||||||||||
| Engineer III | ||||||||||||||||||
| Administrative (Field Office) | ||||||||||||||||||
| Administrative (Home Office) | ||||||||||||||||||
| Operations Supervisor | ||||||||||||||||||
| Principal Engineer I | ||||||||||||||||||
| Principal Software Engineer I | ||||||||||||||||||
| Senior Buyer | ||||||||||||||||||
| Senior Electrical Engineer II | ||||||||||||||||||
| Senior Machinist I | ||||||||||||||||||
| Senior Manufacturing Engineer I | ||||||||||||||||||
| Senior Mechanical Engineer II | ||||||||||||||||||
| Senior Principal SME | ||||||||||||||||||
| Senior Quality Assurance Analyst I | ||||||||||||||||||
| Senior Software Engineer I | ||||||||||||||||||
| Staff Designer I | ||||||||||||||||||
| Staff Electrical Engineer I | ||||||||||||||||||
| Staff Electrical Engineer II | ||||||||||||||||||
| Staff Manufacturing Operations Supervisor | ||||||||||||||||||
| Staff Manufacturing Technican II | ||||||||||||||||||
| Staff Mechnical Technican II | ||||||||||||||||||
| Staff Production Control Coordinator II | ||||||||||||||||||
| UXO Senior Supervisor | ||||||||||||||||||
| UXO Sweep Personnel | ||||||||||||||||||
| UXO Tech I | ||||||||||||||||||
| UXO Tech II | ||||||||||||||||||
| UXO Tech III | ||||||||||||||||||
| UXO Safety Officer | ||||||||||||||||||
| UXO Quality Control Specialist |
Burdens CPFF Rates Opt Year 3
| INSTRUCTIONS - Prepare a table substantially similar to this one to show how you reached your burdened rate. Your firm's accounting system may differ from the approach depicted below, so you are free to substitute a different table in accordance with your accounting system. | ||||||||||||||||||
| Labor Category | CPFF Ceiling Unburdened Hourly Option Year 3 Rates | |||||||||||||||||
| Base Wage | Overtime Rate | 4% Hazard | 8% Hazard | O/T + 4% Hazard | O/T + 8% Hazard | FICA Payroll Taxes | FUTA | Subtotal before fringes | Fringes | Holiday & Vacation | Subtotal before Indirects | Other allowable Overheads rate (describe) | Overhead Costs | Base & Overhead Subtotal | G&A rate | G&A Cost | Total Straight-Time Rate | |
| Program Manager | HAZARD PAY IS NOT GENERALLY APPLCABLE TO THESE LABOR CATEGORIES | |||||||||||||||||
| Project Manager | ||||||||||||||||||
| Robotics Operations Manager | ||||||||||||||||||
| Robotics Operations Onsite Supervisor | ||||||||||||||||||
| Corp Quality Manager | ||||||||||||||||||
| Safety and Health Manager | ||||||||||||||||||
| Certified Safety Professional | ||||||||||||||||||
| Certified Health Physicist | ||||||||||||||||||
| Certified Industrial Hygienist | ||||||||||||||||||
| Industrial Hygienist | ||||||||||||||||||
| Program Property Manager | ||||||||||||||||||
| Senior Contracts Manager | ||||||||||||||||||
| Senior Geophysicist | ||||||||||||||||||
| Geophysicist | ||||||||||||||||||
| Biologist | ||||||||||||||||||
| GIS Manager | ||||||||||||||||||
| Surveyor | ||||||||||||||||||
| Scientist I | ||||||||||||||||||
| Scientist II | ||||||||||||||||||
| Scientist III | ||||||||||||||||||
| Engineer I | ||||||||||||||||||
| Engineer II | ||||||||||||||||||
| Engineer III | ||||||||||||||||||
| Administrative (Field Office) | ||||||||||||||||||
| Administrative (Home Office) | ||||||||||||||||||
| Operations Supervisor | ||||||||||||||||||
| Principal Engineer I | ||||||||||||||||||
| Principal Software Engineer I | ||||||||||||||||||
| Senior Buyer | ||||||||||||||||||
| Senior Electrical Engineer II | ||||||||||||||||||
| Senior Machinist I | ||||||||||||||||||
| Senior Manufacturing Engineer I | ||||||||||||||||||
| Senior Mechanical Engineer II | ||||||||||||||||||
| Senior Principal SME | ||||||||||||||||||
| Senior Quality Assurance Analyst I | ||||||||||||||||||
| Senior Software Engineer I | ||||||||||||||||||
| Staff Designer I | ||||||||||||||||||
| Staff Electrical Engineer I | ||||||||||||||||||
| Staff Electrical Engineer II | ||||||||||||||||||
| Staff Manufacturing Operations Supervisor | ||||||||||||||||||
| Staff Manufacturing Technican II | ||||||||||||||||||
| Staff Mechnical Technican II | ||||||||||||||||||
| Staff Production Control Coordinator II | ||||||||||||||||||
| UXO Senior Supervisor | ||||||||||||||||||
| UXO Sweep Personnel | ||||||||||||||||||
| UXO Tech I | ||||||||||||||||||
| UXO Tech II | ||||||||||||||||||
| UXO Tech III | ||||||||||||||||||
| UXO Safety Officer | ||||||||||||||||||
| UXO Quality Control Specialist |
File details come from the government source that posted it. Updated .