This synopsis announces an indefinite delivery/indefinite quantity contract for robotics services to support military munitions response programs and other munitions-related services. The contract will have a two-year base period and three one-year option periods. Services will include conventional munitions response, hazardous waste response, and support for bases and sites across the contiguous United States as well as Alaska, Hawaii, and U.S. territories. Specific services may involve vegetation clearance, construction support, range maintenance, munitions and explosives of concern removal using robotic and manned technologies, and data management. The contract has a small business set-aside and will be awarded on a best value tradeoff basis, considering technical capability, management, technical approach, past performance, and price/cost. The deadline for responses is May 4, 2018.

ATTACHMENT C - Sample TO PWS

View the file

Other files

File Type Posted
Amendment_0003_28_JUN_18.pdf PDF
ATTACHMENT_H_-_Schedule_B_worksheet-HNC_180611.XLS XLS spreadsheet
A.07.23_SOLICITATION_-_Amendment_II_180627.pdf PDF
ATTACHMENT_I_-_Sample_Task_Order_Pricing_Worksheets_HNC_180611.xls XLS spreadsheet
A.07.23_SOLICITATION_-_CONFORMED_180627.pdf PDF
A.07.23_SOLICITATION_-_AMENDMENT_I_180621.pdf PDF
A.07.23_SOLICITATION_-_OE_ROBOTICS_180620.pdf PDF
A.07.23_SOLICITATION_-_OE_ROBOTICS_r.22_180525.pdf PDF
EXHIBIT_5__3of3_7Mar17.pdf.pdf PDF
EXHIBIT_5__1of3_04_April_18.pdf PDF
EXHIBIT_2_-_PRS.pdf PDF
ATTACHMENT_H_-_Schedule_B_worksheet-HNC.XLS XLS spreadsheet
ATTACHMENT_A_-_Past_Performance_Questionnaire.pdf PDF
EXHIBIT_4_-_Profit-Fee_Calculation_Worksheet_r.1.pdf PDF
EXHIBIT_3_-_QASP_5Jan2018.pdf PDF
ATTACHMENT_F_-_Letter_of_Commitment_of_Key_Subcontractor.pdf PDF
ATTACHMENT_E_-_Letter_of_Commitment_for_Key_Personnel.pdf PDF
ATTACHMENT_B_-_EXPERIENCE_PP_REFERENCE.pdf PDF
ATTACHMENT_C_-_Sample_TO_PWS_Robotics_171222_r.1_180516.pdf PDF
EXHIBIT_5__2of3_7Mar17.pdf.pdf PDF
EXHIBIT_7_-_Government_Property.pdf PDF
A.07.23_SOLICITATION_-_OE_ROBOTICS_r.22_180523.pdf PDF
EXHIBIT_7a_-_Photos_of_Items.pdf PDF
EXHIBIT_8_-__Figure_for_Sample_TO_1_PWS_Robotics_30_Mar_2017.pdf PDF
ATTACHMENT_D_-_Key_Personnel_Resume.pdf PDF
ATTACHMENT_I_-_Sample_Task_Orders_Pricing_WorkSheets_HNC_180516.XLS XLS spreadsheet
EXHIBIT_6_-_Key_Subs_and_Personnel.pdf PDF
ATTACHMENT_G_-Wage_Determination_for_Bowling_Green.pdf PDF
EXHIBIT_1_-_HNC_DIDs__10Aug17.pdf PDF
Show all 29

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sample Task Order

PERFORMANCE WORK STATEMENT (PWS)

ROBOTICS MILITARY MUNITIONS RESPONSE PROGRAM SERVICES AND OTHER

MUNITIONS RELATED SERVICES

22 December 2017 Revision: 1

Revision Date: 15 June 2018

Revision 1 (15 June 2018) Summary of changes (Changes are in Red, strikethrough and/or underlined):

2.4 Site Specific Information: Revisions of paragraphs 2.4.1 Site Location and 2.4.2 Site History to provide additional information on vegetation, terrain, and munitions anticipated.

4.0 GENERAL REQUIREMENTS: Revision of paragraph 4.2, addition of paragraphs 4.3 Backfilling Excavations, 4.4 MEC Accountability, 4.5 Disposal/Disposition of MPPEH, and 4.6 Vegetation Removal, renumbering of subsequent paragraphs.

Price Spreadsheet: Revision of quantities on two tasks.

1.0 PERFORMANCE OBJECTIVE. The objective of this project is to transfer accountability of Government Property (GP) and long term leased equipment inventories, and establish support (i.e., storage, maintenance, and transportation) and initial requisite contract documents (i.e., Corporate Unified Federal Policy Quality Assurance Project Plan and Corporate Accident Prevention Plan) so as to facilitate subsequent Military Munitions Response Program (MMRP) services and Other Munitions Related Services (OMRS) be provided by the Contractor for specified projects under the current and subsequent task orders. In addition, this project is to provide all MMRP necessary to perform tree and other vegetation removal and control activities in designated Munitions and Explosives of Concern (MEC) contaminated areas of Camp Swampy, Virginia.

2.0 INTRODUCTION.

2.1 Future Military Munitions Response Program services and Other Munitions Related Services to be performed by the Contractor are delineated in Section 1.0 of the base contract.

2.2 Munitions and Explosives of Concern (MEC) are a safety hazard and may constitute imminent and substantial danger to site personnel. All MEC and MPPEH found to contain an explosive hazard after inspection shall be destroyed on site.

Applicable provisions of Chapter 29 of the Code of Federal Regulations (CFR) 1910.120 and Section C, Paragraph 2.2 of the Base Contract (Applicable Laws and Regulations) apply to work of this task order. All activities involving work in areas potentially containing MEC and MPPEH hazards shall be conducted in full compliance with United States Army Corps of Engineers (USACE), United States Army Engineering and Support Center Huntsville (CEHNC), Department of the Army (DA), state and local requirements regarding personnel, equipment and procedures, and Department of Defense (DOD) Standard Operating Procedures (SOPs) and safety regulations.

2.3 Work Hours and Workweek. Consistent with Draft EP 1110-1-18, 3 April 2006, Chapter 15-3, Work Standards, the Contractor shall propose anticipated daily work hours. The Contractor shall consider factors such as prevailing weather and seasonal variations, available daylight, site conditions, amount and type of munitions expected, as well as project completion requirements when proposing project daily work hours and workweek schedules. Draft EP 1110-1-18, 3 April 2006, can be found at:

https://eko.usace.army.mil/usacecop/environmental/subcops/htrw/munitions_response/?syspage=Documents&id=262068.

Due to the inherent risk associated with MEC operations, the maximum proposed number of hours that the Contracting Officer may approve will be that MEC personnel shall be limited to a 60 hour workweek consisting of a maximum of 48-hours of MEC field operations. No single workday shall exceed ten (10) hours (total work hours). Twenty-four (24) hours must separate each workweek; however, work schedules of individual teams may be staggered to continue work on a daily basis if needed. These work restrictions apply only to MEC personnel performing digging or demolition work.

2.4 Site Specific Information. In addition to preparing programmatic documents to support the overall contract, the Contractor shall provide MMRP services as indicated in Section 3.0 for Camp Swampy:

http://www.hnd.usace.army.mil/oew/policy/IntGuidRegs/EP1110-1-18.pdf http://www.hnd.usace.army.mil/oew/policy/IntGuidRegs/EP1110-1-18.pdf

2.4.1 Site Location. Camp Swampy is located in northeast Virginia near the city of Bowling Green. Sites identified require tree and other vegetation cutting to provide line-of sight (LOS) at designated areas per Exhibit 8. Additionally, application of herbicide to retard re-growth is anticipated for most some areas. Characteristics of the sites are generally as follows:

Tree Density (% of area) Tree Height (% of area)

Area acreage Major tree type High Moderate Low 25 to 50'

10' to 25' < 10'

1 66 Evergreen Forest 100 0 0 70 20 10 2 50 Evergreen Forest 75 25 0 35 40 25 3 41 Deciduous Forest 60 30 10 50 30 20 4 11 Deciduous Forest 0 80 20 0 70 30 5 27 Emergent Herbaceous Wetlands 0 20 80 0 0 100

% of trees with average diameter (in inches)

Area 36" to 40"

24" to 35.9"

12" to 23.9"

6" to 11.9"

3" to 5.9" <3"

1 10 15 45 15 10 5 2 0 10 40 25 15 10 3 0 10 15 35 25 15 4 0 0 0 0 35 65 5 0 0 0 0 100 100

% of area with SLOPE at this angle Area 0 to 8 degrees 8.1-12 degrees 12.1 to 18 degrees 18.1-26 degrees 26.1 to 30 degrees

1 10 15 25 20 30 2 25 30 20 15 10 3 45 35 20 0 0 4 70 30 0 0 0 5 100 0 0 0 0

Area Acreage Anticipated to Require Herbicide Application (acres)

1 0 2 0 3 41 4 7.75 (northern portion, excluding area near stream) 5 0

Note: Information provided above and on Exhibit 8 supersedes information that may have been gathered from the actual site that is shown on the map as well as from any previous project experience at the site.

2.4.2 Site History. CEHNC has not conducted a MEC reconnaissance survey at any of the project sites (areas). Site history information received from Camp Swampy, however, indicates that generally the following munitions/weapon systems by area shown in the table below have been used at the project sites or in the general area of the sites.: TOW 2 missiles; 105mm and 155mm howitzer; 40mm grenades; and 61mm (confirmed with Fort A.P. Hill Range Control as not being 60mm), 81mm and 120mm mortars. Fort A.P. Hill has indicated that both HE and TP variants (as applicable) of these munitions could be present at the site. The areas where the work is to be completed are to be considered MEC contaminated with a risk level of medium to high.

Area Major ordnance types expected 1 105mm, 155mm howitzer 2 60mm, 81mm 120mm mortars 3 500 lb bombs, 40 mm grenades 4 37mm, MKII Hand grenades 5 2.75", 3.5" rockets

2.5 Chemical Warfare Materiel (CWM). This site is not suspected of containing CWM. However, during work of this task order, if the Contractor identifies or suspects unknown liquid filled munitions, the Contractor shall perform the actions specified by Section C, Paragraph 2.6 of the Base Contract.

2.6 Improved Conventional Munitions. The site is not suspected to contain Improved Conventional Munitions (ICM).

If suspect ICM are encountered during any phase of site activities, which are not considered to be practice ICM, the Contractor shall perform the actions specified by Section C, Paragraph 2.7 of the Base Contract. In the event that practice ICM are encountered the Contractor shall contact the CEHNC OE Safety Office but may continue site activities.

2.7 Quality Control.

2.7.1 Task Order Quality Management: The Contractor shall implement quality control (QC) processes as defined in QC portions of the Contractor’s Corporate Uniform Federal Policy Quality Assurance Project Plan (UFP-QAPP) and any Site Specific UFP-QAPP which may be necessary to account for site specific conditions and means and methods proposed for this project. The Contractor is responsible for ensuring that all work under the contract is of the quality that meets or exceeds task order requirements. The Corporate UFP-QAPP and Site Specific UFP-QAPP, as applicable, shall be detailed and comprehensive and shall cover all aspects of the task order activities impacting quality of deliverables and services. The Contractor shall ensure that QC documentation is maintained and provided in the Site Specific Final Report.

2.7.2 Quality Assurance: The Government will perform quality assurance (QA) of the Contractor's performance under this task order using the method of surveillance specified in the Quality Assurance Surveillance Plan (QASP). The Government reserves the right to modify the surveillance tasks in the QASP at any time. The Government reserves the right to perform QA inspections at any time. QA failure can be defined as workmanship or work products not complying with the UFP-QAPP (Corporate UFP-QAPP and addenda, as applicable), PWS, or not meeting project needs and/or objectives. Failure can also be defined as workmanship not complying with basic safety concepts and other industry safety practices. If any government QA review identifies a process failure or a work product failure, the Contractor will be issued a Corrective Action Request (CAR) or a form ENG Form 6048. The Contractor shall provide full documentation detailing the root cause of the failure, why it was not detected in the Contractor’s QC Program, and how the problem was corrected.

2.8 General Conditions: In accordance with Section C, Paragraph 10.0 of the Base Contract.

3.0 SPECIFIC TASKS: All tasks listed in this section shall be performed in accordance with the applicable requirements of Section 4.0 “GENERAL REQUIREMENTS” of this PWS. Methods to be used to achieve task order objectives at the specified level of performance shall be determined by the Contractor. The Contractor will be evaluated periodically during each of the following tasks to ensure compliance with this PWS and to document that quality objectives, delivery schedule, and the overall completion date are being met. Failure to adequately complete any service or submittal to at least a satisfactory level of quality or timeliness may result in a repeat of the service or submittal, a poor performance evaluation, and/or a reduction in payment to cover additional expenses incurred by the Government for the Contractor’s delay.

3.1 (TASK 1) CORPORATE UNIFIED FACILITIES POLICY QUALITY ASSURANCE PROJECT PLAN (UFP- QAPP) AND CORPORATE ACCIDENT PREVENTION PLAN (APP). This is a FIRM FIXED PRICE task.

Objective: Submit acceptable Corporate UFP-QAPP and Corporate Accident Pretention Plan (APP) in a timely and efficient manner that conforms to task requirements and applicable standards.

Performance Metric: The accuracy of the information provided within the documents as well as the number of submissions required to obtain Government acceptance of the document will be evaluated and shall be the basis of the Contractor’s performance evaluation for this task.

Measurement Method: The Government will review the Corporate UFP-QAPP and the Corporate APP for their ability to meet project objectives, and for proper and safe application of procedures and equipment. The Government will review the Corporate UFP-QAPP and the Corporate APP and provide comments to the Contractor, which will require a written response from the Contractor and/or possible changes to the documents. Performance is determined by the number of submissions required to attain an acceptable document in accordance with the attached Performance Requirements Summary for Performance Assessment Record (PAR).

Remedy: If non-compliance issues are noted, the Contractor shall summarize the actions to be taken and re-submit the Corporate UFP-QAPP and/or Corporate APP at no additional cost to the Government.

Incentives/Disincentives:

- Fewer submissions result in cost savings to Contractor.

- Efficient task completion minimizes overall cost to Contractor.

- Affects overall performance evaluation.

Specific Task Requirements: The Contractor shall prepare, submit for approval, and maintain a Corporate UFP-QAPP approved by the Contracting Officer that addresses all of the typical conventional MEC and MPPEH related operations contemplated under Section 2.1. This Corporate UFP-QAPP shall be in the form of a generic Quality Assurance Project Plan (QAPP) and structured in accordance with Data Item Description (DID) HNC-001.02, EM 200-1-15; EM 385-1-1;

EM 385-1-97 including Errata Sheets and Changes; Intergovernmental Data Quality Task Force UFP-QAPP Manual; and other Interim Guidance and DIDs as appropriate. The Corporate UFP-QAPP shall additionally include as an appendix a Corporate Geophysical Investigation Plan prepared generally in accordance with DID HNC-003.02. The Corporate UFP- QAPP shall include as an appendix a Corporate Property Management Plan (PMP) which shall be prepared IAW Task 2 below. The Contractor shall prepare and maintain a Corporate Accident Prevention Plan (APP) in accordance with Chapter 4 of EM 200-1-15. The Corporate APP shall be approved by the Contracting Officer and shall address all the typical hazards associated with conventional MEC and MPPEH related operations that may be encountered during work within the 50 States. It is envisioned that site specific UFP-QAPP and APP addenda designed to complement the Corporate UFP-QAPP and Corporate APP will normally be required of the Contractor under subsequent task orders for individual work locations.

3.2 (TASK 2) CORPORATE PROPERTY MANAGEMENT PLAN. This is a FIRM FIXED PRICE task.

Objective: Submit as an appendix to the UFP-QAPP an acceptable Corporate Property Management Plan in a timely and efficient manner that conforms to task requirements and applicable standards, and IAW FAR Clause 52.245-1.

Performance Metric: The accuracy of the information provided within the document as well as the number of submissions required to obtain Government acceptance of the document will be evaluated and shall be the basis of the Contractor’s performance evaluation for this task.

Measurement Method: The Government will review the Corporate Property Management Plan for its ability to meet project objectives. Performance is determined by the number of submissions required to attain an acceptable document in accordance with the attached Performance Requirements Summary for Performance Assessment Record (PAR).

Remedy: If non-compliance issues are noted, the Contractor shall revise and re-submit the Corporate Property Management Plan to address all comments requiring resolution to meet the task objective.

Incentives/Disincentives:

- Fewer submissions result in cost savings to Contractor.

- Efficient task completion minimizes overall cost to Contractor.

- Affects overall performance evaluation.

Specific Task Requirements: The Contractor shall prepare and submit for approval a Corporate Property Management Plan (PMP) detailing how the Contractor shall control, maintain, care for, and use Government Property in its possession and control from the time of receipt until properly relieved of responsibility. This plan will address any sensitive items (e.g.: Night Vision Goggles, Weapons, Weapon Sights, GPS units, Satellite Phones, etc.) as well which shall be accounted for daily, monthly and quarterly. This plan shall be in accordance with FAR Clause 52.245-1, and 52.245-9, DFARS Clauses 252.211-7007, 252.245-7001, 252.245-7002, 252.245-7003, 252.245-7004, and DoDI 5000.64.

Additionally, within 15 calendar days after issuance of notice to proceed, the Contractor shall develop and submit a Property Management Plan addendum (and subsequent revisions/updates as needed) in accordance with Federal Acquisition Regulation (FAR) Clause 52.245-1 and 52.245-9 for review and acceptance by the Government Property Administrator and KO. The Property Management Plan addendum, once approved in writing by the Contracting Officer, shall be incorporated into the task order and shall be fully executed by the Contractor. During the transition period between the Contractor and the incumbent contractor the Contractor shall conduct and submit a 100% complete physical inventory of all Government Property, and Contractor Acquired Property in the Contractor’s possession for incorporation into the task order. This includes property hand receipted down to any subcontractors. The Contractor will update the Corporate Property Management Plan as necessary or as conditions warrant at no additional cost to the Government. All revisions are subject to KO approval.

3.3 OPTIONAL (TASK 3) JOINT INVENTORY OF CURRENT GOVERNMENT-FURNISH PROPERTY AND

FOLLOW-ON GOVERNMENT PROPERTY AND LEASED EQUIPMENT ACQUISITION AND

CONFIGURATION. This is a COST PLUS FIXED FEE task.

Objective: The Contractor shall take accountability for and configure as necessary Government Property and leased equipment including, but not limited to robotic equipment to provide MMRP services and OMRS as described in this PWS herein.

Performance Metric: Conformance with the Performance Work Statement will be determined by the Contractor’s ability to provide adequate personnel, equipment, and materials, as applicable, to meet project objectives and schedule.

Measurement Method: Completion of project objectives and meeting project schedule shall form the basis of measurement.

Remedy: If non-compliance issues are noted, the Contractor shall redo work as applicable at no additional cost to the government.

Incentives/Disincentives:

- Affects overall performance evaluation.

Specific Task Requirements: The Contractor shall take accountability for GP and procure leased equipment and configure each as necessary including, but not limited to, robotic equipment to provide MMRP services and OMRS as described in this PWS herein. It is envisioned that such GP would complement Contractor short term equipment rentals, long term leased equipment, and/or Contractor owned equipment to provide such services. It is envisioned that with Contractor Officer approval, this task would support the acquisition and configuration of long term leased equipment;

however, Contractor cost incurred for short term equipment rentals would be included in Contractor prices for work of specific projects as project requirements dictate. The required inventory composition and levels of GP and leased equipment shall be determined by the Contractor, subject to Contracting Officer approval, so as to be able to provide MMRP services and OMRS at one project site at a time with a reasonable backup capability. Follow-on GP acquisition and configuration shall be as subsequent projects dictate, subject to Contracting Officer approval.

Attachment 1 to this PWS specifies robotics equipment mandatory safety features and optional desirable features. The Contractor shall insure that all robotics equipment complies with the equipment safety requirements, as applicable.

The Contractor shall, in conjunction with the outgoing contractor, the Contracting Officer or designated representative, and other Government personnel deemed necessary, jointly inventory GP to be furnished to the gaining Contractor to determine the exact condition and serviceability of Government-furnished property. Upon completion of the inventory, the gaining Contractor shall then certify the findings of this inventory, assume accounting responsibility, and shall take over the property on a hand receipt from the Contract Administrator. The Contractor shall control and maintain all property receipted as required by this contract. Physical shortages and detailed circumstances relative to loss and/or extensive damage will be documented at the time of the inventory to provide the appropriate adjustment of records.

Inventory procedures for property accountability will be IAW ARs 710-2 and 735-5, the FAR and all other applicable regulations and publications.

3.4 OPTIONAL (TASK 4) STORAGE, MAINTENANCE, AND TRANSPORTATION OF GOVERNMENT

FURNISHED EQUIPMENT AND LEASED EQUIPMENT. This is a COST PLUS FIXED FEE task.

Objective: If authorized by the Contracting Officer, the Contractor shall store, maintain (i.e., perform preventative and corrective maintenance) and transport as necessary all GP and long term leased equipment including robotics equipment acquired under this task order and base contract.

Performance Metric: Conformance with the Performance Work Statement will be determined by the Contractor’s ability to provide adequate personnel, equipment, and materials, as applicable, to meet project objectives and schedule.

Measurement Method: Completion of project objectives and meeting project schedule shall form the basis of measurement.

Remedy: If non-compliance issues are noted, the Contractor shall redo work as applicable at no additional cost to the government.

Incentives/Disincentives:

- Affects overall performance evaluation.

Specific Task Requirements: If authorized by the Contracting Officer, the Contractor shall store, maintain (i.e., perform preventative and corrective maintenance) and transport as necessary all GP and long term leased equipment including robotics equipment acquired under this task order and base contract. The requirement for Contractor provided storage of GP is anticipated to be for two years. Contractor storage of GP beyond two years, if required, shall be as directed by the Contracting Officer. The Government will provide cost reimbursement for repair/replacement of GP and long term leased equipment damaged by inadvertent explosions, subject to Contracting Officer approval.

3.5 (TASK 5) SITE SPECIFIC UNIFORM FEDERAL POLICY QUALITY ASSURANCE PROJECT PLAN

(UFP-QAPP). This is a FIRM FIXED PRICE task.

Objective: Submit acceptable site specific Site Specific UFP-QAPP for completion of Tasks 6 and 7 below in a timely and efficient manner that conforms to task requirements and applicable standards.

Performance Metric: The accuracy of the information provided within the documents as well as the number of submissions required to obtain Government acceptance of the document will be evaluated and shall be the basis of the Contractor’s performance evaluation for this task.

Measurement Method: The Government will review the Site Specific UFP-QAPP for their ability to meet project objectives, and for proper and safe application of procedures and equipment. The Government will review the Site Specific UFP-QAPP and provide comments to the Contractor, which will require a written response from the Contractor and/or possible changes to the addenda. The comments will focus primarily on compliance with the PWS and all references contained within. These comments are to be addressed. Additional comments may be provided for the Contractor’s review and consideration that relate to economy and efficiency, which the Contractor may choose to incorporate; however, the Contractor is responsible for any impact this may have, positive or negative. Performance is determined by the number of submissions required to attain an acceptable document in accordance with the attached Performance Requirements Summary for Performance Assessment Record (PAR).

Remedy: If non-compliance issues are noted, the Contractor shall summarize the actions to be taken and re-submit revised Site Specific UFP-QAPP at no additional cost to the Government.

Incentives/Disincentives:

- Fewer submissions result in cost savings to Contractor.

- Efficient task completion minimizes overall cost to Contractor.

- Affects overall performance evaluation.

Specific Task Requirements: The Site Specific UFP-QAPP shall complement the Contractor’s Corporate UFP-QAPP.

The addenda shall be prepared in accordance with Data Item Description (DID) HNC-001.02, EM 200-1-15; EM 385-1-1;

EM 385-1-97 including Errata Sheets and Changes; Intergovernmental Data Quality Task Force UFP-QAPP Manual; and other Interim Guidance and DIDs as appropriate. The intent is for the Corporate UFP-QAPP and Site Specific UFP-QAPP to collectively support all MMRP and ancillary services at the munitions response site in order to meet the objectives and requirements of this PWS. The addenda shall include a project schedule, which demonstrates the ability to perform all tasks requirements within project timelines. The QC portions of the addenda shall augment the Corporate UFP-QAPP with site specific quality control considerations, as applicable. Site Specific UFP-QAPP shall include addenda to the Corporate Accident Prevention Plan (APP) contained in the Corporate UFP-QAPP, as applicable. The addenda shall identify all Government Property (GP) anticipated to be utilized at the project site. The Contractor is authorized a post award site visit for the purpose of supporting preparation of the Site Specific UFP-QAPP. The Contractor shall notify the USAESCH Project Manager (PM) prior to a planned site visit. An Abbreviated Accident Prevention Plan (AAPP) is required for this activity. The AAPP must be approved by USAESCH prior to the site visit and shall be submitted no later than 5 calendar days before the site visit. The Contractor shall provide a trip report to the PM within 7 calendar days after conclusion of the site visit.

3.6 (TASK 6) TREE AND OTHER VEGETATION REMOVAL AND CONTROL. This is a FIRM FIXED PRICE task.

Objective: The Contractor shall remove trees and other vegetation and/or control vegetation re-growth via herbicide application at designated areas to provide LOS at designated areas per Exhibit 8.

MEC Items of Interest: The following munitions/weapon systems have been used at the site or in the general area of the sites: TOW 2 missiles; 105mm and 155mm howitzer; 40mm grenades; and 61mm, 81mm and 120mm mortars. HE variants of any of these munitions could be present at the site. These items constitute MEC items of interest for the project site, but the listing shall incorporate additional MEC items as they may be discovered by the Contractor during the vegetation removal activities.

Performance Metric: Conformance with the Performance Work Statement will be determined by the Contractor’s ability to provide adequate personnel, equipment, and materials, as applicable, to meet project objectives and schedule.

Measurement Method: The Contractor’s conformance with the Performance Work Statement will be evaluated by the Government in accordance with the QASP.

Remedy: If non-compliance issues are noted, the Contractor shall redo work as applicable at no additional cost to the government.

Incentives/Disincentives:

- Efficient task completion minimizes overall cost to Contractor.

- Affects overall performance evaluation

Specific Task Requirements: The Contractor shall cut trees and other vegetation to within 18 inches of the ground surface at designated areas per Exhibit 8. Cutting or mulching in place is acceptable but must not result in accumulation of vegetation which would create line-of-sight problems for the installation. The Contractor shall mobilize and commence field work within 14 calendar days of issuance of Notice to Proceed (NTP) for this task. Unless specified otherwise, all areas are suspected to be MEC contaminated. Due to the potential MEC hazards associated with these areas, the use of unmanned robotic technologies to cut trees and vegetation and to apply herbicide is highly encouraged.

Any hand or manual clearances required (e.g., for excessively soft or steep areas) shall be conducted with due consideration for personnel safety working in a potentially MEC contaminated area, as applicable. Ground disturbance within wetlands areas is to be minimized to the greatest extent practical so as not to create erosion problems within these areas. Equipment selection and employment of such in these areas should take into consideration potential for ground disturbance in potentially wet and/or soft ground surfaces. Hand clearances (with due safety considerations for personnel) may be required in excessively wet and/or soft ground surfaces.

3.6.1 (TASK 6A) END OF IPBC TREE AND OTHER VEGETATION CUTTING. This is a FIRM FIXED PRICE task.

The Contractor shall cut trees and other vegetation in the areas designated by Exhibit 8 (three separate areas totaling approximately 180 195 acres). All requirements of Task 6 above apply.

3.6.2 (OPTIONAL TASK 6B) HERBICIDE APPLICATION TO CONTROL VEGETATION RE-GROWTH. This is a FIRM FIXED PRICE PER ACRE task.

If authorized by the Contracting Officer, the Contractor shall apply approved herbicides to trees and other vegetation by ground-based spray systems in areas as designated by the Contracting Officer to retard re-growth of vegetation on ranges following the removal of vegetation under Task 6A. The locations of specific areas will be directed by the Contracting Officer. Initial areas for application of herbicide will be designated so as to demonstrate the effectiveness, safety and suitability of applications and environmental acceptability of the use of herbicides for vegetation control on range areas. Additional areas may be identified over the life of the task order.

A Vegetation Management Work Plan (VMWP) will be prepared and submitted by the Contractor for approval by the Contracting Officer. The VMWP shall augment the approved Site Specific UFP-QAPP (approved under Task 1) and shall be developed to combine the best management practices associated with managing problem vegetation consistent with the installation and associated laws, regulations, and permits, as applicable. The VMWP shall incorporate sound vegetation control measures improving safety while minimizing collateral damage to desired, non-target species, and increase land use capabilities through Best Management Practices (BMP) and quality assurance. The VMWP shall contain an Emergency Response Plan and a Spill and Decontamination Response Plan.

All herbicides used for this project shall be approved by the installation and comply with the U.S. Department of Defense list of registered products and shall be applied according to the product label. All applications must be applied in accordance with the applicable State of Virginia, and federal laws and regulations. The Contractor shall provide Material Safety Data Sheets (MSDS) for all approved chemicals to the installation.

The Contractor will select the specific herbicide(s), application rate(s), and specific equipment requirements necessary for effective application, consistent with product labels and applicable laws, regulations, and permits. All herbicides selected for use shall be approved by USEPA, the State of Virginia, and Camp Swampy for the control of the target species for the season of application, and at the rate and method of application to be used by the Contractor. All mixing of chemicals shall be conducted in the presence of personnel designated by the installation.

The Contractor shall ensure that only applicator(s) certified IAW state law will perform herbicide applications.

The Contractor shall comply with DoDi 4150.7 - Pest Management Program provide all licenses and certifications required to do the work under this task order, and shall ensure that all such licenses/certifications remain current in the State of Virginia for any work conducted. The Contractor shall provide detailed herbicide application reports to the USAESCH PM and Installation Pest Controller with 14 calendar days of application documenting the quantity and percent of active ingredients for all herbicides applied.

3.7 (TASK 7) SITE SPECIFIC FINAL REPORT (SSFR). This is a FIRM FIXED PRICED task.

Objective. Submit an acceptable SSFR in a timely and efficient manner that conforms to task requirements and applicable standards.

Performance Metric: The accuracy of the information provided within the document as well as the number of submissions required to obtain Government acceptance of the document will be evaluated and shall be the basis of the Contractor’s performance evaluation for this task.

Measurement Method: The Government will review the SSFR and provide comments to the Contractor, which will require a written response from the Contractor and/or possible changes to the SSFR. Performance is determined by the number of submissions required to attain an acceptable document in accordance with the attached Performance Requirements Summary for Performance Assessment Record (PAR).

Remedy: If non-compliance issues are noted, the Contractor shall summarize the actions to be taken and re-submit a revised SSFR at no additional cost to the Government.

Incentives/Disincentives:

- Fewer submissions result in cost savings to Contractor.

- Efficient task completion minimizes overall cost to Contractor.

- Affects overall performance evaluation.

Specific Task Requirements: The Contractor shall prepare a SSFR in accordance with the general format presented in DID HNC-011.02. The SSFR shall include the results for all field activities conducted by the Contractor. The Contractor shall include GIS documentation in the SSFR however, GIS data files are not required to be submitted with the draft version of the SSFR (refer to Section 4.9 “Geographic Information System (GIS)” for additional information). The Contractor shall include a cover letter signed by an authorized person (preferably the person who signed the task order) of the company certifying, on behalf of the company, that the requirements of this task order have been met. If the review of the draft version of the SSFR results in a request for major revisions, the document may be disapproved and will require resubmission.

4.0 GENERAL REQUIREMENTS: All work under Section 3.0 “SPECIFIC TASKS” of this PWS shall be performed in accordance with the following general requirements.

4.1 Permits and Licenses. The Contractor is responsible for obtaining all required permits and licenses to complete the project in accordance with Section C, Paragraph 2.1 of the Base Contract.

4.2 MEC Disposal. The Contractor is not responsible for the destruction of MEC encountered under this task order. The Contractor shall be responsible for the destruction of all MEC encountered during project activities. The Contractor shall address in the WP Addendum how the security of discovered MEC items is to be maintained until the items are destroyed.

4.3 Backfilling Excavations. All access/excavation/detonation holes shall be backfilled by the Contractor.

4.4 MEC Accountability. The Contractor shall maintain a detailed accounting of all MEC items/components encountered. This accounting shall include the amounts of MEC, nomenclature and condition (i.e., UXO, DMM, explosive MC), location and depth of MEC, and disposition. The accounting system shall also account for all demolition materials utilized to detonate MEC on site. The Contractor shall take digital photographs of identifiable MEC found during the investigation. This accounting shall be included in the SSFR.

4.5 Disposal/Disposition of MPPEH. The Contractor shall handle and dispose of all MPPEH in accordance with EM 385-1-97 and Section 3.2 of DODI 4140.62, dated August 20, 2015.

4.6 Vegetation Removal. The Contractor shall be responsible for performing all necessary tree/brush removal to an extent necessary to accomplish the objectives of this PWS. No area burning or vegetation removal is anticipated to be performed by the Government.

4.73 Location Surveys and Mapping. The Contractor shall perform civil surveys delineating clearance boundaries in accordance with EM 200-1-15 and DID HNC-006.02 utilizing the services of a Virginia licensed professional surveyor.

4.84 Geographic Information System (GIS). The Contractor shall produce concise ArcGIS Projects in accordance DID

HNC-006.02.

4.95 Project Management. The Contractor shall provide a single point of contact (POC), who is responsible for the entire project and coordination of team activities. The POC shall serve as a liaison/planner/consultant with the Government staff; advising the Government in MEC safety, as well as scheduling and execution of the operations. The POC shall attend project-planning meetings, as required, for the duration of the project. The POC shall perform project activities necessary to maintain project control, to include, but not be limited to the following:

a. Schedule. The Contractor shall develop and submit, for approval, a comprehensive project schedule for the areas being investigated as part of Project Status Reports with weekly updates in accordance with DID HNC-009.01. The Contractor shall be responsible for coordination and scheduling of all activities with representatives of the project and/or the range construction contractor(s) to avoid conflicts with scheduled activities.

b. Range Access and Coordination. The Contractor shall be responsible for establishing protocol with Camp Swampy Range Control for range access, communication requirements, coordination or modification of schedules to accommodate live fire training, acquisition of vehicle and personnel passes, providing accountability of project personnel, and protocol for entering and exiting the range, etc. The Contractor shall comply with all communication requirements while on the range including monitoring designated Range Control frequencies at all times. The Contractor shall provide alternative means of communication, as required, to ensure contact is possible with all Contractor teams working at the site.

c. Reports/Minutes, Record of Meetings. The Contractor shall prepare and submit a report/minutes of all meetings attended in accordance with Chapter 13 of EM 200-1-15.

d. Telephone Conversations/Correspondence Records. The Contractor shall keep a record of telephone conversations and written correspondence, in accordance with Chapter 13 of EM 200-1-15.

e. Project Status Reports. The Contractor shall prepare and submit Project Status Reports in accordance with DID

HNC-009.01.

f. Property Accounting. In the event that the Contractor uses GFE to conduct project work the Contractor maintain property accounting documentation as required by the Corporate Property Management Plan (PMP), WP addenda, and Contracting Officer/Government Property Administrator (GPA)/ Plant Clearance Officer (PCO).

4.6 Army Contractor Manpower Reporting

4.6.1 Implementation.

4.6.1.1 The Office of the Assistant Secretary of the Army (Manpower & Reserve Affairs) operates and maintains a secure Army data collection site where the contractor will report contractor manpower information (including subcontractor manpower information) required for performance of this contract. The contractor shall submit all the information required in the format specified at the following web address: PERFORMANCE WORK STATEMENT (Insert SITE NAME & Date) https://cmra.army.mil/default.aspx

4.6.1.2 The Contractors shall fill in the required information on the website, fields are shown below:

(1) Contract Number

(2) Delivery Order Number (if applicable)

(3) Task Order Number (if applicable)

(4) Requiring Activity Unit Identification Code (UIC)

(5) Command

(6) Contractor Contact Information

(7) Federal Service Code (FSC)

(8) Direct Labor Hours

(9) Direct Labor Dollars

(10) Location Information (where contractor and subcontractors (if applicable) performed the services.

4.6.1.3 Reporting period will be the period of performance not to exceed 12 months ending 30 September of each government fiscal year and must be reported by 15 October of each calendar year.

4.6.2 If your particular contract crosses fiscal years, 2 entries must be made to capture the data for the contract period; for example if the contract start date is 1 January 2007 and ends 31 December 2007, the data for the period from 1 January 2007 through 30 September 2007 shall be entered not later than 15 October 2007 and the period 1October 2007 through 31 December 2007 shall be entered not later than 15 January 2008.

5.0 SUBMITTALS AND CORRESPONDENCE:

https://cmra.army.mil/default.aspx

5.1 Computer Files. All text and spreadsheet files generated by the Contractor under this contract shall be furnished to the Contracting Officer in Microsoft Office Suite 2007 compatible format. All schedules shall be generated in Microsoft Project. All CADD drawings shall be in MicroStation V8 or higher. Refer to Section 4.9 “Geographic Information System (GIS)” for GIS data format requirements.

5.2 PDF Deliverables. In addition to the paper copies of submittals, uncompressed digital copies on CD ROM of all versions of submittals shall be provided in PDF format. The documents shall be complete with a linked table of contents, tables, photographs, graphs, figures, and appendices. PDF files shall be created from source documents whenever possible, and shall be provided without any security restrictions.

5.3 Review Comments. Various reviewers will have the opportunity to review submittals made by the Contractor under this contract. The Contractor shall review all comments received through the CEHNC Project Manager (PM) and evaluate their appropriateness based upon their merit and the requirements of the PWS. The Contractor shall issue to the CEHNC Project Manager a formal, annotated response to each in accordance with the established schedule in this PWS.

The Contractor shall not non-concur with a comment without discussing the comment with the CEHNC PM. If the PM is not available then the Contractor shall contact the Technical Manager.

5.4 Identification of Responsible Personnel. Each report shall identify the specific members and title of the Contractor's staff and subcontractors that had significant and specific input into the preparation or review of the report.

5.5 Public Affairs. Refer to Section C, Paragraph 8.0 of the Basis Contract for disclosure of information requirements and restrictions. The Contractor shall refer all requests for information concerning site conditions to CEHNC Public Affairs Office with a copy furnished to the CEHNC PM. Reports and data generated under this contract are the property of the DOD and distribution to any other source by the Contractor, unless authorized by the Contracting Officer, is prohibited.

5.6 Submittals. Unless indicated otherwise, the Contractor shall furnish copies of all submittals as specified below in the indicated quantities.

ADDRESSEE COPIES CD

Commander, U.S. Army Engineering and Support Center Huntsville 3 3 Attn: Terry Hamil (CEHNC-OED), 256-895-1518 4820 University Square Huntsville, AL 35816-1822

Commander, U.S. Army Engineering and Support Center 0 1 Attn: __________ (CEHNC-CT), 256-895-____ 4820 University Square Huntsville, AL 35816-1822

Commander, U.S. Army Engineering and Support Center 0 1 Attn: Monty A. Spicer (CEHNC-CT-O) 256 895-1211 4820 University Square Huntsville, AL 35816-1822

5.7 Submittal Due Dates.

For purposes of the PWS all days are considered calendar days.

Deliverable Distribution Due Date PWS Section Reference

Draft Corporate UFP- QAPP/APP and Property Management Plan

USAESCH PM,

Contracting Officer (KO)

21 days after Award. Electronic or CD delivery is acceptable (hardcopy not required).

3.1

Final Corporate UFP-QAPP/APP and Property Management Plan

USAESCH PM,

Contracting Officer (KO)

14 days after receipt of comments.

3.1

Abbreviated Accident Prevention Plan (if applicable)

USAESCH PM,

Contracting Officer (KO)

NLT 5 days prior to Contractor’s post award site visit.

3.5

Site Visit Trip Report (if applicable)

USAESCH PM,

Contracting Officer (KO)

Within 7 days after conclusion of site visit.

3.5

Draft UFP-QAPP Addenda USAESCH PM, Contracting Officer (KO)

14 days after task NTP.

Electronic or CD delivery is acceptable (hardcopy not required).

3.5

Final UFP-QAPP Addenda USAESCH PM, Contracting Officer (KO)

14 days after receipt of comments.

3.5

Vegetation Management Work Plan

USAESCH PM,

Contracting Officer (KO)

14 days after task NTP. 3.6.2

Herbicide Application Report USAESCH PM, Fort A.P.

Hill Installation Pest Controller

14 days after herbicide application.

3.6.2

Draft Site Specific Final Report USAESCH PM, Contracting Officer (KO)

21 days after completion of field activities.

3.7

Final Site Specific Final Report USAESCH PM, Contracting Officer (KO)

14 days after receipt of comments.

3.7

Amy Contractor Manpower Report https://cmra.army.mil/defa ult.aspx

Not to exceed 12 months ending 30 September of each government fiscal year and

4.6 must be reported by 15 October of each calendar year.

Reports/Minutes, Record of Meetings

USAESCH PM,

Contracting Officer (KO)

In accordance with Chapter 13 of EM 200-1-15. Email submission acceptable.

4.5 c

Telephone Conversations/ Correspondence Records

USAESCH PM,

Contracting Officer (KO)

In accordance with Chapter 13 of EM 200-1-15. Email submission acceptable.

4.5 d

Project Status Reports USAESCH PM, Contracting Officer (KO)

In accordance with DID HNC- 009.01.

4.5 e

Tree and Other Vegetation Cutting Progress Maps

USAESCH PM,

Contracting Officer (KO)

Submitted with Project Status Report

4.5 e

GP Accounting Documentation USAESCH PM, Contracting Officer (KO), GPA

If applicable, as required by Corporate PMP and KO/Government Property Administrator (GPA)/ Plant Clearance Officer (PCO).

4.5 f

5.8 Period of Performance. The period of performance of this task order shall be comprised of a base performance period consistent with the base contract, i.e., two years commencing upon award of the base contract or the termination of this task order, whichever occurs earlier, with three 1-year optional extension(s) of performance, if required and authorized by the Contracting Officer. It shall be understood that any and all options of performance (option) beyond the base performance period shall be exercised at the sole discretion of the Government, and as authorized by the Contracting Officer.

5.8.1 Completion Date for MMRP Services. The completion date for MMRP services at Camp Swampy is 6 months following the NTP for Task 6.

5.9 Payment Milestone Schedule. Milestones will be considered met or completed when the appropriate QC documentation has been submitted and QA completed and the submittal and/or product is accepted. Any payment vouchers submitted that do not coincide with the above milestones or do not have the appropriate QC documentation will be rejected. Monthly payment vouchers do not meet milestone requirements. The Contractor shall submit a letter indicating milestones accomplished with each payment voucher. All payments will be made utilizing an agreed upon Payment Milestone Schedule.

Suggested Payment Milestones:

- Corporate UFP-QAPP and Corporate APP (FFP), upon acceptance/approval;

- Optional Initial and Follow-on Government Furnished Property and Leased Equipment Acquisition and Configuration, (CPFF) monthly;

- Optional Storage, Maintenance, and Transportation of GFP and Leased Equipment, (CPFF);

- Site Specific UFP-QAPP (FFP), upon acceptance/approval;

- Tree and Other Vegetation Removal and Control (FFP), upon acceptance/approval;

- SSFR (FFP), upon acceptance/approval.

6.0 REFERENCES.

6.1 Base Contract.

6.2 Data Item Descriptions (DIDs), http://www.hnc.usace.army.mil/Missions/Engineering.aspx.

Price Spreadsheet

For proposal purposes the Contractor shall provide the following price information.

Task, Title, Type, Description Unit Qty. Unit Price Price

1. Corporate UFP-QAPP and APP (FFP) Ea 1 N/A

2. Property Management Plan (FFP Ea 1 N/A

Optional 3. Joint Inventory of Current Government-Furnished Property and Follow-on Government Furnished Property and Leased Equipment Acquisition and Configuration

(CPFF)

L.S. N/A N/A

Optional 4. Storage, Maintenance and Transportation of Government Furnished Property and Leased Equipment (CPFF)

L.S. N/A N/A

5. UFP-QAPP Site Specific Addenda (FFP)

6. Tree and Other Vegetation Cutting

6A. Tree and Other Vegetation Cutting (FFP) L.S. Approximately 195 Acres

N/A

Optional 6B. Herbicide Application to Control Re-Growth (FFP/Acre)

Acre Up to approximately 180 Acres

48.75 Acres

7. Site Specific Final Report (FFP). Ea 1 N/A

Performance Requirements Summary for Performance Assessment Record (PAR)

Exceptional Very Good Satisfactory Marginal Unsatisfactory PAR Category: Quality of Product or Service Performance indicator: Document reviews Draft Plans, Reports, and documents [Plans, documents and reports are considered draft until accepted as final by the Government].

All contract-milestone documents accepted as submitted.

No substantive comments (i.e.

limited to grammar, spelling, terminology) to any of the documents or subplans, but a few exceptions were noted and corrected by change pages.

One or more documents or subplans required revisions to be resubmitted for approval prior to proceeding.

However, no document or subplan required more than one backcheck, all original comments were resolved satisfactorily.

One or more documents or subplans required revisions to be resubmitted for approval prior to proceeding. Two backchecks were required on one or more documents or subplans before original comments were resolved satisfactorily.

One or more documents or subplans did not comply with contract requirements, or one or more documents or subplans required more than two backchecks before original comments were resolved satisfactorily, or one or more documents or subplans were rejected.

Performance indicator: Project Execution Process Compliance

Zero Corrective Action Requests

(CAR).

1-5 CARs for non-critical violations to UFP-

QAPP

requirements.

6-8 CARS for non-critical violations and/or 1 CAR for critical violation.

8-10 CARS for non-critical violations and/or 2-4 CARS for critical violations.

>10 CARS for non-critical violations and/or >4 CARS for critical violations, or any unresolved

CARS.

Task Completion All final data and

QC

documentation submitted and accepted.

Final data and

QC

documentation submitted but not accepted.

PAR Category: Schedule Performance indicator: Timely completion of tasks Final Plans and Reports, project milestones, T.O.

invoices.

All document submittals and task order milestones and invoices complete and accepted by T.O date, project closed out/final invoice approved ahead of schedule.

Project closed out/final invoice accepted ahead of schedule.

Project closed out/final invoice accepted on T.O.

date.

Project closed out/final invoice accepted within 30 calendar days after T.O. date.

Project closed out/final invoice accepted more than 30 calendar days after T.O.

date.

Project status reports accurate.

Yes No

Performance indicator: Impacts to schedule

Impacts caused by Contractor or other causes identified, in writing to

CEHNC CO/

PM, in a timely manner to apply acceptable…