Amendment R0003 - HAHD AWSP FPF Preposal Conference Technical.pdf
PDF 10 MB Posted
- Solicitation number
- W912DW24R0004
About this file
This document is an amendment to the Request for Proposals (RFP) for the W912DW24R0004 - Howard A. Hanson Dam Additional Water Storage Project - Fish Passage Facility solicitation issued by the U.S. Army Corps of Engineers. The amendment provides details on a pre-proposal conference, including the agenda, schedule, and technical details. Key details include:
The pre-proposal conference is scheduled for January 18, 2023 and will cover topics such as the project background, scope of work, design requirements, construction sequencing, environmental considerations, and the proposal submission process. Attachments to the amendment include the agenda, schedule, concept drawings, design documentation, construction specifications, and relevant biological opinions. Offerors are advised to review all attached documents carefully as they contain important information related to the requirements of the solicitation. The deadline for proposal submission remains unchanged from the original RFP.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Purpose: Design and construct a downstream fish passage facility at Howard A Hanson Dam (HAHD) to improve abundance and productivity of ESA-listed salmon and steelhead in the Green/Duwamish basin and contribute to the survival and recovery of the Southern Resident Killer Whales
• Restores biological connection of upper watershed (45% of total area) to the lower watershed via salmon migration
• Substantially increases salmon and steelhead productivity by providing over 100 miles of high-quality river and tributary habitat
• Increases ESA-listed Chinook salmon access to substantially more spawning and rearing area – 221 square miles of undeveloped watershed
• Expected to increase population of Chinook salmon, the primary food source for ESA-listed Southern Resident killer whales
HOWARD A. HANSON DAM AWSP
DOWNSTREAM FISH PASSAGE FACILITY
Location: 35-miles SE of Seattle at River Mile 64 on Green River; in Tacoma municipal watershed
Description: Earth-filled high-head 675’ crest; crown width 23’; max height 235’; top elev. 1228’; design pool
1206’; PMF 1224’;
History & Background: Authorized as Eagle Gorge Dam in Rivers & Harbors Act of 1950 for 106k af flood storage (NOV-FEB) & 24.2k af summer low flow augmentation for fish
Construction: Total at 1962 completion $39M Purposes: Flood Risk Management and Fish
Conservation (1950), Water Supply and Ecosystem Restoration (1999)
HOWARD A. HANSON DAM OVERVIEW
DAM OVERVIEW
Authorization: WRDA 1999, updated WRDA 2022
Sponsor: Tacoma Public Utilities
Multi-Purpose Project:
‒ M&I Water Supply ‒ Ecosystem Restoration
Phase 1: 20,000 acre feet of Municipal and Industrial Water and fish passage (1167’)
Phase 2: 2,400 acre feet of M&I and 9,600 acre feet of low flow augmentation, additional fish and wildlife habitat (1177’)
ADDITIONAL WATER STORAGE PROJECT (AWSP)
RFP/SOW- Preconstruction Services Scope
1. Concrete Mix Design
2. Bulkhead Inspect and Test Pool
Attachments
1. Design Schedule
2. Plan Sheet List
3. Conceptual Design Drawings
4. 35% Design Documentation Report (FIO)
5. Construction Specifications Table of
Content
6. Draft Division 1 Specifications
7. Geotechnical Baseline Report, Information
Report, and Data Report
8. USFWS 2022 Biological Opinion
9. NMFS 2019 Biological Opinion
10. 401 Certification
RFP DOCUMENTS
11. Existing Bulkhead Inspection Report
12. Statement of Work: Existing Bulkhead Inspection
13. As-Builts (NDA required)* 14.Existing Bulkhead ROV inspection Video* 15.Bim Model (FIO)* 16.Survey Data (FIO)*
* Attachment is available to be sent via DoD SAFE upon request via email to Adam Birkland: adam.birkland@usace.army.mil.
CURRENT CONDITION
CONCEPT DESIGN – FRONT ISOMETRIC
CONCEPT DESIGN – REAR ISOMETRIC
CONCEPT DESIGN – GENERAL SITE
CONCEPT DESIGN – INTAKE/BULKHEAD
CONCEPT DESIGN – MULTIPORT COLLECTOR
CONCEPT DESIGN – STEEP SLOPE BYPASS
CONCEPT DESIGN – ACCESS TOWER
CONCEPT DESIGN – STILLING BASIN
THANK YOU!
| Howard A. Hanson Dam AWSP �Downstream Fish Passage Facility |
| Slide Number 2 |
| Slide Number 3 |
| Slide Number 4 |
| Slide Number 5 |
| Slide Number 6 |
| CONCEPT Design – Front Isometric |
| Concept Design – Rear Isometric |
| Concept Design – General Site |
| Concept Design – Intake/Bulkhead |
| Concept Design – Multiport Collector |
| concept Design – Steep Slope Bypass |
| Concept Design – Access Tower |
| concept Design – Stilling Basin |
| Thank you! |
File details come from the government source that posted it. Updated .