This document is a solicitation amendment for upgrades to the DC boards and breakers at Libby Dam in Montana. The Seattle District of the U.S. Army Corps of Engineers is seeking proposals to replace and upgrade the 125VDC, 24/48VDC, and 120VAC electrical systems that power critical dam operations. Major work includes replacing two battery switchboards and chargers, a switchboard enclosure, an inverter and adding a redundant one, switchgear, load panels, an uninterruptible power supply system, and modifications to the battery room. The response due date is extended to March 23, 2022 at 10:00 AM. A pre-proposal site visit will be held on March 2, 2022 for up to two representatives from each offeror. Subcontracting plans are required from large business offerors if awarded the contract.

View the file

Other files for this federal contract opportunity

Other files attached to Libby Dam DC Boards and Breakers, Libby, MT, newest first.
File Type Posted
22R0036_0003.pdf PDF
Amendment 3 Contract Drawings R0003.pdf PDF
SUBMITTAL REGISTER R0003.pdf PDF
TABLE OF CONTENTS R0003.pdf PDF
01 11 10.00 26 R0003.pdf PDF
01 12 16.00 28 R0003.pdf PDF
01 30 00 R0003.pdf PDF
00 73 00-A R0003.docx DOCX document
01 22 00 R0003.pdf PDF
Summary of changes in Amendment 3 (R0003).docx DOCX document
22R0036R2.pdf PDF
Libby PLANS DC Boards and Breakers Replacement Color .pdf PDF
FY21 Powerhouse DC Boards and Breakers Replacement.pdf PDF
Reference Drawings Rev. 5.pdf PDF
W912DW22R0036.pdf PDF
Show all 15

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

This solicitation's due date is being extended to accommodate questions from industry. An additional amendment is forthcoming to answ er queries submitted to ProjNet.

Please acknow ledge this amendment w ith your offer.

1. CONTRACT ID CODE PAGE OF PAGES

1 7

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 09-Mar-2022

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912DW22R0036

X 9B. DATED (SEE ITEM 11)

10-Feb-2022

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

09-Mar-2022

CODE

USA ENGINEER DISTRICT, SEATTLE

ATTN: CENWS-CT

4735 EAST MARGINAL WAY SOUTH, BLDG. 1202

SEATTLE WA 98134-2388

W912DW 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912DW22R0036

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION 00 10 00 - SOLICITATION

The required response date/time has changed from 14-Mar-2022 10:00 AM to 23-Mar-2022 10:00 AM.

SECTION 00 21 00 - INSTRUCTIONS

The following have been modified:

INSTRUCTIONS TO OFFERORS

1. General Description of Work

2. Disclosure of the Magnitude of Construction

3. Copies of Solicitation Documents and Amendments

4. Offeror’s Questions and Comments

5. Small Business Size Standard / NAICS Code:

6. Proposal Expenses and Pre-Award Costs

7. Pre-Proposal Site Visit

8. Accuracy in Proposals

9. Proposal Submittals

10. Bid Guarantee

11. Subcontracting Plan

12. Solicitation Provisions

1. General Description of Work:

Contract Title: Libby Dam DC Boards and Breakers, Libby, MT.

The Seattle District, U.S. Army Corps of Engineers proposes to construct upgrades to Libby Dam DC Boards and Breakers. Libby Dam was completed in 1973 with various replacements and upgrades to the electrical system occurring since then. The existing DC and Preferred AC architecture consists of 125VDC, 24/48VDC, and critical 120VAC systems. These existing systems provide power to loads that are crucial for the project’s operation but lack equipment redundancy. The current system has multiple single points of failure that could affect the plants generation and safety. Furthermore, the equipment is unable to be taken down for maintenance, causing plant personnel and contractors to perform work on energized equipment.

The major features of work include:

125VDC System - existing battery switchboard replacement with two redundant battery switchboards, battery chargers will be replaced with higher capacity chargers (400A) and the 125VDC load centers will be replaced.

24/48VDC System - removal and replacement of the switchboard with an enclosure to house the 125V main battery breaker and load bank connection.

Preferred AC System - inverter will be replaced, and a redundant one will be added. Manual bypass switches are to be added to bypass the inverters. CHO will be removed and replaced with two new redundant switchboards. A redundant bypass transformer and two external manual bypass switches will be added. AC load panels will be replaced and an additional panel will be added. A UPS system will also be added to provide Dam preferred AC.

Battery Room Modification - new pre-fabricated, nonstructural wall, installation of a fireproof door, new ductwork in the battery room to meet ventilation requirements and new spot AC system to meet charger and inverter heat loads in equipment room

2. Disclosure of the Magnitude of Construction:

In accordance with DFARS 236.204(ii) “Disclosure of the Magnitude of Construction Projects,” the magnitude of the project is estimated between $1,000,000 and $5,000,000.

3. Copies of Solicitation Documents and Amendments:

Copies of the solicitation and amendments are available by INTERNET ACCESS ONLY. All solicitation documents will be posted to the U.S. Government’s Contract Opportunities website at: https://www.SAM.gov under Solicitation Number W912DW22R0036. A list of interested vendors (potential offerors and subcontractors) is available on the web site (registration required) with the solicitation announcement.

NOTE: www.SAM.gov is the new official U.S. Government website for Contract Opportunities.

It shall be the contractor’s responsibility to check the websites for any amendments. The Offeror shall submit in the proposal all requested information specified in this solicitation. There will be no public opening of the proposals received as a result of this solicitation.

4. Offeror’s Questions and Comments:

Offeror Inquiry

I. Technical inquiries and questions relating to proposal procedures or bonds are to be submitted via Bidder Inquiry in ProjNet at http://www.projnet.org/projnet.

a. To submit and review bid inquiry items, offerors will need to be a current registered user or self-register into system. To self-register go to web page, click BID tab select Bidder Inquiry, select agency USACE, enter Key for this solicitation listed below, and your e-mail address, click login. Fill in all required information and click create user. Verify that information on next screen is correct and then click continue.

b. From this page you may view all bidder inquiries or add inquiry.

c. Offerors will receive an acknowledgement of their question via email, followed by an answer to their question after it has been processed by our technical team.

d. The Solicitation Number is: W912DW22R0036

e. The Bidder Inquiry Key is: YWYPSE-EAMU3Z

II. The Bidder Inquiry System will be unavailable for new inquires 3 business days prior to proposal submission in order to ensure adequate time is allotted to form an appropriate response and amend the solicitation, if necessary.

III. Offerors are requested to review the specification in its entirety, review the Bidder Inquiry System for answers to questions prior to submission of a new inquiry.

IV. The call center operates weekdays from 8AM to 5PM U.S. Central Time Zone (Chicago).

The telephone number for the Call Center is 800-428-HELP.

V. Offers will NOT be publicly opened. Information concerning the status of the evaluation and/or award will NOT be available after receipt of proposals.

5. Small Business Size Standard / NAICS Code:

See Section 00 45 00, Provision 52.204-8 for the NAICS code and small business size standard.

6. Proposal Expenses and Pre-Award Costs:

This Request for Proposals (RFP) does not commit the Government to pay, as a direct charge, any costs incurred in the preparation and submission of a proposal.

7. Pre-Proposal Site Visit:

A Pre-Proposal Conference and Site Visit will be on 02 March 2022 from 0900 to 1030. Due to COVID-19, social distancing will be strictly observed. Guidelines are as follows:

• Each Offeror will be limited to two representatives, including all subs and partners, for each site visit.

• Offerors are required to provide the names, company affiliation, address, phone number, and driver’s license number to Mr. Evan Lauterbach, whose contact information follows these instructions, within 5 business days before the scheduled sit visit to be included on the site visit list.

• In order to prevent any large gatherings, all participants must provide their own transportation to the Libby Dam security Control Point for vehicle and participant clearance, proceed to the Commons Building, and remain at their vehicles until the Government escorts everyone in "caravan" to the parking lot.

• Once parked, all participants will remain at their vehicle until Government representatives form small sub-groups no more than six persons per sub-group to walk through the project site.

• Attendance for each sub-group will be recorded by the Government rep for each group through verbal communication.

• Masks covering both nose and mouth will be worn at all times while on site.

• Physical distancing (at least six feet distance) will be strictly observed.

• Restroom facilities may not be readily available.

The Government retains the right to cancel this event should Montana State and Federal COVID19 posture regress to a more restrictive level.

The Corps of Engineers (COE) on-site point of contact is Mr. Evan Lauterbach, (509) 244-5571 X1240, Evan.M.Lauterbach@usace.army.mil

OFFERORS ARE URGED AND EXPECTED to inspect the site where construction is to be performed and to satisfy themselves as to all general and local conditions which may affect the cost of performance of the Contract, to the extent such information is reasonably obtainable

8. Accuracy in Proposals:

Proposals must set forth full, accurate, and complete information as required by this RFP (including attachments). The penalty for making false statements is prescribed in 18 U.S.C.

1001.

9. Proposal Submittals

In strict compliance with guidance relating to the current situation with COVID-19 and physical distancing, the only authorized transmission method for proposals in response to this solicitation is electronically via EMAIL Proposals must be submitted to the following email address:

jeannette.k.patton@usace.army.mil

To ensure timely receipt and verification that proposals are received, the offeror is encouraged to submit a separate email (without attachments) and request that the Government affirmatively respond that proposal has been received. Due to potential internet downed systems or delays, the offeror is highly encouraged to submit its proposal several hours prior to stated deadline.

Alternatively, offeror may call 206-316-3891 and leave a voicemail to which the Government will affirmatively respond via email to verify receipt of offeror’s proposal.

10. Bid Guarantee:

The Standard Form (SF) 24, dated 08/2016, shall be used for the submission of your bid bond and can be obtained from https://www.gsa.gov/reference/forms#SF. Submit a copy of the bid bond via email with your proposal.

You are also required to submit a hard-copy original of the bid bond to the following address:

U.S. Army Corps of Engineers, Seattle District Attn: Jeannette Patton – CENWS-CTC 4735 E. Marginal Way South, Bldg. 1202 Seattle, WA 98134-2388

11. Subcontracting Plan

Submission Requirements (NOTE: This Requirement only applies to the otherwise successful Offeror if it is other than a Small Business.

If the Offeror proposing on this solicitation is a large business concern, in accordance with the definition as identified in FAR Clause 52.219-1, “SMALL BUSINESS PROGRAM REPRESENTATION”, upon notification that it is the apparent successful Offeror, the firm must submit a small business subcontracting plan in accordance with FAR Clause 52.219-9 SMALL BUSINESS SUBCONTRACTING PLAN (Jan 2002) The goals established for small business, small disadvantaged business, woman-owned business, HUBZone business, Service disabled veteran-owned small business participation are:

Goals. The U.S. Army Corps of Engineers considers the following goals reasonable and achievable for the performance of the resultant contract:

Small Business - 33%

HUBZone Small Business - 3%

Service-Disabled Veteran-Owned Small Business - 3%

Veteran-Owned Small Business - 2%

Small Disadvantaged Business - 5%

Women-Owned Small Business - 5%

The Small Business Subcontracting Plan shall be thorough, complete, and in accordance with AFARS Appendix DD and FAR Clause 52.219-9, as it will be incorporated into the contract upon award of the contract to the Offeror, if acceptable and upon final approval of the Contracting Officer. The Plan shall include a description of the types of services the firm proposes to subcontract with small business (SB), small disadvantaged business (SDB), woman-owned small business (WOSB), HUBZone business, and service-disabled veteran-owned small business (SDVOSB), along with the proposed percentages of their participation, to demonstrate a plan to meet the subcontracting goals that will apply to these contracts. If practical, the Offeror shall provide specific information on proposed subcontracted effort for this project.

12. Solicitation Provisions

See the applicable Provisions for this Solicitation in Section 00 21 00 and Section 00 45 00.

(End of Summary of Changes)

File details come from the government source that posted it. Updated .