01 11 10.00 26 R0003.pdf
PDF 533 KB Posted
- Attached to
- Libby Dam DC Boards and Breakers, Libby, MT Federal contract opportunity
- Solicitation number
- W912DW22R0036
About this file
This solicitation package includes specifications for the Libby Dam DC Boards and Breakers replacement project located in Libby, Montana. The scope of work involves removing existing DC switchboards, panelboards, battery systems, inverters, and associated equipment, and installing new DC switchboards, panelboards, battery chargers, inverters, UPS systems, transfer switches, converters, ventilation equipment, and a new fire wall. The solicitation was issued by the Department of the Army Corps of Engineers Engineering District Seattle as solicitation number W912DW22R0036. Responses are due based on the solicitation schedule.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 22R0036_0003.pdf | ||
| Amendment 3 Contract Drawings R0003.pdf | ||
| 01 12 16.00 28 R0003.pdf | ||
| 01 30 00 R0003.pdf | ||
| 00 73 00-A R0003.docx | DOCX document | |
| 01 22 00 R0003.pdf | ||
| SUBMITTAL REGISTER R0003.pdf | ||
| TABLE OF CONTENTS R0003.pdf | ||
| Summary of changes in Amendment 3 (R0003).docx | DOCX document | |
| 22R0036R2.pdf | ||
| W922R0036R1.pdf | ||
| FY21 Powerhouse DC Boards and Breakers Replacement.pdf | ||
| Reference Drawings Rev. 5.pdf | ||
| W912DW22R0036.pdf | ||
| Libby PLANS DC Boards and Breakers Replacement Color .pdf |
Show all 15
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FY21 Powerhouse DC Boards and Breakers Replacement 21016 Libby Dam, MT
SECTION TABLE OF CONTENTS
DIVISION 01 - GENERAL REQUIREMENTS
SECTION 01 11 10.00 26
SUMMARY OF WORK
PART 1 GENERAL
1.1 SUMMARY
1.2 WORK COVERED BY CONTRACT DOCUMENTS
1.2.1 Project Description
PART 2 PRODUCTS - NOT USED
PART 3 EXECUTION - NOT USED
-- End of Section Table of Contents --
SECTION 01 11 10.00 26 Page 1
W912DW22R0036 R0003
SECTION 01 11 10.00 26
SUMMARY OF WORK
PART 1 GENERAL
1.1 SUMMARY
This Section provides a summary of the various Contract work elements and their relationship to each other. This summary describes work activities within interim construction completion date. This Section does not provide the technical detail for particular work activities, but describes the work as a whole, providing overall perspective to the separate tasks and their interrelationships. Use this Section in conjunction with all the Specification Sections and the Drawings to establish the total work requirements.
1.2 WORK COVERED BY CONTRACT DOCUMENTS
1.2.1 Project Description
This section is a general summary of the required work and is not all-inclusive. The work described within these specifications include, but not necessarily be limited to the following:
a. Remove DC Switchboards SB1 and SB2.
b. Provide new DC Switchboards SB1, SB2A, and SB2B.
c. Remove DC and Preferred AC Panel boards S1-S5, CE1, CD1, CD2, CHO, CH1, CH2, CH3 and CH5.
d. Provide new DC and Preferred AC Panel boards CE1- CE5, CE7- CE8, CD1, CD2, CHOA, CHOB, CH1 , CH2, CH3, CH4 and - CH5. Furnish DC Panelboard
CE6.
e. Remove 24V/48V Battery and Battery Chargers BCD1, BCD2 and BC3.
f. Remove and Provide new Battery Chargers BCE1 and BCE2.
g. Remove inverter INV1.
h. Provide new inverters INV1 and INV2 and two new Inverter Bypass switches MBS1 and MBS2.
i. Provide new DC/DC Converters ED1 and ED2 to power 24/48VDC loads.
j. Remove DCH.
k. Provide new UPS, Manual Transfer Switch MTS, Automatic Transfer Switch ATS, and new DCH panel.
i. Provide two 10kVA transformers.
j. Divide the battery room into two separate rooms with fire rated wall.
SECTION 01 11 10.00 26 Page 2
k. Remove existing supply and return ductwork and grilles required for modification.
l. Install new ventilation and associated components including seismic support and hangers.
m. Install new fire wall and fire door for new battery room.
PART 2 PRODUCTS - NOT USED
PART 3 EXECUTION - NOT USED