01 11 10.00 26 R0003.pdf

PDF 533 KB Posted

Attached to
Libby Dam DC Boards and Breakers, Libby, MT Federal contract opportunity
Solicitation number
W912DW22R0036
Issued by
Department of the Army Corps of Engineers Engineering District Seattle

About this file

This solicitation package includes specifications for the Libby Dam DC Boards and Breakers replacement project located in Libby, Montana. The scope of work involves removing existing DC switchboards, panelboards, battery systems, inverters, and associated equipment, and installing new DC switchboards, panelboards, battery chargers, inverters, UPS systems, transfer switches, converters, ventilation equipment, and a new fire wall. The solicitation was issued by the Department of the Army Corps of Engineers Engineering District Seattle as solicitation number W912DW22R0036. Responses are due based on the solicitation schedule.

View the file

Other files for this federal contract opportunity

Other files attached to Libby Dam DC Boards and Breakers, Libby, MT, newest first.
File Type Posted
22R0036_0003.pdf PDF
Amendment 3 Contract Drawings R0003.pdf PDF
01 12 16.00 28 R0003.pdf PDF
01 30 00 R0003.pdf PDF
00 73 00-A R0003.docx DOCX document
01 22 00 R0003.pdf PDF
SUBMITTAL REGISTER R0003.pdf PDF
TABLE OF CONTENTS R0003.pdf PDF
Summary of changes in Amendment 3 (R0003).docx DOCX document
22R0036R2.pdf PDF
W922R0036R1.pdf PDF
FY21 Powerhouse DC Boards and Breakers Replacement.pdf PDF
Reference Drawings Rev. 5.pdf PDF
W912DW22R0036.pdf PDF
Libby PLANS DC Boards and Breakers Replacement Color .pdf PDF
Show all 15

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FY21 Powerhouse DC Boards and Breakers Replacement 21016 Libby Dam, MT

SECTION TABLE OF CONTENTS

DIVISION 01 - GENERAL REQUIREMENTS

SECTION 01 11 10.00 26

SUMMARY OF WORK

PART 1 GENERAL

1.1 SUMMARY

1.2 WORK COVERED BY CONTRACT DOCUMENTS

1.2.1 Project Description

PART 2 PRODUCTS - NOT USED

PART 3 EXECUTION - NOT USED

-- End of Section Table of Contents --

SECTION 01 11 10.00 26 Page 1

W912DW22R0036 R0003

SECTION 01 11 10.00 26

SUMMARY OF WORK

PART 1 GENERAL

1.1 SUMMARY

This Section provides a summary of the various Contract work elements and their relationship to each other. This summary describes work activities within interim construction completion date. This Section does not provide the technical detail for particular work activities, but describes the work as a whole, providing overall perspective to the separate tasks and their interrelationships. Use this Section in conjunction with all the Specification Sections and the Drawings to establish the total work requirements.

1.2 WORK COVERED BY CONTRACT DOCUMENTS

1.2.1 Project Description

This section is a general summary of the required work and is not all-inclusive. The work described within these specifications include, but not necessarily be limited to the following:

a. Remove DC Switchboards SB1 and SB2.

b. Provide new DC Switchboards SB1, SB2A, and SB2B.

c. Remove DC and Preferred AC Panel boards S1-S5, CE1, CD1, CD2, CHO, CH1, CH2, CH3 and CH5.

d. Provide new DC and Preferred AC Panel boards CE1- CE5, CE7- CE8, CD1, CD2, CHOA, CHOB, CH1 , CH2, CH3, CH4 and - CH5. Furnish DC Panelboard

CE6.

e. Remove 24V/48V Battery and Battery Chargers BCD1, BCD2 and BC3.

f. Remove and Provide new Battery Chargers BCE1 and BCE2.

g. Remove inverter INV1.

h. Provide new inverters INV1 and INV2 and two new Inverter Bypass switches MBS1 and MBS2.

i. Provide new DC/DC Converters ED1 and ED2 to power 24/48VDC loads.

j. Remove DCH.

k. Provide new UPS, Manual Transfer Switch MTS, Automatic Transfer Switch ATS, and new DCH panel.

i. Provide two 10kVA transformers.

j. Divide the battery room into two separate rooms with fire rated wall.

SECTION 01 11 10.00 26 Page 2

k. Remove existing supply and return ductwork and grilles required for modification.

l. Install new ventilation and associated components including seismic support and hangers.

m. Install new fire wall and fire door for new battery room.

PART 2 PRODUCTS - NOT USED

PART 3 EXECUTION - NOT USED

-- End of Section --