FY21 Powerhouse DC Boards and Breakers Replacement 21016 Kootenai River, Montana
ATTACHMENT 00 73 00-A
INDEX OF DRAWINGS
DRAWING NO. CJP 1.004, DATED 28 MAY 2021
| SHEET NUMBER |
| PLATE NUMBER |
| TITLE |
| REVISION NUMBER |
| DATE |
GENERAL
| 1 |
| G-001 |
| PROJECT LOCATION AND VICINITY MAPS |
| 3 |
| G-003 |
| ELECTRICAL SYMBOLS, ABBREVIATIONS, AND GENERAL NOTES |
| 4 |
| G-004 |
| PROJECT PLAN/ POWERHOUSE ACCESS/ CONTRACTOR STAGING AREA |
| 5 |
| G-005 |
| OVERALL PLAN ELEVATION 2131.50 & 2148.0 |
| 6 |
| G-006 |
| FLOOR PLAN - OIL STORAE & SEWAGE LAGOON - 2100.0 & 2114.0 |
| 7 |
| G-007 |
| FLOOR PLAN - MAINTENANCE BUILDING - EL 2148.00 |
| 8 |
| G-008 |
| DAM ELEVATION 2455.90 |
| 9 |
| G-009 |
| TRANSVERSE SECTION - ERECTION BAY |
| 10 |
| G-010 |
| CABLE TRAY ISOMETRIC |
ARCHITECTURAL
| 12 |
| A-001 |
| GENERAL NOTES, SYMBOLS AND ABBREVIATIONS |
MECHANICAL
| 14 |
| MD101 |
| PARTIAL PLAN BATTERY ROOM VENTILATION - REMOVAL |
| 15 |
| M-101 |
| PARTIAL PLAN BATTERY ROOM VENTILATION HVAC SYMBOLS AND LEGEND - INSTALL |
ELECTRICAL REMOVAL
| ED101 |
| PARTIAL PLAN - EL 2148.00 - REMOVAL |
| 17 |
| ED102 |
| FLOOR PLAN - BATTERY ROOM AND 21, 22 - REMOVAL |
| 18 |
| ED103 |
| PARTIAL PLAN - MAINTENANCE BUILDING AND SCHEDULE - REMOVAL |
| 19 |
| ED104 |
| PARTIAL PLAN - EL 2455.90 BAY 2 - REMOVAL |
| 20 |
| ED201 |
| BATTERY SWITCHBOARDS - 24/48VDC & 125VDC SB1 & SB2 - REMOVAL |
| 21 |
| ED202 |
| AUXILIARY CONTROL SWBD ER1 - 24/48 & 125VDC PANELS CD1, CO2, & CE1 - REMOVAL |
| R0003 |
| 3/18/2022 |
| 22 |
| ED203 |
| PREFERED AC PANELS - CH1, CH2, CH3 & CH5 - REMOVAL |
| 23 |
| ED204 |
| BATTERY CHARGERS - 24/48VDC & 125VDC BCD1, BCD2, BCD3, BCE1 & BCE2 - REMOVAL |
| 24 |
| ED205 |
| INVERTERS & PANEL CHO - ELEVATION VIEW - REMOVAL |
| 25 |
| ED206 |
| DAM PREFERED AC PANEL OCH - ELEVATION VIEW - REMOVAL |
| 26 |
| ED207 |
| UNITS BOARDS S1-S5- ELEVATION VIEW - REMOVAL |
| 27 |
| ED601 |
| CONTROL SOURCE - ONE LINE DIAGRAM -REMOVAL |
| 28 |
| ED602 |
| PREFERRED AC 2 - ONE LINE DIAGRAMS - REMOVAL |
| 29 |
| ED603 |
| SS, TRANS, LINE, DAM ANNUNCIATION - ER23 SCHEMATIC SHEET 1 OF 5 - DEVICE POWER & DIGITAL INPUTS - REMOVAL |
| 30 |
| ED604 |
| SS, TRANS, LINE, DAM ANNUNCIATION - ER23 SCHEMATIC SHEET 2 OF 5 - DEVICE POWER & DIGITAL INPUTS - REMOVAL |
| 31 |
| ED701 |
| SB BOARDS - WIRING DIAGRAM - REMOVAL |
| 32 |
| ED702 |
| PANEL BOARDS ER15 & ER16, CD1, CO2, CE1 & CH1 - WIRING DIAGRAM - REMOVAL |
| 33 |
| ED703 |
| PANELBOARD ER14 CH2 - WIRING DIAGRAM- REMOVAL |
| 34 |
| ED704 |
| ER23 - TOP WIRING DIAGRAM - REMOVAL |
| 35 |
| ED708 |
| GENERATOR SWITCHBOARD S1F WIRING DIAGRAM- REMOVAL |
| 36 |
| ED709 |
| ANN & SWING PANEL TERM. BLOCKS S1 WIRING DIAGRAM- REMOVAL |
| 37 |
| ED710 |
| GENERATOR SWITCHBOARD S1F WIRING DIAGRAM- REMOVAL |
| 38 |
| ED713 |
| STATION SERVICE GDACS RTU WIRING DIAGRAM - REMOVAL |
| 39 |
| E-801 |
| CABLE AND CONDUIT SCHEDULE - SHEET 1 OF 5 - INSTALL |
| R0003 |
| 3/18/2022 |
| 40 |
| E-802 |
| CABLE AND CONDUIT SCHEDULE - SHEET 2 OF 5 - INSTALL |
| R0003 |
| 3/18/2022 |
| 41 |
| E-803 |
| CABLE AND CONDUIT SCHEDULE - SHEET 3 OF 5 - INSTALL |
| R0003 |
| 3/18/2022 |
| 42 |
| E-804 |
| CABLE AND CONDUIT SCHEDULE - SHEET 4 OF 5 - INSTALL |
| R0003 |
| 3/18/2022 |
| 43 |
| E-805 |
| CABLE AND CONDUIT SCHEDULE - SHEET 5 OF 5 - INSTALL |
| R0003 |
| 3/18/2022 |
| 44 |
| E-103 |
| PARTIAL PLAN EL 2114.00 INSTALL |
| R0003 |
| 3/18/2022 |
| 45 |
| E-202 |
| AUXILIARY CONTROL SW BD ER1 24/48 & 125VDC PANELS CD1, CD2, CE9 INSTALL |
| R0003 |
| 3/18/2022 |
| 46 |
| E-207 |
| UNIT CE BOARDS CE1-CE6 ELEVATION VIEWS INSTALL |
| R0003 |
| 3/18/2022 |
| 47 |
| E-701 |
| BATTERY SW ITCHBOARD SB1 W IRING DIAGRAM INSTALL |
| R0003 |
| 3/18/2022 |
REFERENCE DRAWINGS
| LDP-6-0-0/4 |
| GENERATOR BAYS -ARRANGEMENT PLANS EL. 2131.5, BAYS 1 -4 |
| LDP-1-4-2/19 |
| GENERATOR BAYS - CONCRETE OUTLINE PLAN EL. 2131.5, MONOS 20-23 |
| LDP-1-4-3/9 |
| ERECTION BAY - CONCRETE OUTLINE PLAN ELS. 2131.5 AND 2148, MONOS 19 AND 20 |
| LDP-1-4-2/76 |
| GENERATOR BAYS - REINFORCEMENT SERVICE GALLERY FLOOR EL. 2131.5, MONOLITHS 20 & 24 |
| LDP-1-4-2/77 |
| GENERATOR BAYS - REINFORCEMENT SERVICE GALLERY EL. 2131.5, MONOLITHS 21, 22, 23, 25, & 26 |
| LDP-1-2-0/8 |
| ARCHITECTURAL MISCELLANEOUS PLAN, EL. 2131.5 |
| E-53-20-6 |
| MAINTENANCE BUILDING FLOOR PLAN AND SCHEDULE |
| E-53-20-6 |
| MAINTENANCE BUILDING ELECTRICAL PLAN II |
| LDP-1-6-1D1/1 |
| EMBEDDED CONDUIT & GROUNDING ERECTION BAY - EL. 2100 |
| LDP-1-6-1D1/2 |
| EMBEDDED CONDUIT & GROUNDING ERECTION BAY - EL. 2114 |
| LDP-1-6-1D1/3 |
| EMBEDDED CONDUIT & GROUNDING ERECTION BAY - EL. 2135.5 |
| LDP-1-6-1E1/1 |
| EMBEDDED CONDUIT & GROUNDING MAIN UNIT BAY 1 - EL. 2131.5 |
| LDP-1-6-1E1/2 |
| EMBEDDED CONDUIT & GROUNDING MAIN UNIT BAY 2 - EL. 2131.5 |
| LDP-1-6-1E1/3 |
| EMBEDDED CONDUIT & GROUNDING MAIN UNIT BAY 1-4 - EL. 2131.5 |
| LDP-1-6-1H1/1 |
| EMBEDDED CONDUIT & GROUNDING, MAIN UNIT 7 SKELETON BAY & EQUIP GALLERIES, EL. 2131.5 |
| E-53-11-136 |
| ELECTRICAL GALLERIES - MONO 17 TO 21 |
| LDD-1-6-0A40/1 |
| ELECTRICAL GALLERIES - MONO 24 TO 27 |
| 73867-1 |
| BATTERY SWITCHBOARD SB |
| LDP-1-6-9A4/5 |
| AUXILIARY CONTROL SWBD. - ER1 |
| LDP-1.6-6-9A4/1 |
| POWERHOUSE OUTLINE DIAGRAM STATUS SWITCHBOARD (ST) |
| LDP-3-6-9F24/8 |
| POWERHOUSE OUTLINE DIAGRAM MAIN GENERATOR S1 THRU S4 |
| LDP-3-6-9A4/5.8 |
| POWERHOUSE SCHEMATIC DIAGRAM - BATTERY, GEN, & ER1 SWITCHBOARD DIST. |
| LDP-1.6-9A23/2 |
| POWERHOUSE ONELINE DIAGRAM CONTROL SOURCES |
| LDP-1.6-6-9A43/7 |
| AUXILIARY SWBD ER15 & ER16 WIRING DIAGRAMS |
| LDP-1.6-6-9A43/12 |
| BATTERY SWITCHBOARD SB WIRING DIAGRAM |
| LDP-3-6-9A4/5.7 |
| WIRING DIAGRAM AUX SWBD ER1 |
| LDP-1-6-9A53/1 |
| CABLE ROUTING DIAGRAM - SHEET 1 |
| LDP-1-6-9A53/2 |
| CABLE ROUTING DIAGRAM - SHEET 2 |
| LDP-1-6-9A53/3 |
| CABLE ROUTING DIAGRAM - SHEET 3 |
| LDP-1-6-9A53/4 |
| CABLE ROUTING DIAGRAM - SHEET 4 |
| LDP-1-6-9A53/5 |
| CABLE ROUTING DIAGRAM - SHEET 5 |
| LDP-1.6-6-9A53/7 |
| POWERHOUSE UNITS 5-8 CONDUIT & CABLE SCHEDULE - SHEET 1 |
| LDP-1.6-6-9A53/10 |
| POWERHOUSE UNIT 5 CONDUIT & CABLE SCHEDULE - SHEET 2 |
| LDP-1.6-6-9A53/11 |
| POWERHOUSE UNIT 5 CONDUIT & CABLE SCHEDULE - SHEET 3 |
| 14-C-0030 E-801 |
| CABLE & CONDUIT SCHEDULE - INSTALL |
| 14-C-0030 E-802 |
| CABLE AND CONDUIT SCHEDULE - INSTALL |
| 14-C-0030 E-803 |
| CABLE & CONDUIT SCHEDULE - INSTALL |
| 14-C-0030 E-804 |
| CABLE AND CONDUIT SCHEDULE - INSTALL |
| E-53-20-6 |
| DAM ELECTRICAL CABLE SCHEDULE 1 |
| 14-C-0030 E-803 |
| CABLE & CONDUIT SCHEDULE- INSTALL - SHEET 3 OF 3 |
End of Attachment 00 73 00-A