SUBMITTAL REGISTER R0003.pdf
PDF 884 KB Posted
- Attached to
- Libby Dam DC Boards and Breakers, Libby, MT Federal contract opportunity
- Solicitation number
- W912DW22R0036
About this file
This submittal register outlines the required submissions for a federal construction contract to replace DC boards and breakers at the Libby Dam Powerhouse in Libby, Montana. The contract, awarded by the Department of the Army Corps of Engineers Engineering District Seattle, requires submissions including construction plans, safety plans, testing procedures, warranties, as-built drawings, operation and maintenance manuals, and commissioning reports. It specifies due dates and approval requirements for submissions addressing concrete removal, welding, firestopping, doors, ductwork, electrical components, grounding systems, switchboards, generators, and uninterruptible power supplies.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 22R0036_0003.pdf | ||
| Amendment 3 Contract Drawings R0003.pdf | ||
| TABLE OF CONTENTS R0003.pdf | ||
| 01 11 10.00 26 R0003.pdf | ||
| 01 12 16.00 28 R0003.pdf | ||
| 01 30 00 R0003.pdf | ||
| 00 73 00-A R0003.docx | DOCX document | |
| 01 22 00 R0003.pdf | ||
| Summary of changes in Amendment 3 (R0003).docx | DOCX document | |
| 22R0036R2.pdf | ||
| W922R0036R1.pdf | ||
| Libby PLANS DC Boards and Breakers Replacement Color .pdf | ||
| FY21 Powerhouse DC Boards and Breakers Replacement.pdf | ||
| Reference Drawings Rev. 5.pdf | ||
| W912DW22R0036.pdf |
Show all 15
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 20 PAGES
W912DW22R0036
FY21 Powerhouse DC Boards and Breakers Replacement
01 12 16.00 28 SD-01 Preconstruction Submittals
1.3 G HDCEQUIPMENT REPLACEMENT
AND CUTOVER PLAN
SD-03 Product Data
2.1 I HDCTemporary Power Cables
01 14 00 SD-01 Preconstruction Submittals
1.4 GContractor Access and Use of
Premises
1.5List of Contact Personnel
1.6Employee Listing
1.7Vehicle Listing
1.8 GTransportation of Materials
1.9 G HDCLoading Plan for Cranes and
Heavy Equipment
1.10 GLifting Diagram
01 30 00 SD-01 Preconstruction Submittals
1.3View Location Map
1.4Progress and Completion
Pictures
01 32 01.00 10 SD-01 Preconstruction Submittals
1.3 GProject Scheduler Qualifications
3.4.1 GPreliminary Project Schedule
3.4.2 GInitial Project Schedule
3.6.2 GPeriodic Schedule Update
01 33 00 SD-01 Preconstruction Submittals
1.8 GSubmittal Register
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
R0003 g3endwc9 Line g3endwc9 Line g3endwc9 Line g3endwc9 Line g3endwc9 Line
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 20 PAGES
FY21 Powerhouse DC Boards and Breakers Replacement
01 33 29 SD-01 Preconstruction Submittals
1.5.3.2 GPreliminary High Performance
and Sustainable Building Checklist
1.4.1 GSustainability Action Plan
1.5.3.2 GPreliminary Sustainability
eNotebook
01 35 26 SD-01 Preconstruction Submittals
1.7.1 GAPP - Construction
GDive Operations Plan
1.7 GAccident Prevention Plan (APP)
SD-06 Test Reports
1.4Monthly Exposure Reports
1.12Notifications and Reports
1.12.2 GAccident Reports
1.12.3LHE Inspection Reports
SD-07 Certificates
1.6.1.4Crane Operators/Riggers
1.7.3.2 GStandard Lift Plan
1.7.3.3 GCritical Lift Plan
1.7.3.4 GNaval Architecture Analysis
1.8Activity Hazard Analysis (AHA)
1.9.1Confined Space Entry Permit
1.9.1Hot Work Permit
1.12.4Certificate of Compliance
1.14License Certificates
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
R0003
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 20 PAGES
FY21 Powerhouse DC Boards and Breakers Replacement
01 35 26 1.14.1 GRadiography Operation Planning
Work Sheet
1.14.1 GPortable Gauge Operations
Planning Worksheet
01 45 00.00 10 SD-01 Preconstruction Submittals
3.2 GContractor Quality Control (CQC)
Plan
SD-06 Test Reports
3.9.2Verification Statement
01 50 00 SD-01 Preconstruction Submittals
1.3 GConstruction Site Plan
GTraffic Control Plan
GHaul Road Plan
1.4.1.4 GContractor Computer
Cybersecurity Compliance
Statements
1.4.6 GContractor Temporary Network
Cybersecurity Compliance
Statements
01 57 19 SD-01 Preconstruction Submittals
1.5.1Preconstruction Survey
1.9 GSolid Waste Management Permit
1.5.2 GRegulatory Notifications
1.6 GEnvironmental Protection Plan
GDirt and Dust Control Plan
1.5.5 GEmployee Training Records
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 20 PAGES
FY21 Powerhouse DC Boards and Breakers Replacement
01 57 19 1.5.4 GEnvironmental Manager
Qualifications
SD-06 Test Reports
1.9.1 GMonthly Solid Waste Disposal
Report
SD-07 Certificates
1.5.5 GEmployee Training Records
Certificate of Competency
Erosion and Sediment Control
Inspector
SD-11 Closeout Submittals
3.3.1 GWaste Determination
Documentation
3.3.3.6 GDisposal Documentation for
Hazardous and Regulated Waste
1.5.5 GAssembled Employee Training
Records
1.9 GSolid Waste Management Permit
3.3.2.1 GProject Solid Waste Disposal
Documentation Report
3.3.3.1 GHazardous Waste/Debris
Management
1.5.2 GRegulatory Notifications
3.3.2.1 GSales Documentation
3.3.2.1Contractor Certification
01 74 19 SD-01 Preconstruction Submittals
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 5 OF 20 PAGES
FY21 Powerhouse DC Boards and Breakers Replacement
01 74 19 1.6 GConstruction Waste Management
Plan
SD-06 Test Reports
1.8.2Quarterly Reports
1.8.3Annual Report
SD-11 Closeout Submittals
1.9 SFinal Construction Waste
Diversion Report
01 78 00 SD-03 Product Data
1.8.1Warranty Management Plan
1.8.5Warranty Tags
1.6Spare Parts Data
SD-08 Manufacturer’s Instructions
1.8.1Instructions
SD-10 Operation and Maintenance
Data
3.7 GOperation and Maintenance
Manuals
SD-11 Closeout Submittals
3.1 GAs-Built Drawings
3.3 GRecord Drawings
GRecord Model
1.8.1As-Built Record of Equipment and Materials
3.6As-Built Record of Equipment and Materials
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 6 OF 20 PAGES
FY21 Powerhouse DC Boards and Breakers Replacement
01 78 00 3.4 GFinal Approved Shop Drawings
3.5 GConstruction Contract
Specifications
GCertification of EPA Designated
Items
2.2 GCertification Of USDA Designated
Items
GInterim DD FORM 1354
GChecklist for DD FORM 1354
GHigh Performance and
Sustainable Building (HPSB)
Checklist
01 78 23 SD-10 Operation and Maintenance
Data
1.3 GO&M Database
3.1.1 GTraining Plan
3.1.3 GTraining Outline
3.1.2 GTraining Content
SD-11 Closeout Submittals
3.1.4 GTraining Video Recording
3.1.6 GValidation of Training Completion
03 60 00.01 26 SD-01 Preconstruction Submittals
3.4.1 G HDCConcrete Removal and Disposal
Plan
3.4.3 G HDCSaw Cutting Procedure
3.4.4 G HDCCore Drilling Procedure
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 7 OF 20 PAGES
FY21 Powerhouse DC Boards and Breakers Replacement
03 60 00.01 26 3.4.8 G HDCConcrete Imaging Report
3.4.12 G HDCRepair Procedure of Concrete
Surfaces
05 40 00 SD-02 Shop Drawings
1.6.1 G DOFraming Components
SD-03 Product Data
2.1Studs, Joists
SD-05 Design Data
1.6.2 G DOMetal Framing Calculations
SD-07 Certificates
1.4Load-Bearing Cold-Formed Metal
Framing
3.1.1Welds
SD-11 Closeout Submittals
2.1 SRecycled Content of Steel
Products
05 50 03.01 26 SD-03 Product Data
3.2.3 GEC-CCFiller Metal
SD-05 Design Data
3.2.6.1 GEC-CCWelding Procedures
3.3.2.6 G HDCWelding Repair Plan
SD-06 Test Reports
3.3.2.4 GEC-CCWeld Inspection Reports
3.3.2.2 GWeld Inspection Log
SD-07 Certificates
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 8 OF 20 PAGES
FY21 Powerhouse DC Boards and Breakers Replacement
05 50 03.01 26 3.2.4 GEC-CCQualification of Welders and
Welding Operators
3.3.2.1 GEC-CCCertified Weld Inspector's
Qualifications
3.3.2.3Inspection Agency Qualifications
05 50 04.01 26 SD-06 Test Reports
1.4 G CTest of Materials
2.1Materials
07 84 00 SD-02 Shop Drawings
2.1 G HDCFirestopping System
SD-03 Product Data
2.2 G HDCFirestopping Materials
SD-06 Test Reports
3.3 GInspection
SD-07 Certificates
1.5.2Inspector Qualifications
2.2 GFirestopping Materials
1.5.1 G HDCInstaller Qualifications
07 92 00 SD-03 Product Data
2.1 GSealants
GPrimers
GBond Breakers
GBackstops
SD-06 Test Reports
3.1 GField Adhesion
SD-07 Certificates
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 9 OF 20 PAGES
FY21 Powerhouse DC Boards and Breakers Replacement
07 92 00 2.1.1 SIndoor Air Quality For Interior
Sealants
SIndoor Air Quality For Interior
Floor Joint Sealants
SIndoor Air Quality For Interior
Acoustical Sealants
2.2 SIndoor Air Quality For Interior
Caulking
08 11 13 SD-02 Shop Drawings
2.1 G HDCDoors
2.1 G HDCDoors
2.5 G HDCFrames
2.5 G HDCFrames
2.3Accessories
SD-03 Product Data
2.1 G HDCDoors
2.5 G HDCFrames
2.3Accessories
08 33 23 SD-02 Shop Drawings
2.2.1 G HDCOverhead Coiling Doors
2.2.3 G HDCCounterbalancing Mechanism
2.2.4 G HDCManual Door Operators
2.2.1.4 GBottom Bars
2.1.1.1 GGuides
2.2.3.1 GMounting Brackets
2.2.2.2 GHood
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 10 OF 20 PAGES
FY21 Powerhouse DC Boards and Breakers Replacement
08 33 23 2.1.1.1 G HDCInstallation Drawings
SD-03 Product Data
2.2.1 G HDCOverhead Coiling Doors
2.2.2 GHardware
2.2.3 GCounterbalancing Mechanism
2.2.4 GManual Door Operators
2.2.5 G HDCFire-Rated Door Assembly
2.2.1.1 SRecycled content for steel curtain
slats
SD-05 Design Data
2.2.1 G HDCOverhead Coiling Doors
2.2.2 GHardware
2.2.3 G HDCCounterbalancing Mechanism
2.2.4 GManual Door Operators
1.3 G HDCFire-Rated Door
SD-10 Operation and Maintenance
Data
1.3.2 GOperation and Maintenance
Manuals
SD-11 Closeout Submittals
1.3.1 GWarranty
08 71 00 SD-02 Shop Drawings
1.3 GManufacturer's Detail Drawings
1.3 GVerification of Existing Conditions
1.5 GHardware Schedule
SD-03 Product Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 11 OF 20 PAGES
FY21 Powerhouse DC Boards and Breakers Replacement
08 71 00 2.3 GHardware Items
SD-08 Manufacturer’s Instructions
3.1Installation
SD-10 Operation and Maintenance
Data
1.5 GHardware Schedule
09 22 00 SD-02 Shop Drawings
2.1 GMetal Support Systems
SD-03 Product Data
2.1Metal Support Systems
2.1 SRecycled Content for Metal
Support Systems
09 29 00 SD-03 Product Data
2.2.4 GCementitious Backer Units
2.2.2Glass Mat Covered or Reinforced
Gypsum Sheathing
2.2.2.1Glass Mat Covered or Reinforced
Gypsum Sheathing Sealant
2.2.3 GAbuse Resistant Gypsum Board
2.2.9Accessories
1.3Certifications
2.2.1 GGypsum Board
SD-04 Samples
2.2.1 GGypsum Board
SD-07 Certificates
2.2 GAsbestos Free Materials
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 12 OF 20 PAGES
FY21 Powerhouse DC Boards and Breakers Replacement
09 29 00 1.3.1 GIndoor Air Quality
SD-08 Manufacturer’s Instructions
2.2Safety Data Sheets
SD-10 Operation and Maintenance
Data
2.2Manufacturer Maintenance
Instructions
SD-11 Closeout Submittals
2.2.1 SRecycled Content for Gypsum
Board
2.2.1 SRecycled Content for Paper
Facing and Gypsum Cores
2.2.1 SIndoor Air Quality for Gypsum
Board
2.2.5 SVOC Content of Joint Compound
2.2.7 SIndoor Air Quality for Non-aerosol
Adhesives
2.2.7 SIndoor Air Quality for Aerosol
Adhesives
09 90 00 SD-02 Shop Drawings
3.8Piping identification
3.8stencil
SD-03 Product Data
1.4.2Certification
2.1 G ROCoating
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 13 OF 20 PAGES
FY21 Powerhouse DC Boards and Breakers Replacement
09 90 00 2.1Manufacturer's Technical Data
Sheets
2.1 G ROMaterials
SD-04 Samples
1.10 G DOColor
SD-07 Certificates
1.3Applicator's qualifications
1.4.1.2 GQualification Testing
SD-08 Manufacturer’s Instructions
3.5.2Mixing
1.7.2Manufacturer's Safety Data
Sheets
SD-10 Operation and Maintenance
Data
2.1 G ROCoatings
SD-11 Closeout Submittals
1.4.2 G SCertification
13 48 00.00 26 SD-02 Shop Drawings
1.5 G HDCDetail Drawings
1.6 G HDCDetail Drawings
SD-03 Product Data
3.4 G HDCConcrete Anchors
1.4.4 G HDCSeismic Equipment Certification
3.1 G HDCSeismic Sway Bracing
SD-05 Design Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 14 OF 20 PAGES
FY21 Powerhouse DC Boards and Breakers Replacement
13 48 00.00 26 1.5 G HDCStructural Design Calculations for
Seismic Restraints
1.6 G HDCStructural Design Calculations for
Seismic Restraints
SD-06 Test Reports
3.5.2.1 G HDCConcrete Anchor Test Reports
3.5.1 G HDCContractor Qualification Testing
23 00 00 SD-02 Shop Drawings
1.4.3 G HDCDetail Drawings
SD-03 Product Data
2.7.1.1 G HDCGeneral Service Duct Connectors
2.7.2 GDuct Access Doors
2.7.3 G HDCFire Dampers
2.7.4 G HDCManual Balancing Dampers
2.7.6 G HDCRegisters and Grilles
1.4.4 G HDCTest Procedures
2.7.1Indoor Air Quality for Duct
Sealants
2.7.1 G HDCMetal Ductwork
2.9.2 G HDCIndication Light
2.9.1 G HDCAdjustable Air Flow Switch (Aafs)
SD-06 Test Reports
3.13 G HDCPerformance Tests
3.10 G HDCDamper Acceptance Test
3.12 G HDCTesting Existing System
SD-08 Manufacturer’s Instructions
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 15 OF 20 PAGES
FY21 Powerhouse DC Boards and Breakers Replacement
23 00 00 3.2Manufacturer's Installation
Instructions
3.15.2Operation and Maintenance
Training
SD-10 Operation and Maintenance
Data
3.15.1 GOperation and Maintenance
Manuals
2.7.3 G HDCFire Dampers
2.7.4 G HDCManual Balancing Dampers
SD-11 Closeout Submittals
3.14Indoor Air Quality During
Construction
26 05 00.00 26 SD-03 Product Data
2.2.1 G HDCRigid Metal Conduit
2.2.2 G HDCLiquid-Tight Flexible Metal
Conduit
2.2.4 G HDCRigid Metallic Conduit Fittings
2.2.5 G HDCFlexible Conduit Fittings
2.6.2 G HDCControl, Instrument, and Selector
Switches
2.3.2 G HDCEnclosures
2.3.3Prefabricated Control Panel Front
2.5 G HDCMolded Case Circuit Breakers
2.6.1 G HDCTerminal Blocks
2.6.3.1 G HDCControl Relays
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 16 OF 20 PAGES
FY21 Powerhouse DC Boards and Breakers Replacement
26 05 00.00 26 2.6.4 G HDCIndicating Lamp Assemblies
2.7 G HDCEscutcheons and Nameplates
2.8 G HDCIndicating Instruments
SD-08 Manufacturer’s Instructions
2.12 G HDCSpare Parts
26 05 19.00 26 SD-03 Product Data
2.1 G HDCInsulated Wire and Cable
2.3.2 G HDCSignal and Communications
Cable
3.1.8 G HDCCable Supports
2.3.1 G HDCSwitchboard Wire
3.1.11Wire Marking
2.4Terminations
SD-06 Test Reports
1.5.1 G HDCInspection and Tests
3.2.1 G HDCInsulation Resistance Test
3.2.1 G HDCShield Resistance Test
26 05 26.00 26 SD-03 Product Data
2.1 G HDCGround Conductors
2.2 G HDCGround Connections
2.3 G HDCGround Bus
26 05 36.00 26 SD-01 Preconstruction Submittals
3.3.1Cable Tray Installation Plan
SD-02 Shop Drawings
1.4 G HDCFabrication And Assembly
Drawings
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 17 OF 20 PAGES
FY21 Powerhouse DC Boards and Breakers Replacement
26 05 36.00 26 1.4 G HDCInstallation Drawings
SD-03 Product Data
2.2 G HDCCable Tray System
2.2.6 G HDCHangers and Supports
2.2.5Cable Cleats
2.2.7Hardware and Accessories
SD-05 Design Data
3.3.4Cable Tray Fill Calculations
3.3.7Cleat Manufacturer's Spacing
Calculations
SD-08 Manufacturer’s Instructions
3.3.2Manufacturer's Instructions
26 08 01.00 26 SD-01 Preconstruction Submittals
1.6.1 G HDCCommissioning Engineer's
Qualifications
SD-05 Design Data
1.7 G HDCCommissioning Plan
SD-06 Test Reports
3.4 G HDCCommissioning Report
3.3.1 G HDCCircuit Functionality Test Report
26 28 00.00 26 SD-02 Shop Drawings
1.4.1 G HDCSwitchboard Drawings
1.4.2 G HDCPanelboard Drawings
SD-03 Product Data
2.2 G HDCSwitchboards
2.3 G HDCPanelboards
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 18 OF 20 PAGES
FY21 Powerhouse DC Boards and Breakers Replacement
26 28 00.00 26 2.5 G HDCNameplates
2.4 G HDCMolded Case Circuit Breakers
2.2.12 G HDCTerminal Blocks
2.2.10 G HDCRelays
2.2.8 G HDCIndicating Instruments
2.2.9 G HDCInstrument Transformers
2.6 G HDCSpare Parts List
SD-05 Design Data
3.1 G HDCFactory Test Procedures
3.3.1 G HDCField Testing and Commissioning
Plan
SD-06 Test Reports
3.3.4 G HDCField Testing and Commissioning
Report
SD-07 Certificates
3.2.3.1 G HDCCertification of Seismic
Requirement
SD-09 Manufacturer’s Field
Reports
3.1 G HDCFactory Test Reports
SD-10 Operation and Maintenance
Data
3.5 G HDCOperation and Maintenance
Manuals
26 32 34.00 26 SD-07 Certificates
3.1 G HDCCertificate of Recycling
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 19 OF 20 PAGES
FY21 Powerhouse DC Boards and Breakers Replacement
26 32 34.00 26 3.1 G HDCCertificate of Disposal
26 32 36.00 26 SD-03 Product Data
2.1 G HDCBattery Chargers
2.2 G HDCInverters
2.2.15 G HDCManual Bypass Switch
SD-05 Design Data
3.3.4Plan for Field Tests
3.3.6Plan for Operational Tests
2.3 G HDCFoundations
SD-06 Test Reports
3.3.4 G HDCField Test Report
3.3.6 G HDCOperational Test Report
SD-10 Operation and Maintenance
Data
3.4 G HDCOperation and Maintenance
(O&M) Manual
26 33 53.00 20 SD-03 Product Data
2.3 G HDCUPS Module
2.1UPS System
1.9 G HDCSpare Parts
SD-05 Design Data
1.6.1Field Test Plan
3.2.4Field Test Plan
1.6.2Operational Test Plan
3.2.6Operational Test Plan
SD-06 Test Reports
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 20 OF 20 PAGES
FY21 Powerhouse DC Boards and Breakers Replacement
26 33 53.00 20 1.6.3 G HDCField Tests Report
3.2.4 G HDCField Tests Report
1.6.4 G HDCOperational Tests Report
3.2.6 G HDCOperational Tests Report
SD-10 Operation and Maintenance
Data
3.3 G HDCOperation and Maintenance
(O&M) Manual
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
File details come from the government source that posted it. Updated .