This solicitation is for repair work on Building 09175, a permanent party UH, located at Joint Base Lewis-McChord in Washington. The work includes repairs to the HVAC system, electrical system, plumbing system and interior finishes. The solicitation was issued by the Department of the Army Corps of Engineers Engineering District Seattle. The response due date is not provided in the document. Repairs are to be completed in accordance with the specifications and drawings referenced in the solicitation.
View the file
Other files
Show all 32
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SECTION 01 45 00.00 10
QUALITY CONTROL
11/ 16, Revi sed 02/ 18
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
ASTM INTERNATIONAL (ASTM)
ASTM D3740 (2019) Minimum Requirements for Agencies Engaged in the Testing and/or Inspection of Soil and Rock as Used in Engineering Design and Construction
ASTM E329 (2020) Standard Specification for Agencies Engaged in Construction Inspection, Testing, or Special Inspection
1.2 PAYMENT
Separate payment will not be made for providing and maintaining an effective Quality Control program. Include all associated costs in the applicable Bid Schedule item.
1.3 SUBMITTALS
Government approval is required for submittals with a "G" or "S" classification. Submittals not having a "G" or "S" classification are for information only. When used, a code following the "G" classification identifies the office that will review the submittal for the Government.
Submit the following in accordance with Section 01 33 00 SUBMITTAL
PROCEDURES:
SD-01 Preconstruction Submittals
Contractor Quality Control (CQC) Plan ; G
SD-06 Test Reports
Verification Statement
PART 2 PRODUCTS
Include procedures in the contractor QC program to ensure compliance with Federal and JBLM hazardous material, sustainable acquisition, and sustainable design requirements.
SECTION 01 45 00.00 10 Page 1
PART 3 EXECUTION
3.1 GENERAL REQUIREMENTS
Establish and maintain an effective quality control (QC) system that complies with FAR 52.246-12 Inspection of Construction. QC consist of plans, procedures, and organization necessary to produce an end product which complies with the Contract requirements. The QC system covers all construction operations, both onsite and offsite, and be keyed to the proposed construction sequence. The project superintendent will be held responsible for the quality of work and is subject to removal by the Contracting Officer for non-compliance with the quality requirements specified in the Contract. In this context the highest level manager responsible for the overall construction activities at the site, including quality and production is the project superintendent. The project superintendent maintains a physical presence at the site at all times and is responsible for all construction and related activities at the site, except as otherwise acceptable to the Contracting Officer.
3.2 CONTRACTOR QUALITY CONTROL (CQC) PLAN
Submit no later than 20 days after receipt of notice to proceed, the Contractor Quality Control (CQC) Plan proposed to implement the requirements FAR 52.246-12 Inspection of Construction. The Government will consider an interim plan for the first 20 days of operation.
Construction will be permitted to begin only after acceptance of the CQC Plan or acceptance of an interim plan applicable to the particular feature of work to be started. Work outside of the accepted interim plan will not be permitted to begin until acceptance of a CQC Plan or another interim plan containing the additional work.
3.2.1 Content of the CQC Plan
Include, as a minimum, the following to cover all construction-operations, both onsite and offsite, including work by subcontractors fabricators, suppliers and purchasing agents:
a. A description of the quality control organization, including a chart showing lines of authority and acknowledgment that the CQC staff will implement the three phase control system for all aspects of the work specified. Include a CQC System Manager that reports to the project superintendent.
b. The name, qualifications (in resume format), duties, responsibilities, and authorities of each person assigned a CQC function. This includes the Contractor's/subcontractor's Environmental Officer(s).
c. A copy of the letter to the CQC System Manager signed by an authorized official of the firm which describes the responsibilities and delegates sufficient authorities to adequately perform the functions of the CQC System Manager, including authority to stop work which is not in compliance with the Contract. Letters of direction to all other various quality control representatives outlining duties, authorities, and responsibilities will be issued by the CQC System Manager. Furnish copies of these letters to the Contracting Officer.
d. Procedures for scheduling, reviewing, certifying, and managing submittals, including those of subcontractors, offsite fabricators, suppliers, and purchasing agents. These procedures must be in
SECTION 01 45 00.00 10 Page 2 accordance with Section 01 33 00 SUBMITTAL PROCEDURES.
e. Control, verification, and acceptance testing procedures for each specific test to include the test name, specification paragraph requiring test, feature of work to be tested, test frequency, and person responsible for each test. (Laboratory facilities approved by the Contracting Officer are required to be used.)
f. Procedures for tracking preparatory, initial, and follow-up control phases and control, verification, and acceptance tests including documentation. This includes procedures for ensuring compliance with Federal and JBLM environmental requirements, including hazardous materials, sustainable acquisition, and Environmental Management System.
g. Procedures for tracking construction deficiencies from identification through acceptable corrective action. Establish verification procedures that identified deficiencies have been corrected.
h. Reporting procedures, including proposed reporting formats.
i. A list of the definable features of work. A definable feature of work is a task which is separate and distinct from other tasks, has separate control requirements, and is identified by different trades or disciplines, or it is work by the same trade in a different environment. Although each section of the specifications can generally be considered as a definable feature of work, there are frequently more than one definable features under a particular section. This list will be agreed upon during the coordination meeting.
j. Coordinate scheduled work with Special Inspections required by Section 01 45 35 SPECIAL INSPECTIONS, the Statement of Special Inspections and the Schedule of Special Inspections. Where the applicable Code issue by the International Code Council (ICC) calls for inspections by the Building Official, the Contractor must include the inspections in the Quality Control Plan and must perform the inspections required by the applicable ICC. The Contractor must perform these inspections using independent qualified inspectors. Include the Special Inspection Plan requirements in the QC Plan.
3.2.2 Acceptance of Plan
Acceptance of the Contractor's plan is required prior to the start of construction. Acceptance is conditional and will be predicated on satisfactory performance during the construction. The Government reserves the right to require the Contractor to make changes in the Contractor Quality Control(CQC) Plan and operations including removal of personnel, as necessary, to obtain the quality specified.
3.2.3 Notification of Changes
After acceptance of the CQC Plan, notify the Contracting Officer in writing of any proposed change. Proposed changes are subject to acceptance by the Contracting Officer.
3.3 COORDINATION MEETING
After the Preconstruction Conference, before start of construction, and
SECTION 01 45 00.00 10 Page 3 prior to acceptance by the Government of the CQC Plan, meet with the Contracting Officer and discuss the Contractor's quality control system.
Submit the CQC Plan a minimum of 5 calendar days prior to the Coordination Meeting. During the meeting, a mutual understanding of the system details must be developed, including the forms for recording the CQC operations,, control activities, testing, administration of the system for both onsite and offsite work, and the interrelationship of Contractor's Management and control with the Government's Quality Assurance. Minutes of the meeting will be prepared by the Government, signed by both the Contractor and the Contracting Officer and will become a part of the contract file. There can be occasions when subsequent conferences will be called by either party to reconfirm mutual understandings or address deficiencies in the CQC system or procedures which can require corrective action by the Contractor.
3.4 QUALITY CONTROL ORGANIZATION
3.4.1 Personnel Requirements
The requirements for the CQC organization are a Safety and Health Manager, CQC System Manager, and sufficient number of additional qualified personnel to ensure safety and Contract compliance. The Safety and Health Manager reports directly to a senior project (or corporate) official independent from the CQC System Manager. The Safety and Health Manager will also serve as a member of the CQC Staff Personnel identified in the technical provisions as requiring specialized skills to assure the required work is being performed properly will also be included as part of the CQC organization. The Contractor's CQC staff maintains a presence at the site at all times during progress of the work and have complete authority and responsibility to take any action necessary to ensure Contract compliance. The CQC staff will be subject to acceptance by the Contracting Officer. Provide adequate office space, filing systems and other resources as necessary to maintain an effective and fully functional CQC organization. Promptly complete and furnish all letters, material submittals, shop drawing submittals, schedules and all other project documentation to the CQC organization. The CQC organization is responsible to maintain these documents and records at the site at all times, except as otherwise acceptable to the Contracting Officer.
3.4.2 CQC System Manager
Identify as CQC System Manager an individual within the onsite work organization that is responsible for overall management of CQC and has the authority to act in all CQC matters for the Contractor. The CQC System Manager is required to be a graduate engineer, graduate architect, or a graduate of construction management, with a minimum of 5 years construction experience on construction similar to this Contract OR a construction person with a minimum of 10 years in related work. This CQC System Manager is on the site at all times during construction and is employed by the prime Contractor. The CQC System Manager shall not serve as SSHO. The CQC Manager shall not serve as Superintendent. Identify in the plan an alternate to serve in the event of the CQC System Manager's absence. The requirements for the alternate are the same as the CQC System Manager.
3.4.3 Additional Requirement
In addition to the above experience and education requirements, the Contractor Quality Control(CQC) System Manager and Alternate CQC System
SECTION 01 45 00.00 10 Page 4
Manager are required to have completed the Construction Quality Management (CQM) for Contractors course. If the CQC System Manager does not have a current certification, obtain the CQM for Contractors course certification within 90 days of award. This course is periodically offered by the Naval Facilities Engineering Command and the Army Corps of Engineers. Contact the Contracting Officer for information on the next scheduled class.
The Construction Quality Management Training certificate expires after 5 years. If the CQC System Manager's certificate has expired, retake the course to remain current.
3.4.4 Organizational Changes
Maintain the CQC staff at full strength at all times. When it is necessary to make changes to the CQC staff, revise the CQC Plan to reflect the changes and submit the changes to the Contracting Officer for acceptance.
3.5 SUBMITTALS AND DELIVERABLES
Submittals, if needed, have to comply with the requirements in Section 01 33 00 SUBMITTAL PROCEDURES. The CQC organization is responsible for certifying that all submittals and deliverables are in compliance with the contract requirements. When Section 01 91 00.15 10 TOTAL BUILDING COMMISSIONING are included in the contract, the submittals required by those sections have to be coordinated with Section 01 33 00 SUBMITTAL PROCEDURES to ensure adequate time is allowed for each type of submittal required.
3.6 CONTROL
CQC is the means by which the Contractor ensures that the construction, to include that of subcontractors and suppliers, complies with the requirements of the contract. At least three phases of control are required to be conducted by the CQC System Manager for each definable feature of the construction work as follows:
3.6.1 Preparatory Phase
This phase is performed prior to beginning work on each definable feature of work, after all required plans/documents/materials are approved/accepted, and after copies are at the work site. This phase includes:
a. A review of each paragraph of applicable specifications, reference codes, and standards. Make available during the preparatory inspection a copy of those sections of referenced codes and standards applicable to that portion of the work to be accomplished in the field. Maintain and make available in the field for use by Government personnel until final acceptance of the work.
b. Review of the Contract drawings.
c. Check to assure that all materials and equipment have been tested, submitted, and approved. This includes assurance that materials meet Federal and JBLM hazardous material and sustainable acquisition requirements.
d. Review of provisions that have been made to provide required control inspection and testing.
SECTION 01 45 00.00 10 Page 5
e. Review Special Inspections required by Section 01 45 35 SPECIAL INSPECTIONS, the Statement of Special Inspections and the Schedule of Special Inspections.
e. Examination of the work area to assure that all required preliminary work has been completed and is in compliance with the Contract.
f. Examination of required materials, equipment, and sample work to assure that they are on hand, conform to approved shop drawings or submitted data, and are properly stored.
g. Review of the appropriate activity hazard analysis to assure safety requirements are met.
h. Discussion of procedures for controlling quality of the work including repetitive deficiencies. Document construction tolerances and workmanship standards for that feature of work.
i. Check to ensure that the portion of the plan for the work to be performed has been accepted by the Contracting Officer.
j. Discussion of the initial control phase.
k. The Government needs to be notified at least 72 hours in advance of beginning the preparatory control phase. Include a meeting conducted by the CQC System Manager and attended by the superintendent, other CQC personnel (as applicable), and the foreman responsible for the definable feature. Document the results of the preparatory phase actions by separate minutes prepared by the CQC System Manager and attach to the daily CQC report. Instruct applicable workers as to the acceptable level of workmanship required in order to meet contract specifications.
3.6.2 Initial Phase
This phase is accomplished at the beginning of a definable feature of work. Accomplish the following:
a. Check work to ensure that it is in full compliance with contract requirements. Review minutes of the preparatory meeting.
b. Verify adequacy of controls to ensure full contract compliance.
Verify required control inspection and testing are in compliance with the contract.
c. Establish level of workmanship and verify that it meets minimum acceptable workmanship standards. Compare with required sample panels as appropriate.
d. Resolve all differences.
e. Check safety to include compliance with and upgrading of the safety plan and activity hazard analysis. Review the activity analysis with each worker.
f. The Government needs to be notified at least 48 hours in advance of beginning the initial phase for definable feature of work. Prepare separate minutes of this phase by the CQC System Manager and attach to the daily CQC report. Indicate the exact location of initial phase
SECTION 01 45 00.00 10 Page 6 for definable feature of work for future reference and comparison with follow-up phases.
g. The initial phase for each definable feature of work is repeated for each new crew to work onsite, or any time acceptable specified quality standards are not being met.
h. Coordinate scheduled work with Special Inspections required by Section 01 45 35 SPECIAL INSPECTIONS, the Statement of Special Inspections and the Schedule of Special Inspections.
3.6.3 Follow-up Phase
Perform daily checks to assure control activities, including control testing, are providing continued compliance with contract requirements, until completion of the particular feature of work. Record the checks in the CQC documentation. Conduct final follow-up checks and correct all deficiencies prior to the start of additional features of work which may be affected by the deficient work. Do not build upon nor conceal non-conforming work. Coordinate scheduled work with Special Inspections required by Section 01 45 35 SPECIAL INSPECTIONS, the Statement of Special Inspections and the Schedule of Special Inspections.
3.6.4 Additional Preparatory and Initial Phases
Conduct additional preparatory and initial phases on the same definable features of work if: the quality of on-going work is unacceptable; if there are changes in the applicable CQC staff, onsite production supervision or work crew; if work on a definable feature is resumed after a substantial period of inactivity; or if other problems develop.
3.7 TESTS
3.7.1 Testing Procedure
Perform specified or required tests to verify that control measures are adequate to provide a product which conforms to contract requirements.
Upon request, furnish to the Government duplicate samples of test specimens for possible testing by the Government. Testing includes operation and acceptance tests when specified. Procure the services of a Corps of Engineers approved testing laboratory or establish an approved testing laboratory at the project site. Perform the following activities and record and provide the following data:
a. Verify that testing procedures comply with contract requirements.
b. Verify that facilities and testing equipment are available and comply with testing standards.
c. Check test instrument calibration data against certified standards.
d. Verify that recording forms and test identification control number system, including all of the test documentation requirements, have been prepared.
e. Record results of all tests taken, both passing and failing on the CQC report for the date taken. Specification paragraph reference, location where tests were taken, and the sequential control number identifying the test. If approved by the Contracting Officer, actual
SECTION 01 45 00.00 10 Page 7 test reports are submitted later with a reference to the test number and date taken. Provide an information copy of tests performed by an offsite or commercial test facility directly to the Contracting Officer. Failure to submit timely test reports as stated results in nonpayment for related work performed and disapproval of the test facility for this Contract.
3.7.2 Testing Laboratories
All testing laboratories must be validated by the USACE Material Testing Center (MTC) for the tests to be performed. Information on the USACE MTC with web-links to both a list of validated testing laboratories and for the laboratory inspection request for can be found at:
https://mtc.erdc.dren.mil/ .
3.7.2.1 Capability Check
The Government reserves the right to check laboratory equipment in the proposed laboratory for compliance with the standards set forth in the contract specifications and to check the laboratory technician's testing procedures and techniques. Laboratories utilized for testing soils, concrete, asphalt, and steel is required to meet criteria detailed in ASTM D3740 and ASTM E329.
3.7.2.2 Capability Recheck
If the selected laboratory fails the capability check, the Contractor will be required to reimburse the Government for each succeeding recheck of the laboratory or the checking of a subsequently selected laboratory. Such costs will be deducted from the Contract amount due the Contractor.
3.7.3 Onsite Laboratory
The Government reserves the right to utilize the Contractor's control testing laboratory and equipment to make assurance tests, and to check the Contractor's testing procedures, techniques, and test results at no additional cost to the Government.
3.8 COMPLETION INSPECTION
3.8.1 Punch-Out Inspection
Conduct an inspection of the work by the CQC System Manager near the end of the work, or any increment of the work established by a time stated in FAR 52.211-10 Commencement, Prosecution, and Completion of Work, or by the specifications. Prepare and include in the CQC documentation a punch list of items which do not conform to the approved drawings and specifications, as required by paragraph DOCUMENTATION. Include within the list of deficiencies the estimated date by which the deficiencies will be corrected. Make a second inspection the CQC System Manager or staff to ascertain that all deficiencies have been corrected. Once this is accomplished, notify the Government that the facility is ready for the Government Pre-Final inspection.
3.8.2 Pre-Final Inspection
The Government will perform the pre-final inspection to verify that the facility is complete and ready to be occupied. A Government Pre-Final Punch List may be developed as a result of this inspection. Ensure that
SECTION 01 45 00.00 10 Page 8 all items on this list have been corrected before notifying the Government, so that a Final inspection with the customer can be scheduled. Correct any items noted on the Pre-Final inspection in a timely manner. These inspections and any deficiency corrections required by this paragraph need to be accomplished within the time slated for completion of the entire work or any particular increment of the work if the project is divided into increments by separate completion dates.
3.8.3 Final Acceptance Inspection
The Contractor's Quality Control Inspection personnel, plus the superintendent or other primary management person, and the Contracting Officer's Representative is required to be in attendance at the final acceptance inspection. Additional Government personnel including, but not limited to, those from Base/Post Civil Facility Engineer user groups, and major commands can also be in attendance. The final acceptance inspection will be formally scheduled by the Contracting Officer based upon results of the Pre-Final inspection. Notify the Contracting Officer at least 14 days prior to the final acceptance inspection and include the Contractor's assurance that all specific items previously identified to the Contractor as being unacceptable, along with all remaining work performed under the Contract, will be complete and acceptable by the date scheduled for the final acceptance inspection. Failure of the Contractor to have all contract work acceptably complete for this inspection will be cause for the Contracting Officer to bill the Contractor for the Government's additional inspection cost in accordance FAR 52.246-12 Inspection of Construction.
3.9 DOCUMENTATION
3.9.1 Quality Control Activities
Maintain current records providing factual evidence that required quality control activities and tests have been performed. Include in these records the work of subcontractors and suppliers on an acceptable form that includes, as a minimum, the following information:
a. The name and area of responsibility of the Contractor/Subcontractor.
b. Operating plant/equipment with hours worked, idle, or down for repair.
c. Work performed each day, giving location, description, and by whom.
When Network Analysis (NAS) is used, identify each phase of work performed each day by NAS activity number.
d. Test and control activities performed with results and references to specifications/drawings requirements. Identify the control phase (Preparatory, Initial, Follow-up). List of deficiencies noted, along with corrective action.
e. Quantity of materials received at the site with statement as to acceptability, storage, and reference to specifications/drawings requirements.
f. Submittals and deliverables reviewed, with Contract reference, by whom, and action taken.
g. Offsite surveillance activities, including actions taken.
SECTION 01 45 00.00 10 Page 9
h. Job safety evaluations stating what was checked, results, and instructions or corrective actions.
i. Instructions given/received and conflicts in plans and specifications.
3.9.2 Verification Statement
Indicate a description of trades working on the project; the number of personnel working; weather conditions encountered; and any delays encountered. Cover both conforming and deficient features and include a statement that equipment and materials incorporated in the work and workmanship comply with the Contract. Furnish the original and one copy of these records in report form to the Government daily within 24 hours after the date covered by the report, except that reports need not be submitted for days on which no work is performed. As a minimum, prepare and submit one report for every 7 days of no work and on the last day of a no work period. All calendar days need to be accounted for throughout the life of the contract. The first report following a day of no work will be for that day only. Reports need to be signed and dated by the Contractor Quality Control(CQC) System Manager. Include copies of test reports and copies of reports prepared by all subordinate quality control personnel within the CQC System Manager Report.
3.10 NOTIFICATION OF NONCOMPLIANCE
The Contracting Officer will notify the Contractor of any detected noncompliance with the foregoing requirements. Take immediate corrective action after receipt of such notice. Such notice, when delivered to the Contractor at the work site, will be deemed sufficient for the purpose of notification. If the Contractor fails or refuses to comply promptly, the Contracting Officer can issue an order stopping all or part of the work until satisfactory corrective action has been taken. No part of the time lost due to such stop orders will be made the subject of claim for extension of time or for excess costs or damages by the Contractor.
-- End of Section --
SECTION 01 45 00.00 10 Page 10
SECTION 10 26 13 Page 1
SECTION 10 26 13
WALL AND CORNER GUARDS
04/06
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
ALUMINUM ASSOCIATION (AA)
AA DAF-45 (2003) Designation System for Aluminum
Finishes
ASTM INTERNATIONAL (ASTM)
ASTM A 167 (1999; R 2004) Standard Specification for
Stainless and Heat-Resisting Chromium-Nickel Steel Plate, Sheet, and Strip
ASTM B 221 (2006) Standard Specification for Aluminum and Aluminum-Alloy Extruded Bars, Rods, Wire, Profiles, and Tubes
ASTM D 256 (2006a) Determining the Izod Pendulum Impact
Resistance of Plastics
ASTM D 543 (2006) Standard Practices for Evaluating the
Resistance of Plastics to Chemical Reagents
ASTM D 635 (2006) Standard Test Method for Rate of
Burning and/or Extent and Time of Burning of Self-Supporting Plastics in a Horizontal Position
ASTM E 84 (2008a) Standard Test Method for Surface
Burning Characteristics of Building Materials
ASTM G 21 (1996; R 2002) Determining Resistance of
Synthetic Polymeric Materials to Fungi
NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)
NFPA 80 (2006; Errata 2008) Standard for Fire Doors and Other Opening Protectives
SOCIETY OF AUTOMOTIVE ENGINEERS INTERNATIONAL (SAE)
SAE J1545 (2005) Instrumental Color Difference
Measurement for Exterior Finishes, Textiles and Colored Trim
SECTION 10 26 13 Page 2
1.2 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. The following shall be submitted in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
SD-02 Shop Drawings
Corner Guards; G Wall Guards (Bumper Guards); G Door Protectors; G Wall Covering/Panels; G
Drawings indicating locations and typical elevations of each type of item. Drawings shall show vertical and horizontal dimensions, full size sections, thickness of materials, and fastening details.
SD-03 Product Data
Corner Guards; G Wall Guards (Bumper Guards); G Door Protectors; G Wall Covering/Panels; G
Manufacturer's descriptive data, catalog cuts, installation instructions, and recommended cleaning instructions.
SD-04 Samples
Finish; G
Submit three samples indicating color and texture of materials requiring color and finish.
SD-06 Test Reports
Corner Guards Wall Guards (Bumper Guards) Door Protectors Wall Covering/Panels
Fire rating and extinguishing test results for resilient material.
SD-07 Certificates
Corner Guards Wall Guards (Bumper Guards) Door Protectors Wall Covering/Panels
Statements attesting that the items comply with specified fire and safety code requirements.
SECTION 10 26 13 Page 3
1.3 DELIVERY AND STORAGE
Materials shall be delivered to the project site in manufacturer's original unopened containers with seals unbroken and labels and trademarks intact.
Materials shall be kept dry, protected from weather and damage, and stored under cover. Materials shall be stored at approximately 70 degrees F for at least 48 hours prior to installation.
1.4 WARRANTY
Manufacturer's standard performance guarantees or warranties that extend beyond a 1 year period shall be provided.
PART 2 PRODUCTS
2.1 GENERAL
To the maximum extent possible, corner guards, door and door frame protectors, wall guards (bumper guards), wall panels and wall covering shall be the standard products of a single manufacturer and shall be furnished as detailed. Drawings show general configuration of products required, and items differing in minor details from those shown will be acceptable.
2.1.1 Resilient Material
Resilient material shall consist of high impact resistant extruded acrylic vinyl, polyvinyl chloride, or injection molded thermal plastic and shall conform to the following:
2.1.1.1 Minimum Impact Resistance
Minimum impact resistance shall be 18 ft-lbs/sq. inch when tested in accordance with ASTM D 256, (Izod impact, ft-lbs per sq inch notched).
2.1.1.2 Fire Rating
Fire rating shall be Class 1 when tested in accordance with ASTM E 84, having a maximum flame spread of 25 and a smoke developed rating of 450 or less. Material shall be rated self extinguishing when tested in accordance with ASTM D 635. Material shall be labeled and tested by an approved nationally known testing laboratory. Resilient material used for protection on fire rated doors and frames shall be listed by the testing laboratory performing the tests. Resilient material installed on fire rated wood/steel door and frame assemblies shall have been tested on similar type assemblies.
Test results of material tested on any other combination of door/frame assembly will not be acceptable.
2.1.1.3 Integral Color
Colored components shall have integral color and shall be matched in accordance with SAE J1545 to within plus or minus 1.0 on the CIE-LCH scales.
2.1.1.4 Chemical and Stain Resistance
Materials shall be resistant to chemicals and stains reagents in accordance with ASTM D 543.
SECTION 10 26 13 Page 4
2.1.1.5 Fungal and Bacterial Resistance
Materials shall be resistant to fungi and bacteria in accordance with ASTM G 21, as applicable.
2.2 CORNER GUARDS
2.2.1 Resilient Corner Guards
Corner guard units shall be flush-mounted or surface-mounted type, radius formed to profile shown. Corner guards shall be of height indicated Mounting hardware, cushions, and base plates shall be furnished. Assembly shall consist of a snap-on corner guard formed from high impact resistant resilient material, minimum 0.078 inch thick, mounted on a continuous aluminum retainer. Extruded aluminum retainer shall conform to ASTM B 221, alloy 6063, temper T5 or T6. Flush mounted type guards shall act as a stop for adjacent wall finish material. Factory fabricated end closure caps shall be furnished for top and bottom of surface mounted corner guards.
Flush mounted corner guards installed in fire rated wall shall maintain the rating of the wall. Insulating materials that are an integral part of the corner guard system shall be provided by the manufacturer of the corner guard system. Exposed metal portions of fire rated assemblies shall have a paintable surface.
2.2.2 Stainless Steel Corner Guards
Stainless steel corner guards shall be fabricated of 0.0625 inch thick material conforming to ASTM A 167, type 302 or 304. Corner guards shall of height indicated Corner guard shall be formed to dimensions shown.
2.3 WALL GUARDS (BUMPER GUARDS)
2.3.1 Wall Guards, Combination Handrail/Wall Guards and Handrails
Wall guards, combination handrail/wall guards, and handrails shall be provided with prefabricated end closure caps, inside and outside corners, concealed splices, cushions, mounting hardware and other accessories standard with the manufacturer. Extruded aluminum retainers shall conform to ASTM B 221, alloy 6063, temper T5 or T6. End caps and corners shall be field adjustable to assure close alignment with handrails and wall guards.
Wall guards or combination handrail/wall guards as indicated shall have profile as shown.
2.3.1.1 Wall Guards/Bed Locators
Wall guards shall consist of snap-on covers of high impact resistant resilient material, minimum 0.078 inch thick, mounted over 2 inch wide aluminum, minimum 0.062 inch thick retainer, anchored to wall at maximum 24 inches on center.
2.3.1.2 Combination Handrail/Wall Guards
Combination handrail/wall guards shall consist of snap-on covers of high impact resistant resilient material, minimum 0.078 inch thick, on a continuous, extruded aluminum retainer, minimum 0.072 inch thick anchored to wall at maximum 32 inches on center.
SECTION 10 26 13 Page 5
2.3.1.3 Handrails
Handrails shall consist of snap-on covers of high impact resistant resilient material, minimum 0.078 inch thick on a continuous extruded aluminum retainer, minimum 0.072 inch thick anchored to wall at maximum 32 inches on center. Handrails shall be provided with prefabricated end closure caps, inside and outside corners, concealed splices, cushions, mounting hardware and other accessories standard with the manufacturer. End caps and corners shall be field adjustable to assure close alignment with handrails.
2.4 DOOR PROTECTORS
Door protection items shall consist of high impact resistant acrylic vinyl or polyvinyl chloride resilient material, minimum 0.060 inch thick for doors and 0.035 inch thick for door frames. Coordinate door and door frame protection material requirements with door and frame suppliers to insure fit for all components and color matching with other resilient materials.
Provide adhesive as recommended by resilient material manufacturer.
2.5 WALL COVERING/PANELS
Wall covering/panels shall consist of high impact rigid acrylic vinyl or polyvinyl chloride resilient material. Panel sizes shall be as shown.
2.5.1 Rigid Vinyl Acrylic Wall Covering
Wall covering thickness shall be as indicated.
2.5.2 High Impact Wall Panels
Wall panel face and edge thickness shall be as indicated. Panel face shall be factory banded to a 0.375 inch thick fiberboard core. The backside of the panel shall be laminated with a moisture resistant vapor barrier.
2.6 TRIM, FASTENERS AND ANCHORS
Vinyl trim, fasteners and anchors shall be provided for each specific installation as shown.
2.7 FINISH
2.7.1 Aluminum Finish
Finish for aluminum shall be in accordance with AA DAF-45. Exposed aluminum shall be designation AA-C22A31 chemically etched medium matte, with clear anodic coating or AA-C22A32 chemically etched medium matte with integrally colored anodic coating class II architectural coating 0.4 mil thick.
Concealed aluminum shall be mill finish as fabricated, uniform in natural color and free from surface blemishes.
2.7.2 Stainless Steel Finish
Finish for stainless steel shall be in accordance with ASTM A 167, Type 302 or 304, finish number 4.
SECTION 10 26 13 Page 6
2.7.3 Resilient Material Finish
Finish for resilient material shall be indicated texture with colors in accordance with SAE J1545.
2.8 ADHESIVES
Adhesive for resilient material shall be in accordance with manufacturers recommendations.
2.9 COLOR
Color shall be in accordance with Section 09915 COLOR SCHEDULE.
PART 3 EXECUTION
3.1 INSTALLATION
3.1.1 Corner Guards and Wall Guards (Bumper Guards)
Material shall be mounted at location indicated in accordance with manufacturer's recommendations.
3.1.2 Door, Door Frame Protectors, and Wall Panels
Surfaces to receive protection shall be clean, smooth, and free of obstructions. Protectors shall be installed after frames are in place, but prior to hanging of doors, in accordance with manufacturer's specific instructions. Adhesives shall be applied in controlled environment in accordance with manufacturer's recommendations. Protection for fire doors and frames shall be installed in accordance with NFPA 80.
3.1.3 Stainless Steel Guards
a. Mount guards on external corners of interior walls, partitions and columns as shown per manufacturer's recommendations.
b. Where corner guards are installed on walls, partitions or columns finished with plaster or ceramic tile, anchor corner guards as indicated . Coat back surfaces of corner guards, where shown, with a non-flammable, sound deadening material. Corner guards shall overlap finish plaster surfaces.
(1) Where corner guards are installed on exposed structural glazed facing tile units or masonry wall, partitions or columns, anchor corner guards as shown on the drawings . Grout spaces solid between guards and backing with portland cement and sand mortar.
(2) Where corner guards are installed on gypsum board, clean surfaces and anchor guards with a neoprene solvent-type contact adhesive specifically manufactured for use on gypsum board construction. Remove excess adhesive from the guard edges and allow to cure undisturbed for 24 hours.
c. For wall guards, space brackets at no more than 3 feet on centers and anchor to the wall in accordance with the manufacturer's installation instructions.
Specification 12 24 13 – ROLLER WINDOW SHADES – REVISION 04
Specification 12 24 13 for this project is hereby modified as follows:
Descriptive Changes:
(1) Section 12 24 13, Page 5, paragraph 2.2 “COLOR”, replace the entire paragraph with the following requirements:
“Provide color, pattern and texture for metal and shade fabric in accordance with the drawings.
Color listed is not intended to limit the selection of equal colors from other manufacturers.”
SECTION 12 24 13
ROLLER WINDOW SHADES
08/17
Revised 03/18
PART 1 GENERAL
1.1 GENERAL REQUIREMENTS
Provide roller window shades, complete with necessary brackets, fittings, and hardware as indicated. Mount and operate equipment in accordance with manufacturer's instructions. Windows to receive a shade must be completely covered.
a. Submit drawings showing plans, elevations, sections, product details, installation details, operational clearances, wiring diagrams and relationship to adjacent work. Include the use of same room designations as indicated on the drawings.
b. Provide manufacturer's data composed of catalog cuts, brochures, product information, and operating and maintenance instructions on each product to be used. Include styles, profiles and features.
c. Furnish samples of each type and color of roller shade fabric and roller shade channel. Shade material shall be minimum 6 by 6 inch in size. Mark face of material to indicate interior faces.
d. Mock up: Install shade in area designated by Contracting Officer. Do not proceed with remaining work until the Contracting Officer approves workmanship and operation. Re-work mock-up as required to produce acceptable work. The approved shade can be used in installation.
e. Submit fire resistance data, flame spread and smoke contribution data.
1.2 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to in the text by basic designation only.
ASTM INTERNATIONAL (ASTM)
ASTM G21 (2015) Standard Practice for Determining Resistance of Synthetic Polymeric Materials to Fungi
NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)
NFPA 701 (2015) Standard Methods of Fire Tests for Flame Propagation of Textiles and Films
SCIENTIFIC CERTIFICATION SYSTEMS (SCS)
SCS SCS Global Services (SCS)Indoor Advantage
SECTION 12 24 13 Page 1
UNDERWRITERS LABORATORIES (UL)
UL 2818 (2013) GREENGUARD Certification Program For Chemical Emissions For Building Materials, Finishes And Furnishings
UL 325 (2017) UL Standard for Safety Door, Drapery, Gate, Louver, and Window Operators and Systems
1.3 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Submittals with an "S" are for inclusion in the Sustainability eNotebook, in conformance to Section 01 33 29 SUSTAINABILITY REPORTING. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES
SD-02 Shop Drawings
Installation ; G
SD-03 Product Data
Window Shades ; G
SD-04 Samples
Window Shades ; G
SD-06 Test Reports
Window Shades
SD-07 Certificates
Indoor Air Quality
SD-08 Manufacturer's Instructions
Window Shades
SD-10 Operation and Maintenance Data
Window Shades
SD-11 Closeout Submittals
Recycled Content for various fiber components ; S
Indoor Air Quality for roller window shades ; S
Warranty ; G
SECTION 12 24 13 Page 2
1.4 CERTIFICATES
1.4.1 Indoor Air Quality Certifications
1.4.1.1 Roller Window Shades
Provide products certified to meet indoor air quality requirements by UL 2818 (Greenguard) , SCS Global Services Indoor Advantage Gold or provide validation by other third-party program that products meet the requirements of this paragraph. Provide current product certification documentation from certification body.
1.5 QUALITY ASSURANCE
1.5.1 Qualifications
1.5.1.1 Manufacturer's Qualifications
Obtain motor-controlled roller shades through one source from a single manufacturer with a minimum of twenty years experience and minimum of three projects of similar scope and size in manufacturing products comparable to those specified in this section.
1.5.1.2 Installer's Qualifications
Installer trained and certified by the manufacturer with a minimum of ten years experience in installing products comparable to those specified in this section.
1.5.2 Flammability Requirements
Passes in accordance with NFPA 701 small and large-scale vertical burn.
Materials tested must be identical to products proposed for use.
1.5.3 Electrical Requirements
NFPA Article 100 listed and labeled in accordance with UL 325 or other testing agency acceptable to authorities having jurisdiction, marked for intended use, and tested as a system. Individual testing of components will not be acceptable in lieu of system testing.
1.5.4 Anti-Microbial Requirements
'No Growth' per ASTM G21 results for fungi ATCC9642, ATCC 9644, ATCC9645.
1.6 DELIVERY, STORAGE, AND HANDLING
Deliver components to the jobsite in the manufacturer's original packaging with the brand or company name, item identification, and project reference clearly marked. Store components in a dry location that is adequately ventilated and free from dust, water, or other contaminants and has easy access for inspection and handling. Store materials flat in a clean dry area with temperature maintained above 50 degrees F . Do not open containers until needed for installation unless verification inspection is required.
1.7 WARRANTY
Provide 10 year minimum limited warranty.
SECTION 12 24 13 Page 3
2.1 WINDOW SHADES
Roller tube must operate smoothly and be of sufficient diameter and thickness to prevent excessive deflection. Provide brackets that are appropriate for as indicated in Delivery Order mount. The shade cloth must meet the performance described in NFPA 701 , small scale test. Treat steel features for corrosion resistance.
Provide Various Fiber Components with a minimum of 60 percent recycled content. Provide data identifying percentage of recycled content for various fiber components .
Provide certification of indoor air quality for roller window shades .
2.1.1 Light Filtering Shades
Provide light filtering window shades to conform with the following:
a. Roller tube must be extruded aluminum or steel. Diameter, wall thickness, and material to be selected by the manufacturer to accommodate the shade size. Provide roller idler assembly of molded nylon and zinc-plated steel pin. Sliding pin must allow easy installation and removal of roller. Fabric must be connected to the roller tube with double sided adhesive specifically developed to attach coated textiles to metal to eliminate horizontal impressions in fabric or attached with a spline lock system.
b. Fascia must be L-shaped aluminum extrusion to conceal shade roller and hardware that snaps onto end caps without requiring exposed fasteners of any kind. Fascia can be mounted continuously across two or more shade bands.
c. End caps must be stamped steel with universal design suitable for mounting to window mullions. Provide size compatible with roller size. End cap covers must match fascia/headbox finish.
d. Provide hardware that allows for field adjustment or removal of shade roller tube and other operable hardware component or adjustment of motor without requiring removal of brackets and end or center supports. Provide hardware system that allows for operation of multiple shade bands by a single operator. Connectors must be offset to assure alignment from the first to the last shade band. Provide shade hardware constructed of minimum 1/8 inch thick plated steel or heavier as required to support 150 percent of the full weight of each shade.
e. Low voltage switching is required.
f. Operating function: as indicated in the Delivery Order..
2.1.2 Room Darkening Shades
Provide room darkening (black-out) window shades designed to eliminate all visible light gaps when shades are fully closed, and conform with the
SECTION 12 24 13 Page 4 following:
a. Roller tube must be aluminum, controlled by webbing tape or crank operated gear box with steel rods. Provide shop fabricated light traps, consisting of a head box to house the shade roller, and U-shaped channels to serve as guides for the shade along the sides and to receive the bottom edge of the shade along the sill.
b. Provide light trap made of sheet steel having a minimum thickness of 22 gauge or anodized, extruded, aluminum. The legs of the channels must be not less than 1-3/4 inches long and separated by the minimum distance that will permit free operation of the shade. Edges of light trap coming into contact with the shade cloth must be smooth pile light seal. The exposed face of the head box must be hinged or removable for access to the shade roller. The interior or unexposed surfaces of the light trap must have a finish coat of flat black enamel. The exposed portions of the light trap must have a factory-applied priming coat of gray paint.
c. Cloth must be of type for blackout purposes. Make the shade from a single piece of canvas duck cloth laminated to vinyl . When not finished with a selvage, the vertical edges of the shade must be bound or hemmed using a high-grade thread. Make needle holes lightproof by applying a suitable filler.
d. Fit the bottom edge of the shade with a steel operating bar. Shades will engage positively with bottom rail through operating bar or chain pull. Paint bars with flat black enamel. Make pull cords of No. 4 braided nylon or beaded chain having not less than 175 pounds breaking strength.
2.2 COLOR
Provide color, pattern and texture for metal and shade fabric in accordance with Section 09 06 00 SCHEDULES FOR FINISHES. . Color listed is not intended to limit the selection of equal colors from other manufacturers.
PART 3 EXECUTION
3.1 FIELD MEASUREMENTS
After becoming familiar with details of the work, verify all dimensions in the field, and advise the Contracting Officer of any discrepancy before performing the work.
3.2 ROLLER WINDOW SHADE PLACEMENT SCHEDULE
As indicated per the Delivery Order.
3.3 INSTALLATION
Do not install building construction materials that show visual evidence of biological growth.
Perform installation in accordance with the approved detail drawings and manufacturer's installation instructions. Install units level, plumb, secure, and at proper height and location relative to window units.
Provide and install supplementary or miscellaneous items in total, including clips, brackets, or anchorages incidental to or necessary for a
SECTION 12 24 13 Page 5 sound, secure, and complete installation. Do not start installation until completion of room painting and finishing operations.
3.4 CLEAN-UP
Upon completion of the installation, clean window treatments and adjust them for form and appearance and proper operating condition. Repair or replace damaged units as directed by the Contracting Officer. Isolate metal parts from direct contact with concrete, mortar, or dissimilar metals. Ensure shades installed in recessed pockets can be removed without disturbing the pocket. The entire shade, when retracted, must be contained inside the pocket. For shades installed outside the jambs and mullions, overlap each jamb and mullion 0.75 inch or more when the jamb and mullion sizes permit. Include all hardware, brackets, anchors, fasteners, and accessories necessary for a complete, finished installation.
-- End of Section --
SECTION 12 24 13 Page 6
SECTION 23 09 23 Page 1
SECTION 23 09 23
DIRECT DIGITAL CONTROL FOR HVAC AND OTHER LOCAL BUILDING
SYSTEMS 05/19
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
A…