01 30 00-Administrative Requirements-EDITED-REV 02_AMENDMENT 0003.pdf

PDF 291 KB Posted

Attached to
“Repair Building 09175, Permanent Party UH” located on Joint Base Lewis-McChord, WA
Solicitation number
W912DW21B0008
Issued by

About this file

This document summarizes revisions made to specification 01 30 00 for the repair of Building 09175 located on Joint Base Lewis-McChord in Washington state. Key changes include the addition of a new section requiring the contractor to develop above-ceiling coordination documents and conduct coordination meetings to ensure all mechanical, electrical, and telecommunications systems can be properly installed within the designated ceiling heights. It also specifies that work required by sections 23 09 23 and 23 05 93 must be performed directly by a first-tier subcontractor. The related federal contract opportunity is solicitation W912DW21B0008 issued by the Department of the Army Corps of Engineers Engineering District Seattle to repair Building 09175's permanent party unit.

View the file

Other files

File Type Posted
Abstract REV1 W912DW21B0008 Repair Building 9175 Permanent Party UH (SAM.gov).pdf PDF
Abstract W912DW21B0008 Repair Building 9175 Permanent Party UH (SAM.gov).pdf PDF
2021-09-09_JBLM-B9175-REV-04-DWGS_AMENDMENT 6.pdf PDF
Amendment 0006 W912DW21B0008 Repair Bldg 9175.pdf PDF
JBLM DPW Geospatial BIM CIM GIS and CAD Contract Requirements FY21_AMENDMENT 6.pdf PDF
2021-09-09-JBLM-B9175-REV-04-SPECS_AMENDMENT 6.pdf PDF
202109XX_CE0849 SOW_09175_AMENDMENT 6.pdf PDF
26 20 00-INTERIOR DISTRIBUTION SYSTEM-REVISION 03_AMENDMENT 5.pdf PDF
Amendment 0005 W912DW21B0008 Repair Bldg 9175.pdf PDF
20210831_Sign in Roster Repair Bldg 09175 Site Visit 2_AMENDMENT 5.pdf PDF
2021-09-03-JBLM-B9175-DWGS-REVISION 03-AMENDMENT 5.pdf PDF
DDC Controls As-Builts_AMENDMENT 0004.pdf PDF
Amendment 0004 W912DW21B0008 Repair Bldg 9175.pdf PDF
2021-08-20-JBLM-B9175-DWGS-REVISION 01-AMENDMENT 2.pdf PDF
2021-08-20-JBLM-B9175-SPECS-REVISION 01-AMENDMENT 2.pdf PDF
Amendment 0003 W912DW21B0008 Repair Bldg 9175.pdf PDF
Amendment 0002 W912DW21B0008 Repair Bldg 9175.pdf PDF
12 32 00-Manufactured Wood Casework-EDITED-REV 02-ISSUED_AMENDMENT 0003.pdf PDF
20210824_9175 Meeting Attendance Roster_AMENDMENT 0003.pdf PDF
9175-Submittal Register_AMENDMENT 2.xlsx XLSX spreadsheet
20210820_CE0849 SOW_09175_AMENDMENT 2.pdf PDF
W912DW21B0008 Repair Bldg 9175.pdf PDF
9175 Location Site Visit Map.pdf PDF
2021-08-11_B9175 Submittal Register.xlsx XLSX spreadsheet
2021-08-10-JBLM 9175-SPECS-RTA REV001.pdf PDF
20210810_CE0849 SOW_09175.pdf PDF
JA Brand Names or Equal_JBLM 9175-Interior Finishes_Redacted.pdf PDF
Bldg 9175-Final Environmental Report.pdf PDF
Amendment 0001 W912DW21B0008 Repair Bldg 9175.pdf PDF
Barracks Buildings 9175 and 9176 as builts.pdf PDF
2021-08-10_JBLM-B9175-RTA-DWGS-REV01_Part2.pdf PDF
2021-08-10_JBLM-B9175-RTA-DWGS-REV01_Part1.pdf PDF
Show all 32

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Specification 01 30 00 – ADMINISTRATIVE REQUIREMENTS – REVISION 02, 24 AUGUST 2021

Specification 01 30 00 for this project is hereby modified as follows:

Descriptive Changes:

(1) Section 01 30 00, Page 8, Addition of paragraph 1.21

1.21 ABOVE CEILING SYSTEMS COORDINATION

Above ceiling areas have been designed with multiple building systems; structural, mechanical, electrical, fire protection, and telecommunications. These areas are heavily congested and shall be carefully planned and coordinated to accommodate all utilities. Contractor shall demonstrate understanding of these systems and their plan to ensure all systems will be accommodated and installed, to meet the design requirements and within the established ceiling heights. Above ceiling systems coordination includes the following:

a. Systems / Sequencing: Develop above ceiling coordination documents and submit for approval 30 days after Notice To Proceed, illustrating understanding of installation requirements and required clearances

(if applicable), layout of areas designated per plan as high congested areas and sequencing of installation of systems.

b. Coordination Meetings: Conduct coordination meetings with the Government (or as otherwise mutually agreed to) between the meetings described in paragraph entitled PERIODIC SCHEDULE UPDATE

MEETINGS for the purpose of jointly reviewing systems layout, progress of above ceiling system installation, and the status of RFIs or Submittals related to above ceiling systems, as mutually agreed to by the Government.

(2) Section 01 30 00, Page 2, Paragraph 1.7.2 is revised as follows:

All contract requirements of Section 23 09 23 Direct Digital Control for HVAC and Other Local Building Systems or Section 23 05 93 TESTING, ADJUSTING AND BALANCING shall be accomplished directly by a first-tier subcontractor, including the Commissioning Agent. No work required by Section 23 09 23 or Section 23 05 93 shall be accomplished by a second-tier subcontractor.

Repair Building 9175 IJO DER203810J Joint Base Lewis-McChord, WA 24 AUGUST 2021, REVISION 02

(3) Section 01 30 00, Page 4, Paragraph 1.11 ELECTRONIC MAIL (E-MAIL) ADDRESS, delete the entire paragraph.

(4) Section 01 30 00, Page 5, Paragraph 1.14 QUALIFICATIONS OF PERSONNEL ENGAGED IN CONTRACT WORK INVOLVING LIFE SAFETY SYSTEMS, delete the entire paragraph.

File details come from the government source that posted it. Updated .