This document summarizes revisions made to specification 01 30 00 for the repair of Building 09175 located on Joint Base Lewis-McChord in Washington state. Key changes include the addition of a new section requiring the contractor to develop above-ceiling coordination documents and conduct coordination meetings to ensure all mechanical, electrical, and telecommunications systems can be properly installed within the designated ceiling heights. It also specifies that work required by sections 23 09 23 and 23 05 93 must be performed directly by a first-tier subcontractor. The related federal contract opportunity is solicitation W912DW21B0008 issued by the Department of the Army Corps of Engineers Engineering District Seattle to repair Building 09175's permanent party unit.
View the file
Other files
Show all 32
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Specification 01 30 00 – ADMINISTRATIVE REQUIREMENTS – REVISION 02, 24 AUGUST 2021
Specification 01 30 00 for this project is hereby modified as follows:
Descriptive Changes:
(1) Section 01 30 00, Page 8, Addition of paragraph 1.21
1.21 ABOVE CEILING SYSTEMS COORDINATION
Above ceiling areas have been designed with multiple building systems; structural, mechanical, electrical, fire protection, and telecommunications. These areas are heavily congested and shall be carefully planned and coordinated to accommodate all utilities. Contractor shall demonstrate understanding of these systems and their plan to ensure all systems will be accommodated and installed, to meet the design requirements and within the established ceiling heights. Above ceiling systems coordination includes the following:
a. Systems / Sequencing: Develop above ceiling coordination documents and submit for approval 30 days after Notice To Proceed, illustrating understanding of installation requirements and required clearances
(if applicable), layout of areas designated per plan as high congested areas and sequencing of installation of systems.
b. Coordination Meetings: Conduct coordination meetings with the Government (or as otherwise mutually agreed to) between the meetings described in paragraph entitled PERIODIC SCHEDULE UPDATE
MEETINGS for the purpose of jointly reviewing systems layout, progress of above ceiling system installation, and the status of RFIs or Submittals related to above ceiling systems, as mutually agreed to by the Government.
(2) Section 01 30 00, Page 2, Paragraph 1.7.2 is revised as follows:
All contract requirements of Section 23 09 23 Direct Digital Control for HVAC and Other Local Building Systems or Section 23 05 93 TESTING, ADJUSTING AND BALANCING shall be accomplished directly by a first-tier subcontractor, including the Commissioning Agent. No work required by Section 23 09 23 or Section 23 05 93 shall be accomplished by a second-tier subcontractor.
Repair Building 9175 IJO DER203810J Joint Base Lewis-McChord, WA 24 AUGUST 2021, REVISION 02
(3) Section 01 30 00, Page 4, Paragraph 1.11 ELECTRONIC MAIL (E-MAIL) ADDRESS, delete the entire paragraph.
(4) Section 01 30 00, Page 5, Paragraph 1.14 QUALIFICATIONS OF PERSONNEL ENGAGED IN CONTRACT WORK INVOLVING LIFE SAFETY SYSTEMS, delete the entire paragraph.