Solicitation Amendment W912DS26BA0200003 SF 30.pdf
PDF 4 MB Posted
- Solicitation number
- W912DS26BA020
About this file
This is Standard Form 30 Amendment 0003 to a federal solicitation for construction services at Joint Base McGuire-Dix-Lakehurst (JBMDL), New Jersey. The amendment was issued on 25 June 2026 by the W2SD Endist New York KO Contracting Division and covers the Hot Cargo Loading Area project with solicitation number W912DS26BA020. The bid opening date remains 29 June 2026 at 2:00 P.M. EST and has not been extended. Offerors must acknowledge receipt of this amendment prior to the bid submission deadline through completion of amendment items, acknowledgment on offer copies, or separate written communication referencing the solicitation and amendment numbers.
The amendment clarifies general conditions for Section 00 72 00 and addresses seven questions submitted by prospective bidders regarding specifications and project requirements. Key responses include confirmation that galvanized fencing is sufficient (not brown-coated); guidance to follow manufacturer recommendations for cantilever gate specifications; clarification that collateral positions are permitted for the Environmental Manager if qualifications are met; confirmation that the Quality Control Manager cannot have other duties but can serve as Site Safety and Health Officer if qualified; specification that superintendent requirements depend on contract amount and subcontracting volume; denial of bid due date extension; and deletion of a conflicting note regarding contaminated material disposal location, with offerors directed to refer to Amendment 2 reply 3 for disposal procedures. No drawings or specification sections were revised, reissued, added, or deleted by this amendment.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER.
If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
16C. DATE SIGNED
Previous edition unusable STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
Section 00 72 00 - General Conditions
Miscellaneous text in this section has been added to:
Joint Base McGuire-Dix-Lakehurst, NJ
Hot Cargo Loading Area
W912DS26BA020
Amendment 0003
AMENDMENT 0003 to DRAWINGS and SPECIFICATIONS for Hot Cargo Loading Area, at JBMDL NJ.
TO OFFERORS
W912DS26BA0200003
The following changes shall be made to the drawings and specifications.
DRAWINGS
1. The following DRAWINGS have been REVISED but NOT REISSUED:
- None
2. The following DRAWINGS have been and : REVISED REISSUED
- None
3. The following DRAWINGS have been : ADDED
- None
4. The following DRAWINGS have been : DELETED
- None
SPECIFICATIONS
1. The following SPECIFICATION SECTIONS have been and are provided in their entirety ADDED herein:
- None
2. The following SPECIFICATIONS SECTIONS have been in their entirety:DELETED
- None
3. The following SPECIFICATIONS SECTIONS have been and :REVISED REISSUED
- None
4. The following SPECIFICATIONS have been but REVISED : NOT REISSUED
- None
PROPOSER'S QUESTIONS AND GOVERNMENT REPLY
Questions that may be of general interest to all Offerors and/or the Government and that are not readily answered by the proceeding changes will appear below. These questions may have been paraphrased or altered to represent several questions regarding the same subject and/or simply revised to clarify and simplify the question(s). Questions and answers are issued to the Offerors "for information only" and do not revise the solicitation, plans or specifications.
1. Spec Section 32 31 13.53 Is the fencing to be all galvanized Pipe and fence fabric or Brown coated as per base standards? - RESPONSE: Galvanized fence is sufficient.
2. Spec Section 32 31 13.53 Is the 40' W Cantilever gate a duel track since the opening is over 30" W? - RESPONSE: please follow the manufacturer's recommendation for the size of the gate required.
3. Section 01 57 -19 -1.5.4 Environmental Manager -Can the site super act as Env Manager?
RESPONSE: The specification allows collateral position; however, the individual must meet the specified qualifications of paragraph 1.5.4.
4. SSHO and QC manager can be the same person? RESPONSE: The Quality Control (QC) Manager can not have any other duties than managing and implementing the QC program as required by specification section 01 45 00, paragraph 1.7.2.1, and have the qualifications required by paragraph
1.7.2.2. However, they can be designated by the Corporate Safety Official as the Site Safety and Health Officer. They must meet the qualifications specified for the SSHO as well as the QC Manager.
5. Section 01 30 00 - 1.8 -Superintendent Qualifications- how many superintendents are required on a daily basis? RESPONSE: Specification section 01 30 00, paragraph 1.9 specifies how many superintendents are required on the project. The number of superintendents required depends on the amount of work that the Prime contractor subcontracts, based on the contract amount.
6. Can the Bids due date be extended? RESPONSE: Unfortunately bid due date extension is not possible.
7. The note #3 AC on GC -201 -" ALL EXCAVATED CONTAMINATED MATERIAL SHALL BE DISPOSED OF AT THE CONTAMINATED SOIL DISPOSAL LOCATION NEAR THE JBMDL FUEL FARM".
The note #3 on in the RFP documents call for off-site disposal. Which one should we follow? RESPONSE:
please refer to reply #3 in amendment #2. The referenced note is hereby deleted by this amendment.
| IDCode: J |
| Page: 1 |
| Pages: 6 |
| AmendNo: 0003 |
| EffDate: 25 JUN 2026 |
| ReqNo: |
| ProjNo: 562346 |
| IssCode: W912DS |
| AdmCode: |
| IssuedBy: W2SD ENDIST NEW YORK |
KO CONTRACTING DIVISION, 26 FEDERAL PLAZA ROOM 16 300
NEW YORK, NY 10278-0004
UNITED STATES
MOHENDA SURAGE, EMAIL: MOHENDA.R.SURAGE@USACE.ARMY.MIL TELEPHONE: 917-940-8013
AdminBy:
SCD: PAS:
| ContractorNameAdd: |
| Code: |
| FacCode: |
| SolChg: 1 |
| SolNo: W912DS26BA020 |
| SolDate: 29 MAY 2026 |
| AwardChg: Off |
| AwardNo: |
| AwardDate: |
| Amended: 1 |
| OffrExt: Off |
| OffrNoEx: 1 |
| NoCopies: 1 |
| ApprData: SEE SECTION G - CONTRACT ADMINISTRATION DATA |
| ChgeOrd: Off |
| ChgeOrder: |
| Modify: Off |
| SuppAgre: Off |
| SuppAuth: |
| ModOthr: Off |
| OthrSpec: |
| NoReq: Off |
| Require: Off |
| Copies: |
| Descript: The purpose of this amendment is to: |
Answer questions from prospective bidders for informational purposes only The bid opening date remains 29-June-2026 at 2:00 P.M. EST