This is an Abstract of Offers for Construction (Optional Form 1419) documenting the bidding results for solicitation W912DS26BA020, issued by the U.S. Army Corps of Engineers, New York District Contracting Division.

The project concerns construction of a Hot Cargo Loading Area at McGuire Air Force Base. The solicitation was issued on 29 May 2026, with bids opened on 29 June 2029. The work encompasses 15 contract line items (CLINs 0001-0015) including demolition of an existing pad with sampling and testing for contaminants and PFAS; construction of a new pad inclusive of taxiway and shoulders; construction of site work outside the pad including fencing, storage area, and lighting; disposal of contaminated soil (hazardous, non-hazardous, and PFAS); procurement and delivery of satisfactory soil; onsite treatment and disposal of contaminated groundwater; milling and overlay of surrounding asphalt; and labor for access delays. The government estimate totaled $20,023,000.00. Ten bids were received from contractors including AC Infinity Construction LLC, Imperial Construction & Electric Inc, Benaka Inc, Eastern Construction & Electric Inc, Ferreira Construction Co. Inc, LGC Global Inc, Anselmi & DeCicco Inc, Richard E Pierson Construction Co Inc, Road-Con Inc, and others. Bid totals (base plus options) ranged from approximately $14.4 million to $26.3 million. Pricing was structured by unit price for line items measured in gallons or cubic yards and lump-sum pricing for job items. No set-asides or special contracting vehicles were identified in the document.

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PAG

ES

7A. ITEM

NO.

7C. EST.

QUANTITY

D.

UNIT

E. UNIT

PRICE

F. ESTIMATED

AMOUNT

D. UNIT

PRICE

D. UNIT

PRICE

0001 1 Job $3,717,600.00 $1,590,960.00 $2,809,000.00

0002 1 Job $10,740,700.00 $13,158,230.00 $12,826,500.00

0003 1 Job $1,166,400.00 $2,119,929.00 $3,975,000.00

0004 100,000 GL $2,373,800.00 $5.36 $1.62

0005 500 CY $129,800.00 $105.88 $135.00

0006 500 CY $203,700.00 $648.44 $834.00

0007 500 CY $203,700.00 $664.33 $410.00

0008 1500 CY $130,000.00 60.27 $80.66

0009 500 CY $183,300.00 108.94 $124.00

0010 500 CY $224,100.00

108.94

$124.00

0011 500 CY $224,100.00 108.94 $124.00

0012 10000 CY $297,600.00 0.00 $1.60

0013 1 Job $314,800.00 190,735.14 $51,650.00

0014 1 Job $40,400.00 51,875.00 $70,900.00

0015 1 Job $73,400.00 155,625.00 $212,600.00

1 $18,665,700.00 18,040,598.00 $20,582,990.00

1 $1,357,300.00 712,136.89 $537,150.00

Total Base Plus Options 1 $20,023,000.00 18,752,735.00 $21,120,140.00 $21,120,140.00

$51,875.00

$62,000.00

$62,000.00

$62,000.00

$51,650.00

$70,900.00

Construction Hot Cargo Loading Area: All work (includes all plant, labor, and material) for disposal of additional contaminated soil (petroleum based). (Estimated Quantities)

Construction Hot Cargo Loading Area: All work (includes all plant, labor, and material) for disposal of additional contaminated soil (petroleum based). (Estimated Quantities)

Construction Hot Cargo Loading Area: All work (includes all plant, labor, and material) for disposal of additional contaminated soil (petroleum based). (Estimated Quantities)

$18,752,735.00

$54,470.00

$54,470.00

$54,470.00

Construction Hot Cargo Loading Area: All work (includes all plant, labor, and material) for milling and overlay of surrounding asphalt pad as noted on Drawings CD101 & CP101 Access delays during concrete production placement. Estimated quantities are 25 hours.

$190,735.14

AUTHORIZED FOR LOCAL REPRODUCTION

Previous edition is usable

NOTE: If more than two offers are received, continue on OF 1419A. OPTIONAL FORM 1419 (11-88)

$537,150.00

Construction Hot Cargo Loading Area: All work (includes all plant, labor, and material) for onsite treatment and disposal of contaminated Hazardous, and/or contaminated with PFAS ground water. (Estimated Quantities)

$0.00 $16,000.00

Access delays other than during concrete production placement. Estimated quantities are 75 hours. See note 7 below. $155,625.00 $212,600.00

Total Base $18,040,598.00 $20,582,990.00

Total Options $712,136.89

Construction Hot Cargo Loading Area: All work (includes all plant, labor, and material) for disposal of contaminated soil (PFAS).

(Estimated Quantities)

$332,165.00 $205,000.00

Construction Hot Cargo Loading Area: All work (includes all plant, labor, and material) for procurement and delivery of satisfactory soil.

(Estimated Quantities)

$90,405.00 $120,990.00

Construction Hot Cargo Loading Area: All work (includes all plant, labor, and material) for disposal of contaminated soil (non-hazardous).

(Estimated Quantities)

$52,940.00 $67,500.00

Construction Hot Cargo Loading Area: All work (includes all plant, labor, and material) for disposal of contaminated soil (Hazardous).

(Estimated Quantities)

$324,220.00 $417,000.00

Construction Hot Cargo Loading Area: All work (includes all plant, labor, and material) for construction of site work outside of the pad, including fencing, storage area, high mast lighting, grading as described in plans and specifications except for work included in items below.

$2,119,929.00 $3,975,000.00

Construction Hot Cargo Loading Area: All work (includes all plant, labor, and material) for onsite treatment and disposal of contaminated Hazardous, and/or contaminated with PFAS ground water. (Estimated Quantities)

$536,000.00 $162,000.00

Construction Hot Cargo Loading Area: All work (includes all plant, labor, and material) for the demolition of existing pad as described in the plans and specifications, inclusive of sampling and testing for contaminants/PFAS except for work included in items below

$1,590,960.00 $2,809,000.00

Construction Hot Cargo Loading Area: All work (includes all plant, labor, and material) for construction of new pad inclusive of taxiway, shoulders (including edge lights) and de-icing area as described in plans and specifications except for work included in items below.

$13,158,230.00 $12,826,500.00

6. NUMBER OF AMENDMENTS ISSUED C. REASONABLE CONTRACT C. AMENDMENTS ACKNOWLEDGED C. AMENDMENTS ACKNOWLEDGED

7B. DESCRIPTION OF OFFERED ITEM E. ESTIMATED

AMOUNT

E. ESTIMATED

AMOUNT

B. BID SECURITY (Type and amount)

4. ISSUING OFFICE

U.S. Army Corps of Engineers, New York District Contracting Division

I CERTIFY that I have opened, read, and recorded on this abstract all offers received in response to this solicitation.

NAME AND TITLE OF CERTIFYING OFFICIAL: Mohenda Surage, Contract Specialist

SIGNATURE DATE SIGNED

29 June 2029

5. PROJECT TITLE

HOT CARGO LOADING AREA MCGUIRE AFB

8. GOVERNMENT ESTIMATE

(Check A, B or C and complete D, E, and F)

9. OFFERS

NO. 1 NO. 2

A. OFFEROR

AC Infinity Construction, LLC

A. OFFEROR

Imperial Construction & Electric Inc

A. HIRED LABOR

B. REASONABLE CONTRACT

(Without Profit)

B. BID SECURITY (Type and amount)

ABSTRACT OF OFFERS - CONSTRUCTION 1. SOLICITATION NUMBER

W912DS26BA020

2. DATE ISSUED

29 May 2026

3. DATE OPENED

29 June 2029

PAGES

D. UNIT PRICE D. UNIT

PRICE

D. UNIT

PRICE

E. ESTIMATED

AMOUNT

0001 1 Job $1,092,700.89 $824,755.39 $8,025,000.00 $8,025,000.00

0002 1 Job $10,879,770.50 $14,405,847.45 $17,200,000.00 $17,200,000.00

0003 1 Job $2,816,968.83 $2,053,990.56 $5,200,000.00 $5,200,000.00

0004 100,000 GL $2.60 $2.66 $6.00 $600,000.00

0005 500 CY $141.75 $137.35 $158.00 $79,000.00

0006 500 CY $656.25 $739.24 $205.00 $102,500.00

0007 500 CY $341.25 $329.27 $315.00 $157,500.00

0008 1500 CY $57.75 $65.05 $70.00 $105,000.00

0009 500 CY $141.75 $135.40 $158.00 $79,000.00

0010 500 CY $141.75 $135.40 $158.00 $79,000.00

0011 500 CY $141.75 $135.40 $158.00 $79,000.00

0012 10000 CY $2.60 $2.62 $6.00 $60,000.00

0013 1 Job $99,589.75 $60,632.00 $194,472.00 $194,472.00 0014 1 Job $53,025.00 $65,587.50 $90,000.00 $90,000.00 0015 1 Job 15907.5 $87,450.00 $245,000.00 $245,000.00

$31,469,000.00 $826,472.00

Total Base Plus $32,295,472.00

AUTHORIZED FOR LOCAL REPRODUCTION

Previous edition is usable

OPTIONAL FORM 1419A (11-88)

Total Options $55,314.75 $442,998.38 $454,362.00 $16,256,060.96 $18,694,227.23 $14,389,653.00

Total Base $15,705,746.22 $18,281,228.85 $13,935,291.00

$53,025.00 $65,587.50 $38,408.00 $38,408.00 $15,907.50 $87,450.00 $115,225.00 $115,225.00

$26,000.00 $26,235.00 $2.44 $24,400.00 $99,589.75 $60,632.00 $56,459.00 $56,459.00

$70,875.00 $67,697.96 $146.58 $73,290.00 $70,875.00 $67,697.96 $146.58 $73,290.00

$86,625.00 $97,580.21 $59.72 $89,580.00 $70,875.00 $67,697.96 $146.58 $73,290.00

$328,125.00 $369,622.00 $542.88 $271,440.00 $170,625.00 $164,632.60 $352.87 $176,435.00

$260,000.00 $266,127.84 $2.44 $244,000.00

$70,875.00 $68,672.81 $146.58 $73,290.00

$10,879,770.50 $14,405,847.45 $10,874,357.00 $10,874,357.00

$2,816,968.83 $2,053,990.56 $1,468,612.00 $1,468,612.00

D. UNIT PRICE E. ESTIMATED

AMOUNT

$1,092,700.89 $824,755.39 $737,577.00 $737,577.00

3. CONTRACT ITEMS C. AMENDMENTS ACKNOWLEDGED C. AMENDMENTS ACKNOWLEDGED C. AMENDMENTS ACKNOWLEDGED C. AMENDMENTS ACKNOWLEDGED

A. ITEM

NO.

B. ESTIMATED

QUANTITY

C. UNIT

E. ESTIMATED

AMOUNT

E. ESTIMATED

AMOUNT

NO.: 6

A. OFFEROR

Benaka Inc.

A. OFFEROR

Eastern Construction & Electric Inc

A. OFFEROR

Ferreira Construction Co. Inc

A. OFFEROR

LGC Global Inc.

B. BID SECURITY (Type and amount) B. BID SECURITY (Type and amount) B. BID SECURITY (Type and amount) B. BID SECURITY (Type and amount)

ABSTRACT OF OFFERS - CONSTRUCTION CONTINUATION

SHEET

1. SOLICITATION NUMBER

W912DS26BA020

INSTRUCTIONS Attach this form to OF 1419, Abstract of Offers - Construction, when more than 2 offers are received on a construction project. Each Continuation Sheet will accommodate 13 contract items to conform to the number of items which can be entered on the OF 1419. Use additional OF 1419's for contract items in excess of 13 and attach additional continuation Sheets (OF 1419A) as needed.

2. PROJECT TITLE

HOT CARGO LOADING AREA MCGUIRE AFB

4. OFFERS (Continued)

NO.: 3 NO.: 4 NO.: 5

PRICE

D. UNIT

PRICE

E. ESTIMATED

AMOUNT

0001 1 Job $1,590.00 $1,525,000.00 $2,809,000.00 $28,090,000.00

0002 1 Job $13,158,230.00 $6,000,000.00 $12,826,500.00 $12,826,500.00

0003 1 Job $2,119,929.47 $13,500,000.00 $3,975,000.00 $3,975,000.00

0004 100,000 GL $1.50 $1.62 $162,000.00

0005 500 CY $100.00 $135.00 $67,500.00

0006 500 CY $450.00 $834.00 $417,000.00

0007 500 CY $750.00 $80.66 $205,000.00

0008 1500 CY $50.00 $80.66 $120,990.00

0009 500 CY $200.00 $124.00 $62,000.00

0010 500 CY $108.94 $150.00 $124.00 $62,000.00

0011 500 CY $108.94 $150.00 $124.00 $62,000.00

0012 10000 CY $1.00 $1.60 $16,000.00

0013 1 Job $150,000.00 $51,650.00 $51,650.00 0014 1 Job $25,000.00 $70,900.00 $70,900.00 0015 1 Job $75,000.00 $212,600.00 $212,600.00

$20,582,990.00 $537,150.00

Total Base Plus $21,120,140.00

AUTHORIZED FOR LOCAL REPRODUCTION

Previous edition is usable

OPTIONAL FORM 1419A (11-88)

Total Options $712,136.89 $510,000.00 $767,500.00 $18,752,735.00 $22,410,000.00 $20,450,017.00

Total Base $18,040,598.19 $21,900,000.00 $19,682,517.00

$51,875.00 $25,000.00 $100,000.00 $100,000.00 $155,625.00 $75,000.00 $160,000.00 $160,000.00

$124,500.00 $10,000.00 $25.00 $250,000.00 $190,735.14 $150,000.00 $100,000.00 $100,000.00

$54,469.75 $75,000.00 $105.00 $52,500.00 $54,468.75 $75,000.00 $105.00 $52,500.00

$75,000.00 $62.00 $93,000.00 $51,875.00 $100,000.00 $105.00 $52,500.00

$22,500.00 $430.00 $215,000.00 $375,000.00 $320.00 $160,000.00

$536,357.52 $150,000.00 $7.00 $700,000.00

$50,000.00 $105.00 $52,500.00

$13,158,230.00 $6,000,000.00 $12,512,017.00 $12,512,017.00

$2,119,929.47 $13,500,000.00 $4,400,000.00 $4,400,000.00

D. UNIT PRICE E. ESTIMATED AMOUNT

$1,590.00 $1,525,000.00 $1,550,000.00 $1,550,000.00

3. CONTRACT ITEMS C. AMENDMENTS ACKNOWLEDGED C. AMENDMENTS ACKNOWLEDGED C. AMENDMENTS ACKNOWLEDGED C. AMENDMENTS ACKNOWLEDGED

A. ITEM

NO.

B. ESTIMATED

QUANTITY

C. UNIT

E. ESTIMATED

AMOUNT

E. ESTIMATED

AMOUNT

NO.: 6

A. OFFEROR

AC Infinity Construction LLC

A. OFFEROR

Anselmi & DeCicco Inc

A. OFFEROR

Imperial Construction & Elecric Inc

A. OFFEROR

Richard E Pierson Construction Co Inc

B. BID SECURITY (Type and amount) B. BID SECURITY (Type and amount) B. BID SECURITY (Type and amount) B. BID SECURITY (Type and amount)

ABSTRACT OF OFFERS - CONSTRUCTION CONTINUATION

SHEET

1. SOLICITATION NUMBER

W912DS26BA020

INSTRUCTIONS Attach this form to OF 1419, Abstract of Offers - Construction, when more than 2 offers are received on a construction project. Each Continuation Sheet will accommodate 13 contract items to conform to the number of items which can be entered on the OF 1419. Use additional OF 1419's for contract items in excess of 13 and attach additional continuation Sheets (OF 1419A) as needed.

2. PROJECT TITLE

HOT CARGO LOADING AREA MCGUIRE AFB

PRICE

D. UNIT

PRICE

E. ESTIMATED

AMOUNT

0001 1 Job $7,492,314.00

0002 1 Job $11,620,320.00

0003 1 Job $3,547,099.80

0004 100,000 GL $12.00

0005 500 CY $250.00

0006 500 CY $2,200.00

0007 500 CY $650.00

0008 1500 CY $95.00

0009 500 CY $250.00

0010 500 CY $250.00

0011 500 CY $250.00

0012 10000 CY $9.25

0013 1 Job $170,000.00 0014 1 Job $607,500.00 0015 1 Job 55700

$25,552,233.90 $753,950.00

Total Base Plus $26,306,183.90

AUTHORIZED FOR LOCAL REPRODUCTION

Previous edition is usable

OPTIONAL FORM 1419A (11-88)

Total Options $753,950.00 $26,306,183.90

Total Base $25,552,233.90

$60,750.00 $55,700.00

$92,500.00 $170,000.00

$125,000.00 $125,000.00

$142,500.00 $125,000.00

$1,100,000.00 $325,000.00

$1,200,000.00

$125,000.00

$11,620,320.00

$3,547,099.80

D. UNIT PRICE E. ESTIMATED AMOUNT

$7,492,314.00

3. CONTRACT ITEMS C. AMENDMENTS ACKNOWLEDGED C. AMENDMENTS ACKNOWLEDGED C. AMENDMENTS ACKNOWLEDGED C. AMENDMENTS ACKNOWLEDGED

A. ITEM

NO.

B. ESTIMATED

QUANTITY

C. UNIT

E. ESTIMATED

AMOUNT

E. ESTIMATED

AMOUNT

NO.: 6

A. OFFEROR

Road-Con Inc

A. OFFEROR

A. OFFEROR A. OFFEROR

B. BID SECURITY (Type and amount) B. BID SECURITY (Type and amount) B. BID SECURITY (Type and amount) B. BID SECURITY (Type and amount)

ABSTRACT OF OFFERS - CONSTRUCTION CONTINUATION

SHEET

1. SOLICITATION NUMBER

W912DS26BA020

INSTRUCTIONS Attach this form to OF 1419, Abstract of Offers - Construction, when more than 2 offers are received on a construction project.

Each Continuation Sheet will accommodate 13 contract items to conform to the number of items which can be entered on the OF 1419. Use additional OF 1419's for contract items in excess of 13 and attach additional continuation Sheets (OF 1419A) as needed.

2. PROJECT TITLE

HOT CARGO LOADING AREA MCGUIRE AFB

Bid Abstract Form_W912DS26BA020 Page 1
Bid Abstract Form_W912DS26BA020 Page 2
Bid Abstract Form_W912DS26BA020 Page 3
Bid Abstract Form_W912DS26BA020 Page 4
2026-07-01T09:23:47-0400
SURAGE.MOHENDA.RAMESH.1250484549

File details come from the government source that posted it. Updated .