This document is a set of contract specifications and construction plans for repair work on the McGuire Airfield Hazardous Cargo Loading Area (HCLA) at Joint Base McGuire-Dix-Lakehurst in New Jersey. The contract number is W912DS26BA020, issued by the U.S. Army Corps of Engineers (Omaha and New York Districts) in May 2026.
The project encompasses demolition, environmental remediation, pavement repair, electrical system upgrades, and drainage infrastructure improvements at the hazardous cargo loading facility. Key construction requirements include: strict airfield safety protocols with full-time flag persons controlling vehicular traffic at taxiway and apron crossings; dust control on access and haul roads; load covers on dump trucks to prevent spillage; continuous radio communication between the on-site foreman and control tower; vehicle identification with flight line passes and proper markings; barricading of work areas with 24-hour standby personnel; compliance with UFC 3-260-01 and FAA AC 150/5370-2f operational safety standards; confined space entry procedures for trenches; temporary equipment height limitations of 65 feet (with FAA Form 7460-1 submission required for equipment exceeding 25 feet, allowing 60 days for FAA approval); containment and tarping of excavated material stockpiles not exceeding 4 feet in height; and proper damming and silt sock installation to prevent soil runoff. The construction area is adjacent to a former practice mortar range, requiring immediate notification to base security if unexploded ordnance is discovered. Environmental testing and contaminated soil disposal procedures are specified in Section 02 61 13 of the specifications, with contaminated materials directed to the disposal location near the JB MDL Fuel Farm. The project includes coordination with the 787th Civil Engineer Squadron for shutdown of the existing hydrant fuel piping loop serving HCLA #1 two weeks prior to work initiation.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1. CONSTRUCTION GENERAL NOTES
A. PHASING, PROVIDED HEREIN, IS ESTABLISHED TO MAINTAIN
AIRCRAFT OPERATIONAL CAPABILITY AND CONTINUAL ACCESS TO AIR
FORCE FACILITIES DURING CONSTRUCTION. THE CONTRACTOR
SHALL NOT BE ALLOWED TO INITIATE WORK UNTIL THE
CONTRACTOR'S SCHEDULE DEMONSTRATES THE ABILITY TO
COMPLETE THIS WORK WITHIN THE TIME FRAME REQUIRED AND THE
SCHEDULE IS APPROVED BY THE CONTRACTING OFFICER. THE
CONTRACTOR SHALL PROVIDE A TWENTY-ONE (21) DAY WRITTEN
NOTICE IN ADVANCE THROUGH THE CONTRACTING OFFICER
COORDINATING WORK AS SHOWN ON SHEET GC101.
B. THE CONTRACTOR SHALL NOT BE ALLOWED TO INITIATE ANY
WORK WITHIN THE HAZARDOUS CARGO LOADING APRON (HCLA) UNTIL
THE CONTRACTOR HAS AN APPROVED CONCRETE MIX DESIGN
CONFORMING TO 32 13 14.13 CONCRETE FOR AIRFIELDS AND HEAVY
DUTY PAVEMENT AND AN APPROVED JOB MIX FORMULA CONFORMING
TO 32 12 15.13 HMA FOR AIRFIELDS AND THE TEMPORARY ACCESS
ROAD TO THE EXISTING MUNITIONS STORAGE BUILDING HAS BEEN
CONSTRUCTED.
C. THE WORK ZONE SHALL BE DELINEATED WITH LOW PROFILE
BARRICADES ACROSS PAVED AREAS AND ROPE AND BARREL FENCING
ACROSS NON-PAVED AREAS. SEE SHEET GC101 FOR EXACT
LOCATIONS.
D. NOT USED.
E. AN AIR SHOW IS SCHEDULED EACH YEAR IN MAY OR JUNE,
WHICH WILL IMPACT CONSTRUCTION AND FLIGHT OPERATIONS
WITHIN THE AIRFIELD AREA. THE CONTRACTOR SHALL ASSUME THAT
NO WORK OR CONTRACTOR ACCESS TO THE AIRFIELD AREA WILL
OCCUR BETWEEN THE WEDNESDAY PRIOR TO THE AIR SHOW AND
THE MONDAY AFTER THE AIR SHOW IS COMPLETE.
F. HAZARDOUS CARGO OPERATIONS WILL BE CONDUCTED ON
TAXIWAY LIMA AT VARIOUS TIMES DURING THIS PROJECT.
PERIODICALLY, THIS MISSION WILL REQUIRE THE CONTRACTOR TO
CEASE CONSTRUCTION ACTIVITY AND VACATE THE CONSTRUCTION
SITE. AIRFIELD MANAGEMENT WILL NOTIFY THE CORPS OF
ENGINEERS, 787 CES AND THE CONTRACTOR WHEN THIS OCCURS.
G. DUE TO VARIOUS MISSION REQUIREMENTS AT MCGUIRE AIR
FORCE BASE, THE CONTRACTOR WILL BE DIRECTED TO CEASE WORK
AND VACATE THE CONSTRUCTION SITE WITH LESS THAN ONE HOUR
NOTICE. THE AIRFIELD MANAGER WILL NOTIFY THE COR, 787 CES AND
THE CONTRACTOR WHEN THIS OCCURS.
H. ALL PAVEMENT MARKINGS NOT MARKED FOR REMOVAL, WHICH
ARE MARRED OR REMOVED BY THE CONTRACTOR, SHALL BE
REPLACED BY THE CONTRACTOR AT HIS OWN EXPENSE. PAVEMENT
MARKING OF NEW AND EXISTING CONCRETE PAVEMENT SHALL NOT
BE INITIATED UNTIL A MINIMUM OF 30 DAYS AFTER PLACEMENT OF
CONCRETE OR ASPHALT, AS REQUIRED BY SPECIFICATION SECTION
32 17 23.
I. STEEL BUCKET OR BLADE EQUIPMENT SHALL NOT OPERATE
WITH THE BUCKET OR BLADE IN DIRECT CONTACT WITH ANY
PAVEMENT TO REMAIN AT ANY TIME. STEEL BUCKET OR BLADE
EQUIPMENT MAY BE USED TO REMOVE/REPLACE EXISTING BASE AND
SUBGRADE MATERIALS. STEEL TRACKED EQUIPMENT SHALL NOT BE
ALLOWED ON ANY PAVEMENT TO REMAIN AT ANY TIME; ONLY RUBBER
TRACKED EQUIPMENT SHALL BE OPERATE ON PAVEMENT TO REMAIN
TO PROTECT THE PAVEMENT FROM DAMAGE. ANY DAMAGE CAUSED
TO EXISTING PAVEMENT SLABS DUE TO INADEQUATE PROTECTION
SHALL BE ENTIRELY REMOVED AND REPLACED BY THE CONTRACTOR
AT NO EXPENSE TO THE GOVERNMENT.
J. FLAGGERS ARE REQUIRED DURING WORK WITHIN THE HCLA.
SEE SHEET GC101 FOR FLAG PERSON LOCATIONS. REFERENCE NOTE
3.H, THIS SHEET, FOR ADDITIONAL INFORMATION.
2. CONSTRUCTION PHASING DESCRIPTION
A. ALL WORK TO CONSTRUCT THE NEW HCLA SHALL BE
COMPLETED IN ONE PHASE. WORK INCLUDES, BUT IS NOT LIMITED TO:
CONSTRUCTION OF A TEMPORARY ASPHALT ACCESS ROAD;
DEMOLITION OF THE TEMPORARY ASPHALT ROAD AFTER CONTRACT
COMPLETION; DEMOLITION OF THE EXISTING CONCRETE AND
ASPHALT TAXIWAY AND HCLA; DEMOLITION OF THE EXISTING EDGE
LIGHTING; DEMOLITION OF THE EXISTING FENCING AND AREA
LIGHTING; CONSTRUCTION OF NEW WETLAND AREAS; CONSTRUCTION
OF NEW CONCRETE APRON; CONSTRUCTION OF NEW TAXIWAY APRON
EDGE LIGHTING; CONSTRUCTION OF NEW ASPHALT SHOULDERS;
REMOVAL AND REPLACEMENT OF THE EXISTING STORM DRAIN LINE;
INSTALLATION OF NEW PAVEMENT MARKINGS; INSTALLATION OF NEW
HIGH MAST LIGHTING; AND INSTALLATION OF NEW FENCING.
3. AIRCRAFT PARKING APRON ACCESS & SAFETY REQUIREMENTS
A. USE THE CONTRACTOR ACCESS ROUTE AS SHOWN ON GI101
AND GC101. THE CONTRACTOR MAY REQUEST TO USE THE
ALTERNATE ROUTE, BUT APPROVAL IS NOT GUARANTEED. REQUEST
ACCESS TO USE THE ALTERNATE ROUTE AT LEAST 14 DAYS IN
ADVANCE OF ACCESS THE SITE.
B. COORDINATE ACCESS TO THE AIRFIELD WITH THE
CONTRACTING OFFICER. ACCESS TO THE AIRFIELD SHALL BE
THROUGH THE APPROVED ACCESS GATE SHOWN ON SHEET GC101.
ALL VEHICLES ENTERING THE AIRFIELD SHALL BE GIVEN ACCESS BY
GOVERNMENT PERSONNEL. GOVERNMENT PERSONNEL WILL NOT BE
CONTINUOUSLY MANNING THE ACCESS GATE. THEREFORE, THE
CONTRACTOR SHALL STRATEGICALLY SCHEDULE PERSONNEL
ACCESS AND MATERIAL DELIVERIES TO AVOID ACCESS DELAYS.
C. COORDINATE CONSTRUCTION AND ACCESS TO THE SITE WITH
THE AIRFIELD MANAGER, 305 AMW/SEF, 305 OSS/OSAA, 787 CES/CEN
(AIR FORCE PROJECT MANAGEMENT), THE COR AND 87 SFS A MINIMUM
OF 60 DAYS PRIOR TO COMMENCEMENT OF WORK AT THE SITE.
ACCESS TO THE WORKSITE SHALL BE THROUGH THE CONSTRUCTION
AREA ENTRANCE SHOWN ON SHEET GC101. ACCESS SHALL BE
COORDINATED WITH, AND APPROVED BY THE AIRFIELD MANAGER.
UPON APPROVAL, ALL AREAS WITHIN THE CONSTRUCTION FENCING
SHALL BE CONSIDERED A FREE ZONE, I.E. AN ESCORT IS NOT
REQUIRED. THE CONTRACTOR ACCESS / HAUL ROUTE IS WITHIN A
RESTRICTED AREA, AS IDENTIFIED ON GI101. ALL VEHICLES MUST
REMAIN ON THE ROADWAYS SHOWN, AND MUST NOT DEVIATE FROM
THE APPROVED ROUTE UNLESS APPROVED BY THE CONTRACTING
OFFICER.
C.A. ALL CONTRACTOR PERSONNEL WORKING ON THE AIRFIELD
MUST CHECK-IN AND CHECK OUT WITH AIRFIELD MANAGEMENT
(AMOPS) COUNTER DAILY.
C.B. ALL CONTRACTOR PERSONNEL DRIVING A VEHICLE ON THE
AIRFIELD MUST BE TRAINED AND CERTIFIED BY AIRFIELD
MANAGEMENT AND ADHERE TO THE 305TH AIR MOBILITY WING
INSTRUCTION 13-213. VEHICLE OPERATORS MUST HAVE AN AF
FORM 483 IN THEIR POSSESSION AT ALL TIMES.
C.C. AIRFIELD DRIVERS SHALL FOLLOW JB MDL PROCEDURES FOR
OBTAINING AN AIRFIELD DRIVERS LICENSE, WHICH REQUIRES
ATTENDANCE AT A FOUR (4) HOUR TRAINING CLASS INITIALLY AND
AGAIN ANNUALLY FOR REFRESHER TRAINING. EXPECT UP TO 30
DAYS TO RECEIVE THE AIRFIELD DRIVERS LICENSE FROM THE
DATE TRAINING IS REQUESTED. WHEN CROSSING THROUGH OR
DRIVING WITHIN THE RESTRICTED AREA, ALL DRIVERS MUST BE
ESCORTED BY CONTRACTOR PERSONNEL WITH ESCORT
PRIVILEGES IF THE DRIVER DOES NOT ALSO POSSESS A
RESTRICTED LINE BADGE.
C.D. CONTRACTOR PERSONNEL WITH ESCORT PRIVILEGES ARE
REQUIRED TO BE PRESENT AT ALL TIMES WHEN WORKERS ARE
PRESENT WITHIN THE RESTRICTED AREA, WHICH INCLUDES THE
HAUL ROUTE. ONE ESCORT IS REQUIRED FOR EVERY 10
WORKERS PRESENT WITHIN THE RESTRICTED AREA.
CONTRACTOR ESCORT PERSONNEL SHALL FOLLOW JB MDL
PROCEDURES TO OBTAIN A RESTRICTED LINE BADGE WITH
ESCORT PRIVILEGES FROM JB MDL AND SHOULD EXPECT UP TO
60 DAYS TO RECEIVE THE RESTRICTED LINE BADGE FROM THE
DATE THAT THE APPLICATION IS SUBMITTED.
C.E. UNLICENSED DRIVERS THAT NEED TO DRIVE ON THE AIRFIELD
MUST BE ESCORTED BY GOVERNMENT PERSONNEL.
CONTRACTOR PERSONNEL ARE NOT ALLOWED TO ESCORT ANY
UNLICENSED DRIVERS ANYWHERE ON THE AIRFIELD.
C.F. SEE THE AIRFIELD ANNEX OF THE SPECIFICATIONS FOR
ADDITIONAL REQUIREMENTS FOR DRIVING ON THE AIRFIELD.
D. THE CONTRACTOR SHALL CONDUCT BI-WEEKLY CONSTRUCTION
MEETINGS FOR THE DURATION OF CONSTRUCTION. COORDINATE
WITH THE AIRFIELD MANAGER, 305 AMW/SEF, 305 OSS/OSAA, 787
CES/CEN (AIR FORCE PROJECT MANAGEMENT) AND THE COR.
E. ALL WORK ON THE AIRFIELD SHALL BE LIMITED TO DAYLIGHT
HOURS. WORK OUTSIDE OF DAYLIGHT HOURS SHALL BE REQUESTED
A MINIMUM OF FOURTEEN (14) DAYS IN ADVANCE, AND SHALL BE
SUBJECT TO THE APPROVAL OF THE CONTRACTING OFFICER'S
REPRESENTATIVE.
F. ALL WORK ON THE AIRFIELD SHALL BE COORDINATED WITH
AIRFIELD MANAGEMENT. THE CONTRACTOR SHALL CHECK IN DAILY
WITH AIRFIELD MANAGEMENT PRIOR TO PERFORMING ANY WORK IN
ORDER TO DISCUSS AIRFIELD OPERATIONS AND ANY OTHER SPECIAL
REQUIREMENTS FOR THAT DAY. ALL CONTRACTOR PERSONNEL
WORKING ON THE AIRFIELD MUST CHECK-IN AND CHECK OUT WITH
AIRFIELD MANAGEMENT (AMOPS) COUNTER DAILY. AMOPS WILL LOG
THIS IN THE DAILY EVENTS LOG. CONTRACTORS MUST SUPPLY THEIR
OWN RADIOS.
G. ALL HAUL ROUTES AND AREAS TRAVERSED BY THE
CONTRACTORS' VEHICLES AND EQUIPMENT SHALL BE CONTINUALLY
SWEPT AND VACUUMED CLEAN. THE CONTRACTOR SHALL PROVIDE A
SELF-CONTAINED PAVEMENT VACUUMING TRUCK WHICH IS
SPECIFICALLY MANUFACTURED TO CLEAN AIRFIELD PAVEMENTS. THE
VACUUM TRUCK SHALL OPERATE CONTINUOUSLY DURING
CONTRACTOR HAULING OPERATIONS. ADDITIONAL SELF-CONTAINTED
PAVEMENT VACUUMING TRUCKS SHALL BE REQUIRED TO OPERATE
CONCURRENTLY, AS NECESSARY, TO KEEP THE HAUL ROUTE FREE OF
FOD.
H. THE CONTRACTOR SHALL CONTROL DUST ON THE ACCESS AND
HAUL ROADS AND WITHIN THE WORK AREA AS DIRECTED BY THE
CONTRACTING OFFICER.
I. THE MAXIMUM WIGHT LIMIT FOR ALL PAVED ROADS ON THE
BASE IS THE LEGAL LOAD LIMIT.
J. AT ALL LOCATIONS WHERE CONTRACTOR ACCESS ROUTES AND
HAUL ROADS CROSS ACTIVE TAXIWAYS AND APRONS, THE
FOLLOWING REQUIREMENTS SHALL BE STRICTLY ADHERED TO: FOR
TAXIWAY CROSSINGS, A FULL TIME FLAG PERSON SHALL BE
POSITIONED 200 FEET OFF BOTH SIDES OF AN ACTIVE CENTERLINE
CONTROLLING ALL VEHICULAR TRAFFIC. FOR APRON CROSSINGS, A
FULL TIME FLAG PERSON SHALL BE POSITIONED 100 FEET OFF BOTH
EDGES OF AN ACTIVE APRON CONTROLLING ALL VEHICULAR TRAFFIC.
THE TWO FLAG PERSONS, ONE AT EACH LOCATION, SHALL HAVE
RADIO COMMUNICATION WITH EACH OTHER IN ORDER TO SAFELY
CONTROL VEHICULAR TRAFFIC. ONE SET OF FLAG PERSONS MAY
CONTROL MULTIPLE TAXIWAY AND APRON CROSSINGS, PROVIDED
THAT BOTH LINE OF SIGHT AND RADIO CONTACT BETWEEN THE TWO
FLAG PERSONS IS MAINTAINED. EXACT LOCATION OF FLAG PERSONS
SHALL BE COORDINATED WITH AIRFIELD MANAGEMENT. ALL FLAG
PERSONS SHALL BE CONTRACTOR EMPLOYEES AND OBTAIN AND
POSSESS AN AIRFIELD DRIVER'S LICENSE.
K. DUMP TRUCKS SHALL USE LOAD COVERS AND SHALL BE
LOADED BY THE CONTRACTOR SUCH THAT NO SPILLAGE OCCURS
DURING TRANSIT ON THE TAXIWAYS, APRON, AND STATE, MUNICIPAL
OR BASE ROADWAYS.
L. THE ON-SITE FOREMAN SHALL HAVE RADIO CONTACT WITH THE
CONTROL TOWER AT ALL TIMES THE CONTRACTOR IS WORKING AT
THE SITE.
M. ALL VEHICLES SHALL HAVE COMPANY MARKINGS, AND SHALL
HAVE AND DISPLAY FLIGHT LINE PASSES.
N. ANY VEHICLE REQUIRED TO TRAVEL OVER ANY PORTION OF THE
AIRCRAFT MOVEMENT AREA OR RUNWAY APPROACH AREA SHALL BE
PROPERLY IDENTIFIED TO OPERATE IN THE AREA. ALL VEHICLES NOT
REQUIRING AN ESCORT SHALL BE MARKED WITH A FLASHING YELLOW
BEACON, A FLAG AND IDENTIFIED WITH A SIGN ON THE DRIVER'S
DOOR. VEHICLES REQUIRING AN ESCORT SHALL BE IDENTIFIED WITH
A SIGN ON THE DRIVER'S DOOR. THE FLAG SHALL BE NOT LESS THAN
3-FOOT SQUARE CONSISTING OF A CHECKERED PATTERN OF
INTERNATIONAL ORANGE AND WHITE SQUARES OF NOT LESS THAN
ONE FOOT ON EACH SIDE AND DISPLAYED IN FULL VIEW ABOVE THE
VEHICLE.
O. THE WORK AREA SHALL BE DELINEATED WITH LOW PROFILE
BARRICADES ALONG PAVED AREAS AND ROPE AND BARREL FENCING
ALONG NON-PAVED AREAS. THE CONTRACTOR MUST MAINTAIN A
24-HOUR STANDBY PERSON TO RESPOND TO INACTIVE FLASHING
BARRICADE LIGHTS AND BARRICADE/FENCING POSITIONING
PROBLEMS. SEE SHEET GC501 FOR BARRICADE AND FENCING
DETAILS.
P. CONTRACTOR SHALL COMPLY WITH ALL ASPECTS OF UFC
3-260-01, SECTION 14 CONSTRUCTION PHASING PLAN AND
OPERATIONAL SAFETY ON AIRFIELDS DURING CONSTRUCTION AND
FAA AC 150 5370-2f OPERATIONAL SAFETY ON AIRPORTS DURING
CONSTRUCTION.
Q. TRENCHES ARE CONSIDERED A CONFINED SPACE AND THE
CONTRACTOR IS TO FOLLOW ALL PROCEDURES AND REQUIREMENTS
OUTLINED IN EM 385-1-1 FOR CONFINED SPACE ENTRY AND
MONITORING.
R. ALL OPEN TRENCHES SHALL BE SURROUNDED BY SAFETY
FENCING. REFERENCE EM 385-1-1 AND SPECIFICATION SECTIONS 01
35 26 GOVERNMENTAL SAFETY REQUIREMENTS AND 01 50 00
TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS FOR
REQUIREMENTS.
S. STOCKPILING OF EXCAVATED MATERIALS SHALL BE LIMITED TO
A HEIGHT WHERE MATERIAL CAN BE PROPERLY COVERED AND
MAINTAINED, BUT SHALL NOT EXCEED 4 FEET IN HEIGHT.
T. ALL STOCKPILES OF EXCAVATED MATERIALS LOCATED WITHIN
CONSTRUCTION AREAS SHALL BE COMPLETELY COVERED WITH
TARPING AND SUFFICIENTLY WEIGHTED DOWN TO PREVENT DUST
AND MATERIAL FROM ENTERING ALL OTHER AIRFIELD PAVEMENT
AREAS OUTSIDE OF THE BARRICADED AREA.
U. ALL STOCKPILED MATERIAL MUST BE COVERED AT THE END OF
EACH DAY'S WORK.
V. THE CONTRACTOR SHALL LIMIT UNCOVERED STOCKPILES TO A
MINIMUM.
W. THE COVER USED MUST BE ABLE TO BE PROPERLY SECURED
AND ANCHORED TO PREVENT THE COVER FROM BLOWING AWAY. THE
COVER MUST BE SECURED TO WITHSTAND SUSTAINED WINDS OF UP
TO 50 KNOTS. ADDITIONAL TIE DOWNS SHALL BE REQUIRED IF
EXTREME WEATHER CONDITIONS ARE IMMINENT.
X. PROPER DAMMING SHALL BE PROVIDED AROUND THE ENTIRE
STOCKPILE TO PREVENT SOIL RUN OFF FROM GETTING OUTSIDE OF
THE STOCKPILE AREA. PROPERLY SECURED SILT SOCKS ARE
ADVISED TO PREVENT EROSION FROM STOCKPILES.
Y. MAXIMUM EQUIPMENT HEIGHT ALLOWABLE IN THE AREA SHALL
NOT EXCEED 65'. ANY EQUIPMENT OVER 25 FEET IN HEIGHT WILL
REQUIRE AN AIRFIELD CONSTRUCTION WAIVER, WHICH REQUIRES A
MINIMUM 45 DAYS TO PROCESS.
Z. SUBMIT FAA FORM 7460-1 TO THE FAA PRIOR TO BEGINNING
WORK ON THE AIRFIELD. FAA APPROVAL CAN TAKE UP TO 60 DAYS.
CONTRACT EXTENSIONS DUE TO FAILURE TO SUBMIT THE FORM WILL
NOT BE ALLOWED. INCLUDE IN THE SUBMISSION ALL ANTICIPATED
EQUIPEMENT THAT EXCEEDS 25 FEET IN HEIGHT. APPROXIMATE
COORDINATES OF EQUIPMENT LOCATION IS REQUIRED TO BE
INCLUDED WITH THE FORM. CONSTRUCTION MAY BEGIN WHEN THE
FAA HAS ISSUED A DETERMINATION OF NO HAZARD AND THE
TEMPORARY CONSTRUCTION WAIVER HAS BEEN APPROVED BY THE
BASE COMMANDER.
AA. SUBMIT ALL INFORMATION REQUIRED BY THE AIRFIELD
MANAGER TO SUBMIT FOR THE TEMPORARY CONSTRUCTION WAIVER
TO BE SIGNED BY THE BASE COMMANDER. APPROVAL OF THE
TEMPORARY CONSTRUCTION WAIVER CAN TAKE UP TO 60 DAYS FOR
APPROVAL.
AB. PROTECT ALL EXISTING AIRFIELD LIGHTS AND/OR NAVAIDS
DURING CONSTRUCTION. IF AN EXISTING AIRFIELD LIGHTS AND/OR
NAVAIDS IS DAMAGED BY THE CONTRACTOR, IMMEDIATELY NOTIFY
THE CONTRACTING OFFICER. REPAIR OR REPLACE THE DAMAGED
AIRFIELD LIGHTS AND/OR NAVAIDS AT NO ADDITIONAL COST TO THE
GOVERNMENT. REPAIR ALL DAMAGES TO THE CONTRACTING
OFFICER'S SATISFACTION.
AC. ALL EXCAVATED CONTAMINATED MATERIAL SHALL BE DISPOSED
OF AT THE CONTAMINATED SOIL DISPOSAL LOCATION NEAR THE JB
MDL FUEL FARM.
AD. THE CONSTRUCTION AREA IS LOCATED ADJACENT TO A FORMER
PRACTICE MORTAR RANGE. IF ANYTHING IS DISCOVERED DURING
CONSTRUCTION ACTIVITIES THAT APPEARS TO BE AN UNEXPLODED
ORDINANCE, THE CONTRACTOR SHALL STOP WORK, EVACUATE THE
AREA AND IMMEDIATELY CALL BASE SECURITY.
AE. PRIOR TO BEGINNING ANY WORK ON THE AIRFIELD, THE
EXISTING HYDRANT FUEL PIPING LOOP SERVING HCLA #1 WILL BE
REQUIRED TO BE SHUT OFF AT THE EXISTING ISOLATION VALVE PIT.
COORDINATE THE SHUT DOWN WITH 787TH CES, THROUGH THE
CONTRACTING OFFICER, TWO WEEKS PRIOR TO INITIATING ANY WORK
ON THE AIRFIELD.
AF. REFERNENCE THE AIRFIELD ANNEX OF THE SPECIFICATION FOR
ADDITIONAL REQUIREMENTS FOR WORKING ON THE AIRFIELD.
4. AIR FORCE OPERATIONAL NOTES - FOR INFORMATION ONLY
A. TAXIWAY LIMA WILL BE CLOSED TO AIRCRAFT OPERATIONS
WHILE THE CONTRACTOR IS CONSTRING THE TEMPORARY ACCESS
ROAD TO THE MUNITIONS STORAGE BUILDING. THE CLOSURE WILL BE
DURING NON-OPERATIONAL HOURS AND COORDINATED WITH THE
AIRFIELD MANAGER, THROUGH THE CONTRACTING OFFICER.
B. A CAUTIONARY NOTICE TO AIRMAN (NOTAM) WILL BE ISSUED BY
THE AIRFIELD MANAGER INDICATING THAT THE DISTANCE TO THE
TEMPORARY FENCING ON THE HCLA IS 170 FEET FROM THE TAXIWAY
LIMA CENTERLINE, AND THERE ARE NO AIRCRAFT RESTRICTIONS ON
TAXIWAY LIMA.
C. EXCEPT FOR THE SHORT DURATION OF CONSTRUCTION OF THE
TEMPORARY ACCESS ROAD, ALL RUNWAYS, APRONS AND TAXIWAYS
WILL BE AVAILABLE FOR AIRCRAFT OPERATIONS AT ALL TIMES DURING
CONSTRUCTION WITH THE EXCEPTION OF THE HCLA, WHICH WILL BE
CLOSED TO AIRCRAFT OPERATIONS.
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
SU
BM
IT
TE
D B
Y:
C H
EC
KE
D B
Y:
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
IS
SU
E D
AT
E:
SI
ZE
M
AR
K
D
ES
C R
IP
TI
O N
D
AT
E
SHEET ID
US Army Corps of Engineers
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
U .S
.A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
O M
AH
A
D
IS
TR
IC
T
C
AP
IT
O L
AV
EN
U E
O M
AH
A, N
EB
R
AS
KA
N
EW
Y O
R K
D
IS
TR
IC
T
F
ED
ER
AL
P
LA
ZA
N
EW
Y
O R
K, N
EW
Y
O R
K
+X
XX
XX
X-
XX
-X
-X
XX
X
M
AY
SP
EC
C O
D E:
FI
LE
N
AM
E:
AN
SI
D
W
2D S2
6B A0
JO
IN
T
BA
SE
M C
G U
IR
E-
D
IX
-L
AK
EH
U
R
ST
R
EP
AI
R
M C
G U
IR
E
AI
R
FI
EL
D H
AZ
AR
D O
U S
C
AR
G O
L O
AD
IN
G A
R
EA
PN
: P
TF
L1
AD
VE
R
TI
SE
M
EN
T
R
EV
. 0
G
EN
ER
AL
R
EV
IS
IO
N
S
/2 2/
N J0
N J0
5_ G
C
1.
dw g
K.
H
AL
L
B.
G
O
LI
BE
R
B.
G
O
LI
BE
R
B.
F
LE
R
E
PH
AS
IN
G N
O
TE
S
GC201
C :\t em p\ nw o0
\g
6e dh bm g\ d0
\N J0
5_ G
C
1.
dw g 6/
/2
8:
:3
AM
AE
C _B
&W .S
TB
G
6E D
H
BM
G
E
E
CO
CO
CO
CO
E
C
E
E
CB
CB
CB
W
W
CB
CB
CB
CB
E
E E
EE
E
E
E
E
E
E
E
E
E
E
E
E
E
E
C O
M M
E E
E
E E
E
E E
E E
E E
E
E E
E E
E E
E
INVERT = 104.60
MATERIAL = CMP
DIAMETER = "
INVERT = 99.98
MATERIAL = CMP
DIAMETER = "
INVERT = 102.79
MATERIAL = MISC
DIAMETER = "
CO
SD
MW
MWMWMW
MW
MW
MWMWMW
MW
MWMW
MW
MW
MW
MWMWMW
BORE B-4
IH 18-03 A
CORE B
CORE C
BORE B-6CORE D
CP-2
BORE B-5
E
E
CO
CO
CO
CO
CO
W W W W W W W W W
W
W
W
W
W
W
W
W
SD
SD
SD
SD
SD
LP
G
LPG
LPG
LPG
LPG
LPG
LP
G
LP
G
LP
G
LP
G
LP
G
LP
G
LP
G
LP
G
LP
G
LPG
LPG
LPG
LPG
LP
G
LP
G
LP
G
LP
G
CB
MW
ss051p-mw06d
GW
ss051p-gws17
MW
ss051p-mw06s
MW
ss051p-mw10
SW
ss051p-sw11
SW
ss051p-sw12 ft013p-sb20 ft013p-sb21
MW
mw701-12052026
MW
mw702-12052026
MW
mw301-12052026
MW
mw601-12052026
MW
mw602-12052026
MW
mw201-12052026 ss-hlla1-o-12 ss-hlla2-o-12
M
M
SD
SD
SD
SD
M
SD
CB
A
A
M
X X
X X
X
X
X
X
X
X
X
X
X
X X X
X
X
X
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
SU
BM
IT
TE
D B
Y:
C H
EC
KE
D B
Y:
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
IS
SU
E D
AT
E:
SI
ZE
M
AR
K
D
ES
C R
IP
TI
O N
D
AT
E
SHEET ID
US Army Corps of Engineers
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
U .S
.A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
O M
AH
A
D
IS
TR
IC
T
C
AP
IT
O L
AV
EN
U E
O M
AH
A, N
EB
R
AS
KA
N
EW
Y O
R K
D
IS
TR
IC
T
F
ED
ER
AL
P
LA
ZA
N
EW
Y
O R
K, N
EW
Y
O R
K
+X
XX
XX
X-
XX
-X
-X
XX
X
M
AY
SP
EC
C O
D E:
FI
LE
N
AM
E:
AN
SI
D
W
2D S2
6B A0
JO
IN
T
BA
SE
M C
G U
IR
E-
D
IX
-L
AK
EH
U
R
ST
R
EP
AI
R
M C
G U
IR
E
AI
R
FI
EL
D H
AZ
AR
D O
U S
C
AR
G O
L O
AD
IN
G A
R
EA
PN
: P
TF
L1
AD
VE
R
TI
SE
M
EN
T
R
EV
. 0
G
EN
ER
AL
R
EV
IS
IO
6/
/2
N
J0
N J0
5_
BB
1.
dw g
K.
H
AL
L
B.
G
O
LI
BE
R
B.
G
O
LI
BE
R
B.
F
LE
R
E
EN
VI
R
O N
M
EN
TA
L
SA
M
PL
IN
G P
LA
N
BB102
C :\t em p\ nw o0
\g
6e dh bm g\ d0
\N J0
5_
BB
1.
dw g
6/
/2
:3 6:
A
M
AE
C _B
&W .S
TB
G
6E D
H
BM
G
SCALE: 1"=100'
ENVIRONMENTAL SAMPLING PLANA1
SCALE IN FEET
100 0 200100
RIR SOIL BORING SAMPLE LOCATIONft013p-sb21
NORTH
GENERAL SHEET NOTES
LEGEND
1. SEE THE 02 61 13 APPENDIX TO THE SPECIFICATIONS FOR
ENVIRONMENTAL TESTING COORDINATES, CONTAMINATED SOIL
AND GROUNDWATER DATA AND DRAFT RIR SAMPLING
INFORMATION.
2. EXCAVATED SOIL WITHIN THE SITE MAY BE REUSED AT THE
SITE. EXCAVATED SOIL THAT IS TO BE DISPOSED OF OFF SITE
SHALL BE TESTED AND DISPOSED OF AS REQUIRED BY THE
SPECIFICATIONS.
3. EXCESS EXCAVATED MATERIAL SHALL BE STOCKPILED AT
THE LOCATION SHOWN WITHIN THESE PLANS AND DISPOSED OF
OFF SITE PER THE ENVIRONMENTAL REQUIREMENTS WITHIN
THE SPECIFICATIONS.
RIR SURFACE WATER SAMPLE LOCATIONss051p-sw11SW
RIR GROUND WATER SAMPLE LOCATIONss051p-sw11GW
RIR MONITORING WELL SAMPLE LOCATIONss051p-mw10MW
SUPPLEMENTAL WELL SAMPLE LOCATIONmwxxx-12052026MW
SUPPLEMENTAL SLUDGE,
SOLID SAMPLE LOCATION
ss-hllax-O-12
A
B d1.
3.
LAP SPACING :
BAR MAT - 24 BAR DIAMETERS
WIRE FABRIC - ONE SPACING OF WIRE OR 32 WIRE
DIAMETERS, WHICHEVER IS GREATER
NOTE:
NOTES:
TABLE 1
AREA OF STEEL
s(A )
4.
2.
s
A h DENOTES REINFORCED CONCRETE PAVEMENT DESIGN THICKNESS.
REINFORCING STEEL IS NOT CARRIED THROUGH JOINT.
SLABS TO BE REINFORCED ARE SHADED ON THE JOINT LAYOUT PLAN
SHEETS.
REINFORCING SHALL HAVE A MINIMUM STEEL AREA A AS SHOWN IN TABLE 1.
STEEL AREA LISTED IN TABLE 1 IS SQ. IN./FT. IN EACH DIRECTION. MAXIMUM
BAR OR WIRE SPACING SHALL NOT EXCEED 12 INCHES.
LENGTH OF SLAB
LONGITUDINAL CONSTRUCTION JOINT3"
3"
W
ID
TH
O
F
SL
AB
3"
LAP
TRANSVERSE CONTRACTION JOINT
WIRE FABRIC
OR BAR MAT dh
TRANSVERSE CONTRACTION JOINT
3"
D-DENOTES DOWEL DIAMETER
3"
LAP
LONGITUDINAL CONSTRUCTION JOINT
DOWEL
D-DENOTES DOWEL DIAMETER
REINFORCING
STEEL
REINFORCING
STEEL
REINFORCING STEEL
3"
DOWELED JOINT
LENGTH OF FABRIC OR MAT
W
ID
TH
O
F
FA
BR
IC
O R
M
AT
C T
O C
O F
O U
TS
ID
E
LO
N G
IT
U
D
IN
AL
W
IR
ES
O R
B
AR
S
LO
N
G
IT
U D
IN
AL
W
IR
E O
R B
AR
S
PA
C
IN
G
LENGTH OF LAP
TRANSVERSE WIRE OR BAR SPACING
TRANSVERSE WIRE GAUGE
OR BAR DIAMETER
LONGITUDINAL WIRE GAUGE OR BAR DIAMETER
3" hd 4 1"
NOT TO SCALE
DETAIL OF SLAB REINFORCEMENT
NOTE:
LAP SPACING :
BAR MAT - 24 BAR DIAMETERS
WIRE FABRIC - ONE SPACING OF WIRE OR 32 WIRE
DIAMETERS, WHICHEVER IS GREATER
NOT TO SCALE
DETAIL OF WIRE FABRIC OR BAR MAT
dh dh
4 + 1" dh
+ D
SECTION
BSECTION
dh
NOT TO SCALE
DETAIL FOR TERMINATION OF STEEL JOINT
12" & 13.5"
0.072
PAVEMENT
THICKNESS
hd 4 1"
(2) 4 BARS X 48 INCHES LONG @ 6 INCHES
O.C. TOP & BOTTOM AT REINTER CORNERS
(TYP.) - SEE TYPICAL NOTES 1 & 2
TYPICAL NOTES:
1. 3 INCHES CLEAR FROM TOP AND BOTTOM OF SLAB.
2. 3 INCHES CLEAR FROM INNER BAR TO OUTSIDE OF
PIT WALL.
3. ENTIRE SLAB SHALL ALSO BE REINFORCED. SEE
THIS SHEET FOR DETAILS.
NEW PCC SLAB (TYP.)
NOT TO SCALE
HYDRANT FUEL PIT CORNER REINFORCEMENT DETAIL
EXISTING HYDRANT FUEL PIT (TYP.)
19"
0.114
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
SU
BM
IT
TE
D B
Y:
C H
EC
KE
D B
Y:
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
IS
SU
E D
AT
E:
SI
ZE
M
AR
K
D
ES
C R
IP
TI
O N
D
AT
E
SHEET ID
US Army Corps of Engineers
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
U .S
.A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
O M
AH
A
D
IS
TR
IC
T
C
AP
IT
O L
AV
EN
U E
O M
AH
A, N
EB
R
AS
KA
N
EW
Y O
R K
D
IS
TR
IC
T
F
ED
ER
AL
P
LA
ZA
N
EW
Y
O R
K, N
EW
Y
O R
K
+X
XX
XX
X-
XX
-X
-X
XX
X
M
AY
SP
EC
C O
D E:
FI
LE
N
AM
E:
AN
SI
D
W
2D S2
6B A0
JO
IN
T
BA
SE
M C
G U
IR
E-
D
IX
-L
AK
EH
U
R
ST
R
EP
AI
R
M C
G U
IR
E
AI
R
FI
EL
D H
AZ
AR
D O
U S
C
AR
G O
L O
AD
IN
G A
R
EA
PN
: P
TF
L1
AD
VE
R
TI
SE
M
EN
T
R
EV
. 0
G
EN
ER
AL
R
EV
IS
IO
2/
N J0
N J0
5_ C
P5
.d w g
K.
H
AL
L
B.
G
O
LI
BE
R
B.
G
O
LI
BE
R
B.
F
LE
R
E R
EI
N
FO
R
C
EM
EN
T
D
ET
AI
LS
CP503
C :\t em p\ nw o0
\g
6e dh bm g\ d0
\N J0
5_ C
P5
.d w g 6/
/2
8:
:2
AM
AE
C _B
&W .S
TB
G
6E D
H
BM
G
AutoCAD SHX Text
EL
EV
AT
IO
N
STATION
STRM-DRAN-A PROFILE VIEW
0+00 0+20 0+40 0+60 0+80 1+00 1+20 1+40 1+60 1+80 2+00 2+20 2+40 2+60 2+80 3+00 3+20 3+40 3+60 3+80 4+00 4+20 4+40 4+60 4+80 5+00 5+20 5+40 5+60
FINISH GRADE NEW TRENCH DRAIN
EXISTING GRADE
STRM DRAIN LINE A-169.64 LF - 18" RCP
SLOPE = 1.79%
STRM DRAIN LINE A-2
252.71 LF - 18" RCP
SLOPE = 0.50%
STORM DRAIN LINE A-3
42.48 LF - 18" HDPE
SLOPE = 0.50%
STRM DRAIN LINE A-4
146.50 LF - 18" RCP
SLOPE = 0.54%
TD A-1
STA: 1+32.75
RIM: 110.25
INV. OUT: 104.75
MH A-3
STA: 4+55.11
RIM: 110.15
INV. IN: 102.24
INV. IN: 107.78
INV. OUT: 102.04
MH A-2
STA: 2+02.39
RIM: 109.00
INV. IN: 103.50
INV. IN: 104.75
INV. OUT: 103.50
MH A-4
STA: 4+97.59
RIM: 108.26
INV. IN: 101.82
INV. IN: 101.92
INV. OUT: 100.77EXISTING GRADEFINISH GRADE
EL
EV
AT
IO
N
5+60 5+80 6+00 6+20 6+40 6+60 6+80 7+00 7+20
EL
EV
AT
IO
N
EL
EV
AT
IO
N
STATION
STRM-DRAN-B PROFILE VIEW
0+00 0+20 0+40 0+60 0+80 1+00 1+20 1+40 1+60 1+80 2+00 2+20
EL
EV
AT
IO
N
EL
EV
AT
IO
N
STATION
STRM-DRAN-C PROFILE VIEW
-0+20 0+00 0+20 0+40
HW A-5
STA: 6+44.09
RIM: 102.11
INV. IN: 99.98 A-2
252.71 LF - 18" RCP
SLOPE = 0.50%
MH A-2
STA: 1+90.78
RIM: 109.00
INV. IN: 103.50
INV. IN: 104.75
INV. OUT: 103.50
STRM DRAIN LINE B-1
37.30 LF - 18" RCP
SLOPE = 6.72%
MH A-3
STA: 0+12.47
RIM: 110.15
INV. IN: 102.24
INV. IN: 107.78
INV. OUT: 102.04
C-1
12.39 LF - 6" PVC
SLOPE = 1.00%EXISTING GRADE
EXISTING GRADE EXISTING GRADE
FINISH GRADE
FINISH GRADE
NEW TRENCH DRAIN CONNECTION
SEE SHEET CG502 FOR DETAILS
STRM DRAIN LINE B-2
133.47 LF - 18" RCP
SLOPE = 0.50%
18"
INV. 105.42'
MH B-2
STA: 0+57.31
RIM: 108.26
INV. IN: 105.42
INV. OUT: 105.42
STRM DRAIN LINE A-4
146.50 LF - 18" RCP
SLOPE = 0.54%
EL
EV
AT
IO
N
EL
EV
AT
IO
N
STATION
STRM-DRAN-D PROFILE VIEW
0+00 0+20 0+40 0+60 0+80 1+00 1+20 1+40 1+60 1+80
EL
EV
AT
IO
N
EL
EV
AT
IO
N
STATION
STRM-DRAN-ZZ PROFILE VIEW
0+00 0+20 0+40 0+60 0+80 1+00
MH A-4
STA: 1+45.36
RIM: 108.26
INV. IN: 101.82
INV. IN: 101.92
INV. OUT: 100.77
STORM DRAIN LINE D-1125.36 LF - 8" PVC
SLOPE = 1.80%
STRM DRAIN LINE ZZ-1
38.61 LF - 18" RCP
SLOPE = 1.00%
AI ZZ-1
STA: 0+20
RIM: 111.67
INV. OUT: 106.67
EX. AI Z-2
STA: 0+58.61
RIM: 112.42
INV. IN: 101.25
INV. IN: 106.28
INV. OUT: 101.25
EXISTING GRADE
EXISTING GRADE
FINISH GRADEEXISTING TRENCH DRAIN
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
SU
BM
IT
TE
D B
Y:
C H
EC
KE
D B
Y:
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
IS
SU
E D
AT
E:
SI
ZE
M
AR
K
D
ES
C R
IP
TI
O N
D
AT
E
SHEET ID
US Army Corps of Engineers
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
U .S
.A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
O M
AH
A
D
IS
TR
IC
T
C
AP
IT
O L
AV
EN
U E
O M
AH
A, N
EB
R
AS
KA
N
EW
Y O
R K
D
IS
TR
IC
T
F
ED
ER
AL
P
LA
ZA
N
EW
Y
O R
K, N
EW
Y
O R
K
+X
XX
XX
X-
XX
-X
-X
XX
X
M
AY
SP
EC
C O
D E:
FI
LE
N
AM
E:
AN
SI
D
W
2D S2
6B A0
JO
IN
T
BA
SE
M C
G U
IR
E-
D
IX
-L
AK
EH
U
R
ST
R
EP
AI
R
M C
G U
IR
E
AI
R
FI
EL
D H
AZ
AR
D O
U S
C
AR
G O
L O
AD
IN
G A
R
EA
PN
: P
TF
L1
AD
VE
R
TI
SE
M
EN
T
R
EV
. 0
G
EN
ER
AL
R
EV
IS
IO
2/
N J0
N J0
5_ C
G
1.
dw g
K.
H
AL
L
B.
G
O
LI
BE
R
B.
G
O
LI
BE
R
B.
F
LE
R
E
ST
O R
M D
R
AI
N L
IN
ES
A , B
, C , D
Z
Z
PR
O
FI
LE
CG202
C :\t em p\ nw o0
\g
6e dh bm g\ d0
\N J0
5_ C
G
1.
dw g 6/
/2
8:
:4
AM
AE
C _B
&W .S
TB
G
6E D
H
BM
G
SCALE: HORIZ:1" = 20' -0", VERT: 1" = 5'-0"
STORM DRAIN LINE A PROFILEL1
SCALE: HORIZ:1" = 20' -0", VERT: 1" = 5'-0"
STORM DRAIN LINE A PROFILEF1 SCALE: HORIZ:1" = 20' -0", VERT: 1" = 5'-0"
STORM DRAIN LINE B PROFILEF8 SCALE: HORIZ:1" = 20' -0", VERT: 1" = 5'-0"
STORM DRAIN LINE C PROFILEF16
SCALE: HORIZ:1" = 20' -0", VERT: 1" = 5'-0"
STORM DRAIN LINE D PROFILEA1 SCALE: HORIZ:1" = 20' -0", VERT: 1" = 5'-0"
STORM DRAIN LINE ZZ PROFILEA9
M
AT
C H
LI
N
E A-
A
- S
EE
T
H
IS
S H
EE
T
M
AT
C H
LI
N
E A-
A
- S
EE
T
H
IS
S H
EE
T
E
E
M
CO
CO
CO
CO
E
C
E
E
CB
CB
CB
CB
M T
M T
ME
W
W
CB
CB
CB
CB
C
COMM
COMM
COMM
COMM
E E
E
E E
E E
E E
E E
E E
E E
E
E
E
E E
E
E E
E E
E
E E
E E
E E
E
E
E E
E
E E
E
E
E E
E
E
E E E
E
E E
E E
E E E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E E
E E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E E
E E
E E
E
E
E
E
E
E
E
E
E
E
E
E
E E
E
EE
E
E
E
E
E
E
E
E
E
SD
E
E
E
E
CO
M
M
CO
M
M
CO
M
M
CO
M
M
C O
M M
E E
E E
E E
E
E E
E
E
E
E
E
E
E E
E E
E
E
E
E
E E
E E
E E
E E
E E
E E
E E
E E
E
E E
E E
E E
E E
E E
E E
E E
E E
E
E E
INVERT = 104.60
MATERIAL = CMP
DIAMETER = "
INVERT = 99.9
MATERIAL = CMP
DIAMETER = "
INVERT = 102.79
MATERIAL = MISC
DIAMETER = "
CO
SD
SD
SD
MW
MWMWMW
MW
MW
MWMWMW
MW
MWMW
MW
MW
MW
MWMWMW
E E
E E
E E
E E
E
E
E
E
E
E
CO
CO
CO
CO
CO
W W W W W W W W W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
LP
G
LP
G
LP
G
LP
G
LP
G
LP
G
LP
G
LP
G
LP
G
LP
G
LPG
LPG
LPGLPG
LPG
LPG
LPG
LPG
LPG
LPG
LP
G
LP
G
LP
G
LP
G
LP
G
LP
G
LP
G
LP
G
LP
G
LP
G
LP
G
LP
G
LP
G
LP
G
LPG
LPG
LPG
LPG
LPG
LPG
LPG
LP
G
LP
G
LP
G
LP
G
LP
G
LP
G
CB
MW
mw701-12052026
MW
mw702-12052026
MW
mw301-12052026
MW
mw601-12052026
MW
mw602-12052026
MW
mw201-12052026 ss-hlla1-o-12 ss-hlla2-o-12
ES
ES
ES
ES
ES
ES
ES
ES
ES
ES
ES
ES
ES
ES
ES
ES
ES
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
SU
BM
IT
TE
D B
Y:
C H
EC
KE
D B
Y:
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
IS
SU
E D
AT
E:
SI
ZE
M
AR
K
D
ES
C R
IP
TI
O N
D
AT
E
SHEET ID
US Army Corps of Engineers
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
U .S
.A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
O M
AH
A
D
IS
TR
IC
T
C
AP
IT
O L
AV
EN
U E
O M
AH
A, N
EB
R
AS
KA
N
EW
Y O
R K
D
IS
TR
IC
T
F
ED
ER
AL
P
LA
ZA
N
EW
Y
O R
K, N
EW
Y
O R
K
+X
XX
XX
X-
XX
-X
-X
XX
X
M
AY
SP
EC
C O
D E:
FI
LE
N
AM
E:
AN
SI
D
W
2D S2
6B A0
JO
IN
T
BA
SE
M C
G U
IR
E-
D
IX
-L
AK
EH
U
R
ST
R
EP
AI
R
M C
G U
IR
E
AI
R
FI
EL
D H
AZ
AR
D O
U S
C
AR
G O
L O
AD
IN
G A
R
EA
PN
: P
TF
L1
AD
VE
R
TI
SE
M
EN
T
AM
G
EN
ER
AL
R
EV
IS
IO
J U
N
N J0
N J0
5_
ED
1.
dw g
B.
W
LA
SC
H
IN
K.
P
AV
LI
K
K.
P
AV
LI
K
W . D
AV
EN
PO
R
T
EL
EC
TR
IC
AL
D
EM
O
LI
TI
O
N P
LA
N
ED101
C :\d
9\
N J0
5_
ED
1.
dw g
6/
/2
:2 2:
A
M
AE
C _B
&W .S
TB
G
6E D
XK
P8
SHEET KEYNOTES
GENERAL SHEET NOTES
1. B1147 TO BE PROTECTED IN PLACE. CONTAINS A 15KW GENERATOR TO BE
PROTECTED IN PLACE.
2. REMOVE DEMOLISHED SECURITY LIGHTING CIRCUITS INTO ELECTRICAL
SERVICE PANEL LOCATED IN B1147.
3. PROTECT IN PLACE EXISTING TRANSFORMER.
4. DISCONNECT SERVICE TO PANEL PP-1 (SEE NEW SERVICE LINE ON ES101)
AND REMOVE DISCONNECT SERVING PP-1 AT THIS LOCATION. SEE NEW SERVICE
POINT IN ONE-LINE DIAGRAM ON ES507. PANEL PP-1 THROUGH NEW
INSTALLATION WILL BE FED FROM NEW PANEL XDP1.
5. EXISTING PANEL PP-1 TO BE PROTECTED IN PLACE.
6. CONTRACTOR TO DEMO ELECTRICAL SECONDARY SERVICE LINE FROM
EXISTING TRANSFORMER (TO REMAIN) TO EXISTING PANEL PP-1 (TO REMAIN).
SEE ES101 FOR NEW SERVICE LINE FOR PANEL PP-1.
7. CONTRACTOR TO REMOVE PATHWAY IF ENOUNTERED.
LEGEND
1. SEE CD SHEETS FOR CIVIL DEMOLITION INFORMATION.
2. FULL TONE ELECTRICAL ITEMS ARE TO BE REMOVED UNLESS OTHERWISE
NOTED. (FULL TONE ITEMS WILL HAVE AN 'X' MARKED ON THE ELECTRICAL ITEM.)
3. HALF TONE ELECTRICAL ITEMS ARE TO BE PROTECTED IN PLACE UNLESS
OTHERWISE NOTED.
4. ALL LED TAXIWAY LIGHT FIXTURES WITH AN "X" OVER IT SHALL BE TURNED
OVER TO MCGUIRE AFB.
5. NOTE REMOVED.
6. ALL REMOVED PRIMARY UNDERGROUND DUCTBANK SHALL HAVE THE
CONDUCTORS REMOVED. IN THE PRESENCE OF THE COR OR HIS OR HER
REPRESENTATIVE, THE CONTRACTOR SHALL VERIFY THE EXISTING CONDITIONS
INCLUDING NUMBER, SIZE, AND LENGTH OF CONDUCTORS IN REMOVED
DUCTBANKS FOR PRIMARY UNGERGROUND CONDUCTORS SERVING BUILDING
TRANSFORMERS AS SHOWN IN THE PLANS. CONTRACTOR SHALL REPLACE SIZE
AND NUMBER OF CONDUCTORS IN NEW CONCRETE ENCASED UNDERGROUND
DUCTBANKS AS SHOWN IN THE ES500'S SERIES SHEETS. PRIMARY CABLES SHALL
NOT BE SPLICED.
SCALE: 1"=50'
ELECTRICAL DEMOLITION PLANA1
SCALE IN FEET
50 0 10050
E
E
E
REMOVAL MARKING. ANY ELECTRICAL ITEM WITH THIS MARKING SHALL BE
REMOVED ENTIRELY UNLESS OTHER NOTED IN THE DRAWINGS. NOTE IF LIGHT
BASE IS REMOVED, THEN THE CONDUIT AND CABLING SHALL BE REMOVED AS
WELL BETWEEN TWO LIGHT BASES INDICATED TO BE REMOVED.
EXISTING ELECTRICAL VAULT
EXISTING IN-PAVEMENT TAXIWAY EDGE LIGHT
SEE GENERAL NOTES 4 AND 5 ABOVE.
EXISTING CONDUIT TO BE PROTECTED IN PLACE
EXISTING CONDUIT TO BE REMOVED
EXISTING 10' POLE WITH SECURITY LIGHT FIXTURE TO BE REMOVED.
NORTH
1+
2+
3+
4+
5+
6+00
7+00
8+00
9+00
9+82.84
PC: 4+63.12
PT: 5+61.88
PO
E: 9+82.84
M
MSD
SD
SD
SD
SD
SD
SD
SD
SD
SD
M
SD
SD
CB
A
A
M
E
E
M
CO
CO
CO
CO
E
C
CB
CB
CB
CB
M T
M T
ME
W
W
CB
CB
CB
CB
C
COMM
COMM
COMM
COMM
E E
E
E E
E E
E E
E E
E E
E E
E
E
E
E E
E
E E
E E
E
E E
E E
E E
E E
E E
E
E E
E
E
E E E
E
E E
E E
E E
E
E
SD
E
E
E
E
CO
M
M
CO
M
M
CO
M
M
CO
M
M
C O
M M
E E
E E
E E
E
E E
E
E
E
E
E
E
E E
E E
E
E E
E E
E E
E E
E E
E E
E E
E E
E
E E
SD
SD
SD
MW
MWMWMW
MW
MW
MWMWMW
MW
MWMW
MW
MW
MW
MWMWMW
E E
E E
E E
E E
E
E
E
E
E
E
CO
CO
CO
CO
CO
W W W W W W W W W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
SD
SD
SD
SD
SD
LP
G
LP
G
LP
G
LP
G
LP
G
LP
G
LP
G
LP
G
LP
G
LP
G
LPG
LPG
LPGLPG
LPG
LPG
LPG
LPG
LPG
LPG
LP
G
LP
G
LP
G
LP
G
LP
G
LP
G
LP
G
LP
G
LP
G
LP
G
LP
G
LP
G
LP
G
LP
G
LPG
LPG
LPG
LPG
LPG
LPG
LPG
LP
G
LP
G
LP
G
LP
G
LP
G
LP
G
CB
MW
mw701-12052026
MW
mw702-12052026
MW
mw301-12052026
MW
mw601-12052026
MW
mw602-12052026
MW
mw201-12052026 ss-hlla1-o-12 ss-hlla2-o-12
ES
ES
ES
ES
ES
ES
ES
ES
ES
ES
ES
ES
ES
ES
ES
ES
ES
ES
ES
ES
ES
ES
ES
ES
ES
ES
ES
ES
ES
ES
ES
ES
ES
ES
ES
ES
ES
ES
ES
ES
ES
ES
ES
ES
HH
HH
LP1
LP3
LP4
LP2
E
ES
HH
P1
P2
P3
P4
ES
ES
ES
ES
ES
ES
ES
ESHH
ES
ES
ES
ES
ES
HH
ES
HH
HH
ES
ES
ES
ES
ES
ES
ES
ES
ES
ES
ES
ES
E
E
40.00'
101.76'
141.76'
101.76'
40.00'
78.40'
78.40'
38.51' (TYP.)
74.19'
74.19'
35.35' (TYP.)
.4
7'
.3
6'
.3
5'
.96
' (T
YP.)
.4
7'
N: 433,080.04 E: 464,871.84
N: 433,049.66 E: 465,054.90
N: 432,871.57 E: 465,447.03
N: 432,523.37 E: 465,025.28
N: 432,699.70 E: 465,390.81
N: 432,671.23 E: 465,475.28
N: 432,604.94 E: 465,358.87
N: 432,576.47 E: 465,443.34
R
2.
R167.50'
R
5.
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
SU
BM
IT
TE
D B
Y:
C H
EC
KE
D B
Y:
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
IS
SU
E D
AT
E:
SI
ZE
M
AR
K
D
ES
C R
IP
TI
O N
D
AT
E
SHEET ID
US Army Corps of Engineers
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
U .S
.A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
O M
AH
A
D
IS
TR
IC
T
C
AP
IT
O L
AV
EN
U E
O M
AH
A, N
EB
R
AS
KA
N
EW
Y O
R K
D
IS
TR
IC
T
F
ED
ER
AL
P
LA
ZA
N
EW
Y
O R
K, N
EW
Y
O R
K
+X
XX
XX
X-
XX
-X
-X
XX
X
M
AY
SP
EC
C O
D E:
FI
LE
N
AM
E:
AN
SI
D
W
2D S2
6B A0
JO
IN
T
BA
SE
M C
G U
IR
E-
D
IX
-L
AK
EH
U
R
ST
R
EP
AI
R
M C
G U
IR
E
AI
R
FI
EL
D H
AZ
AR
D O
U S
C
AR
G O
L O
AD
IN
G A
R
EA
PN
: P
TF
L1
AD
VE
R
TI
SE
M
EN
T
AM
G
EN
ER
AL
R
EV
IS
IO
J U
N
N J0
N J0
5_
ES
1.
dw g
B.
W
LA
SC
H
IN
K.
P
AV
LI
K
K.
P
AV
LI
K
W . D
AV
EN
PO
R
T
EL
EC
TR
IC
AL
S
IT
E
PL
AN
ES101
C :\d
9\
N J0
5_
ES
1.
dw g
6/
/2
:2 2:
A
M
AE
C _B
&W .S
TB
G
6E D
XK
P8
SHEET KEYNOTES
GENERAL SHEET NOTES
1. HIGH MAST LIGHT POLE TYPE #1, 55' POLE PER LIGHTING DESIGN. SEE SS501.
2. HIGH MAST LIGHT POLE TYPE #2, 70' POLE PER LIGHTING DESIGN. SEE SS501.
3. HIGH MAST LIGHT POLE TYPE #3, 60' POLE PER LIGHTING DESIGN. SEE SS501.
4. EXISTING TRANSFORMER TO SERVE HIGH MAST FLOOD LIGHTS. SEE ES507
FOR ADDITIONAL INFORMATION.
5. NEW STRUT-MOUNTED ELECTRICAL DISTRIBUTION PANELBOARD AS SHOWN
ON DETAILS ON ES507.
6. NEW GENERATOR WITH INTEGRAL DAY TANK. SEE ONE LINE DIAGRAM AND
OTHER INFORMATION ON ES507. BOLLARDS TO BE PROVIDED AS SHOWN ON THE
CIVIL DETAIL SHEETS. SEE SPECIFICATIONS FOR TANK REQUIREMENTS.
7. EXISTING PANEL PP-1, CONNECT NEW CABLING TO PANEL PP-1 FROM NEW
STRUT MOUNTED PANEL XDP1. ONE LINE SHOWN ON ES507.
8. 2SY CONDUIT. SEE ES503.
9. 1SY CONDUIT. SEE ES503.
10. 2S CONDUIT. SEE ES503.
11. MANHOLE IMMERSION HEATER SHALL BE INSTALLED WITHIN MANHOLE
NOTED. SEE CIVIL SHEETS FOR MORE INFORMATION.
12. DIRECTIONAL BORE UNDERNEATH EXISTING DRAIN TRENCH. SEE ES503.
13. 3SY CONDUIT. SEE ES503.
14. NEW NEMA 4 JUNCTION BOX MOUNTED NEAR ACCESS GATE FOR FUTURE
SECURITY SYSTEM.
15. PROVIDE (2) 2" DIRECT BURY, EMPTY CONDUITS FOR FUTURE SECURITY
SYSTEM.
16. NEW NEMA 4 JUNCTION BOXMOUNTED NEAR PANEL PP-1 FOR FUTURE
SECURITY SYSTEM.
LEGEND
1. AIRFIELD LIGHTING CABLING (L-824 TYPE C) SHALL BE #8 AWG SIZE FOR 6.6
AMP SERIES CIRCUITS AND #6 AWG SIZE FOR 20 AMP SERIES CIRCUITS.
2. NOTE REMOVED.
3. CONTRACTOR SHALL VERIFY EXISTING CONDITIONS.
4. SEE SHEETS ES506 FOR AIMING AND ORIENTATION INFORMATION FOR
EACH FIXTURE.
5. WHERE CONDUIT RUNS UNDERNEATH PAVEMENT, CONCRETE DUCT SHALL
BE PROVIDED.
SCALE: 1"=50'
ELECTRICAL SITE PLANA1
SCALE IN FEET
50 0 10050
ES
ELEVATED MEDIUM INTENSITY TAXIWAY EDGE LIGHT SHALL MEET
FAA AC 150/5345-46, TYPE L-861T. SEE NOTE 2 THIS SHEET.
IN-PAVEMENT MEDIUM INTENSITY TAXIWAY EDGE LIGHT SHALL
MEET FAA AC 150/5345-46, TYPE L-852T. SEE NOTE 2 THIS SHEET.
EXISTING CONDUIT TO BE PROTECTED IN PLACE.
NEW AIRFIELD LIGHTING CIRCUIT IN CONCRETE ENCASED
CONDUIT. 2S CONDUIT SEE DETAILS ON SHEET ES503. TICK MARKS
INDICATE NUMBER OF CABLES IN DUCTBANK. ONE CIRCUIT PER
CONDUIT ONLY.
NEW DIRECT BURIED CONDUIT FOR HIGH MAST LIGHT AND OTHER
ELECTRICAL CIRCUITS. SEE KEYED NOTES 8, 9, 10, AND 13, AND
DETAILS ON SHEET ES503.
NEW ELECTRICAL HANDHOLE. SEE DETAILS ON ES501.
HIGH MAST POLE LIGHTING. SEE DETAIL SHEETS ES502 AND ES507
FOR MORE INFORMATION.
OVERHEAD CATENARY LIGHTNING PROTECTION. SEE SHEET ES508
FOR DETAILS.
ELECTRICAL EQUIPMENT CONNECTION. SEE KEYED NOTES.
HH
LP# LP#
E
NORTH
P#
| Sheets and Views |
| NJ05_BB102 |
File details come from the government source that posted it. Updated .