FRAGORD 1 (RESCIND) OPORD 2023-25 (BIL Project Signage Requirements).pdf
PDF 204 KB Posted
- Solicitation number
- W912DS25B0003
About this file
This document is a Fragment Order (FRAGORD) 1 that rescinds a previous Operations Order (OPORD) 2023-25 related to Bipartisan Infrastructure Law (BIL) Project Signage Requirements. Issued by Headquarters USACE (US Army Corps of Engineers) in Washington, DC on 24 February 2025, the order immediately terminates all BIL signage activities, including sign installation and reporting. The order instructs all USACE Major Subordinate Commands (MSCs), Centers, Labs, Field Operating Activities (FOAs), and 249th Engineering Battalion to cease any actions related to pre-existing signage and await further guidance. The point of contact for these requirements is Mr. A.J. Jensen, the HQUSACE National Sign Program Manager, who can be reached at aj.jensen@usace.army.mil or 816-389-3840.
View the file
Other files
Show all 25
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
UNCLASSIFIED
HQUSACE
Washington, DC
24 1900Z FEB 2025
FRAGORD 1 (RESCIND) to OPORD 2023-25 (Bipartisan Infrastructure Law – Project Signage Requirements)
References:
a. OPORD 2025-47, USACE Orders Process, 21 NOV 24.
b. OPORD 2023-25, Bipartisan Infrastructure Law – Project Signage Requirements, 11
APR 2023. (RESCINDED)
c. Public Law 117-58, Infrastructure Investment and Jobs Act (IIJA), also known as Bipartisan Infrastructure Law (BIL).
d. ADD. Executive Order, Initial Rescissions of Harmful Executive Orders and Actions, 20 JAN 25.
e. ADD. Controller Alert 25-01, Recission of Prior Controller Alerts, 31 JAN 25.
Time Zone Used Throughout Order: Zulu (UTC).
1. SITUATION. CHANGE. OPORD 2023-25 (Bipartisan Infrastructure Law – Project Signage Requirements) is RESCINDED in totality.
2. MISSION. CHANGE. Effective Immediately. The enterprise is to cease all BIL Signage activities, including sign installation and reporting. At this time, no action should be taken on pre-existing signage until further guidance is provided.
3. EXECUTION.
4. SUSTAINMENT. Not Used.
5. COMMAND AND SIGNAL.
a. Command. HQUSACE.
b. Signal.
(1) The POC for these requirements is the HQUSACE National Sign Program Manager, Mr. A.J. Jensen at aj.jensen@usace.army.mil or 816-389-3840.
(2) Orders and all attachments will be available on the USACE SharePoint at:
https://usace.dps.mil/sites/USACE-HQ-COLLAB-ORDERS/SitePages/Published.aspx.
ACKNOWLEDGE: All MSCs, Centers, Labs, FOAs, and 249th EN BN will acknowledge receipt of this order at ce-uoc@usace.army.mil.
FOR THE COMMANDER:
mailto:aj.jensen@usace.army.mil https://usace.dps.mil/sites/USACE-HQ-COLLAB-ORDERS/SitePages/Published.aspx mailto:ce-uoc@usace.army.mil
FRAGORD 1 (RESCIND) to OPORD 2023-25 (Bipartisan Infrastructure Law – Project Signage Requirements)
UNCLASSIFIED
GRAHAM
LTG
OFFICIAL:
SCHMIDT
G3
Annexes: (CHANGE)
Annex A – (DELETED) Annex B – (DELETED) Annex C – (DELETED) Annex D – (DELETED) Annex E - CECW-I Memo, Request to Rescind OPORD 2023-25 (Bipartisan Infrastructure Law – Project Signage Requirements), 18 FEB 25. (ADD)
File details come from the government source that posted it. Updated .