Amendment 0009.pdf
PDF 1 MB Posted
- Attached to
- Radial Forge Infrastructure Project
- Solicitation number
- W912DS24R0009
About this file
This document is an Amendment to a Solicitation for a federal contract opportunity. The purpose of this amendment is to close discussions and request a revised final proposal from interested offerors for the Radial Forge Infrastructure project in Watervliet, New York. Revised proposals are due by May 13, 2024 at 2:00PM EST and must be submitted by email.
The contract includes several line items for the Radial Forge Infrastructure work, including the base infrastructure, demolition work, submission of as-built drawings, and development of final O&M manuals. Line items 0003 and 0004 are pre-priced by the government at $100,000 and $75,000 respectively and cannot be changed by offerors. The contract will be awarded based on the overall best value to the government considering both technical and price factors. Offerors must propose on all base contract line items, and any deviations or conditions may render an offer non-responsive. The contract is being administered by the US Army Corps of Engineers, New York District.
View the file
Other files
Show all 27
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is to close discussions and request a revised final proposal.
Revised proposals are due 13 May 2024 at 2:00PM EST. Submit by email to denisse.m.soto@usace.army.mil and nicholas.p.emanuel@usace.army.mil.
NOTE: Bidders must acknow ledge receipt of this amendment by the date specif ied in the solicitation (or as amended) by one of the follow ing methods: In the space provided on the SF1442, by separate letter, or by signing the block 15 below . FAILURE TO ACKNOWLEDGE AMENDMENTS BY THE DATE AND TIME SPECIFIED MAY RESULT IN REJECTION OF YOUR BID IN ACCORDANCE WITH THE LATE BID, LATE
MODIFICATIONS OF BIDS OR LATE WITHDRAWAL OF BIDS (FAR 14.304).
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
1. CONTRACT ID CODE PAGE OF PAGES
1 2
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912DS24R0009
X 9B. DATED (SEE ITEM 11)
14-Feb-2024
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO.
5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
06-May-2024
CODE
US ARMY CORPS OF ENGINEERS, NEW YORK
26 FEDERAL PLAZA, RM 16-300
NEW YORK NY 10278-0090
W912DS 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912DS24R0009
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
(End of Summary of Changes)
Section 00 10 00 - Solicitation
TOTALS/NOTES
TOTAL BASE BID PRICE FOR LINE ITEMS 0001- 0005 _________________________
NOTES:
1. Offerors are required to propose on all the Base Contract Line Items or their offer will be rejected.
2. Offerors are reminded that they must propose on the issued plans and specifications as amended. Any deviations, conditions or attachments made by the bidder himself, thereto, may render the offer non-responsive and be cause for its rejection.
3. The Basis of Evaluation will be the overal best value to the govnerment to include technial and price evaluation.
4. Line item 0003 is pre-priced at $100,000.00 and this price shown may not be changed.
This price is set by the government as assurance to receive final drawings, it may not reflect the actual effort of developing final set. The Offerors are to include balance of actual effort in CLIN 0001, whether credit or additional cost.
5. Line item 0004 is pre-priced at $75,000.00 and this price shown may not be changed.
This price is set by the government as assurance to receive final O&M manuals, it may not reflect the actual effort of developing the manuals. The Offerors are to include balance of actual effort in CLIN 0001, whether credit or additional cost.
6. The Proposal Acceptance Period is as stated on Standard Form 1442.
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 1 Job
Radial Forge Infrastructure – WVA, NY
FFP
All work (includes all equipment, labor, and material) for Radial Forge Infrastructure as described in the plans and specifications except for work included in items below.
FOB: Destination
PSC CD: Y1EZ
NET AMT
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0002 1 Job
Radial Forge Infrastructure – WVA, NY
FFP
All work (includes all equipment, labor, and material) for demolition as shown on Drawings CD101, A101, A103, PD114, PD115, MD113, MD114, MD115, ED101, ED102, ED103, ED104, ED105, ED114, ED115, ED601, except for work included in items below.
FOB: Destination
PSC CD: Y1EZ
NET AMT
0003 1 Job
PRE-PRICED CLIN
FFP
Radial Forge Infrastructure - WVA, NY: All work for submission and acceptance of the as-built drawings. This line item is pre-priced and cannot be changed.
FOB: Destination
PSC CD: Y1EZ
NET AMT
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0004 1 Job
PRE-PRICED CLIN
FFP
Radial Forge Infrastructure - WVA, NY: All work for acceptance of the final O&M Manuals. This line item is pre-priced and cannot be changed.
FOB: Destination
PSC CD: Y1EZ
NET AMT
$100,000.00
$75,000.00
INFORMATIONAL PURPOSES ONLY
FFP
Provide abatement and removal in accordance with drawings and specifications and Hazardous Material report included within the Division 02 for Radial Forge Infrastructure.
NET AMT
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0005AA 800 Square
Foot Asbestos Containing Material (ACM)
FFP
Asbestos Containing Material (ACM) removal of the 1st floor control room-gray floor tile and associated mastic (2nd layer). (Estimated Quantities) FOB: Destination
0005AB 200 Linear
Foot Asbestos Containing Material (ACM)
FFP
Asbestos Containing Material (ACM) removal of the 1st floor control room-window glazing. (Estimated Quantities) FOB: Destination
PSC CD: Y1EZ
NET AMT
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0005AC 450 Linear
Foot Asbestos Containing Material (ACM)
FFP
Asbestos Containing Material (ACM) removal of the 1st floor column #8 and Up at Deck- Pipe Riser Insulation. (Estimated Quantities) FOB: Destination
0005AD 1,600 Linear
Foot Asbestos Containing Material (ACM)
FFP
Asbestos Containing Material (ACM) removal of the 1st floor West Side (lower & upper) Wire Glass Base. (Estimated Quantities) FOB: Destination
PSC CD: Y1EZ
NET AMT
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0005AE 1 Each
Asbestos Containing Material (ACM)
FFP
Asbestos Containing Material (ACM) removal of the 1st floor- Sump Pit, Base #7, pipe fitting insulation.
FOB: Destination
PSC CD: Y1EZ
NET AMT
DELIVERY INFORMATION
CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /
CAGE
0001 N/A N/A N/A N/A
0002 N/A N/A N/A N/A
0003 N/A N/A N/A N/A
0004 N/A N/A N/A N/A
0005 N/A N/A N/A N/A
0005AA N/A N/A N/A N/A
0005AB N/A N/A N/A N/A
0005AC N/A N/A N/A N/A
0005AD N/A N/A N/A N/A
0005AE N/A N/A N/A N/A
File details come from the government source that posted it. Updated .