This document is an amendment to a solicitation for the Radial Forge Infrastructure project at Watervliet, NY, Solicitation #W912DS24R0009.

The amendment provides responses to various contractor requests for information (RFIs) related to the project. Key details include:

  • Clarification on overtime and off-shift work requirements, which may be needed to coordinate with the forge installation contractor. The government has confirmed the contractor must adjust work as necessary to not inhibit forge installation, per the specification requirements.
  • Confirmation that the required triple-winding transformers are available from multiple manufacturers/vendors.
  • Details on the sizes of various hazardous materials and lead-containing items that require abatement, such as metal tanks, window components, and wire glass.
  • Guidance on coordination with the government's overhead gantry cranes and existing equipment during the fire protection work.
  • Clarification on the electrical requirements for a new nitrogen generator.

The amendment does not make any revisions to the solicitation drawings or specifications. Bidders must acknowledge receipt of this amendment by the specified date to avoid potential rejection of their offer.

View the file

Other files

File Type Posted
Amendment 0009.pdf PDF
Amendment 0008 (3).pdf PDF
S-115_Amendment 06.pdf PDF
Amendment 0006.pdf PDF
Radial Forge Infrastructure Amendment 05 Attachment 1 RFI 35 Response.pdf PDF
Amendment 0005.pdf PDF
S-SU0312.pdf PDF
Amendment 0004_04MARCH2024 Site Visit Photos_.pdf PDF
Amendment 0004_Site Visit Sign In Sheet_04MAR2024.pdf PDF
Amendment 0004.pdf PDF
Amendment 0003- 01 45 35.pdf PDF
Amendment 0003- S501.pdf PDF
Amendment 0003- 01 45 35.pdf PDF
Amendment 0003.pdf PDF
Amendment 2-Site Visit Photos_22FEB2024.pdf PDF
Amendment 2-Site Visit Photos_22FEB2024.pdf PDF
Amendment 0002.pdf PDF
Amendment 2-Site Visit Photos_22FEB2024.pdf PDF
Amendment 2 - Site Visit Sign In Sheet_22FEB2024.pdf PDF
Amendment 0001.pdf PDF
WVA Radial Forge Infrastructure_BAA Waiver DF (Non-Availability)_REV1 (2).pdf PDF
JA - WVA B135 Radial Forge Infrastructure (Simplex) - 12 Jan 2024 final signed.pdf PDF
2024.01.16_Final RTA_WVA Forge Infrastructure.pdf PDF
Specs_FINAL RTA_Watervliet Arsenal Radial Forge Infrastructure_Jan2023 Vol.3 of 3.pdf PDF
Specs_FINAL RTA_Watervliet Arsenal Radial Forge Infrastructure_Jan2023 Vol.2 of 3.pdf PDF
Specs_FINAL RTA_Watervliet Arsenal Radial Forge Infrastructure_Jan2023 Vol.1 of 3.pdf PDF
W912DS24R0009.pdf PDF
Show all 27

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this amendment is to provide responses to contractor RFIs.

NOTE: Bidders must acknow ledge receipt of this amendment by the date specif ied in the solicitation (or as amended) by one of the follow ing methods: In the space provided on the SF1442, by separate letter, or by signing the block 15 below . FAILURE TO ACKNOWLEDGE AMENDMENTS BY THE DATE AND TIME SPECIFIED MAY RESULT IN REJECTION OF YOUR BID IN ACCORDANCE WITH THE LATE BID, LATE

MODIFICATIONS OF BIDS OR LATE WITHDRAWAL OF BIDS (FAR 14.304).

1. CONTRACT ID CODE PAGE OF PAGES

1 3

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 29-Mar-2024

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912DS24R0009

X 9B. DATED (SEE ITEM 11)

14-Feb-2024

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

29-Mar-2024

CODE

US ARMY CORPS OF ENGINEERS, NEW YORK

26 FEDERAL PLAZA, RM 16-300

NEW YORK NY 10278-0090

W912DS 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912DS24R0009

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)

The following have been added by full text:

AMENDMENT 0007

Radial Forge Infrastructure, Watervliet, NY Solicitation #: W912DS24R0009

AMENDMENT 007 of 007

TO BIDDERS:

The following changes shall be made to the drawings and specifications.

DRAWINGS: N/A

CHANGE TO DRAWINGS BUT NOT REISSUED: G-003 Note 5, G-004 Note 5, G-005 Note 5 , G-006 Note 5

SPECIFICATIONS: N/A

BIDDERS’ QUESTIONS AND GOVERNMENT REPLY:

Note: RFIs are in numerical order, see previous Amendments for any that are out of sequence.

RFIs: 28 (revised response), 109, 129-133, 138, 140, 150-152, 169, and 171

28. To further quantify the work covered under Note 5 of the General Phasing plan sheets G-003 through G-006, where it states “Contractor must coordinate daily all work for all phases with the forge installation contractor.

Contractor to adjust work as necessary to allow for forge installation. This may include but is not limited to overtime (at no additional cost to the Government) and/or off-shift work (at no additional cost to the Government) as necessary to maintain schedule. Please provide the schedule for manufacturing and the forge contractor for each of the phases of construction. If this information is unavailable, can the government please confirm how much work must be done in overtime or off-shifts? This is a fixed-cost contract and we would like to confirm we have the correct overtime included in our proposal.

Original Response in Amendment 5:

Please reference to RFI # 27 question and response for Overtime and off work hours. Note 5 to be amended in future to align with governing specification 01 14 00.

Revised Response to RFI 28 Rev.1 – no revised drawing to be issued at this time. Revision to Response RFI 28, Please reference to RFI # 27 question and response for Overtime and off work hours. Note 5 to be amended as follows: CHANGE NOTE 5 on G-003 thru G-006: Note 5: contractor must coordinate daily all work for all phases with the forge installation contractor. Contractor to adjust work as necessary to not inhibit forge installation. Please refer to 01 14 00 para 1.3.2 for further details.

109. Electrical: Transformers T1-3B1 & T2-3B1 are not available as specified. Our switchgear vendor has reached out to multiple reps, and all told him the triple winding is not an option. Does the WVA have a manufacturer for these transformers? Otherwise, these are not available. Please advise.

Response 109: DOR has confirmed availability from three (3) separate manufacturers/vendors that meet contract requirements.

W912DS24R0009

129. What are the sizes of the metal tanks mentioned in spec section 02 41 00, Table 3 page 6 of the Hazardous Materials Survey Report?

Response 129: The largest tank impacted by the scope of work is 500 gallons.

130. What is the size of the 1st-floor Control Room window (H-101 Keynote D) needing asbestos abatement?

Response 130: There are ten (10) windows that measure approximately 4-ft x 5-ft.

131. H-101 Keynote D4 says to remove and dispose of asbestos-containing wire glass base. Please clarify if this refers to wire glass or the base of the window.

Response 131: ACM to be removed is the base of the wire glass and all the structural contacts.

132. What is the size of the metal window panel located near interior column #5, per table 2 of the Paint chip Analytical results on page 5 of the Hazardous Materials Survey Report?

Response 132: ~25 sf per window

133. What is the size of the metal window frame in the 1st floor Control Room (right) to calculate lead abatement?

Response 133: 20 lf x ten (10) windows.

138. Are there vibratory concerns caused by demolition concerning the proximity of the forge?

Response 138: Refer to phasing plan and specs for coordination.

140. Are As-Builts available for demolition coordination?

Response 140: Not available at this time.

150. Please confirm that any work required by the Government to be performed off hours will be considered a change order to the contractor per specification 011400, paragraph 1.3.2.

Response 150: See response to Bidder Question 27.

151. Will overhead gantry cranes be in use during normal working hours (7:00 am-3:30 pm) in the areas where the fire protection overhead work is set to take place? If yes, will additional compensation be awarded to contractors impacted by any lost time caused by the overhead gantry crane use?

Response 151: See response to Bidder Question 101.

152. Is there existing equipment that we are prohibited from working over top of with an aerial lift? If yes, what equipment and where?

Response 152: Phasing plan and scheduled coordination will be required with COR. Refer to G-005.

169. The panel schedules on E-701 show panels 19 & 20, which appear to be existing panels. There are several new circuits being fed from these panels. Are the required breakers existing? If new breakers are required, the manufacturer nameplate information for each panel is needed to correctly price the new breakers. Additionally, is it correct to assume that only the bolded circuits are new?

Response 169: See response to bidder question 168.

171. The panel schedule for LP1 on E-701 shows a circuit for a nitrogen generator. However, there is not shown on the electrical floor plans. Please provide the location as well as what the electrical requirements are for this unit.

Response 171: The nitrogen generator is located in the control tower riser room. Provide 2#12w/#12G in 3/4" conduit.

Revision to Solicitation: N/A