This document is an amendment to a solicitation for construction services for a General Instruction Building at West Point in New York. The amendment provides responses to bidder questions to clarify requirements. Key details include revisions to drawings and specifications regarding landscaping, mechanical yard screening, sanitary systems, and telecommunications rooms. The amendment deletes requirements for automatic transfer switches, landscaping guarantees, and secure video conferencing equipment. It confirms the main telecommunications room will incorporate entrance facility requirements without a separate entrance facility. The soliciting agency is the Department of the Army Corps of Engineers Engineering District New York. The solicitation number is W912DS21R0005 and is for a General Instruction Building with project number 094363 and a current proposal due date of June 15, 2021.
View the file
Other files
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is to revise draw ings, respond to bidder inquires, and revise and delete sections in the specifications. NOTE:
Bidders must acknow ledge receipt of this amendment by date specif ied in the bid (or as amended) by one of the follow ing methods. In the space provided on the SF 1442, by separate letter, or by signing block 15 below . FAILURE TO ACKNOWLEDGE AMENDMENT BY DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR BID IN ACCORDANCE WITH THE LATE BID, LATE MODIFICATION OF BID, OR LATE
WITHDRAWAL OF BID (FAR 14.304)
1. CONTRACT ID CODE PAGE OF PAGES
J 1 6
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912DS21R0005
X 9B. DATED (SEE ITEM 11)
27-Apr-2021
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO.
5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
03-Jun-2021
CODE
US ARMY CORPS OF ENGINEERS, NEW YORK
26 FEDERAL PLAZA, RM 16-300
NEW YORK NY 10278-0090
W912DS 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
X 1
W912DS21R0005
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION 00 21 13 - INSTRUCTIONS TO BIDDERS
The following have been added by full text:
AMENDMENT 0004
The purpose of this amendment is to respond to bidder inquiries and to make the following changes to the solicitation.
DRAWINGS
1. The following DRAWINGS have been REVISED and REISSUED: None.
2. The following DRAWINGS have been ADDED: None.
3. The following DRAWINGS have been DELETED: None
4. The following DRAWINGS have been REVISED but NOT REISSUED:
RFP Part 6 Drawing C-03 Note #10 is added to read: "Sanitary and water shown for information only. Contractor to provide final design."
SPECIFICATIONS:
1. The following SPECIFICATION SECTIONS have been ADDED and are provided in their entirety herein: None
2. The following SPECIFICATIONS SECTIONS have been DELETED in their entirety:
RFP Part 3 Chapter 6 ESR D509002 Paragraph 1.2 'Automatic Transfer Switches' is deleted in its entirety.
3. The following SPECIFICATION SECTIONS have been REVISED (red strike/green add) and REISSUED: None.
4. The following SPECIFICATION SECTIONS have been REVISED but NOT REISSUED:
RFP Part 3 Chapter 6 ESR G103002 is revised to delete the following text: “from the borrow areas indicated or.”
RFP Part 3 Chapter 3 paragraph 3.1 is revised to replace this text, “Fescue sod blend,” with this text: “sod or seed consisting of 80% turf type tall fescue and 20% Kentucky blue grass.”
RFP Part 3 Chapter 3 paragraph 3.6 is revised to replace this text, “seeded with a Fescue blend,” with this text: “seeded or sodded.”
RFP Part 3 Chapter 6 ESR G2050 is revised to replace this text, “Fescue sod blend,” with this text: “sod or seed consisting of 80% turf type tall fescue and 20% Kentucky blue grass.”
RFP Part 3 Chapter 6 ESR G205004 is replaced in its entirety with this text: “Seed or sod areas indicated to be turfed in Part 6. Restore existing turf areas disturbed by Contractor operations that are to remain as turf areas. Restore by means of seeding or sodding and provide same guarantee and maintenance as for new landscape areas.”
RFP Part 3 Chapter 6 ESR G2050 is revised to delete the following text: “Guarantee landscaping for a period of one year. Provide a one year Establishment and Maintenance period. Landscaping Guarantee and Establishment and Maintenance periods must commence on the date that the inspection by the Contracting Officer shows that all landscaping under this contract has been satisfactorily installed. Provide complete landscaping maintenance, including but not limited to, routine lawn mowing, edging, pruning, pest inspection/treatment, re-mulching of mulch products, watering, weeding, fertilizing, and restaking, throughout the guarantee period.”
RFP Part 3 Chapter 6 ESR D503001 paragraph 1.6 is revised to replace the text, “government furnished, contractor installed,” with the text: “Government Furnished, Government Installed.”
RFP Part 3 Chapter 6 ESR D503001 paragraph 1.6 is revised to delete the following text: “and the OEMA Conference Room for secure video teleconferencing (VTC)” and “The Conference room will be provided with a hardened Protected Distribution System (PDS) outlet for the secure VTC connection. A hardened PDS wireway will be routed from the IPS safe to the SIPRNET outlet located in the conference room. Digital room door signage will be provided outside the Conference Room for SIPRNET activity.”
RFP Part 3 Chapter 6 ESR D50309001 is revised to delete the following text: “A SIPRNET outlet will be provided in one of the Conference Rooms to support Secure VTC. See SIPRNET paragraph above for requirements.”
Question 1: Paragraph 3.4.5 states that no storm water detention is required but paragraph 3.5 requires EISA 438 compliance, which may require storm water controls. Please clarify.
Government Response 1: RFP Part 3 Chapter 3 paragraph 3.4.5 is correct. No storm detention is REQUIRED, but the intent of EISA 438 should be met to the Maximum extent technically feasible. Based on the site design presented in RFP Part 6, West Point's stormwater manager waived detention of stormwater due to the non-permanent nature of project and relatively shallow rock in the area. Contractor shall prepare and coordinate with West Point's stormwater manager for a final determination during design development.
Question 2: RFP Part 3 Section G101002 requires tree removal to depth of 18 inches with backfill mound 2 inches above grade but G101003 requires stump removal to 3 feet below grade.
Please clarify.
Government Response 2: Both referenced requirements are correct in the RFP. To clarify:
The removal shall be to a depth of 3' below final/finished grade, 18" minimum below existing grade.
Question 3: RFP Part 3 Section G103002 states fill material may be acquired "from the borrow areas indicated" but no borrow areas are indicated in the documents. Please Clarify.
Government Response 3: No borrow area is available at West Point.
Question 4: Part 3 Chapter 6 ESR G2050 states grass to be a Fescue Sod blend but paragraph, G205004 requires seeding, 3.6 states grass areas to be seeded with 80% Fescue/20% Bluegrass.
Please Clarify.
Government Response 4: Both seed and sod will be acceptable alternatives. The grass specification shall be for an 80% turf type tall fescue and 20% Kentucky blue grass.
Question 5: RFP Part 3 Chapter 3 Paragraph 3.6 states the contractor is responsible for grass growth until 3" height or first mowing but Chapter 6 ESR G2050 requires 1 year guarantee which includes mowing, fertilizing, edging, watering. Please Clarify.
Government Response 5: Establishment is the contractor's responsibility until the first mowing or 3" of growth. The referenced one year landscaping maintenance is deleted.
Question 6: RFP Part 3 Chapter 6 ESR G2050 requires landscaped shrub/tree screening of mechanical yard and dumpster, drawing and other parts of the document require only fencing at mechanical yard and bollards at dumpster. Please Clarify.
Government Response 6: The contractor's design shall use shrub/tree screening as described in the RFP. Provide shrubs/trees in a configuration to preserve and enhance scenic views, screen unattractive features, and reduce negative visual impact. The placement of shrubs/trees shall consider antiterrorism and force protection standards. Additionally, provide fencing and bollards as indicated in the RFP.
Question 7: RFP Part 6 Drawing C-03 sanitary drain call out references note #10 but there is no note #10 on the drawing. Please Clarify.
Government Response 7: Note #10 is added to read: "Sanitary and water shown for information only. Contractor to provide final design."
Question 8: Please confirm there is no requirement to maintain current grade elevations within the site boundary.
Government Response 8: While there is no requirement to maintain current grade elevations, it is encouraged to minimize cut/fill activities. The site grading is limited to meeting and maintaining existing grades along the southern sidewalk, the western sidewalk, the baseball field and Cullum Road. Grading should not adversely affect these locations. Proposed grading slopes should be minimal. Existing lawn areas outside building footprint should remain or be close to existing grades. Existing to remain utility and lighting pedestals and manholes should not be adversely affected by grading.
Question 9: Part 3-D5030 states to design and install the facility in accordance with UFC 3-580- 01 and Part 3-D503001 states to provide a building entrance facility, however Part 3-D503001
1.4 and Part 6 supplemental drawings indicate to provide a Main TER. Please verify that a separate Entrance Facility will not be required for this project.
Government Response 9: As per Part 3 Chapter 6 ESR D503001 paragraph 1.4 Telecommunications Rooms/Spaces, a separate Entrance Facility is not required. The Main TER will incorporate the entrance facility requirements, and a separate Entrance Facility is not required. The Main TER just needs to be sized accordingly, so as to accommodate all the required equipment racks/cabinets, wall fields with the associated entrance equipment ( i.e., backboards, protector blocks, cross connects, etc) as is indicated in the RFP Documents.
Question 10: Part 3 Chapter 6 ESR D503001 paragraph 1.6 (second paragraph) states the SIPR (IPS) safe will be Government Furnished, Government Installed (GFGI). However this paragraph later states the SIPR safe will be Government Furnished, Contractor Installed. Please confirm the SIPR safe will be Government Furnished, Government Installed (GFGI).
Government Response 10: RFP Part 3 Chapter 6 ESR D503001 is revised to indicate that the SIPR (IPS) Safe will be Government Furnished, Government Installed.
Question 11: RFP Part 3 Chapter 6 ESR D503001 1.4 and Part 6 supplemental drawings indicate the separate racks for different networks. Please verify whether additional spare racks will be required per UFC 3-580-01.
Government Response 11: Additional spare equipment racks will not be required per UFC 3- 580-01. Equipment racks shall be provided to comply with the requirements indicated in the RFP documents, mainly in RFP Part 3 Chapter 6 ESR D503001 Paragraph 1.4 and the supplemental drawings in RFP Part 6, in regard to the different systems/networks, as well as to accommodate the required spare capacity of patch panel(s) to be provided as indicated in Part 3 Chapter 6 ESR D503001 paragraph 1.4.
Question 12: RFP Part 3, Chapter 6, ESR C3020 Floor Finishes. Two different portions of this section lists the floor material for specific areas, the Conceptual Floor Finish Schedule and Part D - Resilient Floor Finish Requirements. Which portion should be followed? If the Resilient Floor Finish Requirements should be followed, which resilient floor shall be used?
Government Response 12: For the base bid: The Contractor's designer will produce the final floor finishes schedule and may select floor finishes from any of the finishes described in Part 3, Chapter 6, ESR C3020. The conceptual floor finishes schedule in ESR C3020 is conceptual, not definitive.
If Option 1 CLIN 0006 is exercised: The Contractor's designer will produce the final floor finishes schedule and must provide carpet meeting the minimum carpet requirements of ESR C3020 in all interior spaces except those specifically excluded from receiving carpet by ESR C3020.
Question 13: Page 24, 1st paragraph of the RFP states 'Contractor Performance Assessment Reporting System (CPARS) shall be submitted for projects, when available.' Can the
Government please confirm that if we are submitting a CPARS for our past performance information, a Past Performance Questionnaire (PPQ) is NOT required.
Government Response 13: Confirmed. If the Offeror submits a CPARS rating for a past project, a PPQ is not required.
Question 14: Amendment 0001, SF 30, Section 14 states the current due date is Tuesday, June 15th. Due to the Memorial Day three-day weekend, would the Government consider an extension of three days to Friday, June 18th?
Government Response 14: The Government will not extend the proposal due date at this time.
Question 15: Attachment 6, Drawing EP-601, the primary fire pump feeder connection is tapped ahead of the main. The alternate feeder is not shown. Is an alternate feeder required by AHJ?
Government Response 15: An alternate feeder is not required for the fire pump. The power source is considered to be a reliable power source. RFP Part 3 Chapter 6 ESR D509002 Paragraph 1.2 'Automatic Transfer Switches' is deleted in its entirety.
Question 16: RFP Part 3 Chapter 6 ESR D509002 paragraph 1.2 Automatic Transfer Switches is stating that a 3-pole automatic transfer switch is required for the sanitary lift station. Where is the emergency feeder coming from for the transfer to emergency source?
Government Response 16: RFP Part 3 Chapter 6 ESR D509002 Paragraph 1.2 'Automatic Transfer Switches' is deleted in its entirety. The power for the sanitary lift station shall be as shown on conceptual Drawing EP-601 in RFP Part 6.
(End of Summary of Changes)