This justification and approval document supports the use of brand name components for a fire alarm and mass notification system in a construction project at West Point Military Academy. The project involves installing a Monaco fire alarm and mass notification system in the General Instruction Building, Thayer Swing. The Monaco system is required to ensure compatibility with existing systems used across West Point and enable emergency notifications to be sent efficiently to the entire base. A notice of intent to source this system received no responses. The Monaco components will be specified in a best value design-build solicitation for the construction project to be issued by the US Army Corps of Engineers, New York District under solicitation number W912DS21R0005. The total project cost is estimated at $5.75 million and the Monaco system cost is estimated at $311,000.
View the file
Other files
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Control No. 006
JUSTIFICATION REVIEW DOCUMENT FOR OTHER THAN FULL AND OPEN COMPETITION
CONTROL NO. 006
PROJECT/EQUIPMENT: General Instruction Building, Thayer Swing, West Point, NY/Fire Alarm System
AUTHORITY: 10 U.S.C. § 2304(c)(1) AMOUNT: $311,000.00
Prepared By:
NAME/TITLE: Kaitlin Lang, Technical Manager
TELEPHONE: 917-790-8293
DATE:
Contracting Officer
NAME/TITLE: Francis Cashman, Contracting Officer
TELEPHONE: 917-790-8173
Requirements
NAME/TITLE: Diana Trombly, Project Manager
TELEPHONE: 917-790-8249
SIGNATURES ARE REQUIRED BELOW
I have reviewed this J&A and find the justification adequate to support other than full and open competition.
District Small Business Specialist
NAME: Justin Helfman
TELEPHONE: 917-790-
SIGNATURE
Project Manager
NAME: Diana Trombly, Project Manager
TELEPHONE: 917-790-
Office of Counsel
NAME: Lorraine Lee
TELEPHONE: 917-790-8055
DCC/CCC Contracting Chief
NAME: Francis Cashman
TELEPHONE: 917-790-8173
JUSTIFICATION AND APPROVAL
REVIEW
FOR OTHER THAN FULL AND OPEN COMPETITION
FOR:
Monaco Fire Alarm and Mass Notification System
General Instruction Building, Thayer Swing, West Point, NY
5 April 2021
JUSTIFICATION AND APPROVAL
FOR OTHER THAN FULL AND OPEN COMPETITION
Monaco Fire Alarm and Mass Notification System
For General Instruction Building, Thayer Swing West Point, NY
Contract No. W912DS-21-R-0005
1. CONTRACTING ACTIVITY:
The U.S. Army Corps of Engineers (USACE), New York District (NAN), Contracting (CT), 26 Federal Plaza, New York, NY 10278.
2. DESCRIPTION OF ACTION:
This Justification and Approval (J&A) supports the use of brand name components in an upcoming construction project. The government will not purchase the components directly, but rather will require that offerors include the Monaco Fire Alarm and Mass Notification System as part of proposals submitted in response to a design-build solicitation that will lead to the award of a new firm-fixed-price (FFP) construction contract. USACE is responsible for the acquisition and administration of the construction of General Instruction Building, Thayer Swing, at West Point, NY, Contract No. W912DS-21-R-0005.
Funding for this acquisition will be unspecified minor military construction (10 U.S. Code § 2805), The FFP construction will be solicited and awarded as a best value trade-off procurement in accordance with FAR Part 15.
3. DESCRIPTION OF SUPPLIES/SERVICES:
The requirement is to provide the Monaco Fire Alarm and Mass Notification System in General Instruction Building, Thayer Swing, The Monaco Analog Addressable Panel (MAAP) Plus Analog Addressable Integrated Radio Transceiver and Fire Alarm Control Panel is capable of point reporting up to 1584 addressable device points via proprietary UHF radio signal to the Monaco D-21 Enhanced Central Radio Control Alarm receiving system at West Point Fire Department Dispatch. New Fire Alarm installations include Mass Notification Systems (MNS) in accordance with DoD Unified Facilities Criteria (UFC) 4-021-01. The existing radio frequency (RF) infrastructure provided by Monaco supports the UFC requirements for primary MNS communications. The Monaco Fire Alarm and integrated MNS system has the capability to remotely activate the in-building MNS messaging system and provide live-voice announcements directly from the D-21 Central Station at West Point Fire Dispatch.
Each Fire Alarm System (FAS) and Mass Notification System (MNS) shall be a complete, supervised, non-coded, analog-addressable system, installed in class A configuration per NFPA 72. The FAS/MNS shall provide point reporting to the Fire Alarm Control Panel (FACP). The FACP shall in turn provide point reporting to the Monaco D- 21 Central Receiving Station at United States Military Academy (USMA) West Point Fire Department Dispatch. Point reporting, also known as point to point reporting, is the capability to relay the status of each addressable device and certain system components such as Signaling Line Circuits (SLC) to the D-21 Central Receiving Station in real time. The FAS/MNS shall be tested and perform as a critical life-safety system. The FAS/MNS shall be compatible with and shall communicate seamlessly with the D-21 Central Receiving Station, without impairing operational function or reliability of any existing FAS or MNS. Use of interfacing relays between the FACP and
Yassin, Lisa M CIV USARMY CENAN (USA) Ensure the solicitation number and project title is included in this para
Lang, Kaitlin T NAN Done!
Yassin, Lisa M CIV USARMY CENAN (USA) Spell out
Lang, Kaitlin T NAN Corrected!
Yassin, Lisa M CIV USARMY CENAN (USA) Spell out
Lang, Kaitlin T NAN Corrected!
communications transceiver to provide point or zonal alarm trouble status shall not be permitted. The estimated total cost for the construction portion of this project is $5,750,000.00. The estimated cost of the requested brand-name requirement for the Monaco Fire Alarm and Mass Notification System in General Instruction Building, Thayer Swing, is estimated at $311,000. The period of performance for the entire project is 548 calendar days.
4. AUTHORITY CITED:
10 U.S.C. § 2304(c)(1), Only One Responsible Source and No Other Supplies or Services Will Satisfy Agency Requirements, as implemented by FAR 6.302-1(c), Application for Brand Name Descriptions. In accordance with FAR 6.302-1(c), the Contracting Officer will specify that all offerors be required to procure an item peculiar to one supplier (brand-name item).
5. REASON FOR AUTHORITY CITED:
A. Background:
Due to post wide compatibility issues and based on the capabilities described below of a Monaco Fire Alarm system, all new construction and renovation projects at the United States Military Academy (USMA), West Point are now featuring the latest version of the Monaco Fire Alarm Control Panel. The MAAP Plus Analog Addressable Integrated Radio Transceiver and Fire Alarm Control Panel is capable of point reporting up to 1584 addressable device points via proprietary UHF radio signal to the Monaco D-21 Enhanced Central Radio Control Alarm receiving system at West Point Fire Department Dispatch. New Fire Alarm installations include Mass Notification Systems (MNS) in accordance with DoD Unified Facilities Criteria (UFC) 4- 021-01. The existing RF infrastructure provided by Monaco supports the UFC requirements for primary MNS communications. The Monaco Fire Alarm and integrated MNS system has the capability to remotely activate the inbuilding MNS messaging system and provide live-voice announcements directly from the D-21 Central Station at West Point Fire Dispatch.
B. Justification:
To satisfy UFC 4-021-01 requirement of a Mass Notification System, a seamlessly compatible system must be installed in General Instruction Building, Thayer Swing, West Point NY. United States Military Academy (USMA) Fire Department needs to send out mass notification to the entire base in an efficient manner during emergencies. The Monaco Fire Alarm System is used throughout United States Military Academy (USMA), West Point. Due to compatibility issues with other systems, it will not be possible to guarantee delivery of emergency messages to all persons located in General Instruction Building, Thayer Swing, if any other system is installed. For items as important to life, health, and safety as the Fire Alarm and Mass Notification Systems there is no room for error when these products are called upon to be operational. If the Monaco transceiver is not installed in this facility, the fire station will be unable to receive an alarm or trouble signal due to the activation of a detector or pull station. This would delay the response time of the fire department, which could result in extensive damage to the facility and/or personnel.
C. Alternatives:
No viable alternatives will be acceptable to meet the mission requirements of an integrated Mass Notification System due to compatibility issues of the Monaco Fire Alarm System with equipment from other manufacturers, any fire alarm system other than a Monaco Fire Alarm System will not be able to guarantee operational effectiveness of the Mass Notification System to General Instruction Building, Thayer Swing, during an emergency.
The only alternative action to ensure compatibility of a different manufacturer’s Fire Alarm and Mass Notification Systems with the systems used throughout United States Military Academy (USMA), West Point would be to remove and replace the Fire Alarm and Mass Notification Systems in every building in United States Military Academy (USMA), West Point with the same system used in General Instruction Building, Thayer Swing, West Point NY. This would be a very cost prohibitive effort.
D. Impact:
If the J&A is not approved and a different Fire Alarm System is installed in in General Instruction Building, Thayer Swing, the fire alarm system would fail the mission requirement to provide an integrated fire alarm system with a mass notification system. During an emergency situation this could lead to confusion, injury, and even loss of life that could have been avoided if in General Instruction Building, Thayer Swing, were integrated into the Monaco Fire Alarm System that is used in other new fire alarm installations at United States Military Academy (USMA), West Point.
6. EFFORTS TO OBTAIN COMPETITION:
The brand name product has been published as required by FAR 5.201, a Notice of Intent (NOI) to determine sources for this system was synopsized on 16 December 2020. No responses were received for the Notice of Intent. The brand name justification and approval will be posted with the solicitation. As stated in paragraph 5 above, Monaco Fire Alarm and Mass Notification System is the only brand available to ensure compatibility within the West Point existing system.
Monaco Fire Alarm and Mass Notification System is available on the open market for purchase and installation by all offerors.
7. ACTIONS TO INCREASE COMPETITION:
This J&A supports a discrete requirement that will end when the project is complete. Therefore, there are no planned actions to increase competition for the requirement covered by this J&A.
8. MARKET RESEARCH:
A Notice of Intent (NOI) to determine sources for this system was synopsized on 16 December 2020. The NOI was published for the required 15 days in betaSAM. There were no responses to the NOI. Additional research was not done besides the NOI.
9. INTERESTED SOURCES:
There were no responses to the NOI posting. The solicitation will be synopsized in accordance with FAR 5.201 and responses will be evaluated per FAR Part 15.
10. OTHER FACTS:
All pertinent facts are included above.
Yassin, Lisa M CIV USARMY CENAN (USA) Ensure the evidence of the posting is uploaded in PCF
11. TECHNICAL CERTIFICATION:
“I certify that the supporting data under my cognizance which are included in the justification and approval are accurate and complete to the best of my knowledge.”
Name: Kaitlin Lang Date:
Title: Technical Manager
12. REQUIREMENTS CERTIFICATION:
“I certify that the supporting data under my cognizance which are included in the justification and approval are accurate and complete to the best of my knowledge.”
Name: Diana Trombly Date:
Title: Military Programs Branch Project Manager
13. FAIR AND REASONABLE COST DETERMINATION:
“I hereby determine that the anticipated cost or price to the Government for this contract action will be fair and reasonable. This determination is based on the Independent Government Cost Estimate, the items being procured, and historical data.”
Name: Francis Cashman Date:
Title: Contracting Officer
14. CONTRACTING OFFICER CERTIFICATION:
“I certify that this J&A is accurate and complete to the best of my knowledge and belief.”
Name: Francis Cashman Date:
Title: Contracting Officer
APPROVAL
Based on the foregoing justification, I hereby approve the brand name requirement for Monaco Fire Alarm and Mass Notification System, estimated at $311,000.00 in support of the in General Instruction Building, Thayer Swing, Project as authorized by 10 U.S.C. § 2304(c)(1), Only One Responsible Source and No Other Supplies or Services Will Satisfy Agency Requirements, and as implemented by FAR 6.302-1(c), Application for Brand Name Descriptions, subject to availability of funds and provided that the product herein described has otherwise been authorized for this acquisition.
Date: Signature:
Francis Cashman Contracting Officer
| JUSTIFICATION AND APPROVAL |
| REVIEW |
| Monaco Fire Alarm and Mass Notification System |
| West Point, NY |
| 5 April 2021 |
| JUSTIFICATION AND APPROVAL |
| Monaco Fire Alarm and Mass Notification System |
| 2. DESCRIPTION OF ACTION: |
| 3. DESCRIPTION OF SUPPLIES/SERVICES: |
| 4. AUTHORITY CITED: |
| 5. REASON FOR AUTHORITY CITED: |
| 6. EFFORTS TO OBTAIN COMPETITION: |
| 7. ACTIONS TO INCREASE COMPETITION: |
| 8. MARKET RESEARCH: |
| 9. INTERESTED SOURCES: |
| 10. OTHER FACTS: |
| 12. REQUIREMENTS CERTIFICATION: |
| 13. Fair and Reasonable Cost Determination: |
| APPROVAL |
| 2021-04-07T16:28:33-0400 | |
| HEBEL.BARBARA.N.1228746874 |
| 2021-04-08T08:24:59-0400 | |
| LANG.KAITLIN.THERESE.1513252591 |
| 2021-04-08T08:25:54-0400 | |
| LANG.KAITLIN.THERESE.1513252591 |
| 2021-04-08T11:58:46-0400 | |
| TROMBLY.DIANA.LORI.1395191485 |
| 2021-04-08T11:59:26-0400 | |
| TROMBLY.DIANA.LORI.1395191485 |
| 2021-04-08T12:00:10-0400 | |
| TROMBLY.DIANA.LORI.1395191485 |
| 2021-04-09T13:58:09-0400 | |
| HELFMAN.JUSTIN.1368284110 |
| 2021-04-12T07:48:08-0400 | |
| CASHMAN.FRANCIS.1386668368 |
| 2021-04-12T07:49:15-0400 | |
| CASHMAN.FRANCIS.1386668368 |
File details come from the government source that posted it. Updated .