About this file

This modification amends a solicitation for the Fire Island Inlet to Montauk Point project in Suffolk County, New York. The U.S. Army Corps of Engineers Engineering District New York seeks to award a contract by July 2021 for construction services to repair and maintain the shoreline. Daily liquidated damages of $7,241 apply if the project is not substantially complete by the specified schedule, increasing to $1,855 for each subsequent day until punch list items are resolved. The modification provides answers to bidders' questions for clarification, including confirmation that liquidated damages accrue throughout the environmental window period from March to May.

View the file

Other files

File Type Posted
Bid Abstract W912DS21B0014.xlsx XLSX spreadsheet
W912DS21B0014Amendment0008.pdf PDF
08162021W912DS21B00140007.pdf PDF
08112021W912DS21B00140006.pdf PDF
W912DS21B00140006.pdf PDF
08092021W912DS21B00140005.pdf PDF
31 24 00.00 18.pdf PDF
Attachment 2 - Overlook Beach Option.pdf PDF
03082021W912DS21B00130003.pdf PDF
01 56 10.00 18.pdf PDF
01 57 19.pdf PDF
Overlook Beach Existing Topo (Rev 1-17-19).txt TXT text file
30072021C112 Pages from FIMP_CT1 C100 SHEETS.pdf PDF
5011-FIMP_Robert-Moses.txt TXT text file
5011-Gilgo_Beach-Sort.txt TXT text file
3007202101 11 35_FIMP_20210728.pdf PDF
300720212018 Fire Island Inlet Obstruction Encounters.pdf PDF
30072021Draft USACE annual NOx calculator FIMP2 (27 Jul 21).xlsx XLSX spreadsheet
5011_FI_EBB-SHOAL_CPF-1-2.txt TXT text file
30072021W912DS21B00140002.pdf PDF
3007202101 22 00.00 10.pdf PDF
Tobay Beach - GBA - Topo and Hydro.xyz.xlsx XLSX spreadsheet
01 11 35_FIMP_AMEND_1.pdf PDF
20072021W912DS21B0014.pdf PDF
01 22 00.00 10.pdf PDF
Sheet_06 - Tobay Beach Plan.pdf PDF
Attachment 2 - Overlook Beach Option Sheets.pdf PDF
20210621_FIMP ct1_100PCT.pdf PDF
attachment 1 Tobay Beach Fill Area - Reduced File Size (1).pdf PDF
W912DS21B001407012021.pdf PDF
FIMP CT1 SPECS_100PCNT_20210630.pdf PDF
Show all 31

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this amendment is to answer RFI's. Offeror must acknowledge receipt of this amendment by the date specified in the proposal (or as amended) by one of the follow in methods: in the space provided on SF1442, by separate letter, or by signing block 15 below FAILURE TO ACKNOWLEDGE AMENDMENTS BY THE DATE AND TIME SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER IN ACCORDANCE WITH THE SUBMISSION, MODIFICATION, REVISION, AND WITHDRAWAL OF PROPOSALS (FAR 15.208).

1. CONTRACT ID CODE PAGE OF PAGES

1 2

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912DS21B0014

X 9B. DATED (SEE ITEM 11)

01-Jul-2021

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO.

5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

06-Aug-2021

CODE

US ARMY CORPS OF ENGINEERS, NEW YORK

26 FEDERAL PLAZA, RM 16-300

NEW YORK NY 10278-0090

W912DS 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912DS21B0014

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

The following items are applicable to this modification:

CHANGES

Questions and Answers:

The following questions and answers are provided for information only. Nothing contained below amends or revises any provision of the solicitation.

This is for bidder’s reference only and is not to be considered as a part of the Contract Documents.

Contract award will be based on what is contained in the printed Plans and Specifications in a hard copy format or Electronic Bid Set if provided and as posted in the sam.gov.

RFI SET #7:

Question 1. In response to Amendment 3, Question 4, please confirm that the $7,241 for first tier is a lump sum LD and the $1,855 is each calendar day.

Response: $7,241 for first tier is per each calendar day, not lump sum, if contract is not substantially complete by schedule. Second tier of $1,855 per each calendar day after contract is substantially complete and punch list items are pending and not complete by schedule.

Question 2. In response to Amendment 3, Question 4, do the calendar day LDs incur during March 17th to March 31st and will they be incurred throughout the environmental window?

Response: Yes, LD’s are to be executed if contract is not delivered by the schedule date.

File details come from the government source that posted it. Updated .