Sheet_06 - Tobay Beach Plan.pdf

PDF 4 MB Posted

Attached to
Fire Island Inlet to Montauk Point, Suffolk County, NY, Contract 1 Project : Fire Island Inlet
Solicitation number
W912DS21B0014
Issued by

About this file

This document contains plans for a beach nourishment project in Tobay Beach, New York. The project will re-nourish Tobay Beach by building a berm at an elevation of 8.4 feet NAVD 88 along approximately 10,790 feet of shoreline. Sand will be dredged from Fire Island Inlet by the U.S. Army Corps of Engineers and transported to replenish three areas of Tobay Beach totaling approximately 473,000 cubic yards. The Town of Oyster Bay is the project sponsor. Construction is to commence upon availability of funding and placement of sand will work from east to west within the specified fill areas. The U.S. Army Corps of Engineers District New York will oversee the project.

The related federal contract opportunity is a solicitation issued by the U.S. Army Corps of Engineers District New York for the Fire Island Inlet to Montauk Point project. Contract 1 involves work at Fire Island Inlet and includes the beach nourishment plans described above. Interested parties are directed to review the attached solicitation and specifications for additional requirement details.

View the file

Other files

File Type Posted
Bid Abstract W912DS21B0014.xlsx XLSX spreadsheet
W912DS21B0014Amendment0008.pdf PDF
08162021W912DS21B00140007.pdf PDF
08112021W912DS21B00140006.pdf PDF
W912DS21B00140006.pdf PDF
08092021W912DS21B00140005.pdf PDF
W912DS21B00140004.pdf PDF
31 24 00.00 18.pdf PDF
Attachment 2 - Overlook Beach Option.pdf PDF
03082021W912DS21B00130003.pdf PDF
01 56 10.00 18.pdf PDF
01 57 19.pdf PDF
Overlook Beach Existing Topo (Rev 1-17-19).txt TXT text file
30072021C112 Pages from FIMP_CT1 C100 SHEETS.pdf PDF
5011-FIMP_Robert-Moses.txt TXT text file
5011-Gilgo_Beach-Sort.txt TXT text file
3007202101 11 35_FIMP_20210728.pdf PDF
300720212018 Fire Island Inlet Obstruction Encounters.pdf PDF
30072021Draft USACE annual NOx calculator FIMP2 (27 Jul 21).xlsx XLSX spreadsheet
5011_FI_EBB-SHOAL_CPF-1-2.txt TXT text file
30072021W912DS21B00140002.pdf PDF
3007202101 22 00.00 10.pdf PDF
Tobay Beach - GBA - Topo and Hydro.xyz.xlsx XLSX spreadsheet
01 11 35_FIMP_AMEND_1.pdf PDF
20072021W912DS21B0014.pdf PDF
01 22 00.00 10.pdf PDF
Attachment 2 - Overlook Beach Option Sheets.pdf PDF
20210621_FIMP ct1_100PCT.pdf PDF
attachment 1 Tobay Beach Fill Area - Reduced File Size (1).pdf PDF
W912DS21B001407012021.pdf PDF
FIMP CT1 SPECS_100PCNT_20210630.pdf PDF
Show all 31

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

WALL

WALL

OCEAN PKWY

OCEAN PKWY

OCEAN PKWY

OCEAN PKWY

OCEAN PKWY

OCEAN PKWY

OCEAN PKWY

OCEAN PKWY

OCEAN PKWY

OCEAN PKWY

OCEAN PKWY

OCEAN PKWY

OCEAN PKWY

OCEAN PKWY

OCEAN PKWY

OCEAN PKWY

OCEAN PKWY

OCEAN PKWY

OCEAN PKWY

OCEAN PKWY

OCEAN PKWY

OCEAN PKWY

OCEAN PKWY

OCEAN PKWY

OCEAN PKWY

OCEAN PKWY

OCEAN PKWY

OCEAN PKWY

OCEAN PKWY

OCEAN PKWY

OCEAN PKWY

OCEAN PKWY

WALL

WALL

WALL

WALL

WALL

WALL

WALL

WALL

PIPE

PIPE

P

IP

E

P

IP

E

WALL

WALL

10+00 15+00 20+00 25+005+000+00 30+00 35+00 40+00 45+00 50+00 55+00 60+00 65+00 70+00 75+00 80+00 90+00 95+00 100+00 105+00 110+00 115+00 120+00

OFFSET=0

TB1

85+00

TB2

06/01/2021

6238Job:

Scale:

Date:

PREPARED BY

FIRE ISLAND INLET DREDGING

BEACH FILL FROM

TOWN OF OYSTER BAY

TOBAY BEACH, MASSAPEQUA, NY

6516.513.1313

1400 Old Country Road • Westbury • NY • 11590 de Bruin Engineering, P.C.

de Bruin Civil Engineering & Construction Management

SHEET NO. OF 42

TOBAY BEACH PLAN

SEC 67 BLK 002 LOT 3

J O

N E

S B

E A

C H S

T A

T E P

A R

K T

O B

A Y B

E A

C H

OCEAN PARKWAY

10,790'

N

1" = 1,250'

T O

W N O

F O

Y S

T E

R B

A Y

T O

W N O

F B

A B

Y L

O N

PAVILION

BEACH(VARIES ANNUALLY)

BIRD NESTING AREA

BERM - EL 8.4

MHW - EL 2.0

PROPOSEDEX. MHW - EL 2.0 NAVD 88 FILL AREA

AVAILABLE BUDGET.

AMOUNT PLACED IN ONE EVENT WILL BE BASED ON

PLACED WORKING FROM EAST TO WEST. TOTAL

UP TO 263,000 +/- CUBIC YARDS OF SAND WILL BE

TRANSPORT OF SAND ALONG THE BARRIER ISLANDS.

OF THE FIMI PROJECT TO RESTORE LONGSHORE

ISLAND INLET THAT IS PERFORMED BY USACE AS PART

SOURCE OF SAND WILL BE DREDGING FROM FIRE

ELEVATION 8.4 NAVD 88 (9.5 NGVD 1929).

RE-NOURISH TOBAY BEACH BY BUILDING BERM AT

SCOPE OF WORK:

LEGEND

BEACH FILL AREA

AREA 1 - 53,000 CY +/-AREA 2 - 86,000 CY +/-AREA 3 - 124,000 CY +/-

EX. MLW - EL -2.6 NAVD 88 EX. SHW - EL 2.5 NAVD 88

LIMIT OF FILL AREA

BERM CREST

PROPOSED MEAN HIGH WATER (MHW) - EL 2.0

EX. SPRING HIGH WATER (SHW) - EL 2.5

EX. MEAN HIGH WATER (MHW) - EL 2.0

EX. MEAN LOW WATER (MLW) - EL -2.6

EX. FENCE

TOBAY BEACH REFERENCE LINE

PI STATION NORTHING EASTING DISTANCE DIRECTION

0+00.00 159,088.88 1,133,234.30

12,000' N73°40'3.20"E

120+00.00 162,463.40 1,144,750.05

POINT

TB1

TB2

TOBAY BEACH REFERENCE LINE

File details come from the government source that posted it. Updated .