This document contains plans for a beach nourishment project in Tobay Beach, New York. The project will re-nourish Tobay Beach by building a berm at an elevation of 8.4 feet NAVD 88 along approximately 10,790 feet of shoreline. Sand will be dredged from Fire Island Inlet by the U.S. Army Corps of Engineers and transported to replenish three areas of Tobay Beach totaling approximately 473,000 cubic yards. The Town of Oyster Bay is the project sponsor. Construction is to commence upon availability of funding and placement of sand will work from east to west within the specified fill areas. The U.S. Army Corps of Engineers District New York will oversee the project.
The related federal contract opportunity is a solicitation issued by the U.S. Army Corps of Engineers District New York for the Fire Island Inlet to Montauk Point project. Contract 1 involves work at Fire Island Inlet and includes the beach nourishment plans described above. Interested parties are directed to review the attached solicitation and specifications for additional requirement details.
View the file
Other files
Show all 31
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
WALL
WALL
OCEAN PKWY
OCEAN PKWY
OCEAN PKWY
OCEAN PKWY
OCEAN PKWY
OCEAN PKWY
OCEAN PKWY
OCEAN PKWY
OCEAN PKWY
OCEAN PKWY
OCEAN PKWY
OCEAN PKWY
OCEAN PKWY
OCEAN PKWY
OCEAN PKWY
OCEAN PKWY
OCEAN PKWY
OCEAN PKWY
OCEAN PKWY
OCEAN PKWY
OCEAN PKWY
OCEAN PKWY
OCEAN PKWY
OCEAN PKWY
OCEAN PKWY
OCEAN PKWY
OCEAN PKWY
OCEAN PKWY
OCEAN PKWY
OCEAN PKWY
OCEAN PKWY
OCEAN PKWY
WALL
WALL
WALL
WALL
WALL
WALL
WALL
WALL
PIPE
PIPE
P
IP
E
P
IP
E
WALL
WALL
10+00 15+00 20+00 25+005+000+00 30+00 35+00 40+00 45+00 50+00 55+00 60+00 65+00 70+00 75+00 80+00 90+00 95+00 100+00 105+00 110+00 115+00 120+00
OFFSET=0
TB1
85+00
TB2
06/01/2021
6238Job:
Scale:
Date:
PREPARED BY
FIRE ISLAND INLET DREDGING
BEACH FILL FROM
TOWN OF OYSTER BAY
TOBAY BEACH, MASSAPEQUA, NY
6516.513.1313
1400 Old Country Road • Westbury • NY • 11590 de Bruin Engineering, P.C.
de Bruin Civil Engineering & Construction Management
SHEET NO. OF 42
TOBAY BEACH PLAN
SEC 67 BLK 002 LOT 3
J O
N E
S B
E A
C H S
T A
T E P
A R
K T
O B
A Y B
E A
C H
OCEAN PARKWAY
10,790'
N
1" = 1,250'
T O
W N O
F O
Y S
T E
R B
A Y
T O
W N O
F B
A B
Y L
O N
PAVILION
BEACH(VARIES ANNUALLY)
BIRD NESTING AREA
BERM - EL 8.4
MHW - EL 2.0
PROPOSEDEX. MHW - EL 2.0 NAVD 88 FILL AREA
AVAILABLE BUDGET.
AMOUNT PLACED IN ONE EVENT WILL BE BASED ON
PLACED WORKING FROM EAST TO WEST. TOTAL
UP TO 263,000 +/- CUBIC YARDS OF SAND WILL BE
TRANSPORT OF SAND ALONG THE BARRIER ISLANDS.
OF THE FIMI PROJECT TO RESTORE LONGSHORE
ISLAND INLET THAT IS PERFORMED BY USACE AS PART
SOURCE OF SAND WILL BE DREDGING FROM FIRE
ELEVATION 8.4 NAVD 88 (9.5 NGVD 1929).
RE-NOURISH TOBAY BEACH BY BUILDING BERM AT
SCOPE OF WORK:
LEGEND
BEACH FILL AREA
AREA 1 - 53,000 CY +/-AREA 2 - 86,000 CY +/-AREA 3 - 124,000 CY +/-
EX. MLW - EL -2.6 NAVD 88 EX. SHW - EL 2.5 NAVD 88
LIMIT OF FILL AREA
BERM CREST
PROPOSED MEAN HIGH WATER (MHW) - EL 2.0
EX. SPRING HIGH WATER (SHW) - EL 2.5
EX. MEAN HIGH WATER (MHW) - EL 2.0
EX. MEAN LOW WATER (MLW) - EL -2.6
EX. FENCE
TOBAY BEACH REFERENCE LINE
PI STATION NORTHING EASTING DISTANCE DIRECTION
0+00.00 159,088.88 1,133,234.30
12,000' N73°40'3.20"E
120+00.00 162,463.40 1,144,750.05
POINT
TB1
TB2
TOBAY BEACH REFERENCE LINE