20072021W912DS21B0014.pdf
PDF 1021 KB Posted
- Attached to
- Fire Island Inlet to Montauk Point, Suffolk County, NY, Contract 1 Project : Fire Island Inlet
- Solicitation number
- W912DS21B0014
About this file
This document is an amendment to a solicitation for beach nourishment and dredging services. The services include dredging and placement of beachfill material along shorelines in Fire Island Inlet to Montauk Point, New York. The amendment adds an optional line item for NOx offset allowances, answers bidder questions, and revises plans and specifications. Bidders must acknowledge the amendment by the date specified in the solicitation. The Army Corps of Engineers is the contracting agency. The amendment establishes a delivery schedule for the optional NOx allowances, should that line item be exercised. It also provides revised specifications and drawings, as well as questions and answers from bidders, for informational purposes only.
View the file
Other files
Show all 31
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is to add CLIN 0014, answ er RFI's, and revise and reissue plans and specifications. Offeror must acknow ledge receipt of this amendment by the date specified in the proposal (or as amended) by one of the follow in methods: in the space provided on SF1442, by separate letter, or by signing block 15 below . FAILURE TO ACKNOWLEDGE AMENDMENTS BY THE DATE AND TIME SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER IN ACCORDANCE WITH THE SUBMISSION, MODIFICATION, REVISION, AND
WITHDRAWAL OF PROPOSALS (FAR 15.208).
1. CONTRACT ID CODE PAGE OF PAGES
1 13
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912DS21B0014
X 9B. DATED (SEE ITEM 11)
01-Jul-2021
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO.
5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
20-Jul-2021
CODE
US ARMY CORPS OF ENGINEERS, NEW YORK
26 FEDERAL PLAZA, RM 16-300
NEW YORK NY 10278-0090
W912DS 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
SUMMARY OF CHANGES
SECTION SF 30 BLOCK 14 CONTINUATION PAGE W912DS21B0014
W912DS21B0014 Page 3 of 13
W912DS21B0014 Page 4 of 13
W912DS21B0014 Page 5 of 13
W912DS21B0014 Page 6 of 13
W912DS21B0014 Page 7 of 13
W912DS21B0014 Page 8 of 13
W912DS21B0014
CLIN 0014 is added as follows:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0014 48 Short Ton OPTION Option 6 – NOx offset allowances
FFP
Option 6 – NOx offset allowances under the Cross-State Air Pollution Rule (CSAPR) Group 3 FOB: Destination
PSC CD: Y1KZ
NET AMT
The following have been modified:
TOTALS/NOTES
TOTALS:
TOTAL BASE (ITEMS 0001 thru 0008) ________________________________________________
TOTAL OPTIONS (ITEMS 0009 thru 0014) _____________________________________________
TOTAL BASE + OPTIONS (ITEMS 0001 thru 0014) ______________________________________
NOTES:
1. Materially unbalanced bids will be rejected. An unbalanced bid is one which is based on prices significantly less than cost for some work and prices which are significantly overstated for other work.
2. The bidders are required to bid on all items or their bid will be rejected.
3. The low bidder for the purpose of award will be the conforming responsible bidder offering the lowest amount for the Total Base Bid and Optional Bid items.
4. Line item 0008 is pre-priced at $100,000 and this price shown may not be changed. See Section 01 78 00 for Final Record Drawing definition and requirement.
5. The Bid Acceptance Period is as stated on Standard Form 1442.
6. Tapering are included in the items and exact locations are on the plan sheets.
7. All base work must be completed by April 1, 2021 due to environmental restrictions. No work will be allowed after April 1, 2021.
8. The Government is under no obligation to exercise/award any option.
9. Optional items 0009 thru 0014, if awarded, will be awarded within 100 calendar days from issuance of the Notice to Proceed (NTP). No additional time will be added for exercised options.
10. Optional item 0014 for the NOx offset allowances may be exercised as needed during the period of performance of the contract duration.
The following Delivery Schedule for CLIN 0014 has been added:
DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /
CAGE
01-APR-2021 48 CIVIL WORKS SECTION
USACOE-NY DISTRICT ENGRG CIVIL
WORKS SECTION
PLAZA RM17-512
NEW YORK NY 10278-0090
FOB: Destination
E3L0210
The following have been added by full text:
AMENDMENT 0001
W912DS-21-B-0014
Amendment No.0001
To Bidders The following changes shall be made to the drawings and specifications.
DRAWINGS
1. The following DRAWINGS have been REVISED and REISSUED:
- Sheet 6 of Attachment 1 – Tobay Beachfill Area
2. The following DRAWINGS have been ADDED:
-None
3. The following DRAWINGS have been REVISED but NOT REISSUED:
-None
SPECIFICATIONS:
1. The following SPECIFICATION SECTIONS have been ADDED and are provided in their entirety herein:
-None
2. The following SPECIFICATIONS SECTIONS have been DELETED in their entirety:
-None
3. The following SPECIFICATION SECTIONS have been REVISED and REISSUED in their entirety:
- Section 01 22 00.00 10
- Section 01 11 35
4. The following SPECIFICATION SECTIONS have been REVISED but NOT REISSUED:
- Section 01 14 00
- Section 01 30 00
REVISED SPECIFICATIONS:
1- Specifications Section 01 14 00 par. 1.2.1 Order of Work was revised.
Proceed with the placement of the beachfill in a continuous manner along the shoreline moving generally east to west, or as directed by the Contracting Officer. Contractor must dredge the channel, eastern deposition basin and ebb shoal areas prior to dredging the western deposition basins A, B, C. Work for options that are exercised shall be completed after work for hydraulic fill base CLINs is complete.
Questions and Answers:
The following questions and answers are provided for information only. Nothing contained below amends or revises any provision of the solicitation.
This is for bidder’s reference only, and is not to be considered as a part of the Contract Documents.
Contract award will be based on what is contained in the printed Plans and Specifications in a hard copy format or Electronic Bid Set if provided and as posted in the FBO.
RFI SET #1:
Question 1. Is there a deadline to submit questions? If so please provide the final date allowed to submit questions.
Response: Deadline to submit questions is July 26, 2021.
Question 2. Please provide any grain size analysis that was taken on projects in the past.
Response: Information is provided in specifications section 00 90 03.
Question 3. Please provide the coordinates of the sore thumb line so we can determine the quantity that is needed to be dredged before the January 1 Winter Flounder window.
Response: Coordinates are 1) N 172724.3, E 1175116.2 and 2) N 169047.2 E 1175116.2
Question 4. 1.2.1 Order of Work. The contractor requests that the government does not require a dredging sequence as this would limit the production and increase cost for the Contract. We request that the government only requires the Channel to be cleared to the required depth at the end of the project.
Response: Specifications Section 01 14 00 par. 1.2.1 Order of Work was revised.
Proceed with the placement of the beachfill in a continuous manner along the shoreline moving generally east to west, or as directed by the Contracting Officer. Contractor must dredge the channel, eastern deposition basin and ebb shoal areas prior to dredging the western deposition basins A, B, C. Work for options that are exercised shall be completed after work for hydraulic fill base CLINs is complete.
Question 5. 1.2.1 Order of Work states that the contractor must first dredge material from the channel, then eastern deposition basin, then ebb shoal, and finally western deposition basins. With the Winter Flounder window starting on January 1, will the government not apply the order of work dredging sequence to the areas that are inside the sore thumb to make sure that all material is cleared inside the sore thumb before the January 1 window?
Response: Specifications Section 01 14 00 par. 1.2.1 Order of Work was revised.
Question 6. 1.2.1 Order of Work states that the contractor must place material in a continuous manner along the shoreline moving generally east to west. While this is practical for Gilgo Beach, Overlook Beach, and Tobay Beach, it is not practical for Robert Moses State Park. Will the contractor be allowed to move west to east when pumping to Robert Moses State Park?
Response: No, contractor must pump east to west.
Question 7. 1.2.1 Order of Work states that options that are exercised shall be completed after work for hydraulic fill base CLINs is complete. The contractor requests that the government award any options within 30 days of award of the contract.
Response: As per note 9 in Section 00 10 00, “Optional items 0009 thru 0013, if awarded, will be awarded within 100 calendar days from issuance of the Notice to Proceed (NTP). No additional time will be added for exercised options.”
Question 8. On page G-101, it says the information depicted on this survey map represents the results taken on March 2021. In the Spec, Section 01 30 00, 1.20 Estimated Quantities states the estimated quantity of material is based on beach profile survey information taken on January and February 2019.
Please confirm and clarify when the surveys were taken on each beach and when the surveys were taken in the channel.
Response: Sheet G-101 has the correct date of March 2021. Specification section 01 30 00 par 1.2 was revised to state “March 2021”.
Question 9. Please provide all xyz data for the Gilgo Beach, Robert Moses State Park, Overlook Beach, and Tobay Beach.
Response: Provided Gilgo Beach, Robert Moses State Park and Tobay Beach xyz data. Overlook Beach xyz data will be provided when available.
Question 10. Please define the Overlook Beach area where the Contractor will place the material and provide a template.
Response: Updated Overlook Beach plans/template will be provided when available.
Question 11. Please provide all xyz data for the CPF areas (CFP1 and CPF2).
Response: Provided xyz data for CPFs 1 & 2.
Question 12. During the previous project, we encountered multiple obstructions in the channel/borrow areas. Will the contractor be allowed a buffer around these areas to not damage the equipment and prolong the project? Great Lakes can provide information regarding obstructions that were encountered on the previous project.
Response: Please provide information regarding obstructions that were encountered on the previous project. Contractor may apply buffers to obstructions. There are three areas marked as avoidance areas on the plans and one large area marked for monitoring in the channel and the western deposition basin.
Areas marked as avoidance areas should already be left out of the project and no anchoring or dredging may occur in those areas.
Question 13. Please provide coordinate stationing for the Tobay Beach fill area.
Response: Provided coordinate stationing for Tobay Beach fill area on sheet 6 of attachment 1 – Tobay Beach Fill Area.
SECTION 00 70 00 - CONDITIONS OF THE CONTRACT
The following Acceptance/Inspection Schedule was added for CLIN 0014:
INSPECT AT INSPECT BY ACCEPT AT
ACCEPT BY
N/A N/A N/A Government
(End of Summary of Changes)
| 0001W912DS21B0014.pdf |