30072021W912DS21B00140002.pdf

PDF 551 KB Posted

Attached to
Fire Island Inlet to Montauk Point, Suffolk County, NY, Contract 1 Project : Fire Island Inlet
Solicitation number
W912DS21B0014
Issued by

About this file

This document contains a government file related to a federal solicitation for hydraulic beach fill and coastal process features along Fire Island, New York. The U.S. Army Corps of Engineers, New York District is seeking bids for beach fill at Robert Moses State Park, Gilgo Beach, and optional areas at Tobay Beach and Overlook Beach. Bids are due by August 5, 2021 and must be submitted electronically through the DoD SAFE system. The work must be completed by March 17, 2022 and includes line items for mobilization, beach fill quantities estimated at over 1.5 million cubic yards, dune vegetation installation, sand fencing, clearing and grubbing, excavation and grading for coastal process features. Final record drawings and additional insurance are also line items. The solicitation was amended to extend the response deadline and increase the number of required copies, remove NOx emissions credits from the bid schedule, and provide questions and answers regarding the project requirements.

View the file

Other files

File Type Posted
Bid Abstract W912DS21B0014.xlsx XLSX spreadsheet
W912DS21B0014Amendment0008.pdf PDF
08162021W912DS21B00140007.pdf PDF
08112021W912DS21B00140006.pdf PDF
W912DS21B00140006.pdf PDF
08092021W912DS21B00140005.pdf PDF
W912DS21B00140004.pdf PDF
31 24 00.00 18.pdf PDF
Attachment 2 - Overlook Beach Option.pdf PDF
03082021W912DS21B00130003.pdf PDF
01 56 10.00 18.pdf PDF
01 57 19.pdf PDF
Overlook Beach Existing Topo (Rev 1-17-19).txt TXT text file
30072021C112 Pages from FIMP_CT1 C100 SHEETS.pdf PDF
5011-FIMP_Robert-Moses.txt TXT text file
5011-Gilgo_Beach-Sort.txt TXT text file
3007202101 11 35_FIMP_20210728.pdf PDF
300720212018 Fire Island Inlet Obstruction Encounters.pdf PDF
30072021Draft USACE annual NOx calculator FIMP2 (27 Jul 21).xlsx XLSX spreadsheet
5011_FI_EBB-SHOAL_CPF-1-2.txt TXT text file
3007202101 22 00.00 10.pdf PDF
Tobay Beach - GBA - Topo and Hydro.xyz.xlsx XLSX spreadsheet
01 11 35_FIMP_AMEND_1.pdf PDF
20072021W912DS21B0014.pdf PDF
01 22 00.00 10.pdf PDF
Sheet_06 - Tobay Beach Plan.pdf PDF
Attachment 2 - Overlook Beach Option Sheets.pdf PDF
20210621_FIMP ct1_100PCT.pdf PDF
attachment 1 Tobay Beach Fill Area - Reduced File Size (1).pdf PDF
W912DS21B001407012021.pdf PDF
FIMP CT1 SPECS_100PCNT_20210630.pdf PDF
Show all 31

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this amendment is to extend the proposal due date to August 5 2021, delete CLIN 0014, answer RFI's, and revise and reissue plans and specif ications. Offeror must acknowledge receipt of this amendment by the date specified in the proposal (or as amended) by one of the follow in methods: in the space provided on SF1442, by separate letter, or by signing block 15 below .

FAILURE TO ACKNOWLEDGE AMENDMENTS BY THE DATE AND TIME SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER IN ACCORDANCE WITH THE SUBMISSION, MODIFICATION, REVISION, AND WITHDRAWAL OF PROPOSALS (FAR 15.208).

1. CONTRACT ID CODE PAGE OF PAGES

1 19

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912DS21B0014

X 9B. DATED (SEE ITEM 11)

01-Jul-2021

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO.

5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

30-Jul-2021

CODE

US ARMY CORPS OF ENGINEERS, NEW YORK

26 FEDERAL PLAZA, RM 16-300

NEW YORK NY 10278-0090

W912DS 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

X 1

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION 00 10 00 - SOLICITATION

The required response date/time has changed from 03-Aug-2021 02:00 PM to 05-Aug-

2021 02:00 PM.

The number of offeror copies required has increased by 1 from 0 to 1.

ITEM

NO

SUPPLIES/SERVI

CES

QUANTITY UNIT UNIT PRICE AMOUNT

0001 1 Job Mobilization & Demobilization

FFP

Mobilization & Demobilization for Hydraulic Beach Fill FOB: Destination

PSC CD: Y1KZ

NET AMT

ITEM

NO

SUPPLIES/SERVI

CES

QUANTITY UNIT UNIT PRICE AMOUNT

0002 716,000 Cubic Yard

Hydraulic Beach Fill – Robert Moses

FFP

Hydraulic Beach Fill – Robert Moses State Park ESTIMATED

QUANTITIES

FOB: Destination

PSC CD: Y1KZ

NET AMT

ITEM

NO

SUPPLIES/SERVI

CES

QUANTITY UNIT UNIT PRICE AMOUNT

0003 801,700 Cubic Yard

Hydraulic Beach Fill – Gilgo Beach

FFP

Hydraulic Beach Fill – Gilgo Beach ESTIMATED QUANTITIES FOB: Destination

SUPPLIES/SERVI

CES

QUANTITY UNIT UNIT PRICE AMOUNT

0004 1 Acre Dune Vegetation

FFP

Dune Vegetation ESTIMATED QUANTITIES FOB: Destination

PSC CD: Y1KZ

NET AMT

ITEM

NO

SUPPLIES/SERVI

CES

QUANTITY UNIT UNIT PRICE AMOUNT

0005 900 Linear Foot

Sand Fence

FFP

Sand Fence ESTIMATED QUANTITIES FOB: Destination

SUPPLIES/SERVI

CES

QUANTITY UNIT UNIT PRICE AMOUNT

Coastal Process Feature 1

FFP

NET AMT

ITEM

NO

SUPPLIES/SERVI

CES

QUANTITY UNIT UNIT PRICE AMOUNT

0006AA 46 Acre Clearing and Grubbing

FFP

Clearing and Grubbing ESTIMATED QUANTITIES FOB: Destination

SUPPLIES/SERVI

CES

QUANTITY UNIT UNIT PRICE AMOUNT

0006AB 227,000 Cubic Yard

Excavation and Grading

FFP

Excavation and Grading ESTIMATED QUANTITIES FOB: Destination

SUPPLIES/SERVI

CES

QUANTITY UNIT UNIT PRICE AMOUNT

Coastal Process Feature 2

FFP

SUPPLIES/SERVI

CES

QUANTITY UNIT UNIT PRICE AMOUNT

0007AA 13 Acre Clearing and Grubbing

FFP

Clearing and Grubbing ESTIMATED QUANTITIES FOB: Destination

PSC CD: Y1KZ

NET AMT

ITEM

NO

SUPPLIES/SERVI

CES

QUANTITY UNIT UNIT PRICE AMOUNT

0007AB 25,000 Cubic Yard

Excavation and Grading

FFP

Excavation and Grading ESTIMATED QUANTITIES FOB: Destination

SUPPLIES/SERVI

CES

QUANTITY UNIT UNIT PRICE AMOUNT

0007AC 17,700 Cubic Yard

Excavation and Relocation of Stockpile

FFP

Excavation and Relocation of Stockpile Material ESTIMATED

QUANTITIES

FOB: Destination

PSC CD: Y1KZ

NET AMT

ITEM

NO

SUPPLIES/SERVI

CES

QUANTITY UNIT UNIT PRICE AMOUNT

0008 1 Job Final Record Drawings

FFP

FOB: Destination

PSC CD: Y1KZ

$100,000

SUPPLIES/SERVI

CES

QUANTITY UNIT UNIT PRICE AMOUNT

0009 53,000 Cubic Yard

OPTION Option 1 – Hydraulic Beachfill at Tobay

FFP

Option 1 – Hydraulic Beachfill at Tobay Beach Area 1 ESTIMATED

QUANTITIES

FOB: Destination

PSC CD: Y1KZ

NET AMT

ITEM

NO

SUPPLIES/SERVI

CES

QUANTITY UNIT UNIT PRICE AMOUNT

0010 86,000 Cubic Yard

OPTION Option 2 - Hydraulic Beachfill at Tobay

FFP

Option 2 - Hydraulic Beachfill at Tobay Beach Area 2 ESTIMATED

QUANTITIES

FOB: Destination

SUPPLIES/SERVI

CES

QUANTITY UNIT UNIT PRICE AMOUNT

0011 124,000 Cubic Yard

OPTION Option 3 - Hydraulic Beachfill at Tobay

FFP

Option 3 - Hydraulic Beachfill at Tobay Beach Area 3 ESTIMATED

QUANTITIES

FOB: Destination

PSC CD: Y1KZ

NET AMT

ITEM

NO

SUPPLIES/SERVI

CES

QUANTITY UNIT UNIT PRICE AMOUNT

0012 42,000 Cubic Yard

OPTION Option 4 – Hydraulic Beachfill

FFP

Option 4 – Hydraulic Beachfill at Overlook Beach ESTIMATED

QUANTITIES

FOB: Destination

SUPPLIES/SERVI

CES

QUANTITY UNIT UNIT PRICE AMOUNT

0013 1 Job OPTION Option 5 - Additional Insurance

FFP

Check Specifiication Section 01 30 00.

FOB: Destination

PSC CD: Y1KZ

NET AMT

The following have been modified:

TOTALS/NOTES

TOTALS:

TOTAL BASE (ITEMS 0001 thru 0008)

TOTAL OPTIONS (ITEMS 0009 thru 0013)

TOTAL BASE + OPTIONS (ITEMS 0001 thru 0013)

NOTES:

1. Materially unbalanced bids will be rejected. An unbalanced bid is one which is based on prices significantly less than cost for some work and prices which are significantly overstated for other work.

2. The bidders are required to bid on all items or their bid will be rejected.

3. The low bidder for the purpose of award will be the conforming responsible bidder offering the lowest amount for the Total Base Bid and Optional Bid items.

4. Line item 0008 is pre-priced at $100,000 and this price shown may not be changed. See Section 01 78 00 for Final Record Drawing definition and requirement.

5. The Bid Acceptance Period is as stated on Standard Form 1442.

6. Tapering are included in the items and exact locations are on the plan sheets.

7. All work must be completed by March 17, 2022 due to environmental restrictions.

8. The Government is under no obligation to exercise/award any option.

9. Optional items 0009 thru 0013, if awarded, will be awarded within 100 calendar days from issuance of the Notice to Proceed (NTP). No additional time will be added for exercised options.

SECTION 00 21 13 - INSTRUCTIONS TO BIDDERS

The following have been modified:

BID SUBMISSION INSTRUCTIONS

B ID SUBMISSION INSTRUCTIONS

The bidder shall be submitted electronically, as described below. The IFB will provide the Government address and receipt date for bid submittal. The bid shall not contain classified data. The use of hyperlinks in proposals is prohibited.

NOTE: Notice of Intent to Bid must be submitted to Sandra Schenning Sandra.L.schenning@usace.army.mil Nicholas Emanuel Nicholas.P.Emanuel@usace.army.mil two (2) days before the bid opening.

Bids are due 5-Aug-2021 at 2:00 P.M. est however the reading of the bids will happen at 2:30 P.M. to allow for time to download the bids before they are read.

Bids received after 5-Aug-2021 at 2:00 P.M.

est on https://safe.apps.mil/ will be considered late

It is recommended that bidders submit their bids at least 2 hours before to allow enough time for the bid to be uploaded. Please note that bidders do not need to wait until the day of bid opening to submit their bids.

The only authorized transmission method for the bid in response to this solicitation is electronically via SAFE online submission.

NO OTHER TRANSMISSION

METHODS (EMAIL, FACSIMILE,

REGULAR MAIL, HAND CARRIED,

ETC.) WILL BE ACCEPTED.

The bid must be received by the Government by the date/time specified in the solicitation.

The Bidder shall submit their bid using the following link:

h ttps://safe.apps.mil/

NOTE: Problems accessing the DoD SAFE site by external (non- CAC) users are typically due to SSL and/or client certificate issues. If the user receives a warning about a problem with the website's security certificate, this is because their browser is not configured to trust the DoD certificate authorities. The user can either import the DoD certificate authorities by following the instructions in the DoD PKI PMO's guide on Install Root or they can accept the risk and click on the option to continue to the website. The current guide on Install Root can be found Problems accessing the DoD SAFE site by non-CAC users -h ttps://safe.apps.mil/about.php

INSTRUCTIONS FOR SUBMITTING ELECTRONIC PROPOSALS:

In an effort to reduce paperwork and cost, all bids shall be submitted electronically through the SAFE site. Submission shall be in Adobe PDF format. You are limited to five (5) maximum files per upload (total size cannot exceed 2GB). If you have a large number of files, recommend that you combine or ZIP your files before uploading to the SAFE site. Bidders may use compression utility software such as WinZip or PKZip to reduce file size and facilitate transmission.

REQUEST FOR UPLOAD CODE: Offerors must email Contract Specialist Sandra Schenning Sandra.L.schenning@usace.army.mil and Nicholas Emanuel Nicholas.P.Emanuel@usace.army.mil no later than two (2) working days prior to the bid due date to receive a request code which will allow for file uploads via the SAFE site. Bidders that fail to email for request a code two (2) working days before bid submission date may not be able to receive a request code in time to upload their submission.

FILE DESCRIPTION: Include a “File Description” for each file(s) you upload. The “File Description” will be included in the email notice to each of the recipients you choose to have access your file(s). NOTE: Do NOT enter Privacy Act Data (Personal Identification Information (PII)) in the File Description.)

Submission shall be in Adobe PDF format.

INSTRUCTIONS TO FOLLOW ON THE SAFE WEBSITE:

1. Once at the SAFE website select the “Drop-off” icon. This allows users without a CAC or users whose computer is not configured to read a CAC the option to access the SAFE site as a guest.

2. After selecting the “Click Here” link you will be prompted to add your personal information, file information, recipient (Government representative) information and email settings.

3. When completing your file information for transmittal via the SAFE website, you will be required to enter the email address for all recipients. For this solicitation, the recipients are the Contract Specialist and the Contracting Officer. The Contract Specialist for this solicitation is Sandra Schenning

Sandra.L.schenning@usace.army.mil, and the Contracting Officer is N icholas.P.Emanuel@usace.army.mil. The E-Mail address of the Government Employee who initiated the request code will be automatically entered. The Proposer must enter the E-Mail address for both the Contracting Officer and Specialist. The Proposer can enter an additional E-Mail address if desired.

After entering the email address, click the ADD button to add the person(s) email to the “Recipients List” of your response. When your proposal is submitted, a notification will be sent to the recipients you added.

NOTE: Do NOT send the SAFE site packages to group email accounts.

Even if you successfully upload your proposal to the SAFE site, notification will not be sent to the government recipients until you verify your email address.

Entering an incorrect email may result in the rejection of your submission for lateness. A Proposer can confirm proper submission by the ‘Drop-Off Completed” screen which generates based on proper file submission.

NOTE: It has been reported that documents are more quickly uploaded into the SAFE website when using a Firefox web browser. The Government cannot verify that this is true and offers no guarantee that Offerors will have more success utilizing any particular browser.

RECEIPT OF SUBMISSIONS:

W912DS21B0014

For the purposes of establishing whether a proposal submission is considered timely, the government considers the date and time the submission is completely uploaded into the SAFE website. For proposals larger than the 2GB capacity of the SAFE website and require multiple submissions, the Government will consider the date and time the last submission is completely uploaded into the SAFE website. Do not assume that electronic communication is instantaneous. It can take several minutes or even hours in some cases.

The government will not be responsible for submissions delivered to any location or to anyone other than those designated to receive proposals. Offerors are responsible for ensuring that proposals are submitted so as to reach the designated recipient. Offerors are responsible for allowing sufficient time for the proposal to be received in accordance with the instructions provided.

Bidders are encouraged to call into the following teleconference line:

Call number

+1-844-800-2712 US Toll Free +1-669-234-1177 US Toll Access code: 199 476 8533

Bidder must keep their phone on mute as to not disrupt the reader. Please limit the amount of company employees calling into the line so that the line does not disconnect. The abstract of bids will be posted to the Beta.Sam website.

ADDITIONAL INSTRUCTIONS

Potential Bidders are reminded that only the minimum documents are required for bid submission:

1. Signed 1442.

2. Acknowledged amendments.

3. Filled out bid schedule and totals.

4. Bid Guarantee.

5. Bidders must check off box (d) in 52.204-8 Annual

Representations and Certifications (DEC 2019) for being on SAM.gov

This will help reduce file size and speed up electronic transfer in the DoD SAFE site.

(End of Summary of Changes)

The following items are applicable to this modification:

CHANGES

W912DS-21-B-0014

Amendment No.2

To Bidders The following changes shall be made to the drawings and specifications.

DRAWINGS

1. The following DRAWINGS have been REVISED and REISSUED:

- C-112

2. The following DRAWINGS have been ADDED:

-None

3. The following DRAWINGS have been REVISED but NOT REISSUED:

-None

SPECIFICATIONS:

1. The following SPECIFICATION SECTIONS have been ADDED and are provided in their entirety herein:

-None

2. The following SPECIFICATIONS SECTIONS have been DELETED in their entirety:

-None

3. The following SPECIFICATION SECTIONS have been REVISED and REISSUED in their entirety:

- Section 01 10 00

- Section 01 11 35

- Section 01 22 00.00 10

4. The following SPECIFICATION SECTIONS have been REVISED but NOT REISSUED:

- Section 01 11 00

REVISED SPECIFICATIONS:

1- Section 01 10 00 - NOx bid items were removed from the bid schedule

2- Section 01 11 00 paragraph 1.1 (a) revised to the following “a. The Contractor must be required to (i) commence work under this contract within five (5) calendar days after the date the Contractor receives the Notice to Proceed, (ii) prosecute the work diligently, and (iii) complete the entire work ready for use, before March 17, 2022. The date stated for completion must include final cleanup of the premises. (FAR 52.212-3)”

3- Section 01 11 35 – removed procurement of sufficient offsets paragraphs & requirements.

4- Section 01 22 00.00 10 – removed paragraph 1.2.6 & subparagraphs.

Questions and Answers:

The following questions and answers are provided for information only. Nothing contained below amends or revises any provision of the solicitation.

This is for bidder’s reference only, and is not to be considered as a part of the Contract Documents. Contract award will be based on what is contained in the printed Plans and Specifications in a hard copy format or Electronic Bid Set if provided and as posted in the FBO.

RFI SET #1:

Question 1. After reaching out the Allowance Brokers to get a price for ton for air emissions credits, I’ve been told the following: Group 3 allowances have not been traded yet because they are not yet available to purchase and it’s too ambiguous to price. How is a Contractor supposed to price line item 00014 for offset credits when the brokers can’t even come up with a price? Why did the quantity change from 18 tons to 42 tons? How is a Contractor supposed to price a credit that has never been traded?

Response: NOx bid items were removed from the bid schedule.

Question 2. Please provide the NOx excel spreadsheet calculator.

Response: NOx excel spreadsheet calculator provided.

Question 3. Due to the fluctuation in the price of NOx offset allowance, we request that the government set a standard price per short ton for the project.

Response: NOx bid items were removed from the bid schedule.

Question 4. Please provide any grain size analysis that was taken on the projects in the past. No information was provided in the specifications section 00 90 03.

Response: Grain size analysis from projects in the past is not available.

Question 5. Please provide the template and all xyz data for the Overlook Beach Option.

Response: Updated Overlook Beach plans/template/xyz will be provided when available.

Question 6. Will the contractor be allowed to move west to east when pumping on Robert Moses State Park? This would allow typical dredging approach when moving down the beach.

Response: Yes, the contractor will be allowed to move west to east only when pumping on Robert Moses State Park.

Question 7. 1.2.1 Order of Work states that options that are exercised shall be completed after work for hydraulic fill base CLINs is complete. The contractor requests that the government award any options within 60 days of award of the contract. This will ensure equipment will be mobilized to the project in time for completion by the April 1st dredging window.

Response: As per note 9 in Section 00 10 00, “Optional items 0009 thru 0013, if awarded, will be awarded within 100 calendar days from issuance of the Notice to Proceed (NTP). No additional time will be added for exercised options.” The Government’s intent is to award options as soon as possible, if awarded, but may be awarded up to 100 calendar days from NTP.

Question 8. Please see the attached drawing with areas GLDD encountered obstructions as well as data from the magnetometer survey that was performed by a 3rd party when GLDD executed the Fire Island Project in 2018 to 2019.

Response: Provided with amendment 2.

Question 9. We request that the Corps extend Q/A until Thursday 29th, 2021.

Response: Deadline to submit questions is moved to July 30, 2021.

Question 10. Due to the complexity of the Fire Island Project this year compared to past projects, we request that the USACE extend the bid opening by one week to August 10th, 2021.

This will also allow time for contractors to review the Government responses to the outstanding critical questions.

Response: Bid opening will be moved to August 5, 2021.

Question 11. On drawing C-112, for Ebb Shoal Dredge Area, cut depth is labeled in NAVD88 (- 14’NAVD88) this equates to -11.8’ MLW (too shallow). In all other Dredge Area drawings, the cut depth is labeled in MLW water with the cut depth consistent to years past at -14’MLW. Is the cut depth on drawing C-112, for Ebb Shoal Dredge Area supposed to be in NAVD88 of MLW?

Response: Cut depth on drawing C-113 for Ebb Shoal Dredge Area is -14’ NAVD88.

Question 12. On drawing C-112, for Ebb Shoal Dredge Area, there is 0’ Overdepth while other Dredge Areas allow a 2’ Overdepth. Is there any significance why the contractor is not allowed any overdepth in the Ebb Shoal Dredge Area?

Response: Revised note to state there is an allowable 2ft overdepth, consistent with the rest of the project.