This document outlines specifications for a federal construction contract solicitation. The solicitation is for Contract 1 of the Fire Island Inlet to Montauk Point project in Suffolk County, New York. Work will include hydraulic beach fill placement, clearing and grubbing, excavation, installation of sand fencing and dune planting. The specifications provide payment terms and measurement methods for each work item. Surveying requirements are specified for measuring beach fill quantities placed. The solicitation number is W912DS21B0014 and was issued by the U.S. Army Corps of Engineers, New York District. Responses are due based on the posted solicitation date.
View the file
Other files
Show all 31
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FIMP Contract 1 FIMPCT1
100% SPECIFICATIONS - RTA AMENDMENT 2
SECTION 01 22 00.00 10
PRICE AND PAYMENT PROCEDURES
08/15
PART 1 GENERAL
1.1 SINGLE JOB PAYMENT ITEMS
Payment items for the work of this contract for which contract job payments will be made are listed in the SCHEDULE and described below.
All costs for items of work, which are not specifically mentioned to be included in a particular job or unit price payment item, are included in the listed job item most closely associated with the work involved. The job price and payment made for each item listed constitutes full compensation for furnishing all plant, labor, materials, and equipment, and performing any associated Contractor quality control, environmental protection, meeting safety requirements, tests and reports, and for performing all work required for which separate payment is not otherwise provided.
1.1.1 MOBILIZATION AND DEMOBILIZATION
Mobilization must include all costs for operations accomplished prior to commencement of actual dredging operations, such as transfer of dredge and attendant plant and equipment to site, initial installations of pipe, preparation of beach fill areas, and other incidentals in advance of the actual dredging. Demobilization must include general preparation for transfer of plant to home base, removal of pipelines, cleanup of beach fill areas, and transfer of plant to its home base. The cost of work other than mobilization and demobilization of the Contractor's dredging plant and equipment must not be included in this item. For payment for Mobilization and Demobilization see contract clause Section 00 72 00 Contract Clauses.
All costs connected with the mobilization and demobilization of all of the contractor's dredging plant and equipment will be paid for at the contract lump sum price for this item. 60 percent of the lump sum price will be paid to the Contractor upon completion of his mobilization to the work site. The remaining 40 percent will be included in the final payment for work under this contract.
In the event the Contracting Officer and/or his Representative considers that the amount in this item 60 percent, which represents mobilization, does not bear a reasonable relation to the cost of the work in this contract, the Contracting Officer and/or his Representative may require the Contractor to justify this portion of the bid. Failure to justify such price to the satisfaction of the Contracting Officer and/or his Representative will result in payment of actual mobilization costs as determined by the Contracting Officer and/or his Representative, at the completion of mobilization and payment of the remainder of this item in the final payment under this contract. The determination of the Contracting Officer and/or his Representative is not subject to appeal.
1.2 UNIT PRICE PAYMENT ITEMS
Payment items for the work of this contract on which the contract unit
SECTION 01 22 00.00 10 Page 1 price payments will be made are listed in the SCHEDULE and described below. The unit price and payment made for each item listed constitutes full compensation for furnishing all plant, labor, materials, and equipment, and performing any associated Contractor quality control, environmental protection, meeting safety requirements, tests and reports, and for performing all work required for each of the unit price items.
1.2.1 Hydraulic Beach Fill Placement
1.2.1.1 Payment
The total amount of material acceptably placed on the beach (from the dredged areas) is to be paid for at the contract unit price as shown on the price schedule (Section 00 10 00 ), must be measured by the cubic yard in place on the beach by computing the volume between the beach surface shown by a survey made before filling and beach surface shown on a survey after filling. The reference datum must be NAVD. No payment must be made for material placed:
(1) In excess of the quantity to the design grade plus the 0.5 foot tolerance. Refer to the Compensated Slope paragraph in section 31 24 00.00 18 BEACH FILL PLACEMENT for exception regarding compensated slope.
(2) For the extent of the project as shown on the contract drawings, above El +14 ft. NAVD plus tolerance on the dune crest; beyond the 1 on 5 slope line on dune side slope plus tolerance, above +8.5 ft NAVD plus tolerance on the berm, and beyond the point where the 1 on 20 slope line from El. +8.5 ft. NAVD plus tolerance, intersects the ocean bottom. Refer to the Compensated Slope paragraph in section 31 24 00.00 18 BEACH FILL PLACEMENT for exception below elevation +3.0
NAVD.
(3) Which was obtained from outside the designated dredged area or below the maximum dredging limit of the dredged area, except as directed by the Contracting Officer or his representative.
1.2.1.2 Original and Final Surveys
The Contractor must make original and final surveys under the supervision of the Contracting Officer's representative and must make computations to determine the quantities of materials placed on the beach for acceptance.
1.2.1.3 Surveys for Progress Payments
The Contractor will make any surveys for periods for which progress payments are requested and must make the computations based on these surveys.
1.2.1.4 Initial and Final Surveys
Initial and final surveys for acceptance will be taken immediately prior to and after fill placement. Before fill, surveys must not be taken more than 14 days prior to fill placement. Surveys will be taken on parallel profile lines (ranges) spaced at a maximum of 100-foot intervals. The minimum stationing interval will be 25 feet or at breaks in slope.
The Contractor must conduct the original and final surveys, with the
SECTION 01 22 00.00 10 Page 2 presence of Government representatives, and make the computations based on them. The Contractor must conduct the surveys for any periods for which progress payments are requested and must make the computations based on these surveys. All surveys conducted by the Contractor must be done by a New York licensed surveyor and certified hydrographer subjected to approval by the Contracting Officer.
- The Contractor must be responsible to conduct all surveys. The Contractor must maintain work sections - a pre-construction and final acceptance section surveyed while construction is taking place in between.
The pre-construction sections should be maintained at a minimum 300 feet ahead of the fill placement. The Contractor must make such computations as are necessary to determine the quantities of work performed or finally in place and submit the computation for Government approval.
-Promptly upon completing a survey, the Contractor must furnish the originals of all field notes and all other records relating to the survey or to the layout of the work to the Contracting Officer, who must use them as necessary to determine the amount of progress payments. The Contractor must retain copies of all such material furnished to the Contracting Officer or his representative. (FAR 52.236-16)
For Beach Fill Placement:
The Contractor will coordinate with the Contracting Officer's representative to maintain work sections. The Contractor will perform preconstruction surveys between 500 feet and 1500 feet in advance of the last acceptance station but not more than 14 days prior to fill placement.
The surveys must be performed in 100 foot increments. Acceptance surveys must be performed when 500 linear feet of beach is dressed and graded to template.
For dredged area Surveys:
A pre- and post- construction survey of the dredged area at least 100 feet along the length of the dredged area and 25-foot intervals is required for this project to monitor the pre- and post-construction dredged area conditions with other survey methods approved by the COR.
In addition, weekly dredged area surveys are required at 200-foot sections and 5 foot intervals. The Contractor must compute the volume extracted and furnish all computations, Fathometer plots, and depth readings utilized to the Contracting Officer with each CQC report See 01 45 00.00 10 QUALITY
CONTROL
1.2.1.5 Original Field Notes, Computations and Other Records
All original field notes, computations and other records for the purpose of layout of surveys conducted by the Contractor must be recorded in duplicating field books, the original pages of which must be furnished promptly to the Contracting Officer, or his representative, at the site of work. The Contractor must furnish the Contracting Officer, or his representative, profile data for the survey in electronic format specified by the contracting officer. The survey data must be in a format compatible with both the HYPACK program and in X, Y, Z format, and stored on DVD's.
The Contractor must submit to the Contracting Officer, prior to surveying, a base line drawing showing all offsets, elevation, reference lines and range line locations to be utilized.
SECTION 01 22 00.00 10 Page 3
1.2.1.6 Temporary Fencing
No separate payment must be made for temporary fencing, and all costs in connection therewith must be included in the contract unit price for Hydraulic Beach Fill.
1.2.2 Clearing and Grubbing
1.2.2.1 Payment
Payment will be made for costs associated with clearing and grubbing meeting the requirements of Section 31 11 00 CLEARING AND GRUBBING.
1.2.2.2 Measurement
The total quantity of clearing and grubbing to be paid will be the number of acres, computed to the nearest 0.1 of an acre, actually cleared and grubbed. Areas outside the limits of the project will not be measured.
1.2.2.3 Unit of Measure
Unit of measure: Acre.
1.2.3 Excavation
1.2.3.1 Payment
Payment will be made for costs associated with excavation around the existing building at locations as depicted in the contract documents or to perform the work required, which includes performing required excavation and other operations incidental thereto, Contractor-furnished disposal area(s) and disposition of excess excavated material and unsuitable and frozen materials.
1.2.3.2 Measurement
The total quantity of excavated material for which payment will be made will be the theoretical quantity between the ground surface as determined by a survey and the grade and slope of the theoretical cross sections indicated. No allowance will be made for overdepth excavation or for the removal of any material outside the required slope lines unless authorized.
1.2.3.3 Unit of Measure
Unit of measure: cubic yard .
1.2.4 Sand Fence
1.2.4.1 Payment
Payment will be made for all plant, labor, equipment, transportation, and materials for site preparation and installation of sand fence in accordance with the Contract Drawings and Specifications.
1.2.4.2 Measurement
Measurement will be by linear feet of fence.
SECTION 01 22 00.00 10 Page 4
1.2.4.3 Unit of Measure
Unit of measure: Linear feet.
1.2.5 Dune Planting
1.2.5.1 Payment
The price for all vegetation (e.g., grasses, plants, trees, etc) and installation must include the cost of furnishing all labor, materials, equipment, and incidentals necessary to complete this item in accordance with the plans, specifications, and the directions of the Contracting Officer. The Contractor must be paid for percentage complete based on determination of the Contracting Officer during installation. A pre-determined amount will be retained by the Contracting Officer payable when the conditions in the PLANT GUARANTEE paragraph of this specification are met and approved as satisfactory by the Contracting Officer.
1.2.5.2 Measurement
All items for planting (e.g., seaside goldenrod, eastern red cedar, American beach grass, etc) will be measured by the units installed in accordance with the plans and specifications Section 32 94 00 , acres, and to the satisfaction of the Contracting Officer.
1.2.5.3 Unit of Measure
Unit of measure: Acre.
1.2.6 Ozone Season NOx Allowances
1.2.6.1 Payment
Payment will be made for purchase of ozone season NOx allowances (Cross-State Air Pollution Rule Group 3) in accordance with the Specifications.
1.2.6.2 Measurement
The total quantity for which payment will be made will be based on proof of purchase of ozone season NOx allowances.
1.2.6.3 Unit of Measure
Unit of measure: ozone season NOx allowances (tons)
PART 2 PRODUCTS
Not Used
PART 3 EXECUTION
Not Used
-- End of Section --
SECTION 01 22 00.00 10 Page 5
THIS PAGE INTENTIONALLY LEFT BLANK
SECTION 01 22 00.00 10 Page 6
| 01 22 00.00 10 - PRICE AND PAYMENT PROCEDURES |
| PART 1 GENERAL |
| 1.1 SINGLE JOB PAYMENT ITEMS |
| 1.1.1 MOBILIZATION AND DEMOBILIZATION |
| 1.2 UNIT PRICE PAYMENT ITEMS |
| 1.2.1 Hydraulic Beach Fill Placement |
| 1.2.1.1 Payment |
| 1.2.1.2 Original and Final Surveys |
| 1.2.1.3 Surveys for Progress Payments |
| 1.2.1.4 Initial and Final Surveys |
| 1.2.1.5 Original Field Notes, Computations and Other Records |
| 1.2.1.6 Temporary Fencing |
| 1.2.2 Clearing and Grubbing |
| 1.2.2.1 Payment |
| 1.2.2.2 Measurement |
| 1.2.2.3 Unit of Measure |
| 1.2.3 Excavation |
| 1.2.3.1 Payment |
| 1.2.3.2 Measurement |
| 1.2.3.3 Unit of Measure |
| 1.2.4 Sand Fence |
| 1.2.4.1 Payment |
| 1.2.4.2 Measurement |
| 1.2.4.3 Unit of Measure |
| 1.2.5 Dune Planting |
| 1.2.5.1 Payment |
| 1.2.5.2 Measurement |
| 1.2.5.3 Unit of Measure |
| PART 2 PRODUCTS |
| PART 3 EXECUTION |
File details come from the government source that posted it. Updated .