This solicitation is for the construction of a new Golf Clubhouse at West Point, New York. The scope of work includes construction of a single-floor, 12,500 square foot clubhouse with a main entrance, banquet hall, snack bar, kitchen, restrooms, pro shop, storage, and site improvements. Supporting facilities such as utilities, parking, security, communications, and HVAC systems are also in the scope. The North American Industry Classification System code is 236220 and the business size standard is $39.5 million. Questions must be submitted by May 14, 2020 and bids must be submitted electronically by May 20, 2020. The estimated value of construction is between $10-25 million. The soliciting agency is the Department of the Army Corps of Engineers Engineering District New York.
View the file
Other files for this federal contract opportunity
Show all 26
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W912DS20B0008
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of Amendment 0006 is,
1) Bid opening date remains 20-May-2020 at 2:00 P.M. EST
2) ProjNet Bidder Inquiry site w ill close on 14 May 2020.
3) Respond to bidder request for information. For information only.
NOTE: Bidders must acknow ledge receipt of this amendment by date specif ied in the bid (or as amended) by one of the follow ing methods:
In the space provided on the SF 1442, by separate letter, or by signing block 15 below .FAILURE TO ACKNOWLEDGE AMENDMENT BY DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR BID IN ACCORDANCE WITH THELATE BID, LATE MODIFICATION OF BID, OR LATE
WITHDRAWAL OF BID (FAR 14.304)
1. CONTRACT ID CODE PAGE OF PAGES
1 9
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 14-May-2020
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912DS20B0008
X 9B. DATED (SEE ITEM 11)
11-Apr-2020
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
13-May-2020
CODE
US ARMY CORPS OF ENGINEERS, NEW YORK
26 FEDERAL PLAZA, RM 16-300
NEW YORK NY 10278-0090
W912DS 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
The following items are applicable to this modification:
AMENDMENT 0006
Construction of Golf Club House USMA West Point, New York
Amendment 0006
AMENDMENT 0006 for Construction of Golf Clubhouse at West Point, NY
W912DS20B0008.
TO BIDDERS:
ProjNet Bidder Inquiry site will close on 14 May 20.
The following changes shall be made to the drawings and specifications.
DRAWINGS:
1. The following DRAWINGS have been REVISED and REISSUED:
a. None
2. The following DRAWINGS have been REVISED but NOT REISSUED:
3. The following DRAWINGS have been ADDED:
4. The following DRAWINGS have been DELETED:
SPECIFICATIONS:
1. The following SPECIFICATION SECTIONS have been ADDED and are provided in their entirety herein:
2. The following SPECIFICATIONS SECTIONS have been DELETED in their entirety:
a. Specification Section 13 34 23 is deleted.
3. The following SPECIFICATIONS SECTIONS have been REVISED and REISSUED:
4. The following SPECIFICATIONS have been REVISED but NOT REISSUED:
BIDDER’S QUESTIONS AND GOVERNMENT REPLY
(Questions that may be of general interest to all Bidders and/or the Government and that are not readily answered by the proceeding changes will appear below. These questions may have been paraphrased or altered to represent several questions regarding the same subject and/or simply revised to clarify and simplify the question(s).
Questions and answers are issued to the bidders “For Information Only” and do not revise the solicitation, plans or specifications.)
Question 1:
1. Is the project phased. 2. Who purchases lights? 3. Is Monaco FP panel required? 4. Explain ES100D.
Answer 1:
1a) One Phase only
2) All lighting fixtures, with the exception of Type P3, are to be contractor purchased.
3) Use of Monaco is the basis of design only.
4) All drawings titled as Deduct Option 1, indicate clouded revisions associated with the reduced square footage of the Banquet Hall.
4a) ES100D is issued as a reference to the reduction of building size and the effect on feeder and branch wiring lengths.
Quantities have not changed.
Question 2: Specification section 133423.16 Fabricated Storage Buildings indicated basis of design by Keystone Structures. Note on drawing indicates metal building enclosure similar to Parkline Inc. One appears to be a preassembled building delivered to site, while the other is a kit building that is required to be assembled on-site.
Please clarify which manufacturer is basis of design.
Answer 2: Provide pump enclosure as specified on the fire protection documents. Specification section 13 34 23 is deleted.
Question 3: Specification section 114400.2.2.1.7 Fire protection systems refers to a wet chemical system pre-engineered in accordance with division 21, section 21 23 00.00 20 dry chemical fire extinguishing for kitchen cabinet. There is no section 21 23 00.00 20. Please provide this section.
Answer 3: Requirements for the kitchen fire protection system can be found in the spec info column of the Equipment List in Section 11 06 40.13.
Question 4: Scheduled key note #9 on S102, lists L6x3 1/2x5/16 as support for mechanical equipment. Detail A1/S531 is similar with a L6x4x3/8. But detail E1/S531 also lists a C6x8.2 as a support for mechanical equipment.
Are both details required at Keyed note #9 on plan?
Answer 4: Detail A1 is intended for support of interior equipment hung from roof structure. The L6 in this detail is for bracing equipment to either wide flange beam or joist when diagonal brace is perpendicular to roof deck span.
This angle does not support the roof deck. The L6 in Keynote #9 is similar to angle shown in detail C1 & C3 on S-
523. Bolt rooftop mechanical equipment to this angle. Blocking may be required in gap between rooftop deck and angle. Detail E1/S-531 is required at rooftop mechanical equipment, showing web stiffener angles to be added at joists when load is not at joist panel point. Channel shown in this detail is not required. See attached detail for clarification.
Question 5: Specification 051200 sect. 2.6.2 lists shop primers SSPC paint 20 or 29, which are zinc rich primers, with an SSPC SP6 blast cleaning (section 2.6.2.1). Paint Specification 099000 section 3.13.1 exterior paint tables lists steel to be cleaned per SSPC-SP6 and primed with an MPI 79 (Alkyd primer). Paint Specification 099000 section 3.13.2 interior paint tables Item C. Architectural Structural Steel, to be a High Performance Urethane MPI107. The High Performance Coatings Specification 099600 lists an SSPC-SP7 brush-off blast cleaning, suggesting this is to be applied over galvanized steel. (SSPC-SP7 has been updated to SSPC-SP16 in the latest standards.) The Exterior material schedule on drawing A603 lists the High Performance Paint as PT-1 thru PT-4 suggesting the Hi-Perf paint are for exterior steel. Please verify what finishes are required for the following items:
a. Roof screening support steel. (exterior exposed)
b. Interior concealed structural steel framing.
c. Interior exposed to view structural steel framing.
d. Exterior concealed structural steel framing.( framing outside of the building heated space, but inside the exterior façade, triangle edge framing S401)
e. Roof top safety anchors Answer 5: Angle to be continuous L8x6x3/8. See attached detail for clarification.
Question 6: Please provide elevation drawings for the triangle edges shown in plan view on S-101 and S-102, whose details are on S-401 A1 & A3. There's no indication on how many of the triangles there are, vertically, nor how tall the areas are.
Answer 6: Top of Triangle edge is defined on architectural plans detail A7/A-313. Triangle formed from HSS and Channels are spaced at 2'-0" vertically for the entire height.
Question 7: Drawing A-203 EXTERIOR WALL PATTERN, wall partial elevation A4/A-203. There is wall AB-1 which has (2) types per face: rock face (AB-1A) and ground face (AB-1B). Also, wall AB-1 which has (4) types of size: 2'-0" x 8"h, 1'-4" x 8"h, 1'-0" x 4"h, and 2'-0" x 4"h. Detail E4/A-203 shows (4) types of size: 2'-0" x 8"h, 1'-4" x 8"h, 1'-0" x 4"h, and 2'-0" x 4"h only. For blocks AB-2, AB-3, and AB-4 we assumed rock face only. Please confirm.
Answer 7: Exterior Wall Pattern:
AB-1 (Architectural block) Correct, there are two types of finishes; rock face and ground face. Rock face has 4 sizes and ground face has 2 sizes.
AB-2 (Architectural block) Only ground face finish with 4 sizes. This pattern uses the same pattern on AB-1 (shown on A4, E4 on sheet A-203) without the variation of the finishes.
AB-3 (Architectural block) Only chisel face finish with sizes as indicated on detail 3 / LP503 AB-4 (Granite) Only Flame or thermal finish with 4 sizes. This pattern uses the same pattern on AB-1 (shown on A4, E4 on sheet A-203) without the variation of the finishes.
Question 8: Exterior elevation B1/A-201 of drawing A-201, EAST AND WEST ELEVATIONS, 04.20.2020, AMENDMENT #2, has callouts for AB-1, AB-2, and AB-3. We assumed that types are we assumed rock face only With sizes 2'-0" x 8"h, 1'-4" x 8"h, 1'-0" x 4"h, and 2'-0" x 4"h per detail E4/A-203. Please confirm.
Answer 8: Please refer to inquiry response #8558482 for architectural block finishes along with other information.
Additionally, please note the following:
AB-1 as described on the drawings is generally provided at masonry walls on the first floor along with the east facing wall below the first floor between the vertical metal channel reveal (adjacent to column line 8) and the opposite exterior corner (adjacent to column line 4') since the plane of that exterior wall continues below the first floor.
AB-2 as described on the drawings, the extent of this ground face architectural block siding is on the south facing retaining wall (below the first floor) between the exterior concrete stair and the east edge of south façade (refer to B4/A-202 and A7/A-313). Additionally, AB-2 continues to turn the corner as shown in A9/A-203 and termites at the vertical metal channel reveal that is adjacent to column line 8.
AB-3 as described on the drawings is applied to retaining walls beyond the extent of the building boundary as described in the civil and landscape drawings and on detail 3 / LP503.
Question 9: General note "C" refers to wall type AB-4. Wall schedule on drawing A-603, EXTERIOR FINISH SCHEDULE & DEDUCT OPTION #2, 04.20.2020, AMENDMENT #2 calls for granite wall. Please provide specification and details for granite elevation.
Answer 9: Granite masonry is specified in Section 04 20 00 Unit Masonry with sub-paragraphs including but not limited to 2.2.4.
Add Option Granite masonry "AB-4" replaces architectural block masonry "AB-1" and "AB-2" matching unit size (length, width and depth) along with pattern layout as described on sheet A-203 except finish. AB-4 finish is described in sheet A-603.
Wall sections and details provided in the construction documents are applicable for both architectural block and granite masonry walls.
Question 10: Drawing A-202 NORTH AND SOUTH ELEVATIONS, 04.20.2020, AMENDMENT #2, elevation B4/A-202, shows additional exterior concrete stairs. Building plan A100 shows only (1) exterior stair. Drawing CS101 SITE PLAN, 04.20.2020, AMENDMENT #2, shows sidewalk with (3) couples of steps, 15' between EA.
Please provide revised drawings or clarify.
Answer 10: The stepped sidewalk as shown CS101 Site plan is correct.
Question 11: Please provide the following items for the filter system to meet the project needs:
- Water Quality Flow
- Peak Flow
- Drainage Flow
- % Impervious
- Time of Concentration Answer 11: All of the requested information is in the SWPPP application / Stormwater Management Report in Section 01 57 19 of the 100% project specifications.
Question 12: Please clarify if wood ceiling at Banquette Hall is ship lap, tongue & grove or S4S boards Please clarify if wood ceiling at exterior soffit is Tigerwood per Key Note #6 on A-500 or Teak (WD-2) per Legend #15 on A-110. What is WD-3 finish to be applied on plywood sheeting exposed per Key Note #23 on A-561 ceiling deck.
Answer 12: Based on the drawings in this inquiry (Base Bid drawings), Wood Ceiling in the Banquet Hall is Tigerwood standard type planks (1x6) with a ¾" gap between the ceiling planks. However, exterior soffits are Tigerwood shiplap type planks (5/4 x 6). WD-3 does not exist. Please ignore keynote #23.
Question 13: Specification 07200 calls for a glass-mat gypsum roof board. Drawing A602 assembly R1 shows cement board. Is it a cement board they want on the deck or a gypsum board? Is the coverboard to be a cement or gypsum board.
Answer 13: Provide the following:
Cover board (above insulation / below roofing membrane): As described under Section 07 22 00 paragraph 2.3.
Cover board shall be an approved substrate for roofing manufacturer.
Sheathing (above the metal roof deck / below the roof insulation): Shall be glass mat gypsum roof board with ½" minimum thickness as described under Section 07 22 00 paragraph 1.7.
Question 14: Specification 01 35 91 Historic Treatment Procedures is included in the bid documents. Please advise as to what part of the work this applies to or if it is not applicable Answer 14: Spec Section 01 35 91_Historic Treatment Procedures was deleted as part of USACE issued Amendment 2.
Question 15: Regarding specification 01 91 00.15 Commissioning, will this work be done by owner or required by contractor?
Answer 15: Required by the contractor.
Question 16: Specification 01 81 23 Blast Resistance Requirements is included in the spec. book but we do not find this referenced on plans. Is there requirement to include this or is it not applicable?
Answer 16: Refer to Specification 01 81 23 for ATFP requirements. Please note that anchorage and connections shall be for conventional loading only. Refer to Material specific specifications and drawings for Conventional Loading design criteria.
Question 17: Specification 07200 calls for a glass-mat gypsum roof board. Drawing A602 assembly R1 shows cement board. Is it a cement board they want on the deck or a gypsum board? Is the coverboard to be a cement or gypsum board?
Answer 17: Cover board (above insulation / below roofing membrane): As described under Section 07 22 00 paragraph 2.3. Cover board shall be an approved substrate for roofing manufacturer.
Sheathing (above the metal roof deck / below the roof insulation): Shall be glass mat gypsum roof board as described under Section 07 22 00 paragraph 1.7.
Question 18: Specification section 123200 par. 2.1 indicates to construct cabinets as specified meeting the requirements of the Architectural Woodwork Institutes AWI AWS Architectural Woodwork Standards and the Quality Certification Program. This does not specifically state the fabricator is required to hold a AWI AWS certification. Please advise if the fabricator is required to be AWI AWS certified. Please advise if this requirement is also applicable to specifications sections 064116.00 10 Plastic-Laminate-Clad Architectural Cabinets and 066116 Solid Surfacing Fabrications Answer 18: Construction of cabinetry within 12 23 00 shall meet the requirements of the Architectural Woodwork Institutes AWI AWS Architectural Woodwork Standards and Quality Certification Program. In order to meet these requirements, the fabricator shall hold QCP license, the individual project shall be certified and upon awarded work, the fabricator shall register the work for QCP certification. This requirement also applies to specification sections 06 41 16.00-10 Plastic Laminate-Clad Architectural Cabinets and 06 61 16 Solid Surfacing Fabrication.
Question 19: What are the charge weight and standoff distances for blast mitigation?
Answer 19: This information is not required to bid.
Question 20: Please confirm that this bid will be submitted electronically through the DoD SAFE site.
Answer 20: Correct. Refer to Div 0 Instructions to bidders. Follow closely.
Question 21: Following Amendment #0003 please confirm that the bid proposal will only consist of
1. Signed 1442.
2. Acknowledged amendments.
3. Filled out bid schedule and totals.
4. Bid Guarantee.
5. Representations and Certification Report Answer 21: Confirmed
Question 22: Following Amendment #0003 please confirm that the bid proposal will only consist of
1. Signed 1442.
2. Acknowledged amendments.
3. Filled out bid schedule and totals.
4. Bid Guarantee.
5. Representations and Certification Report Answer 22: Confirmed
Question 23: Amendment #0004 states to find Section 00 21 13 Instructions to Bidders in Amendment #0003.
Section 00 21 13 Instructions to Bidders was included in Amendment #0002. Please confirm if there is in Section 00 21 13 Instructions to Bidders for Amendment #0003 and forward.
Answer 23: Answer 10 of Amendment 0004 is revised to: See amendment 0002 section 00 21 13 for instructions.
The solicitation continues to have Section 00 21 13 Instructions to Bidders.
Question 24: Pursuant to Amendment #0002 Section 00 21 13 instructions to Bidders Please provide the Notice of Intent to Bid form which is to be provided to the Contracting Officers two (2) days prior to the bid opening.
Answer 24: Form not required, an e-mail message with subject “Notice of Intent to Bid”. Including in the message your company name, contact name, phone number will be sufficient.
Question 25: Section 01 10 00 Statement of Work was not included within the bid documents as noted under Amendment #0001 Special Contract Requirements. Please provide Section 01 10 00 Statement of Work.
Answer 25: This section is part of the original solicitation.
Question 26: Please confirm that a small business participation plan or a small business subcontracting plan are not required to be forwarded with the bid.
Answer 26: Confirmed not required, will be required if a large business is the apparent low responsive and responsible bidder.
Question 27: Drawing T-101 indicates the OSP cabling pathways but is not to scale. T-101 refers to CU-101 but the pathway on the two drawings do not match up. Please advise.
Drawing T-102 indicates rack as P2P6S, confirm if these are meant to be R2P6S.
Answer 27: T-101 provides the distances from the existing HH-1043 to HH-1046.5 and is a single line drawing not to scale. CU-101 is a scaled drawing showing the new "COMM" ductbank routing. CU-101 "COMM" Handhold locations use the Keynotes: HH-1046.5=#13, HH-1047.1=#9, HH-1047.5=#15.
On Drawing T-102 the part number is a typo. The correct part number for the rack is "R2P6S" as highlighted on the supplied cutsheets.
Question 28: The Representations & Certifications that are in SAM.gov, which are standard for solicitations across the government, do not include Prohibition Segregated Facilities as part of the selection process. There is no capability to personize the Representations and Certifications under SAM.gov. As specified on the attached Invitation for Bids, please advise what type of information is required and what format to be filled out in to satisfy the Prohibition Segregated Facilities requirement.
Additionally, the Representations & Certifications that are in SAM.gov does not include the selection for 52.209-12 Certification Regarding Tax Matters (FEB 2016) which is highlighted as a requirement in this bid under Section 00
45 00 Representations and Certifications. Please advise what type of information is required and what format to be filled out in to satisfy this requirement.
Answer 28:
52.222-21 Prohibition Segregated Facilities as stated in the FAR:
Prohibition of Segregated Facilities (Apr 2015)
(a) Definitions. As used in this clause
Gender identity has the meaning given by the Department of Labor’s Office of Federal Contract Compliance Programs, and is found at http://www.dol.gov/ofccp/LGBT/LGBT_FAQs.html.
Segregated facilities, means any waiting rooms, work areas, rest rooms and wash rooms, restaurants and other eating areas, time clocks, locker rooms and other storage or dressing areas, parking lots, drinking fountains, recreation or entertainment areas, transportation, and housing facilities provided for employees, that are segregated by explicit directive or are in fact segregated on the basis of race, color, religion, sex, sexual orientation, gender identity, or national origin because of written or oral policies or employee custom. The term does not include separate or single-user rest rooms or necessary dressing or sleeping areas provided to assure privacy between the sexes.
Sexual orientation has the meaning given by the Department of Labor’s Office of Federal Contract Compliance Programs, and is found at http://www.dol.gov/ofccp/LGBT/LGBT_FAQs.html.
(b) The Contractor agrees that it does not and will not maintain or provide for its employees any segregated facilities at any of its establishments, and that it does not and will not permit its employees to perform their services at any location under its control where segregated facilities are maintained. The Contractor agrees that a breach of this clause is a violation of the Equal Opportunity clause in this contract.
(c) The Contractor shall include this clause in every subcontract and purchase order that is subject to the Equal Opportunity clause of this contract.
(End of clause)
Please follow the guidelines within the clause.
Regarding 52.209-12 it is incorporated in the solicitation as a separate clause as a fill-in, please find in section 00 45 00 and insert an X mark in the appropriate place within the clause.
Question 29: Spec 01 30 00 indicates a minimum required number/experience of "Contractor's Key Management Personnel" to be allocated to the job. Are those strict requirements or is it up to the Contractor's judgment to follow those requirements?
Answer 29: Yes they are project requirements.