This abstract of offers summarizes bids received in response to Solicitation Number W912DS-20-B-0008 for the construction of a new Golf Clubhouse at West Point, New York. Fourteen contractors submitted bids for the base work and optional items. The apparent low bid was $14,297,131 from IGE Benaka Inc. for the base work alone. Total bids including deductive and optional items ranged from $14,530,031 for IGE Benaka Inc. to $24,271,225 for The Morganti Group. The scope of work includes construction of a single-story, 12,500 square foot clubhouse with banquet hall, snack bar, kitchen, restrooms, pro shop, and support spaces. Optional items involve exterior materials, a moveable snack bar screen, mockups and testing, and a perforated metal roof screen.
View the file
Other files
Show all 26
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet2
| ABSTRACT OF OFFERS - CONSTRUCTION | 1. SOLICITATION NUMBER: | |||
| W912DS-20-B-0008 | 2. DATE ISSUED: | |||
| 21-MAY-2020 | 3. DATE OPENED: |
20-MAY-2020
4. ISSUING OFFICE:
U.S. Army Corps of Engineering, NY District 26 Federal Plaza, Room 16-300 New York N.Y. 10278-0090 I CERTIFY that I have opened, read, and recorded on this abstract all offers received in response to this solicitation. NAME AND TITLE OF CERTIFYING OFFICIAL:
Orlando Nieves
| Signature: | |
| Orlando Nieves | |
| 5. PROJECT TITLE: |
Golf Club House
| Date Signed: | |
| 21-May-20 | |
| 6. NUMBER OF AMENDMENTS ISSUED: |
Seven (7)
| BIDDER #1 | BIDDER #2 | BIDDER #3 | BIDDER #4 | BIDDER #5 | BIDDER #6 | BIDDER #7 | BIDDER #8 | BIDDER #9 | BIDDER #10 | BIDDER #11 | BIDDER #12 | BIDDER #13 | BIDDER #14 | ||||||
| ITEM NO. | DESCRIPTION OF ITEM | IGE | Benaka Inc | Benard Associates Inc | Cleveland Construction | Consigli | Dobco Inc | En Field Conterprises | EW Howell | FOS Development | Intercontinental Construction | Kokolakis | LeChase | Patriot CO | PK Contracting Inc | The Morganti Group | |||
| 0001 | All work associated with the construction of the Golf Club House Facility in accordance with the plans and | ||||||||||||||||||
| specifications EXCEPT for CLINs 0002 thru 0015. | $ 11,778,900.00 | $ 16,970,000.00 | $ 16,925,000.00 | $ 20,450,000.00 | $ 13,603,000.00 | $ 16,269,869.00 | $ 19,557,985.41 | $ 18,487,000.00 | $ 14,952,023.00 | $ 13,688,100.00 | $ 14,867,614.00 | $ 19,243,255.00 | $ 15,238,996.76 | $ 21,139,917.00 | $ 19,246,226.00 | ||||
| 0002 | All work associated with construction of a water main connection as per the plans and specifications. |
Eng, Emily S CIV CENAN CENAD (US): Eng, Emily S CIV CENAN CENAD (US):
| $ 1,071,500.00 | $ 1,200,000.00 | $ 1,360,000.00 | $ 586,000.00 | $ 1,085,000.00 | $ 470,000.00 | $ 806,548.01 | $ 1,885,000.00 | $ 1,410,500.00 | $ 868,500.00 | $ 1,085,000.00 | $ 903,082.00 | $ 1,009,576.43 | $ 1,207,500.00 | $ 600,000.00 | |||||
| 0003 | A one- time payment to Orange and Rockland for the installation of primary from pole to and including a pad | ||||||||||||||||||
| mounted transformer. Prepriced and cannot be changed. | $406,631.00 | $406,631.00 | $406,631.00 | $406,631.00 | $406,631.00 | $406,631.00 | $406,631.00 | $406,631.00 | $406,631.00 | $406,631.00 | $406,631.00 | $406,631.00 | $406,631.00 | $406,631.00 | $406,631.00 | ||||
| 0004 | All work associated with construction of the secondary underground electrical connection from the transformer to the MDP | $ 122,900.00 | $ 75,000.00 | $ 65,500.00 | $ 89,000.00 | $ 58,000.00 | $ 70,000.00 | $ 53,251.71 | $ 48,700.00 | $ 114,400.00 | $ 26,667.00 | $ 58,000.00 | $ 78,450.00 | $ 58,334.42 | $ 82,110.00 | $ 69,000.00 | |||
| 0005 | All work associated with the construction of the sanitary sewer connection as per plans and specifications. | $ 854,100.00 | $ 1,200,000.00 | $ 1,411,000.00 | $ 489,000.00 | $ 1,446,000.00 | $ 492,000.00 | $ 709,960.59 | $ 1,925,000.00 | $ 1,820,000.00 | $ 931,680.00 | $ 1,446,000.00 | $ 926,957.00 | $ 1,013,898.88 | $ 1,207,500.00 | $ 640,000.00 | |||
| 0006 | Handhole EMH-4 and associated 6” conduit from switchboard to handhole, as indicated on ES-100, E-601, E-623. | $ 13,100.00 | $ 12,000.00 | $ 7,000.00 | $ 4,000.00 | $ 8,000.00 | $ 10,000.00 | $ 19,465.69 | $ 2,800.00 | $ 23,400.00 | $ 5,688.00 | $ 2,200.00 | $ 15,122.00 | $ 32,318.18 | $ 21,735.00 | $ 11,000.00 | |||
| 0007 | As Built Plans and Specifications O/M Manuals, and BIM COBIE data following construction. |
Prepriced and cannot be changed.
Eng, Emily S CIV CENAN CENAD (US): Eng, Emily S CIV CENAN CENAD (US):
| $ 50,000.00 | $ 50,000.00 | $ 50,000.00 | $ 50,000.00 | $ 50,000.00 | $ 50,000.00 | $ 50,000.00 | $ 50,000.00 | $ 50,000.00 | $ 50,000.00 | $ 50,000.00 | $ 50,000.00 | $ 50,000.00 | $ 50,000.00 | $ 50,000.00 | ||
| 0008 | Deductive Item # 1 Veneer Masonry Wall: Substitution of 1" block in lieu of 4" block. |
(This deduct is shown as No 3 in section 01 11 00, page 2 And as deduct no 3 on the plans).
Eng, Emily S CIV CENAN CENAD (US): Eng, Emily S CIV CENAN CENAD (US):
Eng, Emily S CIV CENAN CENAD (US): Eng, Emily S CIV CENAN CENAD (US):
| $ (80,500.00) | $ (5,900.00) | $ 342,000.00 | $ 138,000.00 | $ 160,078.00 | $ (1.00) | $ 150,626.00 | $ 210,000.00 | $ (31,400.00) | $ (46,665.00) | $ 101,900.00 | $ 286,635.00 | $ 101,996.37 | $ (1,000.00) | $ 135,000.00 | ||
| 0009 | Deductive Item # 2 Garapa Wood in lieu of Tigerwood: Use of Garapa wood in lieu of Tigerwood |
rainscreens and soffits. (This deduct is shown as No 2 in section 01 11
| 00, page 2 And as deduct no 2 on the plans). | $ (34,000.00) | $ (105,000.00) | $ (5,000.00) | $ (20,000.00) | $ - 0 | $ (20,000.00) | $ (6,025.04) | $ (5,000.00) | $ (2,340.00) | $ (18,864.00) | $ (5,100.00) | $ (111,230.00) | $ (5,333.00) | $ (13,000.00) | $ (9,000.00) | ||||
| 0010 | Deductive Item # 3 Banquet Hall GWB Ceiling Replacement of planked wood in the banquet hall with | ||||||||||||||||||
| painted GWB. (This deduct is shown as No 4 in section 01 11 00, page 2 And as deduct no 4 on the plans). | $ (65,900.00) | $ (270,000.00) | $ (77,800.00) | $ (4,000.00) | $ (68,008.00) | $ (79,999.00) | $ (150,626.00) | $ (110,000.00) | $ (43,650.00) | $ (21,699.00) | $ (120,200.00) | $ (104,230.00) | $ (201,748.04) | $ (34,920.00) | $ (69,000.00) | ||||
| 0011 | Deductive Item # 4 Reduced Gross Area All work associated with the reduction of banquet hall area. | ||||||||||||||||||
| (This deduct is shown as No 1 in section 01 11 00, page 2 and as deduct no 1 on the plans). | $ (300,100.00) | $ (225,000.00) | $ (213,000.00) | $ (216,000.00) | $ (90,520.00) | $ (240,000.00) | $ (231,637.47) | $ (185,000.00) | $ (137,250.00) | $ (669,330.00) | $ (148,800.00) | $ (605,335.00) | $ (504,779.75) | $ (175,000.00) | $ (185,000.00) | ||||
| 0012 | Optional Item # 1 Exterior Skin: Provide Granite (AB-4) for the exterior stone and Natural Stone | ||||||||||||||||||
| (XW2) at back wall of Snack Bar-124 (to match Granite exterior stone), as indicated on A-201, A- 202, A-603 and I-101, I-600. | $ 416,500.00 | $ 200,000.00 | $ 173,000.00 | $ 147,000.00 | $ 347,591.00 | $ 115,000.00 | $ 174,726.16 | $ 471,000.00 | $ 178,620.00 | $ 168,660.00 | $ 113,000.00 | $ 371,870.00 | $ 157,484.94 | $ 49,773.00 | $ 450,000.00 | ||||
| 0013 | Optional Item # 2 Moveable Screen at Snack Bar: Moveable Screen at Snack Bar, including | ||||||||||||||||||
| structural supports, as indicated on I-200, I-502 and S-103, S-531. | $ 22,300.00 | $ 52,000.00 | $ 50,000.00 | $ 45,000.00 | $ 41,525.00 | $ 75,000.00 | $ 27,504.31 | $ 85,000.00 | $ 50,736.00 | $ 21,699.00 | $ 41,700.00 | $ 66,760.00 | $ 46,042.25 | $ 41,055.00 | $ 79,000.00 | ||||
| 0014 | Optional Item # 3 Mock-ups and Testing: Mock-ups and Testing for the exterior systems, as indicated | ||||||||||||||||||
| in individual spec sections. | $ 100,800.00 | $ 155,000.00 | $ 110,000.00 | $ 145,000.00 | $ 74,975.00 | $ 75,000.00 | $ 25,305.16 | $ 202,000.00 | $ 24,700.00 | $ 101,997.00 | $ 72,500.00 | $ 98,316.00 | $ 126,639.04 | $ 36,255.00 | $ 160,000.00 | ||||
| 0015 | Optional Item # 4 Perforated Metal Roof Screen: Provide Perforated Metal Roof Screen and | ||||||||||||||||||
| associated structural supports, as indicated on A-101, A-201, A-202, A-313. | $ 173,800.00 | $ 135,000.00 | $ 242,000.00 | $ 250,000.00 | $ 289,201.00 | $ 135,000.00 | $ 221,040.64 | $ 262,000.00 | $ 161,954.00 | $ 151,767.00 | $ 146,900.00 | $ 218,690.00 | $ 226,347.65 | $ 252,669.00 | $ 290,000.00 | ||||
| TOTAL BASE CLINS 0001-0007 | $ 14,297,131.00 | $ 19,913,631.00 | $ 20,225,131.00 | $ 22,074,631.00 | $ 16,656,631.00 | $ 17,768,500.00 | $ 21,603,842.41 | $ 22,805,131.00 | $ 18,776,954.00 | $ 15,977,266.00 | $ 17,915,445.00 | $ 21,623,497.00 | $ 17,809,755.67 | $ 24,115,393.00 | $ 21,022,857.00 | ||||
| TOTAL DEDUCTIVE ITEMS 0008-0011 | $ (480,500.00) | $ (605,900.00) | $ 46,200.00 | $ (102,000.00) | $ 1,550.00 | $ (340,000.00) | $ (237,662.51) | $ (90,000.00) | $ (214,640.00) | $ (756,558.00) | $ (172,200.00) | $ (534,160.00) | $ (609,864.42) | $ (223,920.00) | $ (128,000.00) | ||||
| TOTAL OPTIONAL CLINS 0012-0015 | $ 713,400.00 | $ 542,000.00 | $ 575,000.00 | $ 587,000.00 | $ 753,292.00 | $ 400,000.00 | $ 448,576.27 | $ 1,020,000.00 | $ 416,010.00 | $ 444,123.00 | $ 374,100.00 | $ 755,636.00 | $ 556,513.88 | $ 379,752.00 | $ 979,000.00 | ||||
| TOTAL BASE, PLUS DEDUCTIVE, PLUS OPTIONAL CLINS 0001-0015 | $ 14,530,031.00 | $ 19,849,731.00 | $ 20,846,331.00 | $ 22,559,631.00 | $ 17,411,473.00 | $ 17,828,500.00 | $ 21,814,756.17 | $ 23,735,131.00 | $ 18,978,324.00 | $ 15,664,831.00 | $ 18,117,345.00 | $ 21,844,973.00 | $ 17,756,405.13 | $ 24,271,225.00 | $ 21,873,857.00 |