LockedBidabstractW912DS20B0008 Golf Club House.xlsx

XLSX spreadsheet 20 KB Posted

Attached to
Construct Golf Clubhouse West Point NY
Solicitation number
W912DS20B0008
Issued by

About this file

This abstract of offers summarizes bids received in response to Solicitation Number W912DS-20-B-0008 for the construction of a new Golf Clubhouse at West Point, New York. Fourteen contractors submitted bids for the base work and optional items. The apparent low bid was $14,297,131 from IGE Benaka Inc. for the base work alone. Total bids including deductive and optional items ranged from $14,530,031 for IGE Benaka Inc. to $24,271,225 for The Morganti Group. The scope of work includes construction of a single-story, 12,500 square foot clubhouse with banquet hall, snack bar, kitchen, restrooms, pro shop, and support spaces. Optional items involve exterior materials, a moveable snack bar screen, mockups and testing, and a perforated metal roof screen.

View the file

Other files

Show all 26

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet2

ABSTRACT OF OFFERS - CONSTRUCTION1. SOLICITATION NUMBER:
W912DS-20-B-00082. DATE ISSUED:
21-MAY-20203. DATE OPENED:

20-MAY-2020

4. ISSUING OFFICE:

U.S. Army Corps of Engineering, NY District 26 Federal Plaza, Room 16-300 New York N.Y. 10278-0090 I CERTIFY that I have opened, read, and recorded on this abstract all offers received in response to this solicitation. NAME AND TITLE OF CERTIFYING OFFICIAL:

Orlando Nieves

Signature:
Orlando Nieves
5. PROJECT TITLE:

Golf Club House

Date Signed:
21-May-20
6. NUMBER OF AMENDMENTS ISSUED:

Seven (7)

BIDDER #1BIDDER #2BIDDER #3BIDDER #4BIDDER #5BIDDER #6BIDDER #7BIDDER #8BIDDER #9BIDDER #10BIDDER #11BIDDER #12BIDDER #13BIDDER #14
ITEM NO.DESCRIPTION OF ITEMIGEBenaka IncBenard Associates IncCleveland ConstructionConsigliDobco IncEn Field ConterprisesEW HowellFOS DevelopmentIntercontinental ConstructionKokolakisLeChasePatriot COPK Contracting IncThe Morganti Group
0001All work associated with the construction of the Golf Club House Facility in accordance with the plans and
specifications EXCEPT for CLINs 0002 thru 0015.$ 11,778,900.00$ 16,970,000.00$ 16,925,000.00$ 20,450,000.00$ 13,603,000.00$ 16,269,869.00$ 19,557,985.41$ 18,487,000.00$ 14,952,023.00$ 13,688,100.00$ 14,867,614.00$ 19,243,255.00$ 15,238,996.76$ 21,139,917.00$ 19,246,226.00
0002All work associated with construction of a water main connection as per the plans and specifications.

Eng, Emily S CIV CENAN CENAD (US): Eng, Emily S CIV CENAN CENAD (US):

$ 1,071,500.00$ 1,200,000.00$ 1,360,000.00$ 586,000.00$ 1,085,000.00$ 470,000.00$ 806,548.01$ 1,885,000.00$ 1,410,500.00$ 868,500.00$ 1,085,000.00$ 903,082.00$ 1,009,576.43$ 1,207,500.00$ 600,000.00
0003A one- time payment to Orange and Rockland for the installation of primary from pole to and including a pad
mounted transformer. Prepriced and cannot be changed.$406,631.00$406,631.00$406,631.00$406,631.00$406,631.00$406,631.00$406,631.00$406,631.00$406,631.00$406,631.00$406,631.00$406,631.00$406,631.00$406,631.00$406,631.00
0004All work associated with construction of the secondary underground electrical connection from the transformer to the MDP$ 122,900.00$ 75,000.00$ 65,500.00$ 89,000.00$ 58,000.00$ 70,000.00$ 53,251.71$ 48,700.00$ 114,400.00$ 26,667.00$ 58,000.00$ 78,450.00$ 58,334.42$ 82,110.00$ 69,000.00
0005All work associated with the construction of the sanitary sewer connection as per plans and specifications.$ 854,100.00$ 1,200,000.00$ 1,411,000.00$ 489,000.00$ 1,446,000.00$ 492,000.00$ 709,960.59$ 1,925,000.00$ 1,820,000.00$ 931,680.00$ 1,446,000.00$ 926,957.00$ 1,013,898.88$ 1,207,500.00$ 640,000.00
0006Handhole EMH-4 and associated 6” conduit from switchboard to handhole, as indicated on ES-100, E-601, E-623.$ 13,100.00$ 12,000.00$ 7,000.00$ 4,000.00$ 8,000.00$ 10,000.00$ 19,465.69$ 2,800.00$ 23,400.00$ 5,688.00$ 2,200.00$ 15,122.00$ 32,318.18$ 21,735.00$ 11,000.00
0007As Built Plans and Specifications O/M Manuals, and BIM COBIE data following construction.

Prepriced and cannot be changed.

Eng, Emily S CIV CENAN CENAD (US): Eng, Emily S CIV CENAN CENAD (US):

$ 50,000.00$ 50,000.00$ 50,000.00$ 50,000.00$ 50,000.00$ 50,000.00$ 50,000.00$ 50,000.00$ 50,000.00$ 50,000.00$ 50,000.00$ 50,000.00$ 50,000.00$ 50,000.00$ 50,000.00
0008Deductive Item # 1 Veneer Masonry Wall: Substitution of 1" block in lieu of 4" block.

(This deduct is shown as No 3 in section 01 11 00, page 2 And as deduct no 3 on the plans).

Eng, Emily S CIV CENAN CENAD (US): Eng, Emily S CIV CENAN CENAD (US):

Eng, Emily S CIV CENAN CENAD (US): Eng, Emily S CIV CENAN CENAD (US):

$ (80,500.00)$ (5,900.00)$ 342,000.00$ 138,000.00$ 160,078.00$ (1.00)$ 150,626.00$ 210,000.00$ (31,400.00)$ (46,665.00)$ 101,900.00$ 286,635.00$ 101,996.37$ (1,000.00)$ 135,000.00
0009Deductive Item # 2 Garapa Wood in lieu of Tigerwood: Use of Garapa wood in lieu of Tigerwood

rainscreens and soffits. (This deduct is shown as No 2 in section 01 11

00, page 2 And as deduct no 2 on the plans).$ (34,000.00)$ (105,000.00)$ (5,000.00)$ (20,000.00)$ - 0$ (20,000.00)$ (6,025.04)$ (5,000.00)$ (2,340.00)$ (18,864.00)$ (5,100.00)$ (111,230.00)$ (5,333.00)$ (13,000.00)$ (9,000.00)
0010Deductive Item # 3 Banquet Hall GWB Ceiling Replacement of planked wood in the banquet hall with
painted GWB. (This deduct is shown as No 4 in section 01 11 00, page 2 And as deduct no 4 on the plans).$ (65,900.00)$ (270,000.00)$ (77,800.00)$ (4,000.00)$ (68,008.00)$ (79,999.00)$ (150,626.00)$ (110,000.00)$ (43,650.00)$ (21,699.00)$ (120,200.00)$ (104,230.00)$ (201,748.04)$ (34,920.00)$ (69,000.00)
0011Deductive Item # 4 Reduced Gross Area All work associated with the reduction of banquet hall area.
(This deduct is shown as No 1 in section 01 11 00, page 2 and as deduct no 1 on the plans).$ (300,100.00)$ (225,000.00)$ (213,000.00)$ (216,000.00)$ (90,520.00)$ (240,000.00)$ (231,637.47)$ (185,000.00)$ (137,250.00)$ (669,330.00)$ (148,800.00)$ (605,335.00)$ (504,779.75)$ (175,000.00)$ (185,000.00)
0012Optional Item # 1 Exterior Skin: Provide Granite (AB-4) for the exterior stone and Natural Stone
(XW2) at back wall of Snack Bar-124 (to match Granite exterior stone), as indicated on A-201, A- 202, A-603 and I-101, I-600.$ 416,500.00$ 200,000.00$ 173,000.00$ 147,000.00$ 347,591.00$ 115,000.00$ 174,726.16$ 471,000.00$ 178,620.00$ 168,660.00$ 113,000.00$ 371,870.00$ 157,484.94$ 49,773.00$ 450,000.00
0013Optional Item # 2 Moveable Screen at Snack Bar: Moveable Screen at Snack Bar, including
structural supports, as indicated on I-200, I-502 and S-103, S-531.$ 22,300.00$ 52,000.00$ 50,000.00$ 45,000.00$ 41,525.00$ 75,000.00$ 27,504.31$ 85,000.00$ 50,736.00$ 21,699.00$ 41,700.00$ 66,760.00$ 46,042.25$ 41,055.00$ 79,000.00
0014Optional Item # 3 Mock-ups and Testing: Mock-ups and Testing for the exterior systems, as indicated
in individual spec sections.$ 100,800.00$ 155,000.00$ 110,000.00$ 145,000.00$ 74,975.00$ 75,000.00$ 25,305.16$ 202,000.00$ 24,700.00$ 101,997.00$ 72,500.00$ 98,316.00$ 126,639.04$ 36,255.00$ 160,000.00
0015Optional Item # 4 Perforated Metal Roof Screen: Provide Perforated Metal Roof Screen and
associated structural supports, as indicated on A-101, A-201, A-202, A-313.$ 173,800.00$ 135,000.00$ 242,000.00$ 250,000.00$ 289,201.00$ 135,000.00$ 221,040.64$ 262,000.00$ 161,954.00$ 151,767.00$ 146,900.00$ 218,690.00$ 226,347.65$ 252,669.00$ 290,000.00
TOTAL BASE CLINS 0001-0007$ 14,297,131.00$ 19,913,631.00$ 20,225,131.00$ 22,074,631.00$ 16,656,631.00$ 17,768,500.00$ 21,603,842.41$ 22,805,131.00$ 18,776,954.00$ 15,977,266.00$ 17,915,445.00$ 21,623,497.00$ 17,809,755.67$ 24,115,393.00$ 21,022,857.00
TOTAL DEDUCTIVE ITEMS 0008-0011$ (480,500.00)$ (605,900.00)$ 46,200.00$ (102,000.00)$ 1,550.00$ (340,000.00)$ (237,662.51)$ (90,000.00)$ (214,640.00)$ (756,558.00)$ (172,200.00)$ (534,160.00)$ (609,864.42)$ (223,920.00)$ (128,000.00)
TOTAL OPTIONAL CLINS 0012-0015$ 713,400.00$ 542,000.00$ 575,000.00$ 587,000.00$ 753,292.00$ 400,000.00$ 448,576.27$ 1,020,000.00$ 416,010.00$ 444,123.00$ 374,100.00$ 755,636.00$ 556,513.88$ 379,752.00$ 979,000.00
TOTAL BASE, PLUS DEDUCTIVE, PLUS OPTIONAL CLINS 0001-0015$ 14,530,031.00$ 19,849,731.00$ 20,846,331.00$ 22,559,631.00$ 17,411,473.00$ 17,828,500.00$ 21,814,756.17$ 23,735,131.00$ 18,978,324.00$ 15,664,831.00$ 18,117,345.00$ 21,844,973.00$ 17,756,405.13$ 24,271,225.00$ 21,873,857.00