35_41_00.pdf
PDF 146 KB Posted
- Solicitation number
- W912DS19B0009
About this file
Specification 35 41 00
View the file
Other files
Show 40 more
Latest 50 of 56 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Gr een Br ook, Segment C- 1
AMENDMENT # 3
35 41 00
LEVEE CONSTRUCTI ON
PART 1 GENERAL
1. 1 REFERENCES
The publ i cat i ons l i s t ed bel ow f or m a par t of t hi s speci f i cat i on t o t he ext ent r ef er enced. The publ i cat i ons ar e r ef er r ed t o wi t hi n t he t ext by t he basi c desi gnat i on onl y.
AMERI CAN ASSOCI ATI ON OF STATE HI GHWAY AND TRANSPORTATI ON OFFI CI ALS
(AASHTO)
AASHTO M 43 ( 2005; R 2009) St andar d Speci f i cat i on f or Si zes of Aggr egat e f or Road and Br i dge Construction
AASHTO T 180 ( 2015) St andar d Met hod of Test f or Moi st ur e- Densi t y Rel at i ons of Soi l s Usi ng a 4. 54- kg ( 10- l b) Rammer and a 457- mm ( 18- i n. ) Dr op
AASHTO T 224 ( 2010) St andar d Met hod of Test f or Cor r ect i on f or Coar se Par t i c l es i n t he Soi l Compact i on Test
ASTM I NTERNATI ONAL ( ASTM)
ASTM C33/ C33M ( 2018) St andar d Speci f i cat i on f or Concr et e Aggregates
ASTM D1556/ D1556M ( 2015; E 2016) St andar d Test Met hod f or Densi t y and Uni t Wei ght of Soi l i n Pl ace by Sand- Cone Met hod
ASTM D1557 ( 2012; E 2015) St andar d Test Met hods f or Labor at or y Compact i on Char act er i s t i cs of Soi l Usi ng Modi f i ed Ef f or t ( 56, 000 f t - l bf / f t 3) ( 2700 kN- m/ m3)
ASTM D1785 ( 2012) St andar d Speci f i cat i on f or Pol y( Vi nyl Chl or i de) ( PVC) , Pl ast i c Pi pe, Schedul es 40, 80, and 120
ASTM D2167 ( 2015) Densi t y and Uni t Wei ght of Soi l i n Pl ace by t he Rubber Bal l oon Met hod
ASTM D2216 ( 2010) Labor at or y Det er mi nat i on of Wat er ( Moi st ur e) Cont ent of Soi l and Rock by Mass
ASTM D2467 ( 2015) St andar d Speci f i cat i on f or Pol y( Vi nyl Chl or i de) ( PVC) Pl ast i c Pi pe Fi t t i ngs, Schedul e 80
SECTI ON 35 41 00 Page 1
ASTM D2487 ( 2017) Soi l s f or Engi neer i ng Pur poses ( Uni f i ed Soi l Cl assi f i cat i on Syst em)
ASTM D2937 ( 2017; E 2017) St andar d Test Met hod f or Densi t y of Soi l i n Pl ace by t he Dr i ve- Cyl i nder Met hod
ASTM D422 ( 1963; R 2007; E 2014; E 2014)
Par t i c l e- Si ze Anal ysi s of Soi l s
ASTM D4318 ( 2017) St andar d Test Met hods f or Li qui d Li mi t , Pl ast i c Li mi t , and Pl ast i c i t y I ndex of Soi l s
ASTM D4643 ( 2017) St andar d Test Met hod f or Det er mi nat i on of Wat er Cont ent of Soi l and Rock by Mi cr owave Oven Heat i ng
ASTM D5084 ( 2010) Measur ement of Hydr aul i c Conduct i v i t y of Sat ur at ed Por ous Mat er i al s Usi ng a Fl exi bl e Wal l Per meamet er
ASTM D5195 ( 2014) Densi t y of Soi l and Rock I n- Pl ace at Dept hs Bel ow t he Sur f ace by Nucl ear Methods
ASTM D6938 ( 2017) St andar d Test Met hod f or I n- Pl ace Densi t y and Wat er Cont ent of Soi l and Soi l - Aggr egat e by Nucl ear Met hods ( Shal l ow Depth)
U. S. ARMY CORPS OF ENGI NEERS ( USACE)
EM 385- 1- 1 ( 2014) Saf et y and Heal t h Requi r ement s Manual
1. 2 DEFINITIONS
1. 2. 1 Clearing
Cl ear i ng consi st s of t he r emoval and sat i sf act or y di sposal of al l above gr ound and bel ow gr ound t r ees, downed t i mber , snags, s l ash, br ush, gar bage, t r ash, debr i s, f enci ng, and ot her i t ems occur r i ng i n t he desi gnat ed ar eas t o be c l ear ed.
1. 2. 2 Grubbing
Gr ubbi ng consi st s of t he r emoval and sat i sf act or y di sposal of st umps, r oot s l ar ger t han 1. 5 i nches i n di amet er , and mat t ed r oot s f r om t he desi gnat ed gr ubbi ng ar eas.
1. 2. 3 Stripping
St r i ppi ng consi st s of t he r emoval and sat i sf act or y di sposal of weeds, gr ass, and ot her veget at i ve mat er i al s t o t he gr ound sur f ace and t opsoi l t o a dept h of 12 i nches or l ess t o ensur e t opsoi l r emoval .
SECTI ON 35 41 00 Page 2
1. 2. 4 Sat i sf act or y Mat er i al s
Sat i sf act or y mat er i al s consi st s of mat er i al s c l assi f i ed i n accor dance wi t h ASTM D2487 as CL, CH, CL- ML, ML, MH, SC, SP, SW, SM f r ee f r om: r oot s and ot her or gani c mat t er ; cont ami nat i on f r om hazar dous, t oxi c or r adi ol ogi cal subst ances; t r ash, debr i s; and f r ozen mat er i al s. Not al l sat i sf act or y mat er i al s can be used i n l evee. Onl y sel ect sat i s f act or y mat er i al s st at ed above, meet i ng t he addi t i onal or modi f i ed r equi r ement s of t he Par agr aph t i t l ed " TYPES OF FI LL MATERI ALS" , can be used f or l evee const r uct i on.
1. 2. 5 Unsat i sf act or y Mat er i al s
Unsat i sf act or y mat er i al s shal l not be used i n any l evee or ot her r equi r ed f i l l . Unsat i sf act or y mat er i al s i ncl udes al l ot her mat er i al s t hat ar e not def i ned above as sat i sf act or y mat er i al s. Unsat i sf act or y mat er i al s al so i ncl udes man- made f i l l s , t r ash, r ef use, and mat er i al s c l assi f i ed as sat i sf act or y whi ch cont ai ns r oot and ot her or gani c mat t er or f r ozen materials.
1. 2. 6 Embankment
The t er ms " l evee" or " embankment " as used i n t hese speci f i cat i ons ar e def i ned as t he ear t h f i l l por t i ons of t he l evee st r uct ur e or ot her f i l l s r el at ed t o t he l evee st r uct ur e, i ncl udi ng t he i nspect i on t r ench and i ncl udes al l t ypes of ear t h f i l l and t oe dr ai n mat er i al s, and al l ot her f i l l s wi t hi n t he l i mi t s of t he l evee, except i ng t hose st one and f i l t er mat er i al s used f or s l ope pr ot ect i on, whi ch ar e descr i bed i n Sect i on 35 31 19
STONE, CHANNEL, SHORELI NE/ COASTAL PROTECTI ON FOR STRUCTURES.
1. 2. 7 Backfill
Backf i l l as used i n t hi s sect i on i s def i ned as t hat f i l l mat er i al whi ch cannot be pl aced ar ound or adj acent t o a st r uct ur e or ut i l i t y unt i l t he st r uct ur e or ut i l i t y i s compl et ed or unt i l a speci f i ed t i me i nt er val has el apsed af t er compl et i on.
1. 2. 8 Excavation
Excavat i on consi st s of r emoval of mat er i al t o t he l i nes and gr ades shown on t he dr awi ngs, or as ot her wi se di r ect ed or appr oved by t he Cont r act i ng Officer.
1. 2. 9 Cl assi f i cat i on of Soi l s
Mat er i al s used t o const r uct t he embankment s and f or backf i l l s shal l be c l assi f i ed i n accor dance wi t h ASTM D2487 ( Uni f i ed Soi l Cl assi f i cat i on Syst em) . Cohesi onl ess mat er i al s i ncl ude mat er i al s c l assi f i ed i n ASTM D2487 as GW, GP, SW, and SP. Cohesi ve mat er i al s i ncl ude mat er i al s c l assi f i ed as GC, SC, ML, CL, MH, and CH. Mat er i al s c l assi f i ed as GM and SM wi l l be i dent i f i ed as cohesi onl ess onl y when t he f i nes ar e nonpl ast i c.
1. 2. 10 Degr ee of Compact i on
Degr ee of compact i on r equi r ed, except as not ed i n t he second sent ence, i s expr essed as a per cent age of t he maxi mum densi t y obt ai ned by t he t est pr ocedur e pr esent ed i n ASTM D1557 abbr evi at ed as a per cent of l abor at or y maxi mum densi t y. Si nce ASTM D1557 appl i es onl y t o soi l s t hat have 30 per cent or l ess by wei ght of t hei r par t i c l es r et ai ned on t he 3/ 4 i nch s i eve, expr ess t he degr ee of compact i on f or mat er i al havi ng mor e t han 30
SECTI ON 35 41 00 Page 3 per cent by wei ght of t hei r par t i c l es r et ai ned on t he 3/ 4 i nch s i eve as a per cent age of t he maxi mum densi t y i n accor dance wi t h AASHTO T 180 and cor r ect ed wi t h AASHTO T 224. To mai nt ai n t he same per cent age of coar se mat er i al , use t he " r emove and r epl ace" pr ocedur e as descr i bed i n NOTE 8 of Par agr aph 7. 2 i n AASHTO T 180.
Degr ee of compact i on i s expr essed as a per cent age of t he maxi mum densi t y obt ai ned by t he t est pr ocedur e pr esent ed i n ASTM D1557, abbr evi at ed her ei naf t er as per cent l abor at or y maxi mum densi t y.
1. 3 SYSTEM DESCRI PTI ON
The wor k cover ed by t hi s sect i on consi st s of f ur ni shi ng al l equi pment , l abor , mat er i al s , and i nci dent al s, and per f or mi ng al l oper at i ons necessar y for t he c l ear i ng, gr ubbi ng, and st r i ppi ng of t he ar eas speci f i ed her ei n or i ndi cat ed on t he dr awi ngs, and f or t he r emoval and di sposal of c l ear ed, gr ubbed, and st r i pped mat er i al s, r emoval or pl uggi ng of exi st i ng dr ai nage st r uct ur es, and r ef i l l i ng of hol es r esul t i ng f r om gr ubbi ng; excavat i on of bor r ow ar eas and f or al l ot her excavat i ons i nci dent al t o t he const r uct i on of l evees, channel s, di t ches, st r uct ur es, and pondi ng ar eas as speci f i ed and shown; f oundat i on pr epar at i on and t he const r uct i on of l evee embankment s, i nc l udi ng new l evee, backf i l l of i nspect i on t r enches, ber ms, r oad cr ossi ngs, backf i l l at dr ai nage st r uct ur es, and ot her i nci dent al ear t hwor k as may be necessar y t o compl et e t he l evee as speci f i ed her ei n and as shown on t he dr awi ngs. Al l wor k under t hi s sect i on shal l compl y wi t h t he r equi r ement s of EM 385- 1- 1.
1. 3. 1 Embankment and Backf i l l Mat er i al s
At l east 30 days pr i or t o del i ver y of any Cont r act or - f ur ni shed mat er i al t o t he s i t e of t he wor k, submi t soi l c l assi f i cat i on t est r esul t s, moi st ur e- densi t y cur ves, gr adat i on cur ves, and l abor at or y r esul t s of t he r equi r ed t est s of t he pr oposed mat er i al . Mat er i al s f or embankment and backf i l l const r uct i on wi l l be obt ai ned f r om on- si t e excavat i ons and of f - s i t e sour ces pr ovi ded by t he Cont r act or . Mat er i al s obt ai ned f r om r equi r ed excavat i on whi ch meet or whi ch can be pr ocessed t o meet t he r equi r ement s f or each embankment mat er i al , or any ot her mat er i al r equi r ed f or t hi s pr oj ect , as speci f i ed her ei n, may be ut i l i zed i n t he appr opr i at e zone of t he embankment or as backf i l l . Al l r oot s, l i mbs, and wood f r agment s shal l be r emoved f r om embankment mat er i al s. Mat er i al s cont ai ni ng sod, ot her or gani c or per i shabl e mat er i al , t r ash, debr i s, and f r ozen mat er i al s shal l not be used i n t he embankment . Submi t t o t he Cont r act i ng Of f i cer t he sour ce or sour ces i nt ended t o pr ovi de mat er i al s f or embankment const r uct i on. I f a sour ce i s sel ect ed ot her t han a commer ci al quar r y or ot her commer ci al ent i t y f r om whi ch ear t h or r ock mat er i al wi l l be di r ect l y pur chased and wher e t he Cont r act or or hi s subcont r act or wi l l per f or m t he bor r ow excavat i on, a wr i t t en st at ement wi l l be pr ovi ded t o t he Cont r act i ng Of f i cer i ndi cat i ng per mi ssi on t o ut i l i ze t he ar ea. I t i s t he Cont r act or ' s r esponsi bi l i t y t o obt ai n Feder al , St at e, and l ocal per mi t s whi ch may be r equi r ed f or excavat i on and r ecl amat i on of t he bor r ow ar ea. A copy of t he pl an and pr ocedur es t o be ut i l i zed f or r ecl amat i on shal l be f ur ni shed t o t he Cont r act i ng Of f i cer , as r equi r ed. The Cont r act i ng Of f i cer wi l l r equi r e mat er i al sampl es f r om any pr oposed bor r ow sour ce t o be submi t t ed as i ndi cat ed i n par agr aph Qual i t y Cont r ol .
1. 3. 2 Stockpiling
Any on- si t e st ockpi l i ng of embankment mat er i al s shal l be i n accor dance wi t h t he Par agr aph t i t l ed " STOCKPI LES" . No payment wi l l be made f or such
SECTI ON 35 41 00 Page 4 st ockpi l i ng nor f or t he r el oadi ng and haul i ng of t hese mat er i al s t o t hei r f i nal posi t i on.
1. 3. 3 Sl i des and Foundat i on Fai l ur es
When sl i di ng occur s i n any par t of t he embankment or backf i l l s pr escr i bed i n t hi s sect i on, af t er t hey have been pl aced, but pr i or t o f i nal accept ance of al l wor k under t he cont r act , r epai r t he s l i de as di r ect ed by t he Cont r act i ng Of f i cer . When t he s l i de i s caused t hr ough t he f aul t of t he Cont r act or , t he r epai r shal l be made at no addi t i onal cost t o t he Gover nment . When t he s l i de i s not t he f aul t of t he Cont r act or , an equi t abl e adj ust ment i n t he cont r act pr i ce shal l be made pur suant t o FAR
52. 243- 4 Changes t o cover t he cost of t he r epai r s.
1. 3. 4 Dr ai nage Requi r ement s
Do not bl ock or r est r i c t t he f l ow i n a nat ur al dr ai n, exi st i ng cul ver t , di t ch or channel at any t i me wi t hout obt ai ni ng pr i or wr i t t en appr oval f r om t he Cont r act i ng Of f i cer . Thi s appr oval wi l l not r el i eve t he Cont r act or f r om r esponsi bi l i t y f or any damage caused by t he oper at i on. Moni t or t he st r eam f l ow and pr ovi de suf f i c i ent f r ee di schar ge ar eas so t hat condi t i ons ar e not wor sened upst r eam or downst r eam by possi bl e f l oods dur i ng const r uct i on. Sur f ace wat er shal l be di r ect ed away f r om excavat i ons and const r uct i on s i t es so as t o pr event er osi on and under mi ni ng of f oundat i ons. Di ver si on di t ches, di kes, and gr adi ng shal l be pr ovi ded and mai nt ai ned as necessar y dur i ng const r uct i on. Excavat ed s l opes and backf i l l sur f aces shal l be pr ot ect ed t o pr event er osi on and sl oughi ng. Excavat i on shal l be per f or med so t hat t he s i t e and t he ar ea i mmedi at el y sur r oundi ng t he s i t e and af f ect i ng oper at i ons at t he s i t e shal l be cont i nual l y and ef f ect i vel y dr ai ned. I f pr i vat e pr oper t y i s t o be used f or dr ai nage, submi t wr i t t en evi dence t hat t he r i ght has been obt ai ned f r om t he pr oper t y owner f or dr ai nage on hi s pr oper t y.
1. 4 SUBMITTALS
Gover nment appr oval i s r equi r ed f or submi t t al s wi t h a " G" desi gnat i on;
submi t t al s not havi ng a " G" desi gnat i on ar e f or i nf or mat i on onl y. When used, a desi gnat i on f ol l owi ng t he " G" desi gnat i on i dent i f i es t he of f i ce t hat wi l l r evi ew t he submi t t al f or t he Gover nment . Submi t t he f ol l owi ng i n accor dance wi t h Sect i on 01 33 00 SUBMI TTAL PROCEDURES:
SD- 01 Pr econst r uct i on Submi t t al s
Shor i ng, Sheet i ng, and Br aci ng Pl an; G, DO
Excavat i on Pl an; G, DO
Pl an of Oper at i ons; G, DO
Dewat er i ng and Di ver si on Pl an; G, DO
SD- 02 Shop Dr awi ngs
Dr ai nage Requi r ement s; G, DO
SD- 03 Pr oduct Dat a
Shor i ng, Sheet i ng, and Br aci ng; G, DO
SECTI ON 35 41 00 Page 5
Excavation ; G, DO
Bor r ow Ar eas; G, DO
Embankment and Backf i l l Mat er i al s ; G, DO
Fi l t er Sand; G, DO
I mper vi ous Fi l l ; G, DO
Cour se Dr ai nage Gr avel ; G, DO
Fi ne Dr ai nage Gr avel ; G, DO
Topsoil ; G, DO
SD- 06 Test Repor t s
Compact i on Test i ng; G, DO
1. 5 REGULATORY REQUI REMENTS
The st at e st at ut or y and r egul at or y r equi r ement s l i s t ed bel ow f or m a par t of t hi s speci f i cat i on t o t he ext ent r ef er enced.
NJDOT - New Jer sey Depar t ment of Tr anspor t at i on St andar d Speci f i cat i ons f or Road and Br i dge Const r uct i on ( 2007)
1. 6 PERMITS
I n accor dance wi t h FAR 52. 236- 7 Per mi t s and Responsi bi l i t i es, obt ai n al l necessar y per mi t s r equi r ed f or di sposal , haul i ng, er osi on cont r ol , and pay al l f ees associ at ed wi t h per mi t t i ng and compl i ance. I n addi t i on, t he Gover nment has obt ai ned per mi t s f or st or m wat er di schar ge, as speci f i ed i n Section 01 57 19 TEMPORARY ENVI RONMENTAL CONTROLS. Compl y wi t h t he t er ms of t hese per mi t s and wi t h t he r equi r ement s of Sect i on 01 57 19 TEMPORARY ENVI RONMENTAL CONTROLS and t hi s sect i on.
1. 7 PROJECT SI TE CONDI TI ONS
1. 7. 1 Pr ot ect i on of Cul t ur al and Nat ur al Resour ces
Al l wor k and oper at i ons shal l compl y wi t h t he r equi r ement s of Sect i on 01 57 19 TEMPORARY ENVI RONMENTAL CONTROLS and wi t h t he r equi r ement s of t hi s section.
1. 7. 2 Pr ot ect i on of Man- Made Faci l i t i es and Nat ur al Feat ur es
Tr ees wi t hi n t he c l ear i ng ar ea shal l be f el l ed i n such a manner as t o avoi d damage t o t r ees l ef t st andi ng and t r ees out s i de t he c l ear i ng ar ea, exi st i ng bui l di ngs, man- made f aci l i t i es and nat ur al f eat ur es, wi t h due r egar d t o t he saf et y of empl oyees and ot her s, and i n compl i ance wi t h EM 385- 1- 1.
Excavat i on shal l f ol l ow t he same r equi r ement s speci f i ed above f or f el l i ng t r ees and shal l be i n compl i ance wi t h EM 385- 1- 1. Exi st i ng ut i l i t y l i nes t hat ar e shown on t he dr awi ngs or t he l ocat i ons of whi ch ar e made known t o t he Cont r act or pr i or t o excavat i on and t hat ar e t o be r et ai ned shal l be pr ot ect ed f r om damage dur i ng excavat i on. When ut i l i t y l i nes t hat ar e t o be r emoved ar e encount er ed wi t hi n t he ar ea of oper at i ons, not i f y t he appl i cabl e ut i l i t y compani es i n suf f i c i ent t i me f or measur es t o be t aken t o
SECTI ON 35 41 00 Page 6 pr event i nt er r upt i on of t he ser vi ces.
1. 7. 3 Hi st or i cal , Ar cheol ogi cal , and Cul t ur al Resour ces
Hi st or i cal , ar cheol ogi cal , and cul t ur al r esour ces wi t hi n t he Cont r act or ' s wor k l i mi t s may exi st . I f , dur i ng const r uct i on act i v i t i es, t he Cont r act or obser ves i t ems t hat may have hi st or i cal or ar cheol ogi cal val ue, such obser vat i ons shal l be r epor t ed i mmedi at el y t o t he Cont r act i ng Of f i cer so t hat appr opr i at e aut hor i t i es may be not i f i ed and a det er mi nat i on made as t o t hei r s i gni f i cance and what , i f any, speci al di sposi t i on of t he f i nds shoul d be made. Cease al l act i v i t i es t hat may r esul t i n t he dest r uct i on of t hese r esour ces and pr event t he wor ker s f r om t r espassi ng on or ot her wi se damagi ng such r esour ces.
1. 7. 4 Subsur f ace Dat a
Subsur f ace i nvest i gat i on r epor t s ar e i ncl uded i n t hese speci f i cat i ons.
Subsur f ace i nvest i gat i on sampl es of mat er i al s obt ai ned f r om subsur f ace i nvest i gat i ons may be exami ned at t he Cor ps of Engi neer ' s Mar i ne Ter mi nal , Caven Poi nt , Jer sey Ci t y, NJ. These dat a r epr esent subsur f ace i nf or mat i on at t he bor i ng l ocat i ons; however , var i at i ons may exi st i n t he subsur f ace bet ween bor i ng l ocat i ons. Gr oundwat er l evel s i ndi cat ed on t he soi l bor i ng l ogs wer e l evel s f ound at t he t i me of expl or at i on. The gr oundwat er t abl e can var y s i gni f i cant l y dependi ng on t i me of year , var i at i on f r om nor mal pr eci pi t at i on, and r i ver st age or t i de l evel .
1. 8 SEQUENCING
1. 8. 1 Cl ear i ng and Gr ubbi ng
Al l c l ear i ng and gr ubbi ng wor k shal l be compl et ed at l east 100 f eet i n advance of embankment const r uct i on. I n l ocat i ons wher e wor k on dr ai nage st r uct ur es i s per f or med pr i or t o embankment const r uct i on, al l c l ear i ng and gr ubbi ng shal l be compl et ed f or t he st r uct ur e at l east 50 f eet on each si de of t he st r uct ur e, measur ed al ong t he l evee cent er l i ne and 25 f eet per pendi cul ar t o t he st r uct ur e. I f r egr owt h of veget at i on or t r ees occur s af t er c l ear i ng and gr ubbi ng and bef or e pl acement of embankment , t he Cont r act or wi l l be r equi r ed t o c l ear and gr ub agai n pr i or t o embankment construction.
1. 8. 2 Stripping
Af t er i nspect i on and accept ance of c l ear ed and gr ubbed ar eas, st r i ppi ng may proceed.
PART 2 PRODUCTS
2. 1 TYPES OF FI LL MATERI ALS
2. 1. 1 I mper vi ous Fi l l
I mper vi ous f i l l shal l consi st of sat i sf act or y i mper vi ous mat er i al c l assi f i ed as l ean c l ay ( CL) , f at c l ay ( CH) , l ow pl ast i c i t y s i l t ( ML) , hi gh pl ast i c i t y s i l t ( MH) , and bor der l i ne c l ay and si l t ( CL- ML) i n accor dance with ASTM D2487. I mper vi ous f i l l shal l have a maxi mum hydr aul i c conduct i v i t y of 1 x 10 - 6 cm/ sec when compact ed t o 95% MDD.
SECTI ON 35 41 00 Page 7
2. 1. 2 Embankment Fi l l
Embankment f i l l shal l consi st of t hose mat er i al s c l assi f i ed as sat i sf act or y. Embankment f i l l shal l have a maxi mum hydr aul i c conduct i v i t y of 1 x 10 - 3 cm/ sec when compact ed t o 95% MDD.
2. 1. 3 Fi l l Pl acement
At l east 30 days pr i or t o del i ver y or f i l l pl acement , submi t soi l c l assi f i cat i on t est r esul t s, i ncl udi ng s i eve anal ysi s, At t er ber g Li mi t s and compact i on and hydr aul i c conduct i v i t y f or al l mat er i al s t o be used.
2. 1. 4 Coar se Dr ai nage Gr avel
Coar se dr ai nage gr avel f or t he t oe dr ai ns shal l be obt ai ned f r om a sour ce pr ovi ded by t he Cont r act or . Coar se dr ai nage gr avel shal l be non- cal car eous, composed of t ough dur abl e par t i c l es, and shal l not cont ai n any or gani c mat er i al or sof t , f r i abl e par t i c l es i n quant i t i es. Bl ast f ur nace sl ag wi l l not be per mi t t ed. The gr avel mat er i al i n- pl ace shal l meet t he r equi r ement s of AASHTO M 43, Si ze No. 57.
2. 1. 5 Fi ne Dr ai nage Gr avel
Fi ne dr ai nage gr avel f or t he t oe dr ai ns shal l be obt ai ned f r om a sour ce pr ovi ded by t he Cont r act or . Fi ne dr ai nage gr avel mat er i al shal l be non- cal car eous, composed of t ough dur abl e par t i c l es, and shal l not cont ai n or gani c mat er i al . The f i ne dr ai nage gr avel i n- pl ace shal l meet t he r equi r ement s of AASHTO M 43, Si ze No. 8.
2. 1. 6 Fi l t er Sand
At l east 30 days pr i or t o del i ver y of any Cont r act or - f ur ni shed mat er i al t o t he wor ksi t e, submi t soi l c l assi f i cat i on t est r esul t s and a gr adat i on cur ve f or each of t he pr oposed f i l t er mat er i al s t o be used. Fi ne aggr egat e f or t he f i l t er sand i n- pl ace shal l meet t he qual i t y r equi r ement s of ASTM C33/ C33M gr adi ng f or f i ne aggr egat e wi t h addi t i onal l i mi t s on t he al l owabl e per cent age passi ng t he No. 200 si eve as speci f i ed bel ow.
SI EVE SI ZE U. S. STANDARD
SQUARE MESH
PERCENTAGE BY WEI GHT
PASSI NG I NDI VI DUAL SI EVE
3/8-inch 100
No. 4 95-100
No. 16 50-85
No. 100 2-10
No. 200 0-5
Addi t i onal l y, t he f i l t er sand shal l not cont ai n any or gani c mat t er or sof t f r i abl e par t i c l es.
2. 1. 7 Topsoil
Topsoi l consi st s of or gani c soi l and shal l be pl aced on t he l evee s l opes as
SECTI ON 35 41 00 Page 8 shown on t he cont r act dr awi ngs and as speci f i ed i n Sect i on 32 92 19 SEEDI NG.
2. 2 PI PE FOR LEVEE TOE DRAI N
Pi pe f or t he l evee t oe dr ai n shal l be of t he s i ze i ndi cat ed and shal l conf or m t o t he r equi r ement s speci f i ed.
a. Pi pe: ASTM D1785, Schedul e 80.
b. Fi t t i ngs: ASTM D2467, Schedul e 80.
PART 3 EXECUTI ON
3. 1 CONSTRUCTION
3. 1. 1 Li nes and Gr ades
The embankment and backf i l l shal l be const r uct ed t o t he l i nes, gr ades, and cr oss sect i ons i ndi cat ed on t he dr awi ngs, unl ess ot her wi se di r ect ed by t he Cont r act i ng Of f i cer . The Gover nment r eser ves t he r i ght t o i ncr ease or decr ease t he f oundat i on wi dt hs and embankment s l opes or t o make such ot her changes i n t he embankment or backf i l l sect i ons as may be deemed necessar y t o pr oduce a saf e st r uct ur e. Changes i n quant i t i es r esul t i ng f r om such r evi s i ons wi l l not const i t ut e j ust i f i cat i on f or change i n cont r act uni t pr i ces, except as pr ovi ded f or i n FAR 52. 211- 18 Var i at i on i n Est i mat ed Quant i t y Cl ause.
3. 1. 2 Conduct of t he Wor k
Mai nt ai n and pr ot ect t he embankment and backf i l l i n a sat i sf act or y condi t i on at al l t i mes unt i l f i nal compl et i on and accept ance of al l wor k under t he Cont r act . I f , i n t he opi ni on of t he Cont r act i ng Of f i cer , t he haul i ng equi pment causes hor i zont al shear pl anes or s l i cken si des, r ut t i ng, quaki ng, heavi ng, cr acki ng, or excessi ve def or mat i on of t he embankment or backf i l l , l i mi t t he t ype, l oad, or t r avel speed of t he haul i ng equi pment on t he embankment or backf i l l . The Cont r act or may be r equi r ed t o r emove, at no addi t i onal cost t o t he Gover nment , any embankment mat er i al pl aced out s i de of pr escr i bed s l ope l i nes. Any appr oved embankment or backf i l l mat er i al whi ch i s l ost i n t r ansi t or r ender ed unsui t abl e af t er bei ng pl aced i n t he embankment or backf i l l and bef or e f i nal accept ance of t he wor k shal l be r epl aced i n a sat i sf act or y manner , at no addi t i onal cost t o t he Gover nment . Excavat e and r emove f r om t he embankment or backf i l l any mat er i al whi ch i s unsat i sf act or y, di spose of such mat er i al , and r ef i l l t he excavat ed ar ea as di r ect ed, at no addi t i onal cost t o t he Gover nment .
3. 2 CLEARING
Cl ear i ng shal l be accompl i shed wi t hi n t he l i mi t s of exi st i ng gr ound t o r ecei ve embankment and st r uct ur es, t oget her wi t h st r i ps 5 f eet wi de, beyond and cont i guous t her et o, pondi ng ar eas, di t ches, s t r uct ur es, t r aver ses, channel s, r i pr ap, r evet ment , bor r ow ar eas and r amps. Tr ees, downed t i mber , snags, s l ash, br ush, gar bage, t r ash, debr i s, f enci ng and ot her i t ems shal l be c l ear ed f l ush wi t h t he exi st i ng gr ound sur f ace. Tr ees and veget at i on desi gnat ed t o be l ef t st andi ng or t o r emai n shal l be pr ot ect ed f r om damage f r om const r uct i on oper at i ons.
3. 3 GRUBBING
Gr ubbi ng shal l be accompl i shed wi t hi n t he l i mi t s of exi st i ng gr ound t o
SECTI ON 35 41 00 Page 9 r ecei ve embankment and st r uct ur es, t oget her wi t h st r i ps 5 f eet wi de, beyond and cont i guous t her et o, di t ches, st r uct ur es, t r aver ses, channel s, r i pr ap, r evet ment , bor r ow ar eas and r amps. Gr ubbi ng shal l be accompl i shed t o a dept h of at l east 3 f eet bel ow t he exi st i ng gr ound sur f ace. Al l hol es caused by gr ubbi ng oper at i ons and r emoval of pi pes and dr ai ns, excl udi ng hol es i n bor r ow ar eas, channel s and di t ches, shal l be f i l l ed wi t h sat i sf act or y mat er i al as speci f i ed. Thi s mat er i al shal l be pl aced i n 12 inch l ayer s t o t he el evat i on of t he adj acent gr ound sur f ace and each l ayer compact ed t o t he r equi r ed densi t i es.
3. 4 STRIPPING
The ent i r e ar ea wi t hi n t he l i mi t s of exi st i ng gr ound t o r ecei ve embankment and st r uct ur es, t oget her wi t h st r i ps 5 f eet wi de, beyond and cont i guous t her et o, pondi ng ar eas, and di t ches shown on t he dr awi ng shal l be st r i pped t o r emove cr ops, weeds, gr ass, and ot her veget at i ve mat er i al s t o t he gr ound sur f ace and t opsoi l t o a dept h of 12 i nches.
3. 5 DI SPOSI TI ON OF CLEARED, GRUBBED, AND STRI PPED MATERI AL
Except as ot her wi se speci f i ed or i ndi cat ed on t he dr awi ngs, al l mat er i al s r esul t i ng f r om cl ear i ng and gr ubbi ng oper at i ons shal l be di sposed of of f - s i t e. I n no case shal l any mat er i al r esul t i ng f or m cl ear i ng and gr ubbi ng oper at i ons be bur i ed or per manent l y pl aced wi t hi n t he l evee f oundat i on or any st r uct ur al f oundat i on. The t opsoi l mat er i al r esul t i ng f r om t he st r i ppi ng oper at i ons shal l be t empor ar i l y st ockpi l ed wi t hi n t he rights-of-way.
3. 5. 1 Removal f r om Si t e of Wor k
The Cont r act or may el ect t o r emove al l or par t of t he c l ear ed and gr ubbed mat er i al s f r om t he s i t e of t he wor k i n accor dance wi t h Sect i on 01 57 19 TEMPORARY ENVI RONMENTAL CONTROLS. The Cont r act or may opt ei t her t o r et ai n any such mat er i al s of val ue or di spose of t hem by sal e or ot her wi se. The Gover nment i s not r esponsi bl e f or t he pr ot ect i on and saf ekeepi ng of any mat er i al s r et ai ned by t he Cont r act or . Such mat er i al s shal l be r emoved f r om t he s i t e of t he wor k bef or e t he dat e of compl et i on of t he wor k.
3. 6 REMOVAL OR PLUGGI NG OF ABANDONED PI PE AND CONDUI TS
Abandoned pi pes and condui t s shal l be r emoved t o t he l i mi t s shown on t he dr awi ngs or pl ugged wi t h concr et e a mi ni mum di st ance of 3 f eet f r om end of t he condui t . Pr i or t o pl uggi ng, c l ean t he i nt er i or of t he pi pe t o be pl ugged and pl ace t he concr et e i n such a manner as t o i nsur e a dense, wel l bonded pl ug.
3. 7 SHORI NG, SHEETI NG, AND BRACI NG
Submi t a det ai l ed shor i ng, sheet i ng and br aci ng pl an 21 days pr i or t o t he begi nni ng of any excavat i on so suppor t ed. The pl an f or shor i ng, sheet i ng and br aci ng shal l be pr epar ed and cer t i f i ed by l i censed pr of essi onal engi neer . I ncl ude i n t he pl an dr awi ngs and desi gn comput at i ons of t he pr oposed shor i ng, sheet i ng, and br aci ng, and document at i on, showi ng det ai l s of t he coor di nat i on and appr oval of shor i ng, sheet i ng, and br aci ng by t he appl i cabl e par t i es. Appr oval of t he det ai l ed pl an shal l be obt ai ned f r om t he Cont r act i ng Of f i cer pr i or t o st ar t i ng t he wor k. I f necessar y, modi f y t he pl an as r equi r ed t o meet f i el d condi t i ons, and t he modi f i cat i ons shal l be appr oved pr i or t o use. Shor i ng, sheet i ng, and br aci ng shal l be i nst al l ed wher e r equi r ed f or t he pr ot ect i on of exi st i ng nat ur al f eat ur es
SECTI ON 35 41 00 Page 10 and man- made f aci l i t i es, f or t he saf et y of wor ker s and t he publ i c, i n compl i ance wi t h EM 385- 1- 1, and t o i nsur e t he i nt egr i t y of t he embankment .
Shor i ng, sheet i ng and br aci ng shal l not be used i n l i eu of t he r equi r ed excavat i on s l opes. Shor i ng, sheet i ng, and br aci ng shal l be adequat el y desi gned and pr oper l y i nst al l ed t o wi t hst and ant i c i pat ed l oads. Shor i ng, sheet i ng and br aci ng shal l be pl anned and desi gned by a r egi st er ed pr of essi onal engi neer . Al l shor i ng, sheet i ng and br aci ng shal l be r emoved as embankment and backf i l l oper at i ons pr ogr ess.
3. 8 DEWATERI NG AND DI VERSI ON
Sur f ace and gr oundwat er cont r ol shal l be accompl i shed i n coor di nat i on wi t h t he r equi r ed excavat i on and embankment and f l ood wal l const r uct i on.
Sur f ace and/ or gr oundwat er cont r ol may necessi t at e t he use of t empor ar y di ver si on di t ches, cof f er dams and/ or dewat er i ng by t he use of pumpi ng Sur f ace and/ or gr oundwat er cont r ol may necessi t at e t he use of t empor ar y sheet i ng, di ver s i on di t ches, cont ai nment ber ms, pump ar ound syst ems, and/ or dewat er i ng by t he use of sump pump and/ or wel l poi nt syst ems. Met hods f or car e of sur f ace wat er and f or cont r ol l i ng t he sur f ace and gr oundwat er l evel s shal l be submi t t ed f or appr oval .
3. 9 EXCAVATION
Excavat i on shal l consi st of r emoval of mat er i al i n pr epar i ng t he f oundat i ons t o t he l i nes and gr ades shown on t he dr awi ngs, r emoval of mat er i al f r om di t ches and channel s t o t he l i nes and gr ades shown on t he dr awi ngs, r emoval of obj ect i onabl e mat er i al s and obt ai ni ng r equi r ed f i l l mat er i al s f r om t he bor r ow ar eas. Bl ast i ng wi l l not be per mi t t ed. Over excavat i on shal l be backf i l l ed t o gr ade wi t h s i mi l ar over excavat ed mat er i al or sat i sf act or y mat er i al and compact ed t o a densi t y of at l east t hat of t he sur r oundi ng mat er i al . Submi t a wr i t t en excavat i on pl an 30 days pr i or t o t he begi nni ng of any excavat i on. Appr oval of t he det ai l ed pl an shal l be obt ai ned f r om t he Cont r act i ng Of f i cer pr i or t o st ar t i ng t he wor k.
I f necessar y, modi f y t he pl an as r equi r ed t o meet f i el d condi t i ons, and t he modi f i cat i ons shal l be appr oved pr i or t o use. As a mi ni mum, t he pl an shal l cont ai n t he f ol l owi ng:
a. Pr oposed met hods f or pr event i ng i nt er f er ence wi t h, or damage t o, exi st i ng under gr ound or over head ut i l i t y l i nes, t r ees desi gnat ed t o r emai n and ot her man- made f aci l i t i es or nat ur al f eat ur es desi gnat ed t o r emai n wi t hi n or adj acent t o t he const r uct i on r i ght s- of - way.
b. Pr ovi s i on f or coor di nat i ng t he wor k wi t h ot her Cont r act or s wor k i ng i n t he const r uct i on r i ght s- of - way or on f aci l i t i es cr ossi ng or adj acent t o t hi s wor k.
c. The pr oposed met hods f or cont r ol l i ng sur f ace and gr ound wat er i n t he bor r ow ar eas and r equi r ed excavat i ons.
d. St ockpi l i ng pl an f or embankment mat er i al bef or e i t i s t r anspor t ed t o t he pr oj ect s i t e showi ng l ocat i ons, st ockpi l e hei ght s, s l opes, l i mi t s, and dr ai nage ar ound t he st ockpi l e ar eas.
e. A compl et e l i s t i ng of equi pment used f or excavat i on and t o t r anspor t t he excavat ed mat er i al .
f . The pr oposed sequence of wor k f or excavat i ng t he bor r ow ar eas wi t h pl an and cr oss sect i onal v i ews showi ng st ar t i ng and f i nal wor k l ocat i ons and cl ear i ng, gr ubbi ng and st r i ppi ng l i mi t s.
SECTI ON 35 41 00 Page 11
g. The pr oposal s f or conser vi ng ar abl e l and and f or maki ng opt i mum use of avai l abl e bor r ow, i ncl udi ng t he Cont r act or ' s pr oposed met hods f or gr adi ng t he bot t om of t he bor r ow ar eas af t er compl et i ng use of t he bor r ow ar eas.
h. The pr oposed r oad pat t er n, and pl an f or i mpl ement i ng dust cont r ol measures.
3. 9. 1 Over Excavat i on
3. 9. 1. 1 Out si de Li mi t s of Levee Foundat i ons or St r uct ur es
Over excavat i on out s i de t he l i mi t s of t he f oundat i ons of l evees or st r uct ur es shal l be backf i l l ed t o gr ade wi t h s i mi l ar over excavat ed mat er i al or sat i sf act or y mat er i al and compact ed t o a densi t y of at l east t hat of t he sur r oundi ng mat er i al .
3. 9. 1. 2 Wi t hi n Li mi t s of Levee Foundat i ons or St r uct ur es
Over excavat i on wi t hi n t he l i mi t s of t he f oundat i ons of l evees or st r uct ur es shal l be backf i l l ed t o gr ade i n accor dance wi t h t he Par agr aph t i t l ed " PREPARATI ON OF FOUNDATI ON, PARTI AL FI LL SURFACES AND ABUTMENTS" .
3. 9. 2 I nspect i on Tr ench
The i nspect i on t r ench shal l be excavat ed and mai nt ai n f r ee of st andi ng wat er t o t he di mensi ons and l ocat i ons shown on t he dr awi ngs.
The pur pose of t he i nspect i on t r ench i s t o expose or i nt er cept any undesi r abl e under gr ound f eat ur es such as ol d dr ai n t i l e, wat er or sewer l i nes, ani mal bur r ows, bur i ed l ogs, pocket s of unsui t abl e mat er i al , or debr i s. Backf i l l shal l be pl aced onl y af t er a car ef ul i nspect i on of t he excavat ed t r ench by t he Cont r act i ng Of f i cer t o ensur e t hat seepage channel s or undesi r abl e mat er i al s ar e not pr esent . I f t hey ar e, t hey shal l be dug out wi t h a base of suf f i c i ent wi dt h t o al l ow backf i l l compact i on wi t h r egul ar compact i on equi pment . To backf i l l nar r ower t r enches pr oper l y, speci al compact i on pr ocedur es and/ or equi pment wi l l be r equi r ed. The compact i on r equi r ement s f or t he i nspect i on t r ench backf i l l shal l be t he same as t hat f or t he embankment .
3. 9. 3 Structures
Excavat i ons f or st r uct ur es shal l conf or m t o t he di mensi ons and el evat i ons i ndi cat ed f or each st r uct ur e and f oot i ng, except as speci f i ed her ei naf t er , and shal l i ncl ude t r enchi ng f or ut i l i t y and f oundat i on dr ai nage syst ems t o a poi nt 5 f eet beyond each st r uct ur e and al l wor k i nci dent al t her et o.
Excavat i on shal l ext end a suf f i c i ent di st ance f r om wal l s and f oot i ngs t o al l ow f or pl aci ng and r emoval of f or ms. Sat i sf act or y mat er i al r emoved bel ow t he dept hs i ndi cat ed wi t hout speci f i c di r ect i on of t he Cont r act i ng Of f i cer shal l be r epl aced, at no addi t i onal cost t o t he Gover nment , and f i l l ed i n accor dance wi t h t he Par agr aph t i t l ed " Over Excavat i on" above.
Over excavat i on bel ow r equi r ed i nver t el evat i ons or bot t oms of f oot i ngs shal l be backf i l l ed wi t h l ean concr et e, at no addi t i onal cost t o t he Gover nment . No f oot i ngs shal l be const r uct ed on unsat i sf act or y mat er i al as det er mi ned by t he Cont r act i ng Of f i cer . Excessi vel y wet and/ or sof t mat er i al i n subgr ades r esul t i ng f r om wat er pondi ng i n f oot i ng excavat i ons shal l be r emoved and r epl aced wi t h l ean concr et e, at no addi t i onal cost t o t he Gover nment .
SECTI ON 35 41 00 Page 12
3. 9. 4 Channels
Channel s shal l be excavat ed at t he l ocat i ons and t o t he l i nes and gr ades shown on t he dr awi ngs and i n accor dance wi t h t he Par agr aph t i t l ed
"TOLERANCES".
3. 9. 5 Ditches
Dr ai nage di t ches shal l be excavat ed at t he l ocat i ons and t o t he l i nes and gr ades shown on t he dr awi ngs and i n accor dance wi t h t he Par agr aph t i t l ed
"TOLERANCES".
3. 9. 6 Sl opes and Sur char ges
Tempor ar y excavat i on s l opes f or any channel , st r uct ur e excavat i on, or ot her r equi r ed excavat i on shal l not be st eeper t han t he speci f i ed f i ni shed sl ope or t he speci f i ed const r uct i on s l ope, as appl i cabl e, and subj ect t o t he appr oval of t he Cont r act i ng Of f i cer . Thi s may be accompl i shed by benchi ng t he t empor ar y s l ope so t hat t he aver age sl ope i s not st eeper t han t he speci f i ed s l ope. I n addi t i on, no t empor ar y, per manent , or const r uct i on s l ope shal l be sur char ged wi t h excavat ed or st ockpi l ed mat er i al or wi t h heavy const r uct i on equi pment whi ch woul d have t he same ef f ect as t he sur char ge mat er i al . The t oe of s t ockpi l ed mat er i al shal l be mai nt ai ned a mi ni mum di st ance back f r om t he t op of t he f i ni shed excavat i on equal t o t he dept h of t he excavat i on. Det er mi ne t he maxi mum hei ght of such st ockpi l e wi t hout causi ng i nst abi l i t y of t he excavat i on s l ope. Any s l i de or ot her adver se condi t i ons caused by f ai l ur e of t he Cont r act or t o mai nt ai n t hese condi t i ons shal l be consi der ed t he r esponsi bi l i t y of t he Cont r act or and r emedi al measur es shal l be at t he Cont r act or ' s expense.
3. 9. 7 Bor r ow Ar eas
3. 9. 7. 1 Contractor-Furnished
Pr oposed bor r ow ar eas shal l be subj ect t o appr oval by t he Cont r act i ng Of f i cer . Any bor r ow sour ces pr oposed, accept ed and appr oved by t he Cont r act i ng Of f i cer shal l meet al l appl i cabl e Feder al , St at e and l ocal requirements.
3. 9. 8 Toe Dr ai ns
Toe dr ai ns shal l be excavat ed t o t he di mensi ons and t he l ocat i ons i ndi cat ed on t he dr awi ngs.
3. 9. 9 Utilities
Excavat i ons f or pi pe beds shal l be shaped t o f i t t he cont our of t he pi pe over a wi dt h of not l ess t han 0. 6 of t he pi pe di amet er , or as speci f i ed el sewher e or shown on t he dr awi ngs.
3. 9. 10 Rock
Rock and ot her har d f oundat i on mat er i al s shal l be c l eaned of l oose debr i s and cut t o a f i r m sur f ace, ei t her l evel , st epped, or ser r at ed, as shown on t he dr awi ngs. Loose di s i nt egr at ed r ock and t hi n st r at a shal l be r emoved.
Rock excavat i on wi l l not be measur ed f or payment . Rock excavat i on wi l l not be pai d f or as a separ at e bi d i t em.
SECTI ON 35 41 00 Page 13
3. 9. 11 Ri pr ap and Beddi ng
Excavat i ons f or r i pr ap and beddi ng shal l be per f or med at t he l ocat i ons and t o t he l i nes and gr ades shown.
3. 10 TOLERANCES
A t ol er ance of 2 i nches above or bel ow t he pr escr i bed gr ade wi l l be al l owed i n t he excavat i on f or channel s, di t ches, i nspect i on t r enches, excavat i ons f or r i pr ap and beddi ng, and mandat or y bor r ow ar eas. A t ol er ance of 2 i nches bel ow t he pr escr i bed gr ade wi l l be al l owed i n t he excavat i on f or al l ot her bor r ow ar eas.
Al l embankment s and backf i l l s shal l be const r uct ed t o t he gr ades, l i nes, and cr oss- sect i ons shown on t he dr awi ngs. At al l poi nt s a t ol er ance of 4 inches above or bel ow t he pr escr i bed gr ade wi l l be per mi t t ed i n t he f i nal dr essi ng, pr ovi ded t hat any excess mat er i al i s so di st r i but ed t hat t he cr own of t he l evee dr ai ns and t hat t her e ar e no abr upt humps or depr essi ons i n any sur f aces. For t opsoi l , a t ol er ance of 1 i nche above t he t hi ckness wi l l be per mi t t ed.
3. 11 SLIDES
I n case sl i di ng occur s i n any par t of t he excavat i ons pr escr i bed i n t hi s sect i on af t er t hey have been excavat ed, but pr i or t o f i nal accept ance of al l wor k under t he cont r act , r epai r t he s l i de as di r ect ed by t he Cont r act i ng Of f i cer . I n case t he s l i de i s caused t hr ough t he f aul t of t he Cont r act or , i t shal l be r epai r ed, at no addi t i onal cost t o t he Gover nment .
I n case t he s l i de i s due t o no f aul t of t he Cont r act or , an equi t abl e adj ust ment i n t he cont r act pr i ce wi l l be made f or t he r epai r s i n accor dance wi t h t he Cont r act Cl ause t i t l ed " Changes" .
3. 12 STOCKPILES
Pr ovi s i ons of t he Par agr aph t i t l ed Sl opes and Sur char ges ar e appl i cabl e t o al l s t ockpi l ed mat er i al s. Upon compl et i on of const r uct i on oper at i ons, al l r emai ni ng st ockpi l ed mat er i al shal l be r emoved and di sposed of by t he di sposal met hods speci f i ed i n t he Par agr aph t i t l ed " DI SPOSI TI ON OF
EXCAVATED MATERI ALS" .
3. 13 SURFACE DRAI NAGE OF COMPLETED AREAS
Al l di st ur bed ar eas shal l be gr aded t o t he l i nes and gr ades shown on t he dr awi ngs. The sur f ace shal l be f r ee f r om shar p r i dges, gul l i es, pot hol es, s i nkhol es, and any ot her sur f ace i r r egul ar i t i es. A t ol er ance of 2 i nches above or bel ow t he pr escr i bed gr ade wi l l be al l owed pr ovi ded t hat t he sur f ace dr ai ns i n t he di r ect i on as i ndi cat ed on t he dr awi ngs.
3. 14 MAI NTENANCE OF WORK
3. 14. 1 Debr i s Removal
Mai nt ai n al l di t ch and channel excavat i ons f r ee f r om l eaves, br ush, st i cks, t r ash, and ot her debr i s unt i l f i nal accept ance of al l wor k under t he cont r act , at no addi t i onal cost t o t he Gover nment .
3. 14. 2 Sedi ment Removal
Pr i or t o f i nal accept ance of al l wor k under t hi s cont r act , t he r emoval of
SECTI ON 35 41 00 Page 14 sedi ment s f r om di t ch or channel excavat i ons shal l be r equi r ed t o r est or e desi gn gr ade and sect i on, at no addi t i onal cost t o t he Gover nment .
3. 15 DI SPOSI TI ON OF EXCAVATED MATERI ALS
3. 15. 1 Sat i sf act or y Mat er i al s
Sat i sf act or y excavat ed mat er i al shal l be i ncor por at ed i n t he appr opr i at e zones of t he embankment . Sat i sf act or y mat er i al shal l consi st of mat er i al as def i ned i n t he Par agr aph t i t l ed " DEFI NI TI ONS" , subpar agr aph Sat i sf act or y Mat er i al s. When di r ect pl acement i s not pr act i cabl e, sat i sf act or y mat er i al f r om t he excavat i on shal l be st ockpi l ed f or subsequent use i n par t s of t he wor k f or whi ch i t i s speci f i ed her ei n and/ or as i ndi cat ed on t he dr awi ngs.
Sat i sf act or y mat er i al s i n excess of t he quant i t y necessar y t o const r uct backf i l l s and embankment s shal l be di sposed of as speci f i ed f or unsat i sf act or y mat er i al s.
3. 15. 2 Unsat i sf act or y Mat er i al s
Unsat i sf act or y mat er i al s shal l be as def i ned i n t he Par agr aph t i t l ed " DEFI NI TI ONS" , subpar agr aph Unsat i sf act or y Mat er i al s. Unsat i sf act or y mat er i al s f r om t he excavat i ons pr escr i bed i n t hi s sect i on shal l be per manent l y di sposed of by r emoval f r om t he s i t e t o a Cont r act or - f ur ni shed di sposal ar ea. No addi t i onal payment wi l l be made f or Cont r act or - f ur ni shed di sposal ar eas.
3. 16 PREPARATI ON OF FOUNDATI ON, PARTI AL FI LL SURFACES AND ABUTMENTS
3. 16. 1 Earth
Af t er excavat i on ( as descr i bed i n t he Par agr aph t i t l ed " EXCAVATI ON" ) or st r i ppi ng ( as descr i bed i n t he Par agr aphs t i t l ed " CLEARI NG" , " GRUBBI NG" and " STRI PPI NG" ) of t he embankment f oundat i on and excavat i on of t he i nspect i on t r ench t o t he ext ent i ndi cat ed or ot her wi se r equi r ed, t he s i des of st ump hol es, t est pi t s , and ot her s i mi l ar cavi t i es or depr essi ons shal l be br oken down so as t o f l at t en out t he s l opes, and t he s i des of t he cut or hol e shal l be scar i f i ed t o pr ovi de bond bet ween t he f oundat i on mat er i al and t he f i l l . Unl ess ot her wi se di r ect ed, each depr essi on shal l be f i l l ed wi t h t he same mat er i al t ype t hat i s t o be pl aced i mmedi at el y above t he f oundat i on.
The f i l l shal l be pl aced i n l ayer s, moi st ened, and compact ed i n accor dance wi t h t he appl i cabl e pr ovi s i ons of t he Par agr aphs t i t l ed " PLACEMENT AND SPREADI NG" , " MOI STURE CONTROL" , and " COMPACTI ON" f or t he speci f i c mat er i al t ype. Mat er i al s whi ch cannot be compact ed by r ol l er equi pment because of i nadequat e c l ear ances shal l be compact ed wi t h power t amper s i n accor dance wi t h t he t he Par agr aph t i t l ed " COMPACTI ON" f or t he speci f i c mat er i al t ype.
Af t er f i l l i ng of depr essi ons and i nspect i on t r ench and i mmedi at el y pr i or t o pl acement of compact ed f i l l i n any sect i on of t he embankment , t he f oundat i on of such sect i on shal l be l oosened t hor oughl y by scar i f y i ng, pl owi ng, di sci ng or har r owi ng t o a mi ni mum dept h of 6 i nches, and t he moi st ur e cont ent shal l be adj ust ed t o t he amount speci f i ed i n t he Par agr aph t i t l ed " MOI STURE CONTROL" f or t he appr opr i at e t ype of mat er i al .
I mmedi at el y pr i or t o pl acement of compact ed f i l l on or agai nst t he sur f aces of any par t i al f i l l sect i on, al l sof t or l oose mat er i al , al l mat er i al cont ai ni ng cr acks or gul l i es, and al l mat er i al t hat does not conf or m wi t h t he speci f i ed zoni ng of t he embankment shal l be r emoved. The r emai ni ng sur f ace of t he par t i al f i l l shal l be l oosened by scar i f y i ng, pl owi ng, di sci ng or har r owi ng t o a mi ni mum dept h of 6 i nches, and t he moi st ur e cont ent shal l be adj ust ed as speci f i ed i n t he Par agr aph t i t l ed " MOI STURE CONTROL" f or t he appr opr i at e t ype of mat er i al . The sur f ace of t he par t i al
SECTI ON 35 41 00 Page 15 f i l l sect i on upon whi ch f i l l i s t o be pl aced shal l t hen be compact ed as her ei naf t er speci f i ed f or t he appr opr i at e t ype of f i l l . No separ at e payment wi l l be made f or l ooseni ng and r ol l i ng t he f oundat i on ar ea, t he abut ment ar ea, or t he sur f aces of par t i al f i l l sect i ons, but t he ent i r e cost t her eof shal l be i ncl uded i n t he appl i cabl e cont r act pr i ce f or f i l l .
3. 16. 2 Benching
Benchi ng i nt o exi st i ng l evee embankment and abut ment s i s r equi r ed i n or der t o pl ace and compact t he mat er i al i n hor i zont al l ayer s. The ver t i cal f ace cut i nt o t he exi st i ng embankment or abut ment r esul t i ng f r om t he benchi ng oper at i on shal l be a mi ni mum of 6 i nches i n hei ght but shal l not exceed 12 inches i n hei ght .
3. 17 PLACEMENT AND SPREADI NG
3. 17. 1 General
Pr i or t o begi nni ng embankment pl acement on t he l evee f oundat i on, not i f y t he Gover nment t hat t he f oundat i on i s r eady t o r ecei ve f i l l . No f i l l shal l be pl aced on any par t of t he embankment f oundat i on unt i l such ar eas have been i nspect ed and gi ven f i nal appr oval by t he Cont r act i ng Of f i cer . Pl ace f i l l i n maxi mum 12 i nch l oose l i f t s .
3. 17. 1. 1 Gr adat i on and Di st r i but i on
The gr adat i on and di st r i but i on of mat er i al s t hr oughout each zone of t he l evee shal l be such t hat t he embankment wi l l be f r ee f r om l enses, pocket s, st r eaks, and l ayer s of mat er i al di f f er i ng subst ant i al l y i n t ext ur e or gr adat i on f r om sur r oundi ng mat er i al of t he same cl ass. I f l enses, pocket s, or l ayer s of mat er i al s di f f er i ng subst ant i al l y i n t ext ur e or gr adat i on f r om sur r oundi ng mat er i al occur i n t he spr ead mat er i al , t he l ayer shal l be mi xed by har r owi ng or any ot her appr oved met hod t o bl end t he mat er i al s. Dur i ng t he pl aci ng and spr eadi ng pr ocess, mai nt ai n at al l t i mes a f or ce of wor ker s adequat e t o r emove al l r oot s, debr i s, and over si ze st one f r om al l embankment mat er i al s. Al l s t ones and r ock f r agment s l ar ger t han 6 i nches i n any di mensi on shal l be r emoved. No f i l l shal l be pl aced upon a f r ozen sur f ace, nor shal l snow, i ce, or f r ozen ear t h be i ncor por at ed i n t he embankment.
3. 17. 1. 2 Foundat i ons and Par t i al Embankment Fi l l s
The f oundat i ons and al l par t i al embankment r ecei v i ng f i l l s shal l be kept t hor oughl y dr ai ned. Pl aci ng oper at i ons wi l l be such as t o avoi d mi xi ng of mat er i al s f r om adj acent sect i ons as much as pr act i cabl e.
3. 17. 1. 3 Equi pment Tr af f i c
Equi pment t r af f i c on any embankment zone shal l be r out ed t o di st r i but e t he compact i ve ef f or t as much as pr act i cabl e. Rut s f or med i n t he sur f ace of any l ayer of spr ead mat er i al wi l l be f i l l ed bef or e t hat mat er i al i s compact ed.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it.