About this file

Section 23 11 13

View the file

Other files

File Type Posted
Bid_Abstract.pdf PDF
Amendment_0008.pdf PDF
Amendment_0007.pdf PDF
Amendment_0006.pdf PDF
03_31_01.00_10.pdf PDF
01_14_00.pdf PDF
01_22_00.00_10.pdf PDF
Raritan_Valley_Line_Schedule-061619.pdf PDF
32_92_19.pdf PDF
25_14_01.pdf PDF
03_25_30.pdf PDF
01_30_00.pdf PDF
26_32_15.00_10.pdf PDF
Amendment_5_Plans_Sheets_12_Sept_2019.pdf PDF
LURP_Permit_29_August_2019.pdf PDF
EXAMPLE_TAP_2019-2.pdf PDF
Verizon_Conduit_Relocation_Plan.pdf PDF
Amendment_0005_final.pdf PDF
Amendment_0004.pdf PDF
03_31_01.00_10.pdf PDF
09_97_02.pdf PDF
01_14_00.pdf PDF
Green_Brook_C1_AM_002_Combined_Sheets_14_Aug_2019.pdf PDF
35_41_00.pdf PDF
REGISTER.pdf PDF
01_33_00.pdf PDF
Amendment_0003.pdf PDF
01_22_00.00_10.pdf PDF
01_50_00.pdf PDF
31_23_00.00_20.pdf PDF
03_11_13.00_10.pdf PDF
Amendment_0002.pdf PDF
05_-_Green_Brook_C-1_Amendment_1_Mechanical_25JUL2019.pdf PDF
01_-_Green_Brook_C-1_Amendment_1_General_25JUL2019.pdf PDF
03_34_00.pdf PDF
31_62_23.13.pdf PDF
07_-_Green_Brook_C-1_Amendment_1_Telelcomm_25JUL2019.pdf PDF
Amendment_0001.pdf PDF
03_-_Green_Brook_C-1_Amendment_1_Architectural_25JUL2019.pdf PDF
06_-_Green_Brook_C-1_Amendment_1_Electrical_25JUL2019.pdf PDF
03_25_30.pdf PDF
32_11_20.pdf PDF
02_-_Green_Brook_C-1_Amendment_1_Civil_25JUL2019.pdf PDF
22_14_29.00_40.pdf PDF
04_-_Green_Brook_C-1_Amendment_1_Structural_25JUL2019.pdf PDF
04_-_Green_Brook_C-1_Landscape_Drawings.pdf PDF
02_-_Green_Brook_C-1_Survey-Hydro_Drawings.pdf PDF
01_-_Green_Brook_C-1_General_Drawings.pdf PDF
06_-_Green_Brook_C-1_Structural_Drawings.pdf PDF
W912DS19B0009.pdf PDF
Show 40 more

Latest 50 of 56 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Green Brook, Segment C-1

AMENDMENT # 1

SECTION 23 11 13

FUEL OIL PUMPING SYSTEM AND CONTROLS FOR STAND-BY POWER

PART 1 GENERAL

1.1 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.

ASME INTERNATIONAL (ASME)

ASME B16.3 (2011) Malleable Iron Threaded Fittings, Classes 150 and 300

ASTM INTERNATIONAL (ASTM)

ASTM A53/A53M (2012) Standard Specification for Pipe, Steel, Black and Hot-Dipped, Zinc-Coated, Welded and Seamless

ASTM B117 (2016) Standard Practice for Operating Salt Spray (Fog) Apparatus

INTERNATIONAL CODE COUNCIL (ICC)

ICC IFC (2018) International Fire Code

NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)

NFPA 30 (2015; ERTA 1 2016) Flammable and Combustible Liquids Code

NFPA 30A (2018) Code for Motor Fuel Dispensing Facilities and Repair Garages

NFPA 37 (2018) Standard for the Installation and Use of Stationary Combustion Engines and Gas Turbines

NFPA 70 (2017; ERTA 1-2 2017; TIA 17-1; TIA 17-2;

TIA 17-3; TIA 17-4; TIA 17-5; TIA 17-6;

TIA 17-7; TIA 17-8; TIA 17-9; TIA 17-10;

TIA 17-11; TIA 17-12; TIA 17-13; TIA

17-14) National Electrical Code

NFPA 780 (2017) Standard for the Installation of Lightning Protection Systems

STATE OF CALIFORNIA AIR RESOURCE BOARD (CARB)

EO VR-302-B (2009) Standing Loss Control Recovery System for New Installations of Aboveground Storage Tanks

SECTION 23 11 13 Page 1

UNDERWRITERS LABORATORIES (UL)

UL 142 (2006; Reprint Jul 2013) Steel Aboveground Tanks for Flammable and Combustible Liquids

UL 2085 (1997; Reprint Sep 2010) Protected Aboveground Tanks for Flammable and Combustible Liquids

UL 508A (2013; Reprint Jul 2017) UL Standard for Safety Industrial Control Panels

UL 752 (2005; Reprint Dec 2015) Standard for Bullet-Resisting Equipment

U.S. DEPARTMENT OF DEFENSE (DOD)

UFC 4-023-07 (2017; with Change 1) Design to Resist Direct Fire Weapons Effects

UNIFORM FIRE CODE (UFC)

UFC 79-7 (2001) UFC Article 79

UNDERWRITERS LABORATORIES (UL)

UL 343 (Ninth Edition, Dated Dec 2008) Standard for Safety Pumps for Oil-Burning Appliances

1.2 SUBMITTALS

Government approval is required for submittals with a "G" designation;

submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Submittals with an "S" are for inclusion in the Sustainability Notebook, in conformance with Section 01 33 29 SUSTAINABILITY REPORTING. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:

SD-02 Shop Drawings

System Layout and Design; G, DO

Point To Point Diagram; G, DO

SD-03 Product Data

Catalog Data; G, DO

Products Installation Instructions And Calibration Charts; G, DO

SD-10 Operation and Maintenance Data

O&M Binder; G, RO

SD-11 Closeout Submittals

Record Documents; G, RO

SECTION 23 11 13 Page 2

Documentation; G, RO

1.3 QUALITY ASSURANCE

1.3.1 Contractor, Designer, and Builder

The Contract Requirements under this section covers the work and responsibility of the Contractor and his affiliated entities and/or Sub-contractors to completely Design and Build the Fuel Storage Tank and Supply/Return Distribution Piping System that will support the Emergency Diesel Generator, which appears elsewhere in this Contract, but is also inclusive within this Contract. The Contractor shall be Fully Responsible in the entire Design, Construction, Start-up, Operator Personnel Training, Registration, and Obtaining any and all Permits required for the Final End-user, and paying all direct and indirect fees necessary, complete. The Contractor shall effectively provide a complete "Turn-Key" system to the Government/End-User with the system fully fueled, tested, ready for full operation inclusive of training, permits, and providing Operations and Maintenance (O&M) Manuel in Hard Copy and Electronic format.

All Points-Of-Contacts (POC) and Document filings and Permitting Particulars and Details shall be coordinated with the COR and discussed as part of the Pre-Construction Conference.

1.3.2 Manufacturer

Equipment, controls and all fuel oil specialty devices shall be provided by a single supplier to ensure a complete functional and coordinated system with single source responsibility. Supplier shall give guidance to equipment and device installation and shall complete all programming, commissioning and owner training. The supplier shall be a firm with five years of documented experience in the installation of integrated emergency fuel systems.

1.3.3 Installer

Company specializing in performing the work of this Section with minimum three years documented experience. Bidding installation contractor shall hold license(s) as required by the Authority Having Jurisdiction (AHJ).

1.4 DELIVERY, STORAGE, AND HANDLING

Contractor shall provide for all delivery, transportation, storage, and exercise all material handling and storage procedures necessary to protect the integrity of the equipment and product as recommended by the manufacturer, and shall meet the satisfaction of the manufacturer.

1.5 PROJECT/SITE CONDITIONS

1.5.1 Environmental Requirements

Submit and comply with all the requirements of the EPA, state and local authorities having jurisdiction. Include installation permit/fees for fuel storage tank and all accessories and appurtenances.

1.5.2 Existing Conditions

This project is for the Design and Construction of an entirely new Storage

SECTION 23 11 13 Page 3 and Fuel Oil Supply/Return Piping System to serve a New Emergency Diesel Generator.

1.5.3 Project Site Specific Requirements

The Fuel Storage Tank and its Fuel Oil Supply/Return Piping shall be expected to be installed underground, to the extent it will traverse below a vehicular roadway surface to be utilized by Service Vehicles (trucks) with an axle loading of AASHTO H-20 (32,000 lbs. per axle or 16,000 lbs.

per tire). Therefore, with the precautionary information stated, the Contractor (Design/Builder) shall design, build, and install all necessary feature to protect the integrity of the fuel storage and piping system.

All alarm set-up and reporting system details shall be coordinated with the Government Contracting Officer Representative (COR).

1.6 WARRANTY

The tank system shall be warranted by the manufacturer against defects in material or workmanship for 30 years following the delivery of the tank.

Warranties that limit such coverage for shorter periods and/or limit the primary tank warranty to failure solely due to non-corrosion related cracking, breakup or collapse will not be permitted. Provide warranty documents.

PART 2 PRODUCTS

2.1 THE DUPLEX PUMP SKID

Integrated pump set, tank monitor and control for the fuel oil transfer of fuel oil to emergency generators. The shop drawings need to indicate system layout and Design with the location and elevation of the fuel oil pumping system and related equipment. Also indicate conduit requirements and routing for electrical power and controls with point to point diagram.

Provide catalog data on all controls, pumps, associated valves, piping, tanks and other equipment including material of construction, dimensional data and ratings. Provide manufacturer's products installation instructions and calibration charts.

2.1.1 Pump Set and Control Panel

The Duplex Pump Set and Integrated Control Panel shall be factory assembled, pre-wired and tested to ensure quality. The Duplex Pump Set and Integrated Control Panel shall be from a single common entity for product integration, compatibility, and single source responsibility. Basis of Design is Core Engineered Solutions or Government Approved Equal.

manufactured by Core Engineered Solutions as a single source supplier to ensure quality and product responsibility. At a minimum, the Pump Set and Control Panel shall incorporate the listed following features:

1. Provide a factory wired NEMA 4X enclosure that includes the operator interface, control switches and indicator lights. The enclosure shall be factory installed and integrated with the support rack that houses the duplex pump assembly. Contractor shall provide Local Safety Disconnect Switch. to All HAND-OFF-AUTO (HOA) control switches shall be keyed to protect from unauthorized operation. All Operator Interface programming changes shall be password protected. The Integrated Control Panel shall be a multi-function controller for monitoring and controlling the entire fuel oil system in one enclosure. The Integrated

SECTION 23 11 13 Page 4

Control Panel shall be capable of performing all of the following functions regardless of whether or not they are included in this phase of the project:

a. Main Storage Tank Leak, Level Monitoring and Control

b. Remote Overfill Protection

c. Main Tank Anti-Siphon

d. Main Tank Automatic Fuel Polishing

e. Day Tank Leak, Level Monitoring and Control for up to two Day Tanks

f. Day Tank Remote Status Displays

g. Day Tank Automatic Fuel Polishing

h. Header-Reservoir Control for both Single and Double Wall Header Systems

i. Duplex Pump, Strainers, Leak, Flow Sensor and Pressure Transmitter

j. Double Wall Pipe Monitoring

k. Double Wall Pipe Leak-Vacuum Monitoring

2.1.2 General Control and Monitoring Hardware

The Integrated Control Panel enclosure must be UL 508A listed and meet NEC ( NFPA 70), NFPA 30 and NFPA 37 requirements. The Integrated Control Panel shall be microprocessor based; relay logic will not be permitted.

1. The Integrated Control Panel shall integrate factory configured control logic that is stored on an EEPROM and password protected to prohibit programming changes by unauthorized personnel. All programming shall be modifiable through the Operator Interface and shall not require the use of a laptop.

2. The Integrated Control Panel shall be capable of interfacing with a remote access point and creating a secure connection to a remote CPU and Operator Interface Terminal (OIT). The remote access point shall be capable of monitoring, controlling, programming and diagnosing the system.

a. The remote access point and connection shall be Industry 4.0 compliant for differential user access management, cloud or private M2M server.

b. The remote access point shall allow for multiple access methods, including: Ethernet, Wi-Fi and Cellular 3G/4G.

3. The Integrated Control Panel shall be designed to operate in the event of device failure and continue to provide power to the pump set and valve assemblies if the microprocessor has failed.

4. The Integrated Control Panel shall have an independent overfill sensor for each main storage tank, day or belly tank, and header-reservoir system. Each overfill sensor shall be monitored by the Integrated

SECTION 23 11 13 Page 5

Control Panel through a normally closer sensor and independent relay monitoring of the signals. The overfill sensor relay shall be configured to LOCK OUT the system's pump and valve assemblies upon loss of a signal from the overfill sensor. The manual HAND-OFF-AUTO (HOA) operation shall not override any LOCK OUT condition.

5. The Integrated Control Panel shall utilize circuit breakers. The use of fuses shall not be permitted.

6. The Integrated Control Panel shall utilize IEC-rated manual motor starters for any motor circuits. Each motor starter shall use overload protection-motor circuit protection.

7. The Integrated Control Panel shall provide safety interlocks to shutdown both pumps during either a LEAK DETECTED or HIGH-HIGH LEVEL status from the day or belly tank. The interlocks shall continue if the Integrated Control Panel operation has failed and the operations are performed in manual or HAND mode.

2.1.3 Operator Interface Terminal (OIT)

The Fuel Oil Storage, Distribution, Control, and Leak Detection system's Supervisory Control AND Data Acquisition (SCADA) System shall integrate into the Main Storm Water Panel Controls Programmable Logic Controls (PLC) Panel. It shall provide local data reporting and be capable to provide Remote Status Condition and Alert/Alarm if desired by the Operator.

Coordinate with Specification Section 25 14 01, PUMP STATATION

INSTRUMENTATION AND CONTROL PANEL.

The Integrated Control Panel OIT or Human Machine Interface (HMI) shall include a 7-inch Screen and include outputs for RS-232/422/485, RJ-12, USB Type A/B, Ethernet, SD Memory Card and Audio Out.

1. The OIT shall be capable of the following actions: data/alarm logging for up to 1,000 events; event management, e-mail out, FTP server, Web Service and remote internet service. These capabilities shall be capable of being monitored, controlled, programmed and diagnosed through the remote access point.

2.1.4 Programmable Logic

The Integrated Control Panel shall be designed with a Brick PLC capable of the processing, memory and input-output (I/O) interface required to operate the automated control system.

1. The following input-output shall be the minimum requirement:

265-digital inputs, 128-relay outputs, 32-channel current (0-20mA) input at 13-bit; 16-channel current (4-20mA) sourcing output at 12-bit.

2. The following communication and connection types shall be the minimum requirement: (1) Ethernet; (1) RS-232; and (1) RS-485.

3. The following TCP/IP Ports and Protocols shall be the minimum requirement: Modbus RTU Master/Slave; Modbus TCP; ASC II In-Out; and Programming-Monitoring. The TCP/IP Port speeds shall be 10/100 Mbps up to 115,200 Baud.

4. The Integrated Control Panel Brick PLC shall be capable of a real-time clock and calendar, retentive memory, battery backup, removable

SECTION 23 11 13 Page 6 terminal blocks and remote internet access.

2.1.5 Communications

The Integrated Control Panel shall integrate into the building management system (BMS). The local network shall provide data streaming for the OIT, PLC, BMS and remote access point. The Integrated Control Panel shall be Modbus equipment and capable of BACnet access point. See Specification 25 14 01 Pump Station Instrumentation and Control Panels and Electrical Drawings; integrate and provide the necessary output connections to communicate with the Main Controls System's Program Logic Controller (PLC) as necessary.

2.1.6 The Integrated Control Panel system shall display the following functions

1. Main Storage Tank Status

a. Level: Inches, Gallons and Percent

b. Leak: Tank Containment and Sensors

c. High, Low and Normal Level Indication

d. Remote Fill: High Level Warning and Alarm Status; Level: Inches, Gallons and Percent

2. Day/Belly Storage Tank(s)

a. Level: Inches, Gallons and Percent

b. Leak: Tank Containment and Sensors

c. High, Low and Normal Level Indication

d. Remote Fill Control Valve Status

e. High Level Control Valve Status

f. Remote Monitoring: High Level Warning and Alarm Status; Level:

Inches, Gallons and Percent; and, Leak Alarm Status

3. Pump Set

a. Lead/Lag Pump Run Status

b. Pump Overload Status

c. Pump Run Timer

d. Duplex Strainer Differential Pressure Status

e. Leak: Containment Sensor Alarm Status

f. Pressure Indicator - Pressure Alarm

g. Flow Indicator - NO FLOW Status Alarm

h. Pump Ready Status

SECTION 23 11 13 Page 7

i. Pump LOCK OUT Status

j. Emergency System - SYSTEM LOCKOUT Status

4. Fuel Polishing

a. Automatic 24/7 Programmable Fuel Polishing Schedule

b. Fuel Polishing Status

c. Fuel Polishing Flow Status

d. Fuel Polishing - Differential Pressure Status

e. Filter Water Sensor Status

f. Filter Water Storage: Tank High and Normal Level Status

g. Filter Enclosure Leak Status

5. Leak-Vacuum Monitoring System

a. Current Test Status

b. Last Test Result (Pass/Fail)

c. Last 10 Test Results (Percent)

d. Loss Rate (1-Hour and 24-Hour Average)

e. 24-Hour Trend (Graphical)

f. 24-Hour Hourly Leak Results

g. Vacuum Percent (Inches)

h. Leak and Level Sensor Status

6. Alarm/Event Log

a. Present and Historical Alarm Log

b. Pump Start and Stop Time

c. System and Device HOA Status

d. Recent Alarm Scrolling Banner (256-Characters)

e. Main and Day Tank - High Level, Low and Leak

f. Header - Level, Pressure and Flow

g. Pump Alarms

h. Fuel Polishing Alarms

i. System Alarms: System not in AUTO, System HAND - Manual Mode, and Emergency Stop - System LOCKOUT.

SECTION 23 11 13 Page 8

7. Building Management System

a. System Summary Alarm

b. (16) Alarm Outputs

c. (2) 4-20mA Outputs - Tank Percent

d. Auto Dialer

2.2 DOUBLE WALL ABOVEGROUND STORAGE TANK - 1,000 GALLON DIESEL

2.2.1 Rectangular Aboveground Tank System

Constructed and listed in accordance with UL 2085, Protected Aboveground Storage Tanks for Flammable and Combustible Liquids. The tank system shall be listed for ballistics protection in accordance with UL 752, Levels 5, 6 and 8.

2.2.2 Code Compliance

The tank system must comply with all provisions of:

1) UFC 79-7, Appendix A-II-F, for both Vehicle Impact Protection and Projectile Resistance;

2) NFPA 30 and NFPA 30A;

3) ICC IFC Chapter 57; and

4) ICC IFC Chapter 23. The tank system shall be tested, certified and approved for Vapor Recovery by EO VR-302-B.

2.2.3 Tank

The tank shall be of double wall construction and provide secondary containment of the primary storage tank contents by an impervious steel outer wall. The tank shall be rectangular in shape and listed per UL 142 and designed for possible future relocation. Welds shall be continuous on all sides and exterior seams, conforming to the American Welding Society Standard for continuous weld. The primary steel tank shall be pressure tested at 5 psig for a minimum of 24 hours. All openings shall be from the top only. The tank shall be supplied with emergency vents for the primary and secondary tanks. The tank shall be provided with Factory Fabricated engineered hold-down seismic restraints whenever available from the manufacturer that meets both the hold-down restraint requirements and seismic criteria requirements, otherwise engineered hold-down restraints system may be engineered and manufactured by a third party entity, but shall meet the satisfaction of all entities - the tank manufacturer, Design Engineer, and The Government.

2.2.4 Secondary Containment and Corrosion Protection

The interstitial monitoring area between the primary and secondary tanks shall be a true void, insuring reliability for testing and immediate migration of any liquid contents to the monitoring point. Designs incorporating insulation or other material in the secondary containment area will not be permitted. The secondary containment must be tested for

SECTION 23 11 13 Page 9 tightness (at the manufacturing plant and in the field before commissioning and use as may be required by local jurisdiction and code). A 6 Mil High-Density Polyethylene liner shall enclose the double wall tank and insulating material to protect against corrosion by isolating the tank and secondary containment from the concrete or other corrosive material. Tank designs that do not protect the secondary containment from corrosion will not be permitted. All exposed steel, with the exception of stainless steel, shall be anti-oxidant powder coated to inhibit corrosion and meet ASTM B117. Secondary containment comprised of an (unprotected) exposed outer steel jacket will not be permitted.

2.2.5 Concrete Encasement

A vaulted concrete enclosure shall encase and must protect both the primary and secondary containment steel tanks. The concrete encasement shall be 6 inches thick with a minimum design strength of 4000 psi. The concrete design shall include the following for long-term durability: air entrainment, water-reducing admixture, and steel reinforcement. Concrete placement shall be a visually verifiable monolithic (seamless) pour to ensure the absence of voids on all sides and beneath the steel tank. The double wall steel tank shall be pressurized to 5 psig during concrete encasement to allow for expansion and contraction of the tank. The vault enclosure shall have concrete support legs of unitized monolithic construction raising the concrete enclosure a minimum of 3 inches above the ground to meet visual inspection requirements. A mid-level seam or other cold joint construction which could compromise the liquid tightness (secondary containment) and fire protection capability of the vault is not permitted.

2.2.6 Thermal Protection

The tank system construction shall include thermal insulation by covering the double wall steel tank with a minimum of 0.25 inches thick polystyrene panels to protect against extreme temperatures.

2.2.7 Ballistics and High Explosive (HE) Blast Resistance

The tank system shall carry a listing under UL 752, Levels 5,6, and 8, see table below, signifying bullet-resisting protection against penetration, passage of fragments of projectiles, or fragmentation of the vault enclosure to the extent that any protected material, including the secondary containment and primary tank are not damaged.

Ballistics Tests

UL 752

Protection Level Shots Ammunition

Level 5 1 7.62mm Rifle Lead Core Full Metal Copper Jacket, Military Ball (.308 caliber)

Level 6 5 9.00mm Full Metal Copper Jacket with Lead Core

SECTION 23 11 13 Page 10

Ballistics Tests

Level 8 5 7.62mm Rifle Lead Core Full Metal Copper Jacket, Military Ball (.308 caliber)

The tank system shall meet UFC 4-023-07 guidelines for a "High" threat level parameter, and shall have been tested and passed the requirements to meet the following Ratings for Bullet Resistant Materials at a National Institute of Justice (NIJ) / National Law Enforcement and Corrections Technology Center (NLECTC) approved laboratory accredited by the National Voluntary Laboratory Accreditation Program (NVLAP):

Rating Shots Ammunition

UL 752 Level 9 1 CAL .30 AP, M2, 166 gr.

National Institute of Justice (NIJ) Level 4

1 CAL .30 AP, M2, 166 gr.

State Department

(SD-STD-.02.01)

Revision G

3 CAL .30 AP, M2, 166 gr.

ASTM F1233 3 CAL .30 AP, M2, 166 gr.

Blast Effects Analysis (BEA)

The tank system design shall have been subjected to a Blast Effects Analysis (BEA) assessing resistance and performance under the following blast threat scenarios per the FEMA 426 - Reference Manual to Mitigate Potential Terrorist Attacks Against Buildings:

1) a 50-pound man-portable improvised explosive device (MPIED) at the standoff distance of 5 ft.;

2) a 500-pound vehicle-born improvised explosive device (VBIED) at the standoff distance of 20 ft.; and

3) a vapor cloud explosion (VCE) with a load of 10 psi. The BEA shall conclude that the tank system will resist the explosion loads and remain intact, without failure of the primary tank or movement of the tank exceeding 2 inches. Tank designs that do not protect the primary tank AND secondary containment by providing both Ballistics and Blast Effect resistance as specified in this Section 2.5 will not be permitted.

2.2.8 Fire Resistance

The tank system shall be designed and tested to provide 2 hour fire protection for the primary tank as per UL 2085 2-hour furnace fire test and 2 hour simulated pool fire test. The average maximum rise in temperature of the primary tank during the test shall not exceed 260° F and the maximum temperature of any single point on the primary tank shall not exceed 400° F. No steel members shall penetrate the walls or floor of the concrete

SECTION 23 11 13 Page 11 encasement to assure isolation from pool fire heat.

2.2.9 Leak Monitoring

A thru-tank leak detection monitoring tube terminating between the primary tank and the secondary containment tank shall be provided to monitor any leaks from the primary tank.

2.2.10 Spill/Overfill Containment

The tank system shall include a UL listed 7 or 15 gallon spill/overfill container manufactured as an integral part of the primary tank, surrounding the fill pipe, and protected by 2 hour fire rating of the enclosure. The spill/overfill container shall include a stick port and normally closed drain valve to release spilled product into the main tank. Exterior steel shall be stainless steel or anti-oxidant powder coated to inhibit rust.

Overfill containment systems that are designed to release spilled product into the interstitial area will not be accepted.

2.2.11 Overfill Protection

Overfill protection shall be provided by the following methods: a) direct reading level gauge visible from fill pipe access;

a) direct reading level gauge visible from fill pipe access;

b) valve rated for pressurized delivery located within fill pipe to close automatically at 95% full level; and

c) high level alarm

2.2.12 Exterior Finish

The tank system exterior shall be a low maintenance architectural coating or exposed aggregate concrete finish. Models with fiber clad or painted steel exterior tanks will not be accepted.

2.2.13 Tank Top Transition Sump

The tank system shall be provided with an integral tank top transition sump. The tank top transition sump shall be 48 inches wide x 36 inches long x 24 inches high.

2.2.14 Signage

Tanks shall be marked on all sides as per state and local codes. Signs will be recessed in concrete exterior to insure against damage during off-loading, refilling or general functions.

2.2.15 Execution

The tank system shall be installed in strict accordance with the manufacturer's recommendations, industry standards, and applicable fire and environmental codes. All state and local permits shall be obtained prior to installation. The tank system shall be handled, lifted, stored and installed in accordance with the manufacturer's instructions on a reinforced concrete base slab designed to support the fully loaded tank.

Protective bollards shall be installed where required by state and local codes. Tanks shall be marked on all sides with warning signs and product

SECTION 23 11 13 Page 12 identification as required by applicable codes. Grounding conductors shall be connected to the two bolts on the tank system for lightning protection in accordance with NFPA 780 and all electrical work shall be in accordance with applicable codes.

2.3 FUEL OIL TRANSFER PUMP SET

The Duplex Pump Skid shall be rated at 30 GPH for Diesel Fuel and No. 4 with a discharge pressure of 100 PSIG; this can be used for Cost Estimating purposes. The final Design and Constructed value shall be developed and verified via analysis and computation by the Official Designer of Record.

2.3.1 General Piping, Pumps and Strainers

The Duplex Pump Skid shall be factory assembled and tested. All pipe shall be Schedule 40 ASTM A53/A53M Grade A with ASME B16.3 Class 150 malleable iron threaded fittings. The assembly shall be factory mounted on a pump skid base and support rack. The pump skid base and support rack shall be continuously welded steel plate with 3 inch steel side rails with a half-inch containment basin drain plug. The pump skid base and support rack shall be powder coated. The pump skid base and support rack shall be hydrostatically tested at the factory.

2.3.1.1 Isolation Valves

The Duplex Pump Skid shall be assembled with four isolation valves, one on both the suction and discharge of each pump. The isolation valves shall be full-port ball valves to provide full flow and positive shutoff.

2.3.1.2 Check Valves

The Duplex Pump Skid shall be assembled with a check valve on the discharge of each pump. The check valves shall be swing style and mounted horizontally. Spring style check valves will not be permitted.

2.3.1.3 Fuel Oil Strainer

The Duplex Pump Skid shall be assembled with a duplex strainer in the incoming fuel line. The duplex strainer shall use 40-mesh baskets. The duplex strainer shall have a differential pressure gauge installed with a 0-10PSIG alarm set point.

2.3.1.4 Pressure Relief Valve

The Duplex Pump Skid shall be assembled with pressure relief valves that are sized to relieve the full discharge of the pump. The pressure relief valves shall be field piped in accordance with NFPA 30. Internal pump pressure relief valves will not be accepted as a sole means of overpressure protection. The pressure relief valves shall be field adjustable with a metal-on-metal lapped seating and stainless steel springs.

2.3.1.5 Flow Switch

The Duplex Pump Skid shall be assembled with a flow sensing switch on the discharge of the pump. The flow switch shall activate the lag pump should the lead pump fail to provide or maintain flow. The flow switch shall be factory wired to the Integrated Control Panel.

SECTION 23 11 13 Page 13

2.3.1.6 Pumps

The Duplex Pump Skid shall be assembled with two positive displacement fuel oil pumps. The pumps shall be UL 343. The pumps shall be rotary type with cast iron housing and self-adjusting mechanical carbon steel ring seals.

Aluminum, brass or bronze pump housing will not be permitted. Packing gland, close-coupled, carbonator shaft or centrifugal pumps will not be permitted. The pumps shall have an internal pressure relief valve for overpressure protection.

a. The pumps shall be configured with two open drip proof, rigid base, NEMA frame motors. The pump and motor assemblies shall be factory assembled and mounted to the pump skid base and support rack with vibration isolation pads. Flexible connectors shall be installed on both the suction and discharge of each pump and motor assembly.

2.3.1.7 Leak Sensor

All leak detection shall be a float type with N/C signal with stainless steel construction. Discriminated leak sensors shall not be permitted due to false alarms. Any leak sensor that is to be installed in the interstice of a tank shall be mounted using a Camlock adapter for easy access.

2.3.1.8 Level Transmitter

All levels of the main storage tank and day tank shall be monitored by using a float level with both 4-20mA Output and a digital N/C overfill sensor signal with stainless steel construction. Both signals shall be derived by using one float; dual float transmitter shall not be allowed for safety and overfill protection. Both signal wires shall be independently wired back to the controller. The level transmitter shall be mounted using a Camlock adapter for easy access. Pressure transmitters shall not be permitted.

2.3.1.9 Integrated Fuel Polishing

The Duplex Pump Skid shall be assembled with an integrated fuel polishing system. The fuel polishing system shall be controlled and monitored by the Integrated Control Panel. The fuel polishing system shall utilize the pump and motor assemblies. The fuel polishing system shall be factory assembled and mounted on the Duplex Pump Skid. The fuel polishing system shall be a four stage system designed for use with fuel oils, including biodiesel fuels. The fuel polishing system shall remove water and solids to 1-micron insuring clean, dry, contaminant free fuel is delivered to the emergency generator. The fuel polishing system shall be automated and run on a 24/7 schedule or programmed to run manually. The fuel polishing system shall be field piped to return the fuel to the main storage tank. The control valve shall be capable of manual bypass in the event of failure.

a. The Integrated Fuel Polishing system shall be assembled with the following:

(a) Isolation ball valve with bronze body rated up to 600PSIG

(b) Control solenoid valve with bronze body rated up to 125PSIG

(c) Visual flow indicator with double windows

(d) Check valve with bronze body rated up to 300PSIG

SECTION 23 11 13 Page 14

(e) Differential pressure gauge with aluminum body and stainless steel internal rated up to 6,000PSIG

(f) Pre-Strainer with bronze body rated up to 300PSIG

(g) Filter Canister with aluminum housing, steel canister and powder coated components - 1.5" inlet and outlet - rated up to 150PSIG and 160°F.

b. Refer to fuel polishing section for details.

2.3.1.10 Integrated Pipe Leak Monitoring System

The Duplex Pump Skid shall be assembled with an integrated pipe leak-vacuum monitoring system. The pipe leak-vacuum monitoring system shall be controlled and monitored by the Integrated Control Panel. The pipe leak-vacuum monitoring system shall be factory assembled and mounted on the Duplex Pump Skid unless otherwise noted in the contract.

a. The Integrated Pipe Leak Monitoring System shall monitor the interstitial space of double wall piping for integrity and tightness of both the primary and secondary piping.

b. The Integrated Pipe Leak Monitoring System shall consist of, but not be limited to the following components:

(a) Vacuum pump - UL listed, 50PSIG, 24inHG, 0.52 CFM

(b) Liquid safety barrier

(c) Digital pressure sensor with PSIG range -14.5 to 14.5

(d) Pressure gauges - 30inHG, 100PSIG, liquid filled, stainless body with brass internals

(e) Compound gauge - 30inHG, 100PSIG or sized to 1.5x system operating PSIG.

(f) Stainless steel bracket for manifold and pump assembly (4B finish)

c. The bracket and assembly shall be factory assembled and wired.

d. Refer to pipe and leak monitoring section for details.

2.3.1.11 Factory Testing

The Duplex Pump Skid shall be factory tested prior to shipment. The factory testing shall include both pressure and vacuum testing for 24-hours. The pressure testing shall be the greater of either 100PSIG or

1.5 times the normal operating pressure of the system with an allowable loss of 4PSIG. The vacuum testing shall be 26inHG with an allowable loss of 1inHG. The power, control logic and control wiring shall be tested through a functionality test of each of the devices. A certification of the factory testing along with a copy of the project specific wiring diagrams shall be placed in the Integrated Control Panel prior to shipment.

SECTION 23 11 13 Page 15

2.4 POSITIVE DISPLACEMENT FUEL OIL PUMP - RETURN

A. Pump type shall be of heavy-duty internal gear type. One rotor of internally cut gear teeth will mesh with one externally cut gear.

Fluid shall be carried between gear teeth and shall be displaced when the gear teeth mesh. The surfaces of the rotors and housing shall cooperate to provide continuous sealing. Internally cut rotor shall terminate at the end of the drive shaft. The drive shaft shall be supported by bearings at two locations, where by both radial and axial support is provided.

B. Pump shall be High Speed Compact series. Pumps shall be of a Heavy Duty design, with thrust control and micrometer adjustments for accurate rotor positioning. Designed to operate at motor speeds, they shall be provided in a close-coupled version for minimum footprint.

See pump schedule for performance requirements.

C. Pump shall be capable of producing flow rates of at a minimum 1.5 times the supply pump.

2.5 UL 142 SINGLE WALL ABOVEGROUND STORAGE TANK WITH RUPTURE BASIN - DAY

TANK OR SUB-BASE/BELLY-TANK WHEN INTERGRATED BY THE EMERGENCY GENERATOR

MANUFACTURER.

A. Provide aboveground storage tank designed for the storage of flammable and combustible liquids at atmospheric pressure. Coordinate this item with Emergency Generator Manufacturer.

B. Aboveground tank primary and secondary containment (inner and outer walls) shall be manufactured in accordance and listed with Underwriters Laboratories UL 142, Standard for Steel Aboveground Tanks for Flammable and Combustible Liquids.

C. Integral secondary containment shall be designed as either an open or closed top vent to atmosphere rupture basin.

D. Integral secondary containment with a minimum 100% containment capacity of the primary storage tank.

E. Integral secondary containment shall provide access for rupture basin leak detection monitoring.

F. The tank system shall also meet or exceed the requirements of the:

(1) National Fire Protection Association (NFPA)

(2) International Fire Code (IFC)

2.6 INTEGRATED FUEL OIL FILTRATION-POLISHING SYSTEM

A. Provide an integrated fuel oil filtration-polishing system with the Duplex Pump Skid. Filtration systems separate from the duplex pump skid will not be accepted for this application.

B. A Fuel Oil Separator shall be included and shall be sized for the fuel oil supply (or return) flow rate as indicated. Separator shall include:

1. Die-cast aluminum head

SECTION 23 11 13 Page 16

2. Steel filter bowl assembly

3. Powder-coated components

4. Locking ring collar

5. Minimum 1" NPT Inlet and Outlet

6. 10 bar @ 240°F max design pressure

7. Manual drain valve

8. Manual vent valve

9. Pressure differential indicator

10. Water sensor

C. The Integrated fuel oil filtration-polishing system shall include a visual flow indicator and ball/isolation valves as required and as indicated in the drawing.

2.7 STAINLESS STEEL DOUBLE WALL PIPE AND MONITORING SYSTEM

A. Stainless steel product piping and fitting systems with integrated Duplex Pump Skid andor Dedicated Leak Monitoring System shall be provided where required by the Contract. The Design/Build Contractor shall, Size, Design, Build, and provide the complete fuel storage and supply/distribution system. The Design/Build Contractor shall in indicates the type, number, size and location of stainless steel product piping systems for the site; all submission shall be coordinated with the Government Field Contractor Officer (COR).

Additionally, the project shall be provided with fuel-oil piping site drawing stamped and certified by licensed P.E. The piping system shall be specifically manufactured and engineered specifically for the fuel oil system type to be used, and among its features are that it be:

flexible, double-walled 316L stainless steel with integral permanent leak detection; the primary and secondary pipes are corrugated stainless steel with a reinforcement tape in the interstitial space and finally, the exterior wrapped in a outer protective polyethylene jacket against abrasion and corrosion; rated for underground or aboveground fueling systems. The piping shall be UL971A listed for underground installation; Florida EQ No.692: California SWRCB approved; and certified for operating pressures up to 240 psig. The Basis of Design for the stainless steel fuel-oil product piping and fittingsis Flexwell-HL by BRUGG Pipe systems; , LLC of Rome, GA or engineer approved equal; and SafeSite Fuel System Controls, integrated FOC Fuel Oil Control System or Dedicated Leak Monitoring System shall be manufactured by SafeSite Fuel System Controls of Herndon, VA or Government Approved Equal. See paragraph 2.1.1 for Control Panel Features; and paragraph 2.1.6 for visual display features.

B. The duplex pump skid or dedicated leak monitoring system must have the capability of testing the integrity of the double wall piping for tightness and leaks.

C. The piping system will have an integrated vacuum/pressure pump and associated control devices. The integrated vacuum/pressure pump must be mounted in an enclosure and pre-wired to the duplex pump skid or

SECTION 23 11 13 Page 17 dedicated leak monitoring system.

D. Each piping system shall be constructed of stainless steel and shall be suitable for use with the products to be stored in the tank system; the piping system shall be UL-listed and approved by authorities having jurisdiction; and third party tested by licensed P.E. for temperatures to 1100 degrees for both primary and secondary pipe; and certified to operate up to 240 psig with installation to be one piece without intermediate joints or fittings without special tools.

E. Each stainless steel piping and fitting joint shall be mechanically bonded. The pipe shall be certified to a pressure rating of 240psi with a 35,000lb burst at up to 150 degrees and contain no epoxy liners.

F. Adhesives shall not be required or allowed on the stainless steel pipe system.

G. The contractors shall supply a recent 3-years certification of training from the pipe manufacture with their submittals along with client references from at least ten (10) Registered and Permitted Approved successful installations.

H. All above grade stainless steel piping shall be installed in accordance with the Manufacturer's recommendations, applicable codes, and as indicated.

I. Hangers, brackets, supports, anchors, clamps, and other devices shall be hot-dip galvanized after fabrication and before assembly and installation. They shall be installed to make the entire pipe system self-supporting and rigid. Defective or inaccurately constructed hangers, brackets, supports, clamps and other hardware shall not be used. Machine bolts, 5/8 inch in diameter and of proper length, shall be used throughout for securing the hangers, brackets, clamps, and supports for pipes larger than 3 inches, and ½-inch diameter bolts for pipes 3 inches and smaller.

J. Protection of Underground Pipe with Sleeve - For the protection of underground piping when subjected to a surface load, vehicle wheel load, or similar surface load/vehicle traffic, provide protective sleeves constructed of Hot Dipped Galvanize Steel Schedule 120 pipe, or Ductile Iron Pipe.

K. Utility Tape - Provide detectable aluminum foil plastic-backed tape or detectable magnetic plastic tape for warning and identification of buried piping. Tape must be detectable by an electronic detection instrument. Provide tape in minimum 3 inches width rolls, color coded for the utility involved, with warning identification imprinted in bold black letters continuously and repeatedly over entire tape length.

Warning identification must be at least 1 inch high and must state as a minimum "BURIED FUEL PIPING BELOW". Provide permanent code and letter coloring that is unaffected by moisture and other substances contained in trench backfill material.

L. Pipeline Markers - Provide pipeline markers constructed of 6 inches diameter, one-half inch thick bronze disk with a 3 inch long bronze headed bolt welded to the back of the disk. Engrave the front of the disk with the words "UNDERGROUND FUEL LINE" in the case of one line and "UNDERGROUND FUEL LINES" in the case of multiple fuel lines.

SECTION 23 11 13 Page 18

PART 3 EXECUTION

3.1 EXAMINATION

A. The FOC system shall not be installed until substrates and adjacent construction has been properly constructed. Verify concrete tank slab, electrical service stub-ups, ESO location, bollard/barrier installation, clearances, setbacks, and other site related work that have impact to fueling system.

B. Notify Manufacturer of any detail or design deviations as may be determined by site conditions.

3.2 FUEL TANK and PIPING INSTALLATION

A. Install FOC system in strict accordance with the manufacturer's recommendations, and applicable fire and environmental codes. State and local permits shall be obtained prior to installation.

B. The legs of all tanks shall be anchored or grouted with non-shrink grout to the slab per manufacturer's recommendations. Engineered resilient pads interface may be used instead of grouting in accordance with the manufacturer's recommendations.

C. Tanks shall be grounded in accordance with electrical codes. Use grounding lugs installed by tank manufacturer.

D. Tanks shall be clearly marked on all sides with warning signs "FLAMMABLE" or "NO SMOKING," tank volume, product identification, and other signs as required by local jurisdictions and applicable code.

E. The Contractor (Design/Builder) shall be responsible in properly protecting all Fuel Oil Supply/Return piping regardless of it being aboveground or belowground with particular attention given in instances where the ground above the piping is a roadway surface serving Vehicular Traffic. It shall also be the responsibility of the Contractor to provide protection for the Fuel Oil Storage Tank and its Fuel Distribution Piping. The Contractor shall provide all analysis, back-up data, and assumptions to justify and verify his design and construction approach.

F. Protection of Fuel Oil Pipe with Pipe Sleeve - Acceptable method of protecting pipe subjected to physical loading is by pipe sleeve.

Provide a pipe sleeve around any pipe that penetrates a wall, floor, or crosses under a roadway. Do not install sleeves in structural members.

Pipe sleeves may be cast in place in masonry structures at the time of the masonry construction. Sleeves must be of such size as to provide a minimum of 1/2 inch all-around clearance between pipe and the sleeve.

Align sleeve and piping such that the pipe is accurately centered within the sleeve by a nonconductive centering element. Securely anchor the sleeve to prevent dislocation. Closure of the space between the pipe and the pipe sleeve must be by means of a mechanically adjustable segmented elastomeric seal. The seal must be installed so as to be flush. For wall or floor penetrations, extend each sleeve through its respective wall or floor and cut flush with each surface. For roadway crossings, pipe sleeves must be continuous for the entire crossing as well as extend a minimum of 150 mm 6 inches beyond both sides of the crossing. Seal around sleeves that penetrate through valve or

SECTION 23 11 13 Page 19 fuel related pits with a Buna-N casing seal. Seal around sleeves that penetrate through non-fire-rated walls and floors in accordance with Section 07 92 00 JOINT SEALANTS. If penetrating through fire rated wall, seal around sleeves that penetrate through fire-rated walls and floors with firestopping.

3.3 ELECTRICAL SYSTEMS

A. All wiring shall be designed and installed to meet the requirements of the NEC and NFPA 70. All necessary branch circuit conduit and wiring shall be installed, providing for a stub-up at designated location to which the FOC will be mounted. From there power and control wiring shall be as indicated.

B. Pumps and all other equipment and all other equipment used in the hazardous areas should be UL listed.

3.4 FIELD QUALITY CONTROL

A. Perform system inspection as outlined in manufacturer's installation manual.

B. Test fueling distribution in accordance with NFPA 30 and other applicable codes. Properly dispose of any fuel generated in adherence to environmental regulations.

C. Submit field installation inspection report to manufacturer.

D. The final FOC system installation shall be inspected by the manufacturer or its certified contractor.

E. Record documents shall include as built Drawings indicating the location of fuel oil pumping system and system components.

3.5 SYSTEM ACTIVATION

A. Prior to activating the FOC system, perform the following procedure:

B. Flush system piping with grade of fuel to be used by Owner to remove any debris and foreign matter in piping prior to filling tank for the first time.

1. Service all system filters and screens and dispose of fuel in accordance with EPA and NFPA regulations after flushing

2. Open valves to correct position for system operation.

3. The Installation Contractor shall be responsible for the review of, and compliance with local requirements for system inspection, reporting and registration, as well as administrative paperwork requirements.

3.6 ADJUSTING AND CLEANING

A. Touch-up any abraded areas with the application of same coating used by the manufacturer. Manufacturer to include sufficient quantity of touch-up paint for this purpose.

B. Repair or replace damaged components.

SECTION 23 11 13 Page 20

3.7 START UP AND OPERATIONAL TRAINING

A. A factory trained technician shall be onsite to conduct system start up.

B. Perform training of owner's personnel per the materials included with the FOC system manufacturer's installation manual.

c. Fuel oil system installation, start-up and commissioning check-lists and other applicable documentation shall be provided.

d. Include manufacturers' installation, operation and maintenance instructions, spare parts lists, and training information for distribution and review in electronic format; when approved, a minimum of one complete O&M binder shall be provided for use on-site.

-- End of Section --

SECTION 23 11 13 Page 21

23 11 13 - FUEL OIL PUMPING SYSTEM AND CONTROLS FOR STAND-BY POWER
PART 1 GENERAL
1.1 REFERENCES
1.2 SUBMITTALS
1.3 QUALITY ASSURANCE
1.3.1 Contractor, Designer, and Builder
1.3.2 Manufacturer
1.3.3 Installer
1.4 DELIVERY, STORAGE, AND HANDLING
1.5 PROJECT/SITE CONDITIONS
1.5.1 Environmental Requirements
1.5.2 Existing Conditions
1.5.3 Project Site Specific Requirements

1.6 WARRANTY

PART 2 PRODUCTS
2.1 THE DUPLEX PUMP SKID
2.1.1 Pump Set and Control Panel
2.1.2 General Control and Monitoring Hardware
2.1.3 Operator Interface Terminal OIT
2.1.4 Programmable Logic
2.1.5 Communications
2.1.6 The Integrated Control Panel system shall display the following
2.2 DOUBLE WALL ABOVEGROUND STORAGE TANK - 1,000 GALLON DIESEL
2.2.1 Rectangular Aboveground Tank System
2.2.2 Code Compliance
2.2.3 Tank
2.2.4 Secondary Containment and Corrosion Protection
2.2.5 Concrete Encasement
2.2.6 Thermal Protection
2.2.7 Ballistics and High Explosive HE Blast Resistance
2.2.8 Fire Resistance
2.2.9 Leak Monitoring
2.2.10 Spill/Overfill Containment
2.2.11 Overfill Protection
2.2.12 Exterior Finish
2.2.13 Tank Top Transition Sump
2.2.14 Signage
2.2.15 Execution
2.3 FUEL OIL TRANSFER PUMP SET
2.3.1 General Piping, Pumps and Strainers
2.3.1.1 Isolation Valves
2.3.1.2 Check Valves
2.3.1.3 Fuel Oil Strainer
2.3.1.4 Pressure Relief Valve
2.3.1.5 Flow Switch
2.3.1.6 Pumps
2.3.1.7 Leak Sensor
2.3.1.8 Level Transmitter
2.3.1.9 Integrated Fuel Polishing
2.3.1.10 Integrated Pipe Leak Monitoring System
2.3.1.11 Factory Testing
2.4 POSITIVE DISPLACEMENT FUEL OIL PUMP - RETURN
2.5 UL 142 SINGLE WALL ABOVEGROUND STORAGE TANK WITH RUPTURE BASIN - DAY
2.6 INTEGRATED FUEL OIL FILTRATION-POLISHING SYSTEM
2.7 STAINLESS STEEL DOUBLE WALL PIPE AND MONITORING SYSTEM
PART 3 EXECUTION
3.1 EXAMINATION
3.2 FUEL TANK and PIPING INSTALLATION
3.3 ELECTRICAL SYSTEMS
3.4 FIELD QUALITY CONTROL
3.5 SYSTEM ACTIVATION
3.6 ADJUSTING AND CLEANING
3.7 START UP AND OPERATIONAL TRAINING