About this file

Specification 03 11 13

View the file

Other files

File Type Posted
Bid_Abstract.pdf PDF
Amendment_0008.pdf PDF
Amendment_0007.pdf PDF
Amendment_0006.pdf PDF
03_31_01.00_10.pdf PDF
01_14_00.pdf PDF
01_22_00.00_10.pdf PDF
Raritan_Valley_Line_Schedule-061619.pdf PDF
32_92_19.pdf PDF
25_14_01.pdf PDF
03_25_30.pdf PDF
01_30_00.pdf PDF
26_32_15.00_10.pdf PDF
Amendment_5_Plans_Sheets_12_Sept_2019.pdf PDF
LURP_Permit_29_August_2019.pdf PDF
EXAMPLE_TAP_2019-2.pdf PDF
Verizon_Conduit_Relocation_Plan.pdf PDF
Amendment_0005_final.pdf PDF
Amendment_0004.pdf PDF
03_31_01.00_10.pdf PDF
09_97_02.pdf PDF
01_14_00.pdf PDF
Green_Brook_C1_AM_002_Combined_Sheets_14_Aug_2019.pdf PDF
35_41_00.pdf PDF
REGISTER.pdf PDF
01_33_00.pdf PDF
Amendment_0003.pdf PDF
01_22_00.00_10.pdf PDF
01_50_00.pdf PDF
31_23_00.00_20.pdf PDF
Amendment_0002.pdf PDF
05_-_Green_Brook_C-1_Amendment_1_Mechanical_25JUL2019.pdf PDF
01_-_Green_Brook_C-1_Amendment_1_General_25JUL2019.pdf PDF
03_34_00.pdf PDF
23_11_13.pdf PDF
31_62_23.13.pdf PDF
07_-_Green_Brook_C-1_Amendment_1_Telelcomm_25JUL2019.pdf PDF
Amendment_0001.pdf PDF
03_-_Green_Brook_C-1_Amendment_1_Architectural_25JUL2019.pdf PDF
06_-_Green_Brook_C-1_Amendment_1_Electrical_25JUL2019.pdf PDF
03_25_30.pdf PDF
32_11_20.pdf PDF
02_-_Green_Brook_C-1_Amendment_1_Civil_25JUL2019.pdf PDF
22_14_29.00_40.pdf PDF
04_-_Green_Brook_C-1_Amendment_1_Structural_25JUL2019.pdf PDF
04_-_Green_Brook_C-1_Landscape_Drawings.pdf PDF
02_-_Green_Brook_C-1_Survey-Hydro_Drawings.pdf PDF
01_-_Green_Brook_C-1_General_Drawings.pdf PDF
06_-_Green_Brook_C-1_Structural_Drawings.pdf PDF
W912DS19B0009.pdf PDF
Show 40 more

Latest 50 of 56 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Gr een Br ook, Segment C- 1

AMENDMENT # 3

SECTI ON 03 11 13. 00 10

STRUCTURAL CAST- I N- PLACE CONCRETE FORMI NG

PART 1 GENERAL

1. 1 SCOPE

The wor k i ncl udes f ur ni shi ng, del i ver i ng, handl i ng, i nst al l i ng ( as appl i cabl e) al l mat er i al , l abor , equi pment , t ool s, f or m l i ner s and i nci dent al s necessar y t o compl et e t he wor k speci f i ed her ei n, i ncl udi ng f or mwor k r el at ed t o t he br i dge cul ver t , wi ngwal l s and channel s l ab.

1. 2 REFERENCES

The publ i cat i ons l i s t ed bel ow f or m a par t of t hi s speci f i cat i on t o t he ext ent r ef er enced. The publ i cat i ons ar e r ef er r ed t o wi t hi n t he t ext by t he basi c desi gnat i on onl y.

AMERI CAN CONCRETE I NSTI TUTE I NTERNATI ONAL ( ACI )

ACI 347R ( 2014; Er r at a 1 2017) Gui de t o For mwor k f or Concr et e

APA - THE ENGI NEERED WOOD ASSOCI ATI ON ( APA)

APA PS1 ( 1995) Const r uct i on and I ndust r i al Pl ywood

( APA V995)

ASTM I NTERNATI ONAL ( ASTM)

ASTM C979/ C979M ( 2016) St andar d Speci f i cat i on f or Pi gment s f or I nt egr al l y Col or ed Concr et e

ASTM C1077 ( 2017) St andar d Pr act i ce f or Agenci es Test i ng Concr et e and Concr et e Aggr egat es f or Use i n Const r uct i on and Cr i t er i a f or Test i ng Agency Eval uat i on

ASTM C31/ C31M ( 2018a) St andar d Pr act i ce f or Maki ng and Cur i ng Concr et e Test Speci mens i n t he Fi el d

ASTM C39/ C39M ( 2018) St andar d Test Met hod f or Compr essi ve St r engt h of Cyl i ndr i cal Concr et e Speci mens

1. 3 DESI GN REQUI REMENTS

The desi gn, engi neer i ng, and const r uct i on of t he f or mwor k shal l be t he r esponsi bi l i t y of t he Cont r act or . St r uct ur al desi gn of f or ms shal l be per f or med i n conf or mance wi t h ACI 347R and t he Occupat i onal Saf et y and Heal t h Admi ni st r at i on ( OSHA) r egul at i ons. The f or mwor k shal l be desi gned f or ant i c i pat ed l i ve and dead l oads and shal l compl y wi t h t he t ol er ances speci f i ed i n Sect i on 03 31 01. 00 10 CAST- I N- PLACE STRUCTURAL CONCRETE FOR CI VI L WORKS, par agr aph CONSTRUCTI ON TOLERANCES. However , f or sur f aces wi t h an ACI Cl ass A sur f ace desi gnat i on, t he al l owabl e def l ect i on f or f aci ng

SECTI ON 03 11 13. 00 10 Page 1 mat er i al bet ween st uds, f or st uds bet ween wal er s and wal er s bet ween br aci ng shal l be l i mi t ed t o 0. 0025 t i mes t he span. The f or mwor k shal l be desi gned as a compl et e syst em wi t h consi der at i on gi ven t o t he ef f ect s of cement i t i ous mat er i al s and mi xt ur e addi t i ves such as f l y ash, cement t ype, pl ast i c i zer s, accel er at or s, r et ar der s, ai r ent r ai nment , and ot her s. The desi gn anal ysi s f or t he f or mwor k shal l be submi t t ed f or r evi ew. The adequacy of f or mwor k desi gn and const r uct i on shal l be moni t or ed pr i or t o and dur i ng concr et e pl acement as par t of t he Cont r act or ' s appr oved Qual i t y Cont r ol Pl an.

1. 4 SUBMI TTALS

Gover nment appr oval i s r equi r ed f or submi t t al s wi t h a " G" desi gnat i on;

submi t t al s not havi ng a " G" desi gnat i on ar e f or i nf or mat i on onl y. When used, a desi gnat i on f ol l owi ng t he " G" desi gnat i on i dent i f i es t he of f i ce t hat wi l l r evi ew t he submi t t al f or t he Gover nment . The f ol l owi ng shal l be submi t t ed i n accor dance wi t h Sect i on 01 33 00 SUBMI TTAL PROCEDURES:

SD- 02 Shop Dr awi ngs

Formwork ; G, DO

Dr awi ngs and desi gn comput at i ons f or al l f or mwor k r equi r ed shal l be submi t t ed at l east 30 days ei t her bef or e f abr i cat i on on s i t e or bef or e del i ver y of pr ef abr i cat ed f or ms. I f r eshor i ng i s per mi t t ed, t he met hod, i ncl udi ng l ocat i on, or der , and t i me of er ect i on and r emoval shal l al so be submi t t ed f or r evi ew.

For m Removal Schedul e; G, DO

SD- 03 Pr oduct Dat a

Materials ; G, DO

Manuf act ur er ' s l i t er at ur e shal l be submi t t ed f or pl ywood, concr et e f or m har d boar d, f or m accessor i es, pr ef abr i cat ed f or ms, f or m coat i ng, and f or m- l i ni ng mat er i al s t o i ncl ude but not l i mi t ed t o f or mi ng mat er i al s of hi gh densi t y pol yet hel ene.

For ms and For m Li ner s G, DO

Submi t manuf act ur er ' s dat a f or a f l ut ed f i n f or m l i ner pat t er n no.

1707 Li ncol n Fl ut e 3/ 4 i nch deep smoot h r i b 6 i nch pat t er n r epeat pl ast i c l i ner .

For m Rel easi ng Agent s; G, DO

Manuf act ur er ' s r ecommendat i on on met hod and r at e of appl i cat i on of f or m r el easi ng agent s.

SD- 04 Sampl es

Sampl e Panel s; G, RO

Al l manuf act ur er r equi r ement s and di r ect i ons concer ni ng handl i ng, t r anspor t , st or age and i nst al l at i on of l i ner s ar e t o be f ol l owed.

SD- 05 Desi gn Dat a

Desi gn Anal ysi s; G, DO

SECTI ON 03 11 13. 00 10 Page 2

Desi gn anal ysi s and cal cul at i ons f or f or m desi gn and met hodol ogy used i n t he desi gn.

SD- 06 Test Repor t s

Inspection ; G, DO

The Cont r act or shal l submi t f i el d i nspect i on r epor t s f or concr et e f or ms and embedded i t ems.

For mwor k Not Suppor t i ng Wei ght of Concr et e; G, DO

I f f or ms ar e t o be r emoved i n l ess t han 24 hour s on f or mwor k not suppor t i ng t he wei ght of concr et e, t he eval uat i on and r esul t s of t he cont r ol cyl i nder t est s or mat ur i t y i nst r ument at i on shal l be submi t t ed t o and appr oved bef or e t he f or ms ar e r emoved.

1. 5 SHOP DRAWI NGS

The shop dr awi ngs and dat a submi t t ed shal l i ncl ude t he t ype, s i ze, quant i t y, and st r engt h of al l mat er i al s of whi ch t he f or ms ar e made, t he pl an f or j oi nt i ng of f aci ng panel s, det ai l s af f ect i ng t he appear ance, and t he assumed desi gn val ues and l oadi ng condi t i ons.

1. 6 SAMPLE PANELS

Const r uct t wo sampl e panel s ( one of each of t he t wo i ni t i al l y sel ect ed concr et e col or s) f or concr et e cul ver t as speci f i ed i n Sect i on

03 31 01. 00 10 - CAST- I N- PLACE STRUCTURAL CONCRETE FOR THE CONCRETE BRI DGE

CULVERT. Panel s shal l be 6 f eet l ong and 4 f eet wide t al l . The panel s shal l be const r uct ed t o t he pr oposed wal l t hi ckness cont ai ni ng t he f ul l al l ocat i on of r ei nf or c i ng st eel t hat wi l l be used i n t he st r uct ur e, wi t h t he f or mi ng syst em t hat dupl i cat es i n ever y det ai l t he one t hat wi l l be used i n const r uct i on of t he st r uct ur e. The same concr et e mi xt ur e pr opor t i on and mat er i al s, t he same pl acement t echni ques and equi pment , and t he same f i ni shi ng t echni ques and t i mi ng shal l be used t hat ar e pl anned f or t he st r uct ur e. For accur at e col or , t he quant i t y of concr et e mi xed t o pr oduce t he mock up shal l not be l ess t han 3 cubi c yar ds ( or not l ess t han 1/ 3 t he capaci t y of t he mi xi ng dr um on t he r eady- mi xed concr et e t r uck) .

Const r uct i on of cul ver t and wi ng wal l s Cl ass F f i ni sh wi l l not be per mi t t ed unt i l sampl e panel s have been appr oved. Sampl e panel s shal l be pr ot ect ed f r om const r uct i on oper at i ons i n a manner t o pr ot ect appr oved f i ni sh, and ar e not t o be r emoved unt i l al l Cl ass F cul ver t and wi ngwal l finish concrete has have been accept ed.

1. 7 DELI VERY, STORAGE, AND HANDLI NG

St or e f i ber voi ds above gr ound l evel i n a dr y l ocat i on. Keep f i ber voi ds dr y unt i l i nst al l ed and over l ai d wi t h concr et e.

PART 2 PRODUCTS

2. 1 MATERIALS

2. 1. 1 For ms and For m Li ner s

For ms and f or m l i ner s shal l be f abr i cat ed wi t h f ac i ng mat er i al s t hat wi l l pr oduce a f i ni sh meet i ng t he speci f i ed i r r egul ar i t i es i n f or med sur f ace

SECTI ON 03 11 13. 00 10 Page 3 r equi r ement s as def i ned i n ACI 347R. For ms and f or m l i ner s shal l be f abr i cat ed wi t h f aci ng mat er i al s as speci f i ed bel ow.

2. 1. 1. 1 Cl ass " A" Fi ni sh

Thi s c l ass of f i ni sh shal l appl y t o al l concr et e exposed t o publ i c v i ew, not speci f i ed t o r ecei ve Cl ass F. The f or m f aci ng mat er i al shal l be composed of new, wel l - mat ched t ongue- and- gr oove l umber or new pl ywood panel s conf or mi ng t o APA PS1, Gr ade B- B concr et e f or m, Cl ass I .

2. 1. 1. 2 Cl ass " B" Fi ni sh

Thi s c l ass of f i ni sh shal l appl y t o al l sur f aces except t hose speci f i ed t o r ecei ve Cl ass A, Cl ass C, Cl ass D or Cl ass F. The f or m f aci ng mat er i al shal l be composed of t ongue- and- gr oove or shi pl ap l umber , pl ywood conf or mi ng t o APA PS1, Gr ade B- B concr et e f or m, t emper ed concr et e f or m har d boar d or st eel . St eel l i ni ng on wood sheat hi ng wi l l not be per mi t t ed.

2. 1. 1. 3 Cl ass " C" Fi ni sh

Thi s c l ass of f i ni sh shal l appl y t o cur ved or war ped concr et e exposed t o publ i c v i ew not speci f i ed t o r ecei ve Cl ass F. The f or m f aci ng may be ei t her t ongue- and- gr oove l umber , pl ywood, concr et e f or m har d boar d or st eel . Wood f or m f aci ng f or cur ved or war ped sur f aces shal l be composed of spl i nes of l umber whi ch can be bent t o t he r equi r ed shape wi t hout spl i t t i ng or cr acki ng.

2. 1. 1. 4 Cl ass " D" Fi ni sh

Thi s c l ass of f i ni sh shal l appl y t o al l ot her concr et e not exposed t o publ i c v i ew. The f or m f aci ng may be of wood or st eel .

2. 1. 1. 5 Cl ass " F" Fi ni sh

Thi s c l ass of f i ni sh consi st s of a c l ass “ A” f i ni sh col or ed concr et e. The col or at i on of t he concr et e must be per f or med by use of pi gment s f or i nt egr al l y col or ed concr et e i n accor dance wi t h ASTM C979/ C979M. The col or sel ect i on shal l be submi t t ed and appr oved by t he COR.

2. 1. 1. 6 Cl ass " G" Fi ni sh

Thi s c l ass of f i ni sh consi st s of a c l ass " C" f i ni shed col or ed concr et e. The col or at i on of t he concr et e must be per f or med by use of pi gment s f or i nt egr al l y col or ed concr et e i n accor dance wi t h ASTM C979/ C979MASTM C979/ C979M. The col or sel ect i on shal l be submi t t ed and appr oved by t he COR.

2. 1. 2 For m Coat i ng

For m coat i ng shal l be commer ci al f or mul at i on t hat wi l l not bond wi t h, st ai n, cause det er i or at i on, or any ot her damage t o concr et e sur f aces. The coat i ng shal l not i mpai r subsequent t r eat ment of concr et e sur f aces dependi ng upon bond or adhesi on nor i mpede t he wet t i ng of sur f aces t o be cur ed wi t h wat er or cur i ng compounds. I f speci al f or m l i ner s ar e t o be used, t he Cont r act or shal l f ol l ow t he r ecommendat i on of t he f or m coat i ng manufacturer.

2. 2 ACCESSORI ES

Ti es and ot her s i mi l ar f or m accessor i es t o be par t i al l y or whol l y embedded

SECTI ON 03 11 13. 00 10 Page 4 i n t he concr et e shal l be of a commer ci al l y manuf act ur ed t ype. Af t er t he ends or end f ast ener s have been r emoved, t he embedded por t i on of met al t i es shal l t er mi nat e not l ess t han 2 i nches f r om any concr et e sur f ace ei t her exposed t o v i ew or exposed t o wat er . Pl ast i c snap t i es may be used i n l ocat i ons wher e t he sur f ace wi l l not be exposed t o v i ew. For m t i es shal l be const r uct ed so t hat t he ends or end f ast ener s can be r emoved wi t hout spal l i ng t he concr et e.

PART 3 EXECUTI ON

3. 1 I NSTALLATI ON

3. 1. 1 For m Const r uct i on

For ms shal l be const r uct ed t r ue t o t he st r uct ur al desi gn and r equi r ed al i gnment . The f or m sur f ace and j oi nt s shal l be mor t ar t i ght and suppor t ed t o achi eve saf e per f or mance dur i ng const r uct i on, concr et e pl acement , and f or m r emoval . The Cont r act or shal l cont i nuousl y moni t or t he al i gnment and st abi l i t y of t he f or ms dur i ng al l phases t o assur e t he f i ni shed pr oduct wi l l meet t he r equi r ed sur f ace c l ass or c l asses speci f i ed i n par agr aph FORMS AND FORM LI NERS and t ol er ances speci f i ed i n par agr aph DESI GN REQUI REMENTS. Fai l ur e of any suppor t i ng sur f ace ei t her due t o sur f ace t ext ur e, def l ect i on or f or m col l apse shal l be t he r esponsi bi l i t y of t he Cont r act or as wi l l t he r epl acement or cor r ect i on of unsat i sf act or y sur f aces. When f or ms f or cont i nuous sur f aces ar e pl aced i n successi ve uni t s, car e shal l be t aken t o f i t t he f or ms over t he compl et ed sur f ace t o obt ai n accur at e al i gnment of t he sur f ace and t o pr event l eakage of mor t ar .

For ms shal l not be r e- used i f t her e i s any evi dence of def ect s whi ch woul d i mpai r t he qual i t y of t he r esul t i ng concr et e sur f ace. Al l sur f aces of used f or ms shal l be c l eaned of mor t ar and any ot her f or ei gn mat er i al bef or e reuse.

3. 1. 2 For m Li ner s

For m l i ner s shal l be i nst al l ed as per t he manuf act ur er ' s r equi r ement s.

For m l i ner s shal l be f or t he ent i r e l i ngt h of t he wal l as shown on t he pl ans. The l i s t i ng shal l ext end as shown on t he pl ans.

3. 1. 3 Chamf er i ng

Al l exposed j oi nt s, edges and ext er nal cor ner s shal l be chamf er ed by mol di ng pl aced i n t he f or ms unl ess t he dr awi ngs speci f i cal l y st at e t hat chamf er i ng i s t o be omi t t ed or as ot her wi se speci f i ed. Chamf er ed j oi nt s shal l not be per mi t t ed wher e ear t h or r ockf i l l i s pl aced i n cont act wi t h concr et e sur f aces. Chamf er ed j oi nt s shal l be t er mi nat ed 12 i nches out s i de t he l i mi t of t he ear t h or r ockf i l l so t hat t he end of t he chamf er s wi l l be c l ear l y v i s i bl e.

3. 1. 4 Coat i ng

For ms f or exposed or pai nt ed sur f aces shal l be coat ed wi t h f or m oi l or a f or m- r el ease agent bef or e t he f or m or r ei nf or cement i s pl aced i n f i nal posi t i on. The coat i ng shal l be used as r ecommended i n t he manuf act ur er ' s i nst r uct i ons. For ms f or unexposed sur f aces may be wet wi t h wat er i n l i eu of coat i ng i mmedi at el y bef or e pl aci ng concr et e, except t hat , i n col d weat her when f r eezi ng t emper at ur es ar e ant i c i pat ed, coat i ng shal l be mandat or y. Sur pl us coat i ng on f or m sur f aces and coat i ng on r ei nf or c i ng st eel and const r uct i on j oi nt s shal l be r emoved bef or e pl aci ng concr et e.

SECTI ON 03 11 13. 00 10 Page 5

3. 2 FORM REMOVAL

For ms shal l not be r emoved wi t hout appr oval . The mi ni mal t i me r equi r ed f or concr et e t o r each a st r engt h adequat e f or r emoval of f or mwor k wi t hout r i sk i ng t he saf et y of wor ker s or t he qual i t y of t he concr et e depends on a number of f act or s i ncl udi ng, but not l i mi t ed t o, ambi ent t emper at ur e, concr et e l i f t hei ght s, t ype and amount of concr et e admi xt ur e, and t ype and amount of cement i t i ous mat er i al i n t he concr et e. I t i s t he r esponsi bi l i t y of t he Cont r act or t o consi der al l appl i cabl e f act or s and l eave t he f or ms i n pl ace unt i l i t i s saf e t o r emove t hem. I n any case f or ms shal l not be r emoved unl ess t he mi ni mum t i me or mi ni mum compr essi ve st r engt h r equi r ement s bel ow ar e met , except as ot her wi se di r ect ed or speci f i cal l y aut hor i zed. When condi t i ons ar e such as t o j ust i f y t he r equi r ement , f or ms wi l l be r equi r ed t o r emai n i n pl ace f or a l onger per i od. Al l r emoval shal l be accompl i shed i n a manner whi ch wi l l pr event damage t o t he concr et e and ensur e t he compl et e saf et y of t he st r uct ur e. Wher e f or ms suppor t mor e t han one el ement , t he f or ms shal l not be r emoved unt i l t he f or m r emoval cr i t er i a ar e met by al l suppor t ed el ement s. A f or m r emoval schedul e shal l be devel oped and al l necessar y r epai r s per f or med as speci f i ed i n Sect i on 03 31 01. 00 10 CAST- I N- PLACE STRUCTURAL CONCRETE FOR CI VI L WORKS. Evi dence t hat concr et e has gai ned suf f i c i ent st r engt h t o per mi t r emoval of f or ms shal l be det er mi ned by t est s on cont r ol cyl i nder s. Al l cont r ol cyl i nder s shal l be st or ed i n t he st r uct ur e or as near t he st r uct ur e as possi bl e so t hey r ecei ve t he same cur i ng condi t i ons and pr ot ect i on met hods as gi ven t hose por t i ons of t he st r uct ur e t hey r epr esent . Cont r ol cyl i nder s shal l be r emoved f r om t he mol ds at an age of no mor e t han 24 hour s. Al l cont r ol cyl i nder s shal l be pr epar ed and t est ed i n accor dance wi t h ASTM C31/ C31M and ASTM C39/ C39M at t he expense of t he Cont r act or by an i ndependent l abor at or y t hat compl i es wi t h ASTM C1077 and shal l be t est ed wi t hi n 4 hour s af t er r emoval f r om t he s i t e.

3. 2. 1 For mwor k Not Suppor t i ng Wei ght of Concr et e

For mwor k f or wal l s, col umns, s i des of beams, gr avi t y st r uct ur es, and ot her ver t i cal t ype f or mwor k not suppor t i ng t he wei ght of concr et e shal l not be r emoved i n l ess t han 24 hour s af t er concr et e pl acement i s compl et ed.

Cont r ol cyl i nder s shal l be pr epar ed f or each set of f or ms t o be r emoved bef or e 24 hour s. The st abi l i t y of t he concr et e shal l be eval uat ed by a st r uct ur al engi neer pr i or t o r emoval of t he f or ms.

3. 2. 2 For mwor k Suppor t i ng Wei ght of Concr et e

For mwor k suppor t i ng wei ght of concr et e and shor i ng shal l not be r emoved unt i l s t r uct ur al member s have acqui r ed suf f i c i ent st r engt h t o saf el y suppor t t hei r own wei ght and any const r uct i on or ot her super i mposed l oads t o whi ch t he suppor t ed concr et e may be subj ect ed. As a mi ni mum, f or ms shal l be l ef t i n pl ace unt i l cont r ol concr et e t est cyl i nder s i ndi cat e evi dence t he concr et e has at t ai ned at l east 70 per cent of t he compr essi ve st r engt h r equi r ed f or t he st r uct ur e i n accor dance wi t h t he qual i t y and l ocat i on r equi r ement s of Sect i on 03 31 01. 00 10 CAST- I N- PLACE STRUCTURAL

CONCRETE FOR CI VI L WORKS.

3. 3 INSPECTION

For ms and embedded i t ems shal l be i nspect ed i n suf f i c i ent t i me pr i or t o each concr et e pl acement by t he Cont r act or i n or der t o cer t i f y t o t he Cont r act i ng Of f i cer t hat t hey ar e r eady t o r ecei ve concr et e. The r esul t s of each i nspect i on shal l be r epor t ed i n wr i t i ng. Submi t f i el d i nspect i on r epor t s f or concr et e f or ms and embedded i t ems.

SECTI ON 03 11 13. 00 10 Page 6

- - End of Sect i on - -

SECTI ON 03 11 13. 00 10 Page 7

03 11 13.00 10 - STRUCTURAL CAST-IN-PLACE CONCRETE FORMING
PART 1 GENERAL
1.1 SCOPE
1.2 REFERENCES
1.3 DESIGN REQUIREMENTS
1.4 SUBMITTALS
1.5 SHOP DRAWINGS
1.6 SAMPLE PANELS
1.7 DELIVERY, STORAGE, AND HANDLING
PART 2 PRODUCTS
2.1 MATERIALS
2.1.1 Forms and Form Liners
2.1.1.1 Class "A" Finish
2.1.1.2 Class "B" Finish
2.1.1.3 Class "C" Finish
2.1.1.4 Class "D" Finish

2.1.2 Form Coating

2.2 ACCESSORIES

PART 3 EXECUTION
3.1 INSTALLATION
3.1.1 Form Construction
3.1.2 Form Liners
3.1.3 Chamfering
3.1.4 Coating
3.2 FORM REMOVAL
3.2.1 Formwork Not Supporting Weight of Concrete
3.2.2 Formwork Supporting Weight of Concrete

3.3 INSPECTION

File details come from the government source that posted it.