01_22_00.00_10.pdf
PDF 56 KB Posted
- Solicitation number
- W912DS19B0009
About this file
Specification 01 22 00.00
View the file
Other files
Show 40 more
Latest 50 of 56 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Gr een Br ook, Segment C- 1
AMENDMENT # 3
SECTI ON 01 22 00. 00 10
PRI CE AND PAYMENT PROCEDURES
PART 1 GENERAL
1. 1 SI NGLE JOB PAYMENT I TEMS
Payment i t ems f or t he wor k of t hi s cont r act f or whi ch j ob payment s wi l l be made ar e l i s t ed i n t he BIDDING SCHEDULE. Al l cost s f or i t ems of wor k, must const i t ut e f ul l compensat i on f or f ur ni shi ng al l pl ant , l abor , mat er i al s, and equi pment , and per f or mi ng any associ at ed Cont r act or qual i t y cont r ol , envi r onment al pr ot ect i on, meet i ng saf et y r equi r ement s, t est s and r epor t s, and f or per f or mi ng al l wor k r equi r ed f or whi ch separ at e payment i s not ot her wi se pr ovi ded.
1. 1. 1 Mobi l i zat i on and Demobi l i zat i on
1. 1. 1. 1 Mobilization
Mobi l i zat i on must i ncl ude al l cost s f or pr epar at or y wor k and oper at i ons necessar y f or t he movement of per sonnel , equi pment , suppl i es, and i nci dent al s t o t he pr oj ect s i t e, and ot her wor k per f or med pr i or t o act ual commencement of wor k. The Cont r act or must f ur ni sh and set up necessar y gener al f aci l i t i es, as ar e r equi r ed by l ocal , count y, st at e or Feder al l aws, r egul at i ons or codes. The cost of r equi r ed i nsur ance and bonds and/ or any ot her s i mi l ar s i gni f i cant i ni t i al expense r equi r ed f or t he i ni t i at i on of t he cont r act wor k must be i ncl uded i n t hi s i t em. The det er mi nat i on of t he adequacy of t he Cont r act or ' s f aci l i t i es, except as r equi r ed by l ocal , count y, st at e or Feder al l aws or r egul at i ons, must be made by t he Cont r act or .
1. 1. 1. 2 Demobilization
Demobi l i zat i on must consi st of al l act i v i t i es and cost s f or movement of per sonnel , equi pment , and suppl i es/ mat er i al s not used i n t hi s cont r act , i ncl udi ng t he di sassembl y, r emoval and si t e c l eanup of any t empor ar y of f i ces, bui l di ngs, or ot her f aci l i t i es assembl ed on t he s i t e f or t hi s cont r act . Upon compl et i on of wor k, t he Cont r act or must r est or e al l access ar eas t o t he same condi t i ons as pr i or t o t he st ar t of wor k. The Cont r act or must mar k t he posi t i ons of each gr ade st ake, and t o r emove t hem af t er compl et i on of t he pr oj ect . Cont r act or must be hel d r esponsi bl e f or account i ng f or 100% r emoval of al l gr ade st akes, as t hey pose a ser i ous publ i c saf et y hazar d as t he f i l l er odes and any r emai ni ng st akes become exposed i n t he sur f . Al l s t akes shoul d be met al pi pes, so t hat t hey can be pul l ed out i nt act , and l ocat ed wi t h a met al det ect or , i f necessar y.
1. 1. 1. 3 Payment Schedul e
Al l cost s connect ed wi t h t he mobi l i zat i on and demobi l i zat i on of t he Cont r act or ' s per sonnel , equi pment , suppl i es, and mat er i al s wi l l be pai d f or t he cont r act l ump sum pr i ce f or t hi s i t em. Si xt y per cent ( 60%) of t he l ump sum pr i ce wi l l be pai d t o t he Cont r act or upon compl et i on of hi s mobi l i zat i on t o t he wor k s i t e. The r emai ni ng f or t y per cent ( 40%) wi l l be i ncl uded i n t he f i nal payment f or wor k under t hi s cont r act .
SECTI ON 01 22 00. 00 10 Page 1
I n t he event t hat t he Cont r act i ng Of f i cer and/ or hi s r epr esent at i ve ( COR) consi der s t hat t he amount i n t hi s i t em whi ch r epr esent s mobi l i zat i on ( 60%) does not bear a r easonabl e r el at i on t o t he cost of wor k i n t hi s cont r act , t he Cont r act i ng Of f i cer may r equi r e t he Cont r act or t o pr oduce cost dat a t o j ust i f y t hi s por t i on of hi s bi d. Fai l ur e t o j ust i f y such pr i ce t o t he sat i sf act i on of t he Cont r act i ng Of f i cer / COR, wi l l r esul t i n payment , upon compl et i on of mobi l i zat i on, of act ual mobi l i zat i on cost s as det er mi ned f r om t he cost dat a submi t t ed by t he Cont r act or . Payment f or t he r emai nder of t hi s i t em wi l l be i ncl uded i n f i nal payment f or wor k under t hi s cont r act .
The det er mi nat i on of t he Cont r act i ng Of f i cer / COR i s not subj ect t o appeal .
1. 1. 1. 4 Uni t of Measur e
Uni t of measur e: j ob.
1. 1. 2 Vi br at i on Moni t or i ng
1. 1. 2. 1 Payment
Payment wi l l be made f or al l cost s associ at ed wi t h per f or mi ng t he wor k necessar y t o moni t or t he v i br at i on of st r uct ur es i n accor dance wi t h t he dr awi ngs and speci f i cat i ons.
1. 1. 2. 2 Uni t of Measur e
Uni t of measur e: Job.
1. 1. 3 Levee, Access Road, 30" Cr oss Dr ai n Under Ramp and Ramp t o Br ook
( OPTI ON 2)
1. 1. 3. 1 Payment
Payment wi l l be made f or cost s associ at ed wi t h const r uct i ng t he l evee bet ween STA 0+00D t o 4+30D, paved access r oad bet ween st at i ons 0+50B t o 2+73B, swal e bet ween st at i ons 0+50A t o 5+50A, and paved access r amp t o br ook bet ween st at i ons 0+00C t o 1+54C i ncl udi ng but not l i mi t ed t o t he embankment , r amps, t oe dr ai ns, i nspect i on t r ench excavat i on, shor i ng, and backf i l l wi t h sat i sf act or y mat er i al , i n accor dance wi t h t he dr awi ngs and specifications.
1. 1. 3. 2 Uni t of Measur e
Uni t of measur e: Job.
1. 1. 4 Scour hol e r ock excavat i on at dr ai nage St r uct ur e #6
1. 1. 4. 1 Payment
Payment wi l l be made f or cost s associ at ed wi t h wor k necessar y f or t r ench excavat i on i n r ock i n or near Bound Br ook at dr ai nage st r uct ur e #6. The t r ench wal l s shal l be as near l y ver t i cal as possi bl e, and l oosened r ock mat er i al shal l be ei t her consol i dat ed or r emoved. Al l necessar y measur es shal l be t aken t o mai nt ai n t he pr oper shape of t he t r ench and t o pr event i t f r om bei ng f i l ed wi t h sedi ment or mud unt i l t he scour hol e i s const r uct ed.
1. 1. 4. 2 Uni t of Measur e
Uni t of measur e: JOB.
SECTI ON 01 22 00. 00 10 Page 2
1. 1. 5 By Pass Channel & Channel Ret ai ni ng Wal l ( OPTI ON 1)
1. 1. 5. 1 Payment
Payment wi l l be made f or cost s associ at ed wi t h const r uct i ng ear t hen and TRM by pass channel bet ween st at i ons 0+00E and 3+99E, const r uct i on of a channel r et ai ni ng wal l , and a gr avel t oe dr ai n and ear t hen ber m. Wor k i ncl udes but not l i mi t ed t o, excavat i on, dewat er i ng, shor i ng, backf i l l , and er osi on cont r ol measur es, al l i n accor dance wi t h t he dr awi ngs and speci f i cat i ons
1. 1. 5. 2 Uni t of Measur e
Uni t of measur e: JOB.
1. 1. 6 Floodwall
1. 1. 6. 1 Payment
Payment wi l l be made f or cost s associ at ed wi t h const r uct i ng t he concr et e T- wal l bet ween STA 3+79D t o 14+78D 4+79. 2 t o 14+77. 52 i ncl udi ng but not l i mi t ed t o wal l f oundat i on, sheet pi l e cut - of f wal l , t oe dr ai n, excavat i on, shor i ng, dewat er i ng, concr et e r ei nf or c i ng, j oi nt const r uct i on, concr et e mat er i al and t est i ng, wat er st ops, f or ml i ner s, backf i l l wi t h sat i sf act or y mat er i al , and al l ot her r equi r ed i t ems, i n accor dance wi t h t he dr awi ngs and specifications.
1. 1. 6. 2 Uni t of Measur e
Uni t of measur e: Job.
1. 1. 7 Fl oodwal l ( OPTI ON 3)
1. 1. 7. 1 Payment
Payment wi l l be made f or cost s associ at ed wi t h const r uct i ng t he concr et e T- wal l bet ween STA 3+69. 56 t o 3+78. 70 i ncl udi ng but not l i mi t ed t o wal l f oundat i on, sheet pi l e cut - of f wal l , t oe dr ai n, excavat i on, shor i ng, dewat er i ng, concr et e r ei nf or c i ng, j oi nt const r uct i on, concr et e mat er i al and t est i ng, wat er st ops, f or ml i ner s, backf i l l wi t h sat i sf act or y mat er i al , and al l ot her r equi r ed i t ems, i n accor dance wi t h t he dr awi ngs and specifications.
1. 1. 7. 2 Uni t of Measur e
Uni t of measur e: Job.
1. 1. 8 St abi l i t y Ber m- Nor t h Si de of NJTRR ( OPTI ON 1)
1. 1. 8. 1 Payment
Payment wi l l be made f or cost s associ at ed wi t h const r uct i ng a r i p r ap st abi l i t y ber m al ong t he nor t h s i de of t he NJT Rai l Road embankment f r om st at i on 0+00F t o 11+50F, i ncl udi ng but not l i mi t ed t o excavat i on, pl acement of r i p r ap, and er osi on cont r ol measur es i n accor dance wi t h t he dr awi ngs and speci f i cat i ons.
1. 1. 8. 2 Uni t of Measur e
Uni t of measur e: JOB.
SECTI ON 01 22 00. 00 10 Page 3
1. 1. 9 Gener at or Bui l di ng, Concr et e Fuel Pad, Pump Chamber & Ret ai ni ng Wal l
( OPTI ON 2)
1. 1. 9. 1 Payment
Payment wi l l be made f or cost s associ at ed wi t h const r uct i ng a f ul l y f unct i oni ng gener at or bui l di ng i ncl udi ng cont r ol panel s, mechani cal and el ect r i cal equi pment , a concr et e f uel pad wi t h above gr ound f uel t ank, and pump chamber wi t h al l mechani cal and el ect r i cal equi pment r equi r ed t o make i t f unct i onal , r et ai ni ng wal l , and connect i ng el ect r i c ser vi ce, al l i n accor dance wi t h t he dr awi ngs and speci f i cat i ons.
1. 1. 9. 2 Uni t of Measur e
Uni t of measur e: JOB.
1. 1. 10 Access Road - Sout h Si de NJTRR ( OPTI ON 1)
1. 1. 10. 1 Payment
Payment wi l l be made f or cost s associ at ed wi t h const r uct i ng an asphal t access r oad and access ar ea bet ween st at i ons 0+00G t o 9+05G f r om Sout h Avenue t o Pr oposed Br i dge under NJTRR, i n accor dance wi t h t he dr awi ngs and specifications.
1. 1. 10. 2 Uni t of Measur e
Uni t of measur e: JOB.
1. 1. 11 New Bidge Brige Under NJT Rai l Road Embankment ( OPTI ON 1)
1. 1. 11. 1 Payment
Payment wi l l be made f or cost s associ at ed wi t h const r uct i ng a new t wo span br i dge under t he exi st i ng NJT Rai l Road embankment , i ncl udi ng t empor ar y gr ound st abi l i zat i on, on- si t e f or mi ng, excavat i on, di sposal , shor i ng, dewat er i ng, and over a weekend movi ng i nt o l ocat i on and backf i l l i ng and al l ot her act i v i t i es t o const r uct t he br i dge such t hat NJT i s oper at i onal by end of t he weekend as speci f i ed and i n t he NJT occupancy per mi t . Al l wor k t o be per f or med i n compl i ance wi t h NJ Tr ansi t r ai l r oad r equi r ement s.
1. 1. 11. 2 Uni t of Measur e
Uni t of measur e: JOB.
1. 1. 12 Pl ug Exi st i ng 36 I nch X 42 I nch RCP Under NJTRR ( OPTI ON 1)
1. 1. 12. 1 Payment
Payment wi l l be made f or cost s associ at ed wi t h pl ugi ng an exi st i ng 36 i nch x 42 i nch RCP under t he NJT Rai l Road embankment at st at i on 11+21F and t o at t ach a new i nl et wi t h 24 i nch di amet er f l ai r ed end sect i on t o an exi st i ng I nl et on t he Sout h Si de of Sout h Avenue i ncl udi ng but not l i mi t ed t o, saw cut t i ng t he exi st i ng pavement , excavat i on, dewat er i ng, backf i l l , pavi ng and er osi on cont r ol measur es i n accor dance wi t h t he dr awi ngs and speci f i cat i ons. Al l wor k wi t hi n NJT r i ght of way t o be per f or med i n compl i ance wi t h New Jer sey Tr ansi t r ai l r oad r equi r ement s.
SECTI ON 01 22 00. 00 10 Page 4
1. 1. 12. 2 Uni t of Measur e
Uni t of measur e: JOB.
1. 1. 13 NJT Tr ai ni ng ( OPTI ON 1)
1. 1. 13. 1 Payment
Payment wi l l be made f or cost s associ at ed wi t h New Jer sey Tr ansi t Tr ai ni ng t o be pr ovi ded t o al l wor ker s
1. 1. 13. 2 Uni t of Measur e
Uni t of measur e: JOB.
1. 1. 14 Ver i zon Condui t
1. 1. 14. 1 Payment
Payment wi l l be made f or cost s associ at ed wi t h t he i nst al l at i on of one, f our - i nch condui t , i nner duct , hand hol es, dr ag l i nes, pol ydome and one pi pe penet r at i on i ncl udi ng c l ear i ng, excavat i on, shor i ng, dewat er i ng and backfill.
1. 1. 14. 2 Uni t of Measur e
Uni t of measur e: JOB.
1. 1. 15 Li abi l i t y I nsur ance
1. 1. 15. 1 Payment
Payment wi l l be made f or cost s associ at ed wi t h l i abi l i t y i nsur ance f or New Jer sey Depar t ment of Envi r onment al Pr ot ect i on ( NJDEP) , Mi ddl esex Count y, and t he Bor ough of Mi ddl esex Li abi l i t y I nsur ance. The amount bi d wi l l be t he maxi mum amount payabl e. Act ual payment wi l l be based on act ual cost s not t o exceed pr epr i ced amount .
1. 1. 15. 2 Uni t of Measur e
Uni t of measur e: Job.
1. 1. 16 New Jer sey Tr ansi t Rai l r oad I nsur ance ( OPTI ON 1)
Payment wi l l be made f or cost s associ at ed wi t h New Jer sey Tr ansi t Rai l r oad I nsur ance. The amount bi d wi l l be t he maxi mum amount payabl e. Act ual payment wi l l be based on act ual cost s not t o exceed pr epr i ced amount .
1. 1. 16. 1 Uni t of Measur e
Uni t of measur e: Job.
1. 1. 17 As-Builts
Payment wi l l be made f or cost s associ at ed t o compl et e t he Recor d Dr awi ngs, As- Bui l t Dr awi ngs and CAD submi t t al s as r equi r ed by Speci f i cat i on Sect i on
01 78 00 CLOSEOUT SUBMI TTALS.
SECTI ON 01 22 00. 00 10 Page 5
1. 1. 17. 1 Uni t of Measur e
Uni t of measur e: Job.
1. 1. 18 Submer si bl e Pump ( OPTI ON 2)
1. 1. 18. 1 Payment
Payment wi l l be made f or cost s associ at ed wi t h f ur ni shi ng and i nst al l i ng t he submer si bl e pump, axi al - f l ow pr opel l er pumps, and af t er havi ng been conf i r med f or i t s pr oper oper at i ons of t he pumpi ng syst em and i t s di r ect associ at ed cont r ol s syst em as speci f i ed and i ndi cat ed i n t he Cont r act .
1. 1. 18. 2 Uni t of Measur e
Uni t of measur e: JOB.
1. 2 UNI T PRI CE PAYMENT I TEMS
Payment i t ems f or t he wor k of t hi s cont r act on whi ch t he cont r act uni t pr i ce payment s wi l l be made ar e l i s t ed i n t he BIDDING SCHEDULE and descr i bed bel ow. The uni t pr i ce and payment made f or each i t em l i s t ed const i t ut es f ul l compensat i on f or f ur ni shi ng al l pl ant , l abor , mat er i al s, and equi pment , and per f or mi ng any associ at ed Cont r act or qual i t y cont r ol , envi r onment al pr ot ect i on, meet i ng saf et y r equi r ement s, t est s and r epor t s, and f or per f or mi ng al l wor k r equi r ed f or each of t he uni t pr i ce i t ems.
1. 2. 1 Top Soi l
1. 2. 1. 1 Payment
Payment wi l l be made f or cost s associ at ed wi t h al l wor k necessar y t o obt ai n t op soi l , meet i ng al l s t at e r esi dent i al r equi r ement s, and t r anspor t i t t o t he pr oj ect s i t e i n accor dance wi t h t he dr awi ngs and speci f i cat i ons.
" Est i mat ed Quant i t i es"
1. 2. 1. 2 Measurement
The t ot al quant i t y of t op soi l f or whi ch payment wi l l be made wi l l be measur ed by cer t i f i ed haul wei ght t i cket s di v i ded by a r epr esent at i ve uni t wei ght of t he mat er i al .
1. 2. 1. 3 Uni t Of Measur e
Uni t of Measur e: cubi c yar ds
1. 2. 2 NJT Fl agger ( OPTI ON 1)
1. 2. 2. 1 Payment
Payment wi l l be made f or cost s associ at ed wi t h t he pr ovi s i on of a New Jer sey Tr ansi t Fl agger dur i ng al l wor k i n t he New Jer sey Tr ansi t boundar i es.
1. 2. 2. 2 Measurement
Act ual payment wi l l be based on act ual cost s not t o exceed pr epr i ced amount .
SECTI ON 01 22 00. 00 10 Page 6
1. 2. 2. 3 Uni t Of Measur e
Uni t of Measur e: Dai l y
1. 2. 3 NJT Rai l , Ti e & Bal l ast Removal and Repl acment ( OPTI ON 1)
1. 2. 3. 1 Payment
Payment wi l l be made f or cost s associ at ed wi t h New Jer sey Tr ansi t cont r act t o r emove al l r ai l s , t i es and bal l ast necessar y t o al l ow t he br i dge st r uct ur e t o be const r uct ed and t o r epl ace such once t he br i dge and back f i l l ar e i n pl ace. Cont r act or t o per f or m al l needed coor di nat i on wi t h NJ Tr ansi t r ai l r oad and t hei r di r ect cont r act or s.
1. 2. 3. 2 Measurement
Act ual payment wi l l be based on act ual cost s not t o exceed pr epr i ced amount .
1. 2. 3. 3 Uni t Of Measur e
Uni t of Measur e: Job
1. 2. 4 Ver i zon Fi ber Opt i c Cabl e
1. 2. 4. 1 Payment
Payment wi l l be made f or cost s associ at ed wi t h Desi gn, di sconnect , r emove, i nst al l and r econnect per manent Ver i zon f i ber opt i c l i nes and ser vi ce connect i ons, pr ovi di ng al l l abor , equi pment and mat er i al f or t hi s wor k.
1. 2. 4. 2 Measurement
Act ual payment wi l l be based on act ual cost s not t o exceed pr epr i ced amount .
1. 2. 4. 3 Uni t Of Measur e
Uni t of Measur e: Job
1. 2. 5 Fi ber Opt i c Cabl e NJTRR Embankment ( OPTI ON 1)
1. 2. 5. 1 Payment
Payment wi l l be made f or cost s associ at ed wi t h Desi gn, di sconnect , r emove, i nst al l and r econnect per manent Li ght Tower and Zayo f i ber opt i c l i nes and ser vi ce connect i ons, pr ovi di ng al l l abor , equi pment and mat er i al f or t hi s wor k.
1. 2. 5. 2 Measurement
Act ual payment wi l l be based on act ual cost s not t o exceed pr epr i ced amount .
1. 2. 5. 3 Uni t Of Measur e
Uni t of Measur e: Job
SECTI ON 01 22 00. 00 10 Page 7
1. 2. 6 Si gnal And El ect r i c Ser vi ce ( OPTI ON 1)
1. 2. 6. 1 Payment
Payment wi l l be made f or cost s associ at ed wi t h Desi gn, di sconnect , r emove, i nst al l and r econnect per manent Si gnal and El ect r i c l i nes owned by NJTRR and ser vi ce connect i ons, pr ovi di ng al l l abor , equi pment and mat er i al f or t hi s wor k.
1. 2. 6. 2 Measurement
Act ual payment wi l l be based on act ual cost s i ncur r ed not t o exceed pr epr i ced amount .
1. 2. 6. 3 Uni t Of Measur e
Uni t of Measur e: Job
1. 2. 7 Passenger Passanger Tr anspor t Dur i ng Tr ack Out age ( OPTI ON 1)
1. 2. 7. 1 Payment
Payment wi l l be made f or cost s associ at ed wi t h cont r act i ng New Jer sey Tr ansi t f or t empor ar y t r anspor t of passenger s dur i ng per i od of t r ack shut down f or i nst al l at i on of t he new Br i dge. Wor k shal l i ncl ude al l vehi c l es and l abor and f ees associ at ed wi t h t he t empor ar y t r anspor t of passengers.
1. 2. 7. 2 Measurement
Act ual payment wi l l be based on act ual cost s i ncur r ed not t o exceed pr epr i ced amount .
1. 2. 7. 3 Uni t Of Measur e
Uni t of Measur e: Job
1. 2. 8 Haul , Di sposal and Repl acement of Unsat i sf act or y Mat er i al
1. 2. 8. 1 Payment
Payment wi l l be made f or cost s associ at ed wi t h al l wor k necessar y t o haul and di spose of unsat i sf act or y mat er i al at an appr oved of f - s i t e l ocat i on i n accor dance wi t h t he dr awi ngs and speci f i cat i ons.
1. 2. 8. 2 Measurement
The t ot al quant i t y of unsat i sf act or y mat er i al f or whi ch payment wi l l be made wi l l be measur ed by cer t i f i ed haul wei ght t i cket s di v i ded by a r epr esent at i ve uni t wei ght of t he mat er i al r emoved. The uni t wei ght wi l l be det er mi ned t hr ough a USACE cer t i f i ed l abor at or y anal ysi s of t he soi l r emoved f r om t he pr oj ect s i t e. The USACE cer t i f i ed l abor at or y, used f or t hi s pur pose, wi l l be hi r ed and pai d f or by t he Cont r act or .
1. 2. 8. 3 Uni t of Measur e
Uni t of measur e: cubi c yar ds.
SECTI ON 01 22 00. 00 10 Page 8
1. 2. 9 Cont ami nat ed Non- Hazar dous Mat er i al Removal ( OPTI ON 4)
1. 2. 9. 1 Payment
Payment wi l l be made f or cost s associ at ed wi t h handl i ng, t r anspor t , t r eat ment and of f - s i t e di sposal of mat er i al exceedi ng NJDEP r esi dent i al soi l c l eanup cr i t er i a and cl assi f i ed as cont ami nat ed non- hazar dous ( I D27 WASTE) , sui t abl e f or l andf i l l cover , r oadway subbase and r ecycl i ng f aci l i t i es, compl et e. " Est i mat ed Quant i t i es"
1. 2. 9. 2 Measurement
The t ot al quant i t y of unsat i sf act or y mat er i al f or whi ch payment wi l l be made wi l l be measur ed by cer t i f i ed haul wei ght t i cket s di v i ded by a r epr esent at i ve uni t wei ght of t he mat er i al r emoved. The uni t wei ght wi l l be det er mi ned t hr ough a USACE cer t i f i ed l abor at or y anal ysi s of t he soi l r emoved f r om t he pr oj ect s i t e. The USACE cer t i f i ed l abor at or y, used f or t hi s pur pose, wi l l be hi r ed and pai d f or by t he Cont r act or .
1. 2. 9. 3 Uni t Of Measur e
Uni t of Measur e: cubi c yar ds
1. 2. 10 For est ed Wet l ands
1. 2. 10. 1 Payment
Payment wi l l be made f or pur chase of mi t i gat i on cr edi t s i n accor dance wi t h t he Speci f i cat i ons.
1. 2. 10. 2 Measurement
The t ot al quant i t y f or whi ch payment wi l l be made wi l l be based on pr oof of pur chase of mi t i gat i on cr edi t s.
1. 2. 10. 3 Uni t of Measur e
Uni t of measur e: credits .
1. 2. 11 Ri par i an Zone
1. 2. 11. 1 Payment
Payment wi l l be made f or pur chase of mi t i gat i on cr edi t s i n accor dance wi t h t he Speci f i cat i ons.
1. 2. 11. 2 Measurement
The t ot al quant i t y f or whi ch payment wi l l be made wi l l be based on pr oof of pur chase of mi t i gat i on cr edi t s.
1. 2. 11. 3 Uni t of Measur e
Uni t of measur e: cr edi t s.
SECTI ON 01 22 00. 00 10 Page 9
1. 2. 12 Open Wat er
1. 2. 12. 1 Payment
Payment wi l l be made f or pur chase of mi t i gat i on cr edi t s i n accor dance wi t h t he Speci f i cat i ons.
1. 2. 12. 2 Measurement
The t ot al quant i t y f or whi ch payment wi l l be made wi l l be based on pr oof of pur chase of mi t i gat i on cr edi t s.
1. 2. 12. 3 Uni t of Measur e
Uni t of measur e: cr edi t s.
PART 2 PRODUCTS
Not Used
PART 3 EXECUTI ON
Not Used
- - End of Sect i on - -
SECTI ON 01 22 00. 00 10 Page 10
| 01 22 00.00 10 - PRICE AND PAYMENT PROCEDURES |
| PART 1 GENERAL |
| 1.1 SINGLE JOB PAYMENT ITEMS |
| 1.1.1 Mobilization and Demobilization |
| 1.1.1.1 Mobilization |
| 1.1.1.2 Demobilization |
| 1.1.1.3 Payment Schedule |
| 1.1.1.4 Unit of Measure |
| 1.1.2 Vibration Monitoring |
| 1.1.2.1 Payment |
| 1.1.2.2 Unit of Measure |
| 1.1.3 Levee, Access Road, 30" Cross Drain Under Ramp and Ramp to Brook |
| 1.1.3.1 Payment |
| 1.1.3.2 Unit of Measure |
| 1.1.4 Scour hole rock excavation at drainage Structure #6 |
| 1.1.4.1 Payment |
| 1.1.4.2 Unit of Measure |
| 1.1.5 By Pass Channel & Channel Retaining Wall OPTION 1 |
| 1.1.5.1 Payment |
| 1.1.5.2 Unit of Measure |
| 1.1.6 Floodwall |
| 1.1.6.1 Payment |
| 1.1.6.2 Unit of Measure |
| 1.1.7 Floodwall OPTION 3 |
| 1.1.7.1 Payment |
| 1.1.7.2 Unit of Measure |
| 1.1.8 Stability Berm- North Side of NJTRR OPTION 1 |
| 1.1.8.1 Payment |
| 1.1.8.2 Unit of Measure |
| 1.1.9 Generator Building, Concrete Fuel Pad,Pump Chamber & Retaining Wall |
| 1.1.9.1 Payment |
| 1.1.9.2 Unit of Measure |
| 1.1.10 Access Road - South Side NJTRR OPTION 1 |
| 1.1.10.1 Payment |
| 1.1.10.2 Unit of Measure |
| 1.1.11 New BidgeBrige Under NJT Rail Road Embankment OPTION 1 |
| 1.1.11.1 Payment |
| 1.1.11.2 Unit of Measure |
| 1.1.12 Plug Existing 36 Inch X 42 Inch RCP Under NJTRR OPTION 1 |
| 1.1.12.1 Payment |
| 1.1.12.2 Unit of Measure |
| 1.1.13 NJT Training OPTION 1 |
| 1.1.13.1 Payment |
| 1.1.13.2 Unit of Measure |
| 1.1.14 Verizon Conduit |
| 1.1.14.1 Payment |
| 1.1.14.2 Unit of Measure |
| 1.1.15 Liability Insurance |
| 1.1.15.1 Payment |
| 1.1.15.2 Unit of Measure |
| 1.1.16 New Jersey Transit Railroad Insurance OPTION 1 |
| 1.1.16.1 Unit of Measure |
| 1.1.17 As-Builts |
| 1.1.17.1 Unit of Measure |
| 1.1.18 Submersible Pump OPTION 2 |
| 1.1.18.1 Payment |
| 1.1.18.2 Unit of Measure |
| 1.2 UNIT PRICE PAYMENT ITEMS |
| 1.2.1 Top Soil |
| 1.2.1.1 Payment |
| 1.2.1.2 Measurement |
| 1.2.1.3 Unit Of Measure |
| 1.2.2 NJT Flagger OPTION 1 |
| 1.2.2.1 Payment |
| 1.2.2.2 Measurement |
| 1.2.2.3 Unit Of Measure |
| 1.2.3 NJT Rail, Tie & Ballast Removal and Replacment OPTION 1 |
| 1.2.3.1 Payment |
| 1.2.3.2 Measurement |
| 1.2.3.3 Unit Of Measure |
| 1.2.4 Verizon Fiber Optic Cable |
| 1.2.4.1 Payment |
| 1.2.4.2 Measurement |
| 1.2.4.3 Unit Of Measure |
| 1.2.5 Fiber Optic Cable NJTRR Embankment OPTION 1 |
| 1.2.5.1 Payment |
| 1.2.5.2 Measurement |
| 1.2.5.3 Unit Of Measure |
| 1.2.6 Signal And Electric Service OPTION 1 |
| 1.2.6.1 Payment |
| 1.2.6.2 Measurement |
| 1.2.6.3 Unit Of Measure |
| 1.2.7 Passenger Passanger Transport During Track Outage OPTION 1 |
| 1.2.7.1 Payment |
| 1.2.7.2 Measurement |
| 1.2.7.3 Unit Of Measure |
| 1.2.8 Haul, Disposal and Replacement of Unsatisfactory Material |
| 1.2.8.1 Payment |
| 1.2.8.2 Measurement |
| 1.2.8.3 Unit of Measure |
| 1.2.9 Contaminated Non-Hazardous Material Removal OPTION 4 |
| 1.2.9.1 Payment |
| 1.2.9.2 Measurement |
| 1.2.9.3 Unit Of Measure |
| 1.2.10 Forested Wetlands |
| 1.2.10.1 Payment |
| 1.2.10.2 Measurement |
| 1.2.10.3 Unit of Measure |
| 1.2.11 Riparian Zone |
| 1.2.11.1 Payment |
| 1.2.11.2 Measurement |
| 1.2.11.3 Unit of Measure |
| 1.2.12 Open Water |
| 1.2.12.1 Payment |
| 1.2.12.2 Measurement |
| 1.2.12.3 Unit of Measure |
| PART 2 PRODUCTS |
| PART 3 EXECUTION |
File details come from the government source that posted it.