31_23_00.00_20.pdf
PDF 76 KB Posted
- Solicitation number
- W912DS19B0009
About this file
Specification 31 23 00
View the file
Other files
Show 40 more
Latest 50 of 56 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Gr een Br ook, Segment C- 1
AMENDMENT # 3
SECTI ON 31 23 00. 00 20
EXCAVATI ON, FI LL, AND BACKFI LL FOR STRUCTURES
PART 1 GENERAL
1. 1 REFERENCES
The publ i cat i ons l i s t ed bel ow f or m a par t of t hi s speci f i cat i on t o t he ext ent r ef er enced. The publ i cat i ons ar e r ef er r ed t o i n t he t ext by t he basi c desi gnat i on onl y.
ASTM I NTERNATI ONAL ( ASTM)
ASTM C136/ C136M ( 2014) St andar d Test Met hod f or Si eve Anal ysi s of Fi ne and Coar se Aggr egat es
ASTM C33/ C33M ( 2018) St andar d Speci f i cat i on f or Concr et e Aggregates
ASTM D1140 ( 2017) St andar d Test Met hods f or Det er mi ni ng t he Amount of Mat er i al Fi ner t han 75- µm ( No. 200) Si eve i n Soi l s by Washing
ASTM D1557 ( 2012; E 2015) St andar d Test Met hods f or Labor at or y Compact i on Char act er i s t i cs of Soi l Usi ng Modi f i ed Ef f or t ( 56, 000 f t - l bf / f t 3) ( 2700 kN- m/ m3)
ASTM D2216 ( 2010) Labor at or y Det er mi nat i on of Wat er ( Moi st ur e) Cont ent of Soi l and Rock by Mass
ASTM D2487 ( 2017) Soi l s f or Engi neer i ng Pur poses ( Uni f i ed Soi l Cl assi f i cat i on Syst em)
ASTM D2922 ( 2005) Densi t y of Soi l and Soi l - Aggr egat e i n Pl ace by Nucl ear Met hods ( Shal l ow Dept h)
ASTM D3017 ( 2005) Wat er Cont ent of Soi l and Rock i n Pl ace by Nucl ear Met hods ( Shal l ow Dept h)
ASTM D4318 ( 2017) St andar d Test Met hods f or Li qui d Li mi t , Pl ast i c Li mi t , and Pl ast i c i t y I ndex of Soi l s
ASTM D698 ( 2012; E 2014; E 2015) Labor at or y Compact i on Char act er i st i cs of Soi l Usi ng St andar d Ef f or t ( 12, 400 f t - l bf / cu. f t .
( 600 kN- m/ cu. m. ) )
ASTM D75 ( 2003) St andar d Pr act i ce f or Sampl i ng Aggregates
SECTI ON 31 23 00. 00 20 Page 1
U. S. ARMY CORPS OF ENGI NEERS ( USACE)
EM 385- 1- 1 ( 2014) Saf et y and Heal t h Requi r ement s Manual
NEW JERSEY DEPARTMENT OF TRANSPORTATI ON ( NJDOT)
NJDOT St andar d Speci f i cat i ons ( 2007) St andar d Speci f i cat i ons f or Road and Br i dge Const r uct i on
1. 2 DEFI NI TI ONS
1. 2. 1 Degr ee of Compact i on
Degr ee of compact i on i s expr essed as a per cent age of t he maxi mum densi t y obt ai ned by t he t est pr ocedur e pr esent ed i n ASTM D1557, f or gener al soi l t ypes, abbr evi at ed as per cent l abor at or y maxi mum densi t y.
1. 2. 2 Har d Mat er i al s
Weat her ed r ock, dense consol i dat ed deposi t s, or congl omer at e mat er i al s whi ch ar e not i ncl uded i n t he def i ni t i on of " r ock" but whi ch usual l y r equi r e t he use of heavy excavat i on equi pment , r i pper t eet h, or j ack hammer s f or r emoval .
1. 2. 3 Rock
Sol i d homogeneous i nt er l ocki ng cr yst al l i ne mat er i al wi t h f i r ml y cement ed, l ami nat ed, or f ol i at ed masses or congl omer at e deposi t s, nei t her of whi ch can be r emoved wi t hout syst emat i c dr i l l i ng and t he use of expansi on j acks or f eat her wedges, or t he use of backhoe- mount ed pneumat i c hol e puncher s or r ock br eaker s; al so l ar ge boul der s, bur i ed masonr y, or concr et e ot her t han pavement exceedi ng 1 cubi c yar d i n vol ume. Rock r emoval may r equi r e excavat i on wi t h power equi pment . Removal of har d mat er i al wi l l not be consi der ed r ock excavat i on because of i nt er mi t t ent dr i l l i ng and bl ast i ng t hat i s per f or med mer el y t o i ncr ease pr oduct i on.
1. 2. 4 Pi l e Suppor t ed St r uct ur e
As used her ei n, a st r uct ur e wher e bot h t he f oundat i on and f l oor s l ab ar e pi l e suppor t ed.
1. 3 SUBMI TTALS
Gover nment appr oval i s r equi r ed f or submi t t al s wi t h a " G" desi gnat i on;
submi t t al s not havi ng a " G" desi gnat i on ar e f or i nf or mat i on onl y. When used, a desi gnat i on f ol l owi ng t he " G" desi gnat i on i dent i f i es t he of f i ce t hat wi l l r evi ew t he submi t t al f or t he Gover nment . The f ol l owi ng shal l be submi t t ed i n accor dance wi t h Sect i on 01 33 00 SUBMI TTAL PROCEDURES:
SD- 01 Pr econst r uct i on Submi t t al s
Shor i ng and Sheet i ng Pl an; G, DO
Dewat er i ng wor k pl an; G, DO
Submi t 15 days pr i or t o st ar t i ng wor k.
SD- 06 Test Repor t s
SECTI ON 31 23 00. 00 20 Page 2
Bor r ow Si t e Test i ng; G, DO
Fi l l and backf i l l t est ; G, DO
Sel ect mat er i al t est ; G, DO
Por ous f i l l t est f or capi l l ar y wat er bar r i er ; G, DO
Densi t y t est s; G, DO
Moi st ur e Cont ent Test s; G, DO
Copi es of al l l abor at or y and f i el d t est r epor t s wi t hi n 24 hour s of t he compl et i on of t he t est .
Dense Gr aded Aggr egat e ( Dga) Test s; G, DO
1. 4 DELI VERY, STORAGE, AND HANDLI NG
Per f or m i n a manner t o pr event cont ami nat i on or segr egat i on of mat er i al s.
1. 5 CRI TERI A FOR BI DDI NG
Base bi ds on t he f ol l owi ng cr i t er i a:
a. Sur f ace el evat i ons ar e as i ndi cat ed.
b. Pi pes or ot her ar t i f i c i al obst r uct i ons, except t hose i ndi cat ed, wi l l not be encount er ed.
c. Gr ound wat er el evat i ons i ndi cat ed by t he bor i ng l og wer e t hose exi st i ng at t he t i me subsur f ace i nvest i gat i ons wer e made and do not necessar i l y r epr esent gr ound wat er el evat i on at t he t i me of construction.
d. Mat er i al char act er i s i ndi cat ed by t he bor i ng l ogs.
e. Har d mat er i al s wi l l not be encount er ed wi t hi n t he t op 4 f eet bel ow exi st i ng sur f ace el evat i ons.
f . Bor r ow mat er i al , sui t abl e backf i l l , and beddi ng mat er i al i n t he quant i t i es r equi r ed i s not avai l abl e at t he pr oj ect s i t e.
g. Bl ast i ng wi l l not be per mi t t ed. Remove mat er i al i n an appr oved manner.
1. 6 QUALI TY ASSURANCE
1. 6. 1 Shor i ng and Sheet i ng Pl an
The Cont r act or shal l submi t as par t of t he Shor i ng and Sheet i ng pl an dr awi ngs and cal cul at i ons, cer t i f i ed by a r egi st er ed pr of essi onal engi neer , descr i bi ng t he met hods f or shor i ng and sheet i ng of excavat i ons f or appr oval 15 days pr i or t o st ar t i ng wor k. I n addi t i on t o Sect i on 25 A and B of EM 385- 1- 1 and ot her r equi r ement s set f or t h i n t hi s cont r act , i ncl ude pr ovi s i ons i n t he shor i ng and sheet i ng pl an t hat wi l l accompl i sh t he following:
SECTI ON 31 23 00. 00 20 Page 3
a. Pr event under mi ni ng of pavement s, ut i l i t i es, r ai l r oads, f oundat i ons and sl abs.
b. Pr event s l i ppage or movement i n banks or s l opes adj acent t o t he excavation.
c. Pr r ot ect wor kmen.
c. Al l ow f or t he abandonment of shor i ng and sheet i ng mat er i al s i n pl ace i n cr i t i cal ar eas as t he wor k i s compl et ed. I n t hese ar eas, backf i l l t he excavat i on t o wi t hi n 1 f oot of t he f i ni shed gr ade and r emove t he r emai ni ng exposed por t i on of t he shor i ng bef or e compl et i ng t he backf i l l .
The Cont r act or i s r equi r ed t o hi r e a Pr of essi onal Geot echni cal Engi neer t o pr ovi de i nspect i on of excavat i ons and soi l / gr oundwat er condi t i ons t hr oughout const r uct i on. The Geot echni cal Engi neer shal l be r esponsi bl e f or per f or mi ng pr e- const r uct i on and per i odi c s i t e v i s i t s t hr oughout const r uct i on t o assess s i t e condi t i ons. The Geot echni cal Engi neer shal l updat e t he excavat i on, sheet i ng and dewat er i ng pl ans as const r uct i on pr ogr esses t o r ef l ect changi ng condi t i ons and shal l submi t an updat ed pl an i f necessar y. A wr i t t en r epor t shal l be submi t t ed, at l east mont hl y, i nf or mi ng t he Cont r act or and Cont r act i ng Of f i cer of t he st at us of t he pl an and an account i ng of t he Cont r act or ' s adher ence t o t he pl an addr essi ng any pr esent or pot ent i al pr obl ems. The Geot echni cal Engi neer shal l be avai l abl e t o meet wi t h t he Cont r act i ng Of f i cer at any t i me t hr oughout t he cont r act dur at i on.
1. 6. 1. 1 Dr awi ng Submi t t al
Submi t a det ai l ed l ayout of t empor ar y r et ai ni ng st r uct ur es on st andar d s i ze ( 22" x 34" ) sheet s. These shop dr awi ngs shal l bear t he st amp and s i gnat ur e of t he Regi st er ed Pr of essi onal Engi neer . These dr awi ngs shal l c l ear l y show:
( a) Al l per t i nent di mensi ons and l ocat i ons of t hese st r uct ur es wi t h r ef er ence t o t he pr oj ect cent er l i ne ( Wal l - l i ne, Basel i ne, et c. ) .
( b) Mat er i al gr ade, wei ght , l engt h and desi gnat i on of st eel sheet pi l e sect i on( s) used.
( c) Br aci ng det ai l s .
( d) Excavat i on sequence and pr ocedur e.
( e) Pr ovi s i ons, i f any, f or i nst al l i ng t he shor i ng i n t he v i c i ni t y of over head, hi gh vol t age t r ansmi ssi on and di st r i but i on l i nes and ot her l ow over head cl ear ance ar eas.
( f ) Any ot her i t ems i nci dent al or s i gni f i cant t o t hi s wor k.
1. 6. 2 Dewat er i ng Wor k Pl an
Submi t pr ocedur es f or accompl i shi ng dewat er i ng wor k.
1. 6. 3 Ut i l i t i es
Movement of const r uct i on machi ner y and equi pment over pi pes and ut i l i t i es dur i ng const r uct i on shal l be at t he Cont r act or ' s r i sk. Per f or m wor k adj acent t o non- Gover nment ut i l i t i es as i ndi cat ed i n accor dance wi t h
SECTI ON 31 23 00. 00 20 Page 4 pr ocedur es out l i ned by ut i l i t y company. Excavat i on made wi t h power - dr i ven equi pment i s not per mi t t ed wi t hi n 2 f eet of known Gover nment - owned ut i l i t y or subsur f ace const r uct i on. For wor k i mmedi at el y adj acent t o or f or excavat i ons exposi ng a ut i l i t y or ot her bur i ed obst r uct i on, excavat e by hand. St ar t hand excavat i on on each si de of t he i ndi cat ed obst r uct i on and cont i nue unt i l t he obst r uct i on i s uncover ed or unt i l c l ear ance f or t he new gr ade i s assur ed. Suppor t uncover ed l i nes or ot her exi st i ng wor k af f ect ed by t he cont r act excavat i on unt i l appr oval f or backf i l l i s gr ant ed by t he Cont r act i ng Of f i cer . Repor t damage t o ut i l i t y l i nes or subsur f ace const r uct i on i mmedi at el y t o t he Cont r act i ng Of f i cer .
1. 6. 4 Foundat i on Subgr ades
For cul ver t , wi ngwal l s, and apr ons, t he f oundat i on subgr ades wi l l be i nspect ed and appr oved by t he geot echni cal engi neer bef or e const r uct i on can proceed.
PART 2 PRODUCTS
2. 1 SOI L MATERI ALS
2. 1. 1 Sat i sf act or y Mat er i al s
Any mat er i al s c l assi f i ed by ASTM D2487 as GW, GP, GM, GP- GM, GW- GM, GC, GP- GC, GM- GC, SW, SP, f r ee of debr i s, r oot s, wood, scr ap mat er i al , veget at i on, r ef use, sof t unsound par t i c l es, and f r ozen, del et er i ous, or obj ect i onabl e mat er i al s. Unl ess speci f i ed ot her wi se, t he maxi mum par t i c l e di amet er shal l not exceed 3 i nches i n any di r ect i on.
2. 1. 2 Unsat i sf act or y Mat er i al s
Mat er i al s whi ch do not compl y wi t h t he r equi r ement s f or sat i sf act or y mat er i al s. Unsat i sf act or y mat er i al s al so i ncl ude man- made f i l l s , t r ash, r ef use, or backf i l l s f r om pr evi ous const r uct i on. Unsat i sf act or y mat er i al al so i ncl udes mat er i al c l assi f i ed as sat i sf act or y whi ch cont ai ns r oot and ot her or gani c mat t er , f r ozen mat er i al , and st ones l ar ger t han 3 i nches.
The Cont r act i ng Of f i cer shal l be not i f i ed of any cont ami nat ed mat er i al s.
2. 1. 3 Cohesi onl ess and Cohesi ve Mat er i al s
Cohesi onl ess mat er i al s i ncl ude mat er i al s c l assi f i ed i n ASTM D2487 as GW, GP, SW, and SP. Cohesi ve mat er i al s i ncl ude mat er i al s c l assi f i ed as GC, SC, ML, CL, MH, and CH. Mat er i al s c l assi f i ed as GM, GP- GM, GW- GM, SW- SM, SP- SM, and SM shal l be i dent i f i ed as cohesi onl ess onl y when t he f i nes ar e nonpl ast i c ( pl ast i c i t y i ndex equal s zer o) . Mat er i al s c l assi f i ed as GM and SM wi l l be i dent i f i ed as cohesi ve onl y when t he f i nes have a pl ast i c i t y i ndex gr eat er t han zer o.
2. 1. 4 Expansi ve Soi l s
Soi l s t hat have a pl ast i c i t y i ndex equal t o or gr eat er t han 15 when t est ed i n accor dance wi t h ASTM D4318.
2. 1. 5 Nonf r ost Suscept i bl e ( NFS) Mat er i al
A uni f or ml y gr aded washed sand wi t h a maxi mum par t i c l e s i ze of 4 i nch and l ess t han 5 per cent passi ng t he No. 200 si ze s i eve, and wi t h not mor e t han 3 per cent by wei ght f i ner t han 0. 02 mm gr ai n s i ze.
SECTI ON 31 23 00. 00 20 Page 5
2. 1. 6 Common Fi l l
Appr oved, uncl assi f i ed soi l mat er i al wi t h t he char act er i st i cs r equi r ed t o compact t o t he soi l densi t y speci f i ed f or t he i nt ended l ocat i on.
2. 1. 7 Backf i l l and Fi l l Mat er i al
ASTM D2487, c l assi f i cat i on GW, GP, GM, GC, SW, SP, and SM, wi t h a maxi mum of 25 per cent by wei ght passi ng ASTM D1140, No. 200 si eve.
2. 1. 8 Sel ect Mat er i al
Pr ovi de mat er i al s c l assi f i ed as GW, GP, SW, SP by ASTM D2487 wher e indicated.
The combi ned mat er i al shal l conf or m t o t he f ol l owi ng s i eve anal ysi s:
Si eve Si ze Per cent Passi ng by Wei ght
2 1/ 2 i nches 100 No. 4 40 - 85 No. 10 20 - 80 No. 40 10 - 60 No. 200 5 - . 5
2. 1. 9 Topsoi l
Pr ovi de as speci f i ed i n Sect i on 32 92 19 SEEDI NG.
2. 1. 10 Dense Gr aded Aggr egr at e ( DGA)
Use a DGA as speci f i ed i n NJDOT St andar d Speci f i cat i on 2007 - 901. 03. 01
The mat er i al shal l conf or m t o t he f ol l owi ng s i eve anal ysi s:
Si eve Si ze Per cent Passi ng by Wei ght
1 1/ 2 i nches 100 3/ 4 i nch 55 - 90 No. 4 25 - 50 No. 50 5 - 20 No. 200 3 - 10
2. 2 BORROW
Obt ai n bor r ow mat er i al s r equi r ed i n excess of t hose f ur ni shed f r om excavat i ons f r om sour ces out s i de of Gover nment pr oper t y.
2. 2. 1 Bor r ow Si t e Test i ng
Per f or m bor r ow s i t e t est i ng i n accor dance wi t h Sect i on 31 00 00 EARTHWORK.
2. 3 CONTROL LOW STRENGTH MATERI AL ( CLSM)
Use CLSM i n accor dance wi t h Sect i on 03 34 00 CONTROLLED LOW STRENGTH
MATERI AL ( CLSM) .
SECTI ON 31 23 00. 00 20 Page 6
PART 3 EXECUTI ON
3. 1 PROTECTI ON
3. 1. 1 Shor i ng and Sheet i ng
Pr ovi de shor i ng and sheet i ng syst ems wher e i ndi cat ed. I n addi t i on t o Sect i on 25 A and B of EM 385- 1- 1 and ot her r equi r ement s set f or t h i n t hi s cont r act , i ncl ude pr ovi s i ons i n t he shor i ng and sheet i ng pl an t hat wi l l accompl i sh t he f ol l owi ng:
a. Pr event under mi ni ng of pavement s, r esi dent i al f oundat i ons and slabs.
b. Pr event s l i ppage or movement i n banks or s l opes adj acent t o t he excavation.
c. Al l ow f or t he abandonment of shor i ng and sheet i ng mat er i al s i n pl ace i n cr i t i cal ar eas as t he wor k i s compl et ed. I n t hese ar eas, backf i l l t he excavat i on t o wi t hi n 1 f oot of t he f i ni shed gr ade and r emove t he r emai ni ng exposed por t i on of t he shor i ng bef or e compl et i ng t he backf i l l .
3. 1. 1. 1 I nst al l at i on
The Cont r act or i s advi sed t hat t her e may exi st hi gh vol t age t r ansmi ssi on and di st r i but i on l i nes, under whi ch shor i ng may have t o be i nst al l ed. Some l i nes may not be r el ocat ed and ot her s may not be de- ener gi zed. These l i nes ar e i dent i f i ed on t he Dr awi ngs. The Cont r act or shal l mai nt ai n t he mi ni mum speci f i ed c l ear di st ances bet ween t he sheet pi l e dr i v i ng equi pment and t he t r ansmi ssi on l i ne per EM 385- 1- 1. Mai nt ai ni ng mi ni mum saf e di st ances may r equi r e dr i v i ng t he sheet s i n segment s and f i el d spl i c i ng.
3. 1. 2 Dr ai nage and Dewat er i ng
Pr ovi de f or t he col l ect i on and di sposal of sur f ace and subsur f ace wat er encount er ed dur i ng const r uct i on. Pr ovi de compl i ance wi t h envi r onment al and er osi on cont r ol .
3. 1. 2. 1 Dr ai nage
So t hat const r uct i on oper at i ons pr ogr ess successf ul l y , compl et el y dr ai n const r uct i on s i t e dur i ng per i ods of const r uct i on t o keep soi l mat er i al s suf f i c i ent l y dr y. The Cont r act or shal l est abl i sh/ const r uct st or m dr ai nage f eat ur es ( ponds/ basi ns) at t he ear l i est st ages of s i t e devel opment , and t hr oughout const r uct i on gr ade t he const r uct i on ar ea t o pr ovi de posi t i ve sur f ace wat er r unof f away f r om t he const r uct i on act i v i t y and/ or pr ovi de t empor ar y di t ches, di kes, swal es, and ot her dr ai nage f eat ur es and equi pment as r equi r ed t o mai nt ai n dr y soi l s , pr event er osi on and under mi ni ng of f oundat i ons. When unsui t abl e wor ki ng pl at f or ms f or equi pment oper at i on and unsui t abl e soi l suppor t f or subsequent const r uct i on f eat ur es devel op, r emove unsui t abl e mat er i al and pr ovi de new soi l mat er i al as speci f i ed her ei n. I t i s t he r esponsi bi l i t y of t he Cont r act or t o assess t he soi l and gr ound wat er condi t i ons pr esent ed by t he pl ans and speci f i cat i ons and t o empl oy necessar y measur es t o per mi t const r uct i on t o pr oceed. Excavat ed s l opes and backf i l l sur f aces shal l be pr ot ect ed t o pr event er osi on and sl oughi ng. Excavat i on shal l be per f or med so t hat t he s i t e, t he ar ea i mmedi at el y sur r oundi ng t he s i t e, and t he ar ea af f ect i ng oper at i ons at t he s i t e shal l be cont i nual l y and ef f ect i vel y dr ai ned.
SECTI ON 31 23 00. 00 20 Page 7
3. 1. 2. 2 Dewat er i ng
Gr oundwat er f l owi ng t owar d or i nt o excavat i ons shal l be cont r ol l ed t o pr event s l oughi ng of excavat i on s l opes and wal l s, boi l s , upl i f t and heave i n t he excavat i on and t o el i mi nat e i nt er f er ence wi t h or der l y pr ogr ess of const r uct i on. Fr ench dr ai ns, sumps, di t ches or t r enches wi l l not be per mi t t ed wi t hi n 3 f eet of t he f oundat i on of any st r uct ur e, except wi t h speci f i c wr i t t en appr oval , and af t er speci f i c cont r act ual pr ovi s i ons f or r est or at i on of t he f oundat i on ar ea have been made. Cont r ol measur es shal l be t aken by t he t i me t he excavat i on r eaches t he wat er l evel i n or der t o mai nt ai n t he i nt egr i t y of t he i n s i t u mat er i al . Whi l e t he excavat i on i s open, t he wat er l evel shal l be mai nt ai ned cont i nuousl y, at l east 2 f eet bel ow t he wor ki ng l evel .
Oper at e dewat er i ng syst em cont i nuousl y unt i l const r uct i on wor k bel ow exi st i ng wat er l evel s i s compl et e. Submi t per f or mance r ecor ds weekl y.
Measur e and r ecor d per f or mance of dewat er i ng syst em at same t i me each day by use of obser vat i on wel l s or pi ezomet er s i nst al l ed i n conj unct i on wi t h t he dewat er i ng syst em. Rel i eve hydr ost at i c head i n pr evi ous zones bel ow subgr ade el evat i on i n l ayer ed soi l s t o pr event upl i f t .
3. 1. 3 Under gr ound Ut i l i t i es
Locat i on of t he exi st i ng ut i l i t i es i ndi cat ed i s appr oxi mat e. The Cont r act or shal l physi cal l y ver i f y t he l ocat i on and el evat i on of t he exi st i ng ut i l i t i es i ndi cat ed pr i or t o st ar t i ng const r uct i on. The Cont r act or shal l cont act t he Publ i c Wor ks and ut i l i t y compani es f or assi st ance i n l ocat i ng exi st i ng ut i l i t i es.
3. 1. 4 Machi ner y and Equi pment
Movement of const r uct i on machi ner y and equi pment over pi pes dur i ng const r uct i on shal l be at t he Cont r act or ' s r i sk. Repai r , or r emove and pr ovi de new pi pe f or exi st i ng or newl y i nst al l ed pi pe t hat has been di spl aced or damaged.
3. 2 SURFACE PREPARATI ON
3. 2. 1 Cl ear i ng and Gr ubbi ng
Unl ess i ndi cat ed ot her wi se, r emove t r ees, st umps, l ogs, shr ubs, br ush and veget at i on and ot her i t ems t hat woul d i nt er f er e wi t h const r uct i on oper at i ons wi t hi n t he c l ear i ng l i mi t s. Remove st umps ent i r el y. Gr ub out mat t ed r oot s and r oot s over 2 i nches i n di amet er t o at l east 18 i nches bel ow exi st i ng sur f ace.
3. 2. 2 St r i ppi ng
St r i p sui t abl e soi l f r om t he s i t e wher e excavat i on or gr adi ng i s i ndi cat ed and st ockpi l e separ at el y f r om ot her excavat ed mat er i al . Mat er i al unsui t abl e f or use as t opsoi l shal l be st ockpi l ed and used f or backf i l l i ng. Locat e t opsoi l so t hat t he mat er i al can be used r eadi l y f or t he f i ni shed gr adi ng. Wher e suf f i c i ent exi st i ng t opsoi l conf or mi ng t o t he mat er i al r equi r ement s i s not avai l abl e on s i t e, pr ovi de bor r ow mat er i al s sui t abl e f or use as t opsoi l . Pr ot ect t opsoi l and keep i n segr egat ed pi l es unt i l needed.
SECTI ON 31 23 00. 00 20 Page 8
3. 2. 3 Unsui t abl e Mat er i al
Remove veget at i on, debr i s, decayed veget abl e mat t er , sod, mul ch, and r ubbi sh under neat h paved ar eas or concr et e s l abs.
3. 3 EXCAVATI ON
Excavat e t o cont our s, el evat i on, and di mensi ons i ndi cat ed. Reuse excavat ed mat er i al s t hat meet t he speci f i ed r equi r ement s f or t he mat er i al t ype r equi r ed at t he i nt ended l ocat i on. Keep excavat i ons f r ee f r om wat er .
Excavat e soi l di st ur bed or weakened by Cont r act or ' s oper at i ons, soi l s sof t ened or made unsui t abl e f or subsequent const r uct i on due t o exposur e t o weat her . Excavat i ons bel ow i ndi cat ed dept hs wi l l not be per mi t t ed except t o r emove unsat i sf act or y mat er i al . Unsat i sf act or y mat er i al encount er ed bel ow t he gr ades shown shal l be r emoved as di r ect ed. Unl ess speci f i ed ot her wi se, r ef i l l excavat i ons cut bel ow i ndi cat ed dept h as di r ect ed.
Sat i sf act or y mat er i al r emoved bel ow t he dept hs i ndi cat ed, wi t hout speci f i c di r ect i on of t he Cont r act i ng Of f i cer , shal l be r epl aced wi t h sat i sf act or y mat er i al s t o t he i ndi cat ed excavat i on gr ade; except as speci f i ed f or spr ead f oot i ngs. Det er mi nat i on of el evat i ons and measur ement s of appr oved over dept h excavat i on of unsat i sf act or y mat er i al bel ow gr ades i ndi cat ed shal l be done under t he di r ect i on of t he Cont r act i ng Of f i cer .
3. 3. 1 St r uct ur es Wi t h Spr ead Foot i ngs
Ensur e t hat f oot i ng subgr ades have been i nspect ed and appr oved by t he Cont r act i ng Of f i cer pr i or t o concr et e pl acement . Fi l l over excavat i ons wi t h concr et e dur i ng f oundat i on pl acement .
3. 3. 2 Har d Mat er i al Excavat i on
Remove har d mat er i al t o el evat i ons i ndi cat ed i n a manner t hat wi l l l eave f oundat i on mat er i al i n an unshat t er ed and sol i d condi t i on. Roughen l evel sur f aces and cut s l oped sur f aces i nt o benches f or bond wi t h concr et e.
Pr ot ect shal e f r om condi t i ons causi ng decomposi t i on al ong j oi nt s or c l eavage pl anes and ot her t ypes of er osi on. Removal of har d mat er i al beyond l i nes and gr ades i ndi cat ed wi l l not be gr ounds f or a c l ai m f or addi t i onal payment unl ess pr evi ousl y aut hor i zed by t he Cont r act i ng Of f i cer . Excavat i on of t he mat er i al c l ai med as r ock shal l not be per f or med unt i l t he mat er i al has been cr oss sect i oned by t he Cont r act or and appr oved by t he Cont r act i ng Of f i cer . Common excavat i on shal l consi st of al l excavat i on not c l assi f i ed as r ock excavat i on.
3. 3. 3 Excavat ed Mat er i al s
Sat i sf act or y excavat ed mat er i al r equi r ed f or f i l l or backf i l l shal l be pl aced i n t he pr oper sect i on of t he per manent wor k r equi r ed or shal l be separ at el y st ockpi l ed i f i t cannot be r eadi l y pl aced. Sat i sf act or y mat er i al i n excess of t hat r equi r ed f or t he per manent wor k and al l unsat i sf act or y mat er i al shal l be di sposed of as speci f i ed i n Par agr aph " DI SPOSI TI ON OF
SURPLUS MATERI AL. "
3. 3. 4 Fi nal Gr ade of Sur f aces t o Suppor t Concr et e
Excavat i on t o f i nal gr ade shal l not be made unt i l j ust bef or e concr et e i s t o be pl aced. For pi l e f oundat i ons, t he excavat i on shal l be st opped at an elevation 6 t o 12 i nches above t he bot t om of t he f oot i ng bef or e dr i v i ng pi l es. Af t er pi l e dr i v i ng has been compl et ed, t he r emai nder of t he excavat i on shal l be compl et ed t o t he el evat i ons shown. Onl y excavat i on
SECTI ON 31 23 00. 00 20 Page 9 met hods t hat wi l l l eave t he f oundat i on r ock i n a sol i d and unshat t er ed condi t i on shal l be used. Appr oxi mat el y l evel sur f aces shal l be r oughened, and sl oped sur f aces shal l be cut as i ndi cat ed i nt o r ough st eps or benches t o pr ovi de a sat i sf act or y bond. Shal es shal l be pr ot ect ed f r om sl aki ng and al l sur f aces shal l be pr ot ect ed f r om er osi on r esul t i ng f r om pondi ng or f l ow of wat er .
3. 4 SUBGRADE PREPARATI ON
Unsat i sf act or y mat er i al i n sur f aces t o r ecei ve f i l l or i n excavat ed ar eas shal l be r emoved and r epl aced wi t h sat i sf act or y mat er i al s as di r ect ed by t he Cont r act i ng Of f i cer . The sur f ace shal l be scar i f i ed t o a dept h of 6 inches bef or e t he f i l l i s st ar t ed. Sl oped sur f aces st eeper t han 1 ver t i cal t o 4 hor i zont al shal l be pl owed, st epped, benched, or br oken up so t hat t he f i l l mat er i al wi l l bond wi t h t he exi st i ng mat er i al . When subgr ades ar e l ess t han t he speci f i ed densi t y, t he gr ound sur f ace shal l be br oken up t o a mi ni mum dept h of 6 i nches, pul ver i zed, and compact ed t o t he speci f i ed densi t y. When t he subgr ade i s par t f i l l and par t excavat i on or nat ur al gr ound, t he excavat ed or nat ur al gr ound por t i on shal l be scar i f i ed t o a dept h of 12 i nches and compact ed as speci f i ed f or t he adj acent f i l l .
Mat er i al shal l not be pl aced on sur f aces t hat ar e muddy, f r ozen, or cont ai n f r ost . Compact i on shal l be accompl i shed by sheepsf oot r ol l er s, pneumat i c- t i r ed r ol l er s, st eel - wheel ed r ol l er s, or ot her appr oved equi pment wel l sui t ed t o t he soi l bei ng compact ed. Mat er i al shal l be moi st ened or aer at ed as necessar y t o pl us or mi nus 3 per cent of opt i mum moi st ur e t o pr ovi de t he moi st ur e cont ent t hat wi l l r eadi l y f ac i l i t at e obt ai ni ng t he speci f i ed compact i on wi t h t he equi pment used. Mi ni mum subgr ade densi t y shal l be as speci f i ed her ei n.
3. 4. 1 Pr oof Rol l i ng
Pr oof r ol l i ng shal l be done on an exposed subgr ade f r ee of sur f ace wat er ( wet condi t i ons r esul t i ng f r om r ai nf al l ) whi ch woul d pr omot e degr adat i on of an ot her wi se accept abl e subgr ade. Af t er st r i ppi ng, pr oof r ol l t he exi st i ng subgr ade of t he base sl ab wi t h s i x passes of a mi ni mum 15 t on, smoot h dr um vi br at or y or pneumat i c- t i r ed r ol l er . Oper at e t he r ol l er i n a syst emat i c manner t o ensur e t he number of passes over al l ar eas, and at speeds bet ween 2 1/ 2 t o 3 1/ 2 mi l es per hour . Not i f y t he Cont r act i ng Of f i cer a mi ni mum of 3 days pr i or t o pr oof r ol l i ng. Pr oof r ol l i ng shal l be per f or med i n t he pr esence of t he Cont r act i ng Of f i cer . Rut t i ng or pumpi ng of mat er i al shal l be under cut t o a dept h of 6 i nches and r epl aced wi t h f i l l and backf i l l sel ect mat er i al . Bi ds shal l be based on r epl aci ng appr oxi mat el y 500 squar e yards , wi t h an aver age dept h of 6 i nches at var i ous l ocat i ons.
3. 4. 2 Subgr ade Pr epar at i on f or St r uct ur es
The f i nal 2 f eet of excavat i on t o subgr ade f or t he cul ver t , wi ngwal l s and apr on f oundat i ons shal l be per f or med usi ng equi pment oper at i ng at l east 2 f eet above subgr ade, or by r each of equi pment , or usi ng t i mber mat s. The f i nal pass of excavat i on shoul d be made wi t h a smoot h t ool , such as a backhoe bucket wi t h t he t eet h shi el ded wi t h a met al pl at e. I f a t oot hed bucket i s used, a smoot h bot t om consi st i ng of undi st ur bed mat er i al shal l be pr ovi ded by hand excavat i on and r emoval of l oosened mat er i al . Subgr ade shal l be f r ee of wat er . Subgr ade sl opes shal l be no st eeper t han 1V: 10H;
benchi ng shal l be used t o f l at t en excessi ve s l opes. I mmedi at el y af t er exposur e, t he subgr ade shal l be i nspect ed by a qual i f i ed and exper i enced geot echni cal engi neer . Once appr oved, f oundat i on subgr ades shoul d be pr ot ect ed by a concr et e mud mat at l east 3 i nches t hi ck or a mi ni mum 6 i nch t hi ckness of compact ed DGA, or t he f oundat i on cast t he same day. I f
SECTI ON 31 23 00. 00 20 Page 10 over excavat i on i s r equi r ed t o r each sui t abl e mat er i al , t he over excavat ed vol ume shal l be f i l l ed wi t h compact ed DGA, f l owabl e f i l l , or l ean concr et e.
3. 5 FI LLI NG AND BACKFI LLI NG
Fi l l and backf i l l t o cont our s, el evat i ons, and di mensi ons i ndi cat ed.
Compact each l i f t bef or e pl aci ng over l ayi ng l i f t .
3. 5. 1 Common Fi l l Pl acement
Pr ovi de f or gener al s i t e. Use sat i sf act or y mat er i al s. Pl ace i n 6 i nch l i f t s . Compact ar eas not accessi bl e t o r ol l er s or compact or s wi t h mechani cal hand t amper s. Aer at e mat er i al excessi vel y moi st ened by r ai n t o a sat i sf act or y moi st ur e cont ent . Fi ni sh t o a smoot h sur f ace by bl adi ng, r ol l i ng wi t h a smoot h r ol l er , or bot h.
3. 5. 2 Backf i l l and Fi l l Mat er i al Pl acement
Pr ovi de f or paved ar eas and under concr et e s l abs, except wher e sel ect mat er i al i s pr ovi ded. Pl ace i n 6 i nch l i f t s . Do not pl ace over wet or f r ozen ar eas. Pl ace backf i l l mat er i al adj acent t o st r uct ur es as t he st r uct ur al el ement s ar e compl et ed and accept ed. Backf i l l agai nst concr et e onl y when appr oved. Pl ace and compact mat er i al t o avoi d l oadi ng upon or agai nst t he st r uct ur e.
3. 5. 3 Sel ect Mat er i al and DGA Pl acement
Pr ovi de under st r uct ur es not pi l e suppor t ed or wi t hi n t he l evee f oot pr i nt .
Pl ace i n 6 i nch l i f t s . Do not pl ace over wet or f r ozen ar eas. Backf i l l adj acent t o st r uct ur es shal l be pl aced as st r uct ur al el ement s ar e compl et ed and accept ed. Backf i l l agai nst concr et e onl y when appr oved. Pl ace and compact mat er i al t o avoi d l oadi ng upon or agai nst st r uct ur e.
3. 5. 4 Backf i l l and Fi l l Mat er i al Pl acement at Wal l s
Backf i l l i ng shal l not begi n unt i l const r uct i on bel ow f i ni sh gr ade has been appr oved, under gr ound ut i l i t i es syst ems have been i nspect ed, t est ed and appr oved, f or ms r emoved, and t he excavat i on c l eaned of t r ash and debr i s.
Backf i l l shal l be br ought t o i ndi cat ed f i ni sh gr ade. Wher e pi pe i s coat ed or wr apped f or pr ot ect i on agai nst cor r osi on, t he backf i l l mat er i al up t o an elevation 2 f eet above sewer l i nes and 1 f oot above ot her ut i l i t y l i nes shal l be f r ee f r om st ones l ar ger t han 1 i nch i n any di mensi on. Heavy equi pment f or spr eadi ng and compact i ng backf i l l shal l not be oper at ed c l oser t o f oundat i on or r et ai ni ng wal l s t han a di st ance equal t o t he hei ght of backf i l l above t he t op of f oot i ng; t he ar ea r emai ni ng shal l be compact ed i n l ayer s not mor e t han 4 i nches i n compact ed t hi ckness wi t h power - dr i ven hand t amper s sui t abl e f or t he mat er i al bei ng compact ed. Backf i l l shal l not be pl aced agai nst f oundat i on wal l s pr i or t o 7 days af t er compl et i on of t he wal l s or 10 days bet ween November and Apr i l , t emper at ur es per mi t t i ng. As f ar as pr act i cabl e, backf i l l shal l be br ought up evenl y on each si de of t he wal l and s l oped t o dr ai n away f r om t he wal l .
3. 6 BORROW
Wher e sat i sf act or y mat er i al s ar e not avai l abl e i n suf f i c i ent quant i t y f r om r equi r ed excavat i ons, appr oved bor r ow mat er i al s shal l be obt ai ned as speci f i ed her ei n.
SECTI ON 31 23 00. 00 20 Page 11
3. 7 COMPACTI ON
Det er mi ne i n- pl ace densi t y of exi st i ng subgr ade; i f r equi r ed densi t y exi st s, no compact i on of exi st i ng subgr ade wi l l be r equi r ed. Densi t y r equi r ement s speci f i ed her ei n ar e f or cohesi onl ess mat er i al s. When cohesi ve mat er i al s ar e encount er ed or used, densi t y r equi r ement s may be r educed by 5 per cent .
3. 7. 1 Gener al Si t e
Compact under neat h ar eas desi gnat ed f or veget at i on and ar eas out s i de t he 5 foot l i ne of t he paved ar ea or st r uct ur e t o 95 per cent of ASTM D1557.
3. 7. 2 St r uct ur es, Spr ead Foot i ngs, and Concr et e Sl abs
Compact t op 12 i nches of subgr ades t o 95 per cent of ASTM D1557. Compact sel ect mat er i al t o 95 per cent of ASTM D1557.
3. 7. 3 Adj acent Ar ea
Compact ar eas wi t hi n 5 f eet of st r uct ur es t o 95 per cent of ASTM D1557.
3. 7. 4 Paved Ar eas
Compact t op 12 i nches of subgr ades t o 95 per cent of ASTM D1557.
3. 8 FI NI SH OPERATI ONS
3. 8. 1 Gr adi ng
Fi ni sh gr ades as i ndi cat ed wi t hi n one- t ent h of one f oot . Gr ade ar eas t o dr ai n wat er away f r om st r uct ur es. Mai nt ai n ar eas f r ee of t r ash and debr i s. For exi st i ng gr ades t hat wi l l r emai n but whi ch wer e di st ur bed by Cont r act or ' s oper at i ons, gr ade as di r ect ed.
3. 8. 2 Topsoi l and Seed
Pr ovi de as speci f i ed i n Sect i on 32 92 19, TOPSOI L AND SEEDI NG.
3. 8. 3 Pr ot ect i on of Sur f aces
Pr ot ect newl y backf i l l ed, gr aded, and t opsoi l ed ar eas f r om t r af f i c , er osi on, and set t l ement s t hat may occur . Repai r or r eest abl i sh damaged gr ades, el evat i ons, or s l opes.
3. 9 DI SPOSI TI ON OF SURPLUS MATERI AL
Remove f r om Gover nment pr oper t y sur pl us or ot her soi l mat er i al not r equi r ed or sui t abl e f or f i l l i ng or backf i l l i ng, and br ush, r ef use, st umps, r oot s, and t i mber .
3. 10 FI ELD QUALI TY CONTROL
3. 10. 1 Sampl i ng
Take t he number and si ze of sampl es r equi r ed t o per f or m t he f ol l owi ng t est s.
SECTI ON 31 23 00. 00 20 Page 12
3. 10. 2 Test i ng
Per f or m one of each of t he f ol l owi ng t est s f or each mat er i al used. Pr ovi de addi t i onal t est s f or each sour ce change.
3. 10. 2. 1 Fi l l and Backf i l l Mat er i al Test i ng
Test f i l l and backf i l l mat er i al i n accor dance wi t h ASTM C136/ C136M f or conf or mance t o ASTM D2487 gr adat i on l i mi t s; ASTM D1140 f or mat er i al f i ner t han t he No. 200 si eve; ASTM D4318 f or l i qui d l i mi t and f or pl ast i c l i mi t ;
ASTM D698 or ASTM D1557 f or moi st ur e densi t y r el at i ons, as appl i cabl e. Al l t est s shal l be per f or med at a f r equency of 1 t est per 1, 000 cubi c yar ds
3. 10. 2. 2 Sel ect Mat er i al Test i ng
Test sel ect mat er i al i n accor dance wi t h ASTM C136/ C136M f or conf or mance t o ASTM D2487 gr adat i on l i mi t s; ASTM D1140 f or mat er i al f i ner t han t he No. 200 sieve; ASTM D698 or ASTM D1557 f or moi st ur e densi t y r el at i ons, as appl i cabl e. Al l t est s shal l be per f or med at a f r equency of 1 t est per 1, 000 cubi c yar ds
3. 10. 2. 3 Por ous Fi l l Test i ng
Test por ous f i l l i n accor dance wi t h ASTM C136/ C136M f or conf or mance t o gr adat i on speci f i ed i n ASTM C33/ C33M.
3. 10. 2. 4 Densi t y Test s
Test densi t y i n accor dance wi t h ASTM D2922 and ASTM D3017.
Test each l i f t at r andoml y sel ect ed l ocat i ons ever y 2000 squar e f eet of exi st i ng gr ade i n f i l l s f or st r uct ur es and concr et e s l abs, and ever y 2500 squar e f eet f or ot her f i l l ar eas wi t h a mi ni mum of 2 t est s per l i f t .
I ncl ude densi t y t est r esul t s i n dai l y r epor t .
3. 10. 2. 5 Moi st ur e Cont ent Test s
I n t he st ockpi l e, excavat i on or bor r ow ar eas, a mi ni mum of t wo t est s per day per t ype of mat er i al or sour ce of mat er i al s bei ng pl aced i s r equi r ed dur i ng st abl e weat her condi t i ons. Dur i ng unst abl e weat her , t est s shal l be made as di ct at ed by l ocal condi t i ons and appr oved moi st ur e cont ent shal l be t est ed i n accor dance wi t h ASTM D2216. I ncl ude moi st ur e cont ent t est r esul t s i n dai l y r epor t .
3. 10. 2. 1 Dense Gr aded Aggr egat e ( DGA) Test s
For gr adat i on accept ance, sampl e DGA accor di ng t o ASTM D75 f or each 500 cubi c yar ds. Pr oduce DGA f r om br oken st one conf or mi ng t o NJDOT St andar d Speci f i cat i ons 2007 sect i on 901. 03. 01, cr ushed gr avel conf or mi ng t o NJDOT 2007 901. 03. 02, or bl ast f ur nace conf or mi ng t o NJDOT St andar d Speci f i cat i on 2007 sect i on 901. 04 except t hat at l east 90 per cent of al l f r agment s shal l cont ai n at l east one f r act ur ed f ace. Ensur e t hat t he moi st ur e cont ent of DGA i mmedi at el y bef or e pl acement i s 6 +/ - 2 per cent based on dr y wei ght . When t est ed accor di ng t o ASTM D4318, ensur e t hat t he por t i on passi ng No. 40 s i eve i s non- pl ast i c. Ensur e t he gr adat i on conf or ms t o t he r equi r ement s i n sect i on 2. 1. 10.
- - End of Sect i on - -
SECTI ON 31 23 00. 00 20 Page 13
SECTI ON 31 23 00. 00 20 Page 14
| 31 23 00.00 20 - EXCAVATION, FILL, AND BACKFILL FOR STRUCTURES |
| PART 1 GENERAL |
| 1.1 REFERENCES |
| 1.2 DEFINITIONS |
| 1.2.1 Degree of Compaction |
| 1.2.2 Hard Materials |
| 1.2.3 Rock |
| 1.2.4 Pile Supported Structure |
| 1.3 SUBMITTALS |
| 1.4 DELIVERY, STORAGE, AND HANDLING |
| 1.5 CRITERIA FOR BIDDING |
| 1.6 QUALITY ASSURANCE |
| 1.6.1 Shoring and Sheeting Plan |
| 1.6.1.1 Drawing Submittal |
| 1.6.2 Dewatering Work Plan |
| 1.6.3 Utilities |
| 1.6.4 Foundation Subgrades |
| PART 2 PRODUCTS |
| 2.1 SOIL MATERIALS |
| 2.1.1 Satisfactory Materials |
| 2.1.2 Unsatisfactory Materials |
| 2.1.3 Cohesionless and Cohesive Materials |
| 2.1.4 Expansive Soils |
| 2.1.5 Nonfrost Susceptible NFS Material |
| 2.1.6 Common Fill |
| 2.1.7 Backfill and Fill Material |
| 2.1.8 Select Material |
| 2.1.9 Topsoil |
| 2.1.10 Dense Graded Aggregrate DGA |
| 2.2 BORROW |
| 2.2.1 Borrow Site Testing |
2.3 CONTROL LOW STRENGTH MATERIAL CLSM
| PART 3 EXECUTION |
| 3.1 PROTECTION |
| 3.1.1 Shoring and Sheeting |
| 3.1.1.1 Installation |
| 3.1.2 Drainage and Dewatering |
| 3.1.2.1 Drainage |
| 3.1.2.2 Dewatering |
| 3.1.3 Underground Utilities |
| 3.1.4 Machinery and Equipment |
| 3.2 SURFACE PREPARATION |
| 3.2.1 Clearing and Grubbing |
| 3.2.2 Stripping |
| 3.2.3 Unsuitable Material |
| 3.3 EXCAVATION |
| 3.3.1 Structures With Spread Footings |
| 3.3.2 Hard Material Excavation |
| 3.3.3 Excavated Materials |
| 3.3.4 Final Grade of Surfaces to Support Concrete |
| 3.4 SUBGRADE PREPARATION |
| 3.4.1 Proof Rolling |
| 3.4.2 Subgrade Preparation for Structures |
| 3.5 FILLING AND BACKFILLING |
| 3.5.1 Common Fill Placement |
| 3.5.2 Backfill and Fill Material Placement |
| 3.5.3 Select Material and DGA Placement |
| 3.5.4 Backfill and Fill Material Placement at Walls |
| 3.6 BORROW |
| 3.7 COMPACTION |
| 3.7.1 General Site |
| 3.7.2 Structures, Spread Footings, and Concrete Slabs |
| 3.7.3 Adjacent Area |
| 3.7.4 Paved Areas |
| 3.8 FINISH OPERATIONS |
| 3.8.1 Grading |
| 3.8.2 Topsoil and Seed |
| 3.8.3 Protection of Surfaces |
| 3.9 DISPOSITION OF SURPLUS MATERIAL |
| 3.10 FIELD QUALITY CONTROL |
| 3.10.1 Sampling |
| 3.10.2 Testing |
| 3.10.2.1 Dense Graded Aggregate DGA Tests |
File details come from the government source that posted it.