GB_SEG_C2_CD-106XXX_Sep172018_F.pdf
PDF 525 KB Posted
- Attached to
- Green Brook Segment C2
- Solicitation number
- W912DS-18-B-0027
About this file
CD-106 Darwing
View the file
Other files
Show all 22
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
N
40'
SCALE:1"= 20'
0 20'
P A
R K
E R S
T R
E E
T
L E E D
R
IV
E
DENTON PLACE
PAVED FOOT PATH
X X X X X X X X X
BLOCK 241
LOT 7
BLOCK 244
LOT 1
BLOCK 239
LOT 21
BLOCK 239
LOT 26
BLOCK 239
LOT 36
BLOCK 239
LOT 35
BLOCK 239.01
LOT 10
BLOCK 239.01
LOT 9
LOT 34
BLOCK 239
LOT 33
BLOCK 239
BLOCK 239
LOT 32
BLOCK 246
LOT 2
A (15"R
C P
A (1 5"
R C P
B (18"R
C P
S
INV 18"RCP=35.6
INV(B)=36.4
INV(A)=36.3
GR=39.8
CATBSN
INV(B)=36.6
INV(A)=36.8
GR=39.8
CATBSN
INV(A)=37.2
GR=40.2
CATBSN INV(A)=36.8
GR=39.9
CATBSN
CONNECTION
PROBABLE U.G.
12"PVC=36.1
EL=37.5
TOP HDWL
INV(A)=38.2
GR=39.7
CATBSN
C u rb
C u rb
Curb
Cu rb
C u rb
C&G
C
G
C
G
Curb
Curb
C&G
C u rb
Cu rb
Curb
C u rb
B(1 "R
C P ) A
B (1
"R
C P
A (1
"R
C P
A (1
"R
C P
A( "R
CP)
G
G
CB
CB
CB
CB
CB
CB
W
W
61749MXB
61748 M
61666
61667 MX
S
S
18"CMP=35.2
Brush
Brush
S O
L
IC
IT
A T
IO
N N
O
F
IL
E N
A M
E
D W
N B
Y
C K
D B
Y
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
D
2 3
C
4 5
A
B
M A
R K
A P
P R
D A
T E
F
IL
E N
U M
B E
R
S
IZ
E
S U
B M
IT
T E
D B
Y
P L
O T S
C A
L E
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
C O
N T
R A
C T N
O
IDENTIFICATION
SHEET
D A
T E
A P
P R
®of Engineers
US Army Corps of Engineers
US Army Corps
IS
S
U E D
A T
E
W P
-X
D D -M
O N -Y
Y Y
Y
A N
S I
D
N E
W Y
O R
K
N E
W Y
O R
K
N E
W Y
O R
K D
IS
T R
IC
T
U S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
SHEET OF 164
B O
R O
O F M
ID
D
L E
S E
X A
N D G
R E
E N B
R O
O K T
W P
N J
S E
G M
E N
T C
C
O N
T R
A C
T N
O
S U
B -B
A S
IN
O
F T
H E R
A R
IT
A N R
IV
E R
G R
E E
N B
R O
O K F
L O
O D R
IS
K M
A N
A G
E M
E N
T P
R O J E
C T
AMENDMENT NO. 2 - AUGUST 2018
J A
C O
B S
+0
48+0 0 49+00
50+00
X
X X X X X
XX
X X X X X X X X X X
X X X X X X X X X X X
X X X X X X
RIGHT-OF-WAY
PROPOSED
WORKING LIMITS
CONTRACTOR
C SEGMENT C2 FLOODWALLL
WORKING LIMITS
CONTRACTOR
BOUND BROOK
KEY
SEE NOTE 4
EXISTING STORM SEWER
FENCE REMOVAL
TREES TO BE REMOVED
PAVEMENT REMOVAL
CONTRACTOR WORKING LIMITS
PROPOSED RIGHT-OF-WAY AND
CONTRACTOR WORKING LIMITS
PROPOSED RIGHT-OF-WAY AND
WORKING LIMITS
AND CONTRACTOR
PERMANENT EASEMENT
(NOTE 4)
SEWER TO BE REMOVED
EXISTING STORM
(NOTE 8)
(NOTE 8)
(NOTE 2)
REMOVED (TYP)
WORKING LIMITS TO BE
TREES WITHIN CONTRACTOR
(NOTE 1)
REMOVED (NOTE 1)
FENCE TO BE
CONTRACTOR WORKING LIMITS
PROPOSED RIGHT-OF-WAY AND
WORKING LIMITS
CONTRACTOR
SIDEWALK REMOVAL
FENCE TO BE REMOVED
SEE NOTE 8
SEE NOTE 8 TO BE REMOVED (NOTE 4)
EXISTING STORM SEWER
(NOTE 7)
REMOVED (NOTE 1)
FENCE TO BE
RIGHT-OF-WAY
PROPOSED
S T
A . 4
.2
OPTION 1CONTRACT
OPTION 2CONTRACT
UNDER SEPARATE CONTRACT.
LOT 1 OF BLOCK 244 ARE TO BE REMOVED BY OTHERS
AND APPRUTENANCES ON LOT 26 OF BLOCK 239 AND
ALL STRUCTURES, PAVEMENT, TREES, LANDSCAPING8.
DO NOT DISTURB7.
NOT USED.6.
EXCAVATING.
PIPE CONDUIT. LOCATE CONDUIT BEFORE
FIBER OPTIC CABLE IS CONTAINED IN A 6" STEEL5.
MINED BY THE LOCATION OF THE NEW CONSTRUCTION.
REMOVAL OR ABANDONMENT ARE DETER-
REMOVED AND BACKFILLED. LIMITS OF THE
PLAN, AS SHOWN IN THE KEY BELOW, ARE TO BE
MANHOLES OR OTHER STRUCTURES MARKED ON THE
EXISTING STORM SEWERS AND ASSOCIATED 4.
THE COR AT NO COST TO THE GOVERNMENT.
SHALL REPAIR OR REPLACE AS DIRECTED BY
OF THE CONTRACTOR. THE CONTRACTOR
TO REMAIN IN PLACE) IS THE RESPONSIBILITY
CURBS, SIDEWALKS OR ROADWAYS (THAT ARE
3. ANY DAMAGE TO EXISTING OR SURROUNDING
TREES TO BE REMOVED.2.
BY COR.
TIME OF REMOVAL AT LOCATION DIRECTED
REMOVE EXISTING AND REPLACE IN KIND AT1.
NOTES:
(NOTE 1)
REPLACE SHED
REMOVE AND
TO BE REMOVED
POOL, PAD AND DECK
(NOTE 1)
REPLACE SHED
REMOVE AND
%PRODUCTION DATA 4%%PRODUCTION DATA 3%%PRODUCTION DATA 2%
%PRODUCTION DATA 1%
C S
F R
E D
D O
C L S
G S
T A
U D
E R
M A
T C
H L
IN
E S
T A . 4
S
H E
E T C
D -1
CD-106
S E
G M
E N
T C
G B S
E G C
C D -1
X X
X .d g n
-S
E P -2
D E
M O
L
IT
IO
N P
L A
N S
H E
E T
M R
P
S T
A T
O S
T A .5
SHEET 67 OF 164
OPTIONS 1 AND 2
CONTRACT
SHEET IS IN
WORK ON THIS
A
M E
N D
M E
N T N
O
/1
/1
G
M S
GB_SEG C2_CD-106XXX
File details come from the government source that posted it.