GB_SEG_C2_CD-101XXX_Sep172018_F.pdf
PDF 394 KB Posted
- Attached to
- Green Brook Segment C2
- Solicitation number
- W912DS-18-B-0027
About this file
CD-101 Drawing
View the file
Other files
Show all 22
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
40'
SCALE:1"= 20'
0 20'
N
CAP LANE
X X X X X X X X X
BLOCK 231
LOT 48
B L
O C
K
L O
T
BLOCK 238
LOT 3
BLOCK 250
LOT 1
BLOCK 251
LOT 1
A (1
"R
C P
B (1
"R
C P ) A
(1 "R
C P
A (1
"R
C P
B (1
"R
C P
C (1
"R
C P
INV(A)=34.9
GR=36.6
CATBSN
INV(B)=34.2
INV(A)=34.3
GR=36.7
CATBSN
INV(C)=34.2
INV(B)=34.1
INV(A)=34.2
GR=36.8
CATBSN
MI
DDLE
SEX
COUNTY
BOROUGH
OF
MI
DDLE
SEX
BOUND BROOK
Curb
Curb
Curb
CPP AT END OF PIPEREPAIR-CHANGED TO *POSSIBLE PIPE
INV=31.6
15"CCP
FH
Brush
6100MX
61003MXB
W
FH
CB
CB
CB
S
G
61004MXB
61008MXB
E 494672.3 N 635383.1 Pipe
KNOWN EXPOSURE
INV(15"RCP) 33.8'
E 494892.6 N 635450.4 Pipe
KNOWN EXPOSURE
S O
L
IC
IT
A T
IO
N N
O
F
IL
E N
A M
E
D W
N B
Y
C K
D B
Y
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
D
2 3
C
4 5
A
B
M A
R K
A P
P R
D A
T E
F
IL
E N
U M
B E
R
S
IZ
E
S U
B M
IT
T E
D B
Y
P L
O T S
C A
L E
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
C O
N T
R A
C T N
O
IDENTIFICATION
SHEET
D A
T E
A P
P R
®of Engineers
US Army Corps of Engineers
US Army Corps
IS
S
U E D
A T
E
W P
-X
D D -M
O N -Y
Y Y
Y
A N
S I
D
N E
W Y
O R
K
N E
W Y
O R
K
N E
W Y
O R
K D
IS
T R
IC
T
U S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
SHEET OF 164
B O
R O
O F M
ID
D
L E
S E
X A
N D G
R E
E N B
R O
O K T
W P
N J
S E
G M
E N
T C
C
O N
T R
A C
T N
O
S U
B -B
A S
IN
O
F T
H E R
A R
IT
A N R
IV
E R
G R
E E
N B
R O
O K F
L O
O D R
IS
K M
A N
A G
E M
E N
T P
R O J E
C T
AMENDMENT NO. 2 - AUGUST 2018
J A
C O
B S
27+00 28+00
29+0
30+00 31+00
X
X
X
X
X
BOROUGH RIGHT-OF-WAY
RIGHT-OF-WAY
PROPOSED
WORKING LIMITS
CONTRACTOR
C SEGMENT C2 FLOODWALLL
RIGHT-OF-WAY
PROPOSED
WORKING LIMITS
CONTRACTOR
KEY
SEE NOTE 4
EXISTING STORM SEWER
FENCE REMOVAL
TREES TO BE REMOVED
PAVEMENT REMOVAL
NOT USED.8.
DO NOT DISTURB7.
NOT USED.6.
BEFORE EXCAVATING.
FIBER OPTIC CABLE IS CONTAINED IN A 6" STEEL PIPE CONDUIT. LOCATE CONDUIT5.
NEW CONSTRUCTION.
BACKFILLED. LIMITS OF THE REMOVAL ARE DETERMINED BY THE LOCATION OF THE
MARKED ON THE PLAN, AS SHOWN IN THE KEY BELOW, ARE TO BE REMOVED AND
EXISTING STORM SEWERS AND ASSOCIATED MANHOLES OR OTHER STRUCTURES 4.
COST TO THE GOVERNMENT.
THE CONTRACTOR SHALL REPAIR OR REPLACE AS DIRECTED BY THE COR AT NO
(THAT ARE TO REMAIN IN PLACE) IS THE RESPONSIBILITY OF THE CONTRACTOR.
3. ANY DAMAGE TO EXISTING OR SURROUNDING CURBS, SIDEWALKS OR ROADWAYS
TREES TO BE REMOVED.2.
ITEM TO BE REMOVED, REPLACED OR RELOCATED AS DIRECTED BY THE COR.1.
NOTES:
POWER POLE AND GUY WIRE (NOTE 7)
(NOTE 2)
REMOVED (TYP.)
WORKING LIMITS TO BE
TREES WITHIN CONTRACTOR
TO BE RELOCATED (NOTE 5)
MCI/VERIZON FIBER LINE
POWER POLE AND GUY WIRE (NOTE 7)
SIDEWALK REMOVAL
REMOVE BENCH
%PRODUCTION DATA 4%%PRODUCTION DATA 3%%PRODUCTION DATA 2%
%PRODUCTION DATA 1%
T
A T
O S
T A
G S
T A
U D
E R
C L S
C S
F R
E D
D O
M A
T C
H L
IN
E S
T A S
H E
E T C
D -1
CD-101
D E
M O
L
IT
IO
N P
L A
N S
H E
E T
S E
G M
E N
T C
-S
E P -2
G B S
E G C
C D -1
X X
X .d g n
BASE CONTRACT
SHEET IS IN
WORK ON THIS
SHEET 62 OF 164
M R
P
A
M E
N D
M E
N T N
O
/1
/1
G
M
GB_SEG C2_CD-101XXX
File details come from the government source that posted it.