W912DS-15-B-0013-AMENDMENT 0004

View the file

Other files

File Type Posted
W912DS-15-B-0013_BID_ABSTRACT.pdf PDF
W912DS-15-B-0013-AMENDMENT_0008.pdf PDF
W912DS-15-B-0013-AMENDMENT_0007.pdf PDF
W912DS-15-B-0013-0006.pdf PDF
W912DS-15-B-0013-AMENDMENT_0005.pdf PDF
W912DS-15-B-0013-0003.pdf PDF
Memo_Style.pdf PDF
Amend_3_plans.pdf PDF
01_22_00.00_18.pdf PDF
35_20_23.00_18.pdf PDF
4360-mapped-data-over-sewage-tunnel-ELEVATION.xyz XYZ file
DeepWater-sh1.dgn —
IDC204_TO0027_SPJ4_e4Report.pdf PDF
W912DS-15-B-0013-0002_AMENDMENT.pdf PDF
IDC209_TO001_SPJ4-QA_e4Rpt_Final_PrintVersion.pdf PDF
WQC-Waiver_Requests_and_email_and_ATP-Nov2015.pdf PDF
4360-hit-map_color.pdf PDF
Median_2x2.tif TIF image
PreBid_Conference_Sign-In_Sheet_12_Nov_15.pdf PDF
AS_Built_WM_PDF.zip ZIP file
Presentation__and_MFR__and_QA_NOV12_V_FINAL.pdf PDF
01_35_30.00_18.pdf PDF
35_20_23.10_18.pdf PDF
AMENDMENT_0001_W912DS-15-B-00013.pdf PDF
RNARROWSSIPHON2RECORDPROFILESTATION.zip ZIP file
IDC209_TO10_Anchorage_e4Report_20150408_opt.pdf PDF
Final_Data_Report_KVK_AC_HARS_2013.pdf PDF
GrainsizeSAN.pdf PDF
AN-BoringsdDoc.pdf PDF
abbreviated-summary.pdf PDF
4364-3x3med_ELEVATION.7z 7Z file
W912DS-15-B-0013_SOLICITATION.pdf PDF
IFB_0013_specs.pdf PDF
FINAL-REPORT-TO12.pdf PDF
USACECCRcalculatorSANUC9Feb15.xlsx XLSX spreadsheet
Survey4364.7z 7Z file
IFB_B00013_plansopt.pdf PDF
Show all 37

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this amendment is to:

1. Revise the Sprecifications.

2. Answ er Bidders question for information purposes only. Responses do not revise the solicitation, plans or specifications.

The Bid Opening date remains 24 November 2015 at 10:00 AM Eastern Standard Time.

NOTE: Bidders must acknow ledge receipt of this amendment by the date specified in the bid (or as amended) by one of the follow ing methods: In the space provided on the SF 1442, by separate letter, or by signing block 15 below . FAILURE TO ACKNOWLEDGE AMENDMENT BY THE DATE AND TIME SPECIFIED MAY RESULT IN REJECTION OF YOUR BID IN ACCORDANCE WITH THE LATE BID, LATE

MODIFICATION OF BID, OR LATE WITHDRAWAL OF BID (FAR 14.304).

1. CONTRACT ID CODE PAGE OF PAGES

J 1 3

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 20-Nov-2015

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912DS-15-B-0013

X 9B. DATED (SEE ITEM 11)

26-Oct-2015

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

20-Nov-2015

CODE

US ARMY CORPS OF ENGINEERS, NEW YORK

26 FEDERAL PLAZA, RM 1843

NEW YORK NY 10278-0090

W912DS 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912DS-15-B-0013

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION 00 73 00 - SPECIAL CONTRACT REQUIREMENTS

The following have been added by full text:

AMENDMENT 0004

W912DS-15-B-0013

Amendment No 0004 USACE, Department of the Army, NYD Corps of Engineers New York, NY 10278-0090 AMENDMENT NO.4 for IFB NO. W912DS-15-B-0013

The following changes shall be made to the specifications The New York District has received questions about the contract.

1-SPECIFICATIONS:

Section 00 73 00

1.32 INSURANCE PROCURED BY CONTRACTOR AND THE PORT AUTHORITY

1.32A INSURANCE PROCURED BY CONTRACTOR

Paragraph 1.32A revise sub paragraph “a.” as below :

“a. The Contractor shall procure and maintain during the entire period of its performance under this contract the following insurance policies:”

2-Questions and Answers:

The following questions and answers are provided for information only. Nothing contained below amends or revises any provision of the solicitation.

This is for bidder’s reference only, and is not to be considered as a part of the Contract Documents. Contract award will be based on what is contained in the printed Plans and Specifications in a hard copy format or Electronic Bid Set if provided. Responses do not revise the solicitation, plans or specifications.

Q1. Solicitation Section 00 73 00, Clause l .32A.a states "The Contractor shall procure, p , maintain limits, and pay deductibles (if necessary) during the entire period of its performance under this contract with contractual liability coverage covering the risks assumed and indemnification given by the Port Authority, under this Modification Agreement..". Does the USACE request the Contractor extend Contractual Liability insurance to the Port Authority's risks assumed and indemnification?

A1. Yes

Q2. Amendment 0003 Questions 18 - Please confirm that buckets will be allowed for the entire project, with the understanding that no teeth will be allowed over the utility corridors (Work Area 6).

A2. The Government would entertain a plan, as required by 35 20 23.00 18-5.3, that includes the use of a bucket with no teeth. However, 35 20 23.00 18-5.3.3 requires that “The work plan shall be developed in coordination with the utility owner and include a written approval from the Owners.” As 35 20 23.00 5.4.1.2 discusses only bar

W912DS-15-B-0013

levelling has been pre-coordinated with the utility owners. The Government cannot state that the owners will approve the use of a bucket with no teeth.

Q3. The answer to question 18 states there’s a work area 7? Is this a typo and it was meant to say “Area 6”? Please confirm that buckets area allow in work Area 6?

A3. The question is correct. The reference to “work area 7” is a mistake. Please see Revised Question and Answer below.

Q18. Please confirm that buckets will be allowed for the entire project, with the understanding that no teeth will be allowed over the utility corridors (Work Area 6).

A18. The use of buckets are un-restricted in work areas 1-5. Permits allow the use of buckets in Port Jersey, but with restrictions. See the permits further details. When working in Port Jersey be careful of underlying utility protection in place measures. Per 35 20 23.00 18-5.3 the Contractor will prepare a plan for removing the material in Work Area 6. This plan requires various approvals. See the referenced clause for further details

(End of Summary of Changes)